Schedule: - B
1
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
vi. Setting out of the works and liaison with all concerned authorities for approval of the
same.
vii. Ascertaining from the concerned authorities the locations to which the storm drainage can
be discharged, before commencing the project.
viii. Paying all statutory dues and taxes, housing, paying salaries and bonus etc for employees
of the Contractor.
ix. Providing and maintaining throughout the entire construction period, safety barriers
around all excavations and making them visible during night. Providing motorable access
to the industrial units or other plots where entry is obstructed by the road works.
x. Obtaining permission, where necessary, to cross land, for use of public or private land,
paying compensation, if any, for damage to property or for other effects due to the
presence of the Contractor’s labourers and equipment on such land, protecting any
fencing, private or public property, repairing any damage caused by the Contractor’s
plant to public utility services (oil, water, electricity, telephone, sewers, etc.).
xi. Assistance to the Engineer as required, all reporting requirements including taking and
2
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
printing of photographs.
xii. General foreseen and unforeseen expenses of the Contractor.
xiii. Removing all construction debris to a tip approved by the local authorities,
xiv. Any other expenses required for the execution, completion and maintenance of the works
until the final handing-over of the Works, without any exceptions or reservations and the
Contractor shall have no right to claim any compensation or extra cost of any necessary
work for the execution, completion and maintenance of the works.
xv. Insurance charges wherever applicable both for protection of work and contractor’s
labour.
xvi. Maintaining the commissioned parts of the Works for a maintenance period as specified
in the Contract Data.
xvii. Night work wherever necessary to complete the work expeditiously and to limit public
inconveniences to the minimum.
xviii. In case, any retest at factory for any permanent material to be used in the Works,
becomes necessary to ascertain the quality of materials, the entire cost of re-inspection
and retests including cost of travel, accommodation etc. of the inspecting official will be
charged to the contractor if the retest confirms poor quality of the material.
xix. Providing and maintaining traffic diversion arrangements as described in the special
specifications
The cost of meeting the above mentioned obligations during the entire period of Contract
is deemed to be distributed amongst all billed items.
(c) Completion Period of Work
The Contractor is to commence the work soon as he receives the Commencement Order and
complete the work in the period indicated in the memorandum, failure to which will attract a
penalty for the delay of works, as liquidated damages, as specified in tender.
(d) Provisional Items
Provisional Item means an item included in the Contract and so designed for the execution of
work or the supply of goods, materials or services, which item may be used by the Employer by
appointing Nominated Contractors or by instructing the Main Contractor, in whole or in part or
not at all, at the discretion of the Engineer in Charge, and the Contractor shall not have any right
at any time to claim for delays or extra expenditure suffered by him if the Provisional Items are
executed only in part or not at all.
(e) Items for Which Separate Payment will not be made
The following items are to be performed as part of the Contract. The cost of these works is
deemed to be distributed in the pay items of the Contract.
i. Site Survey for establishing reference points in each road and fixing alignment of sewers.
ii. Providing and maintaining proper markers and profile rails.
iii. Supporting sides of deep excavations.
iv. Selection of materials for backfilling of trenches and against permanent structures.
3
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
xi. The contractor shall provide, during the Defect Liability Period, a facility of on call at
project location in case of need, which will attend immediately and undertake the
rectification.
xii. Appropriate marking and labeling of electrical machinery relating them to the pumps and
motors and instrumentation equipments.
xiii. All risks, liabilities and obligations set forth or implied in the tender document.
xiv. Displaying framed drawings of all electrical and mechanical equipment/single line
diagrams inside the control rooms.
xv. Mobilization and demobilization to and from site, all plant, machinery, equipment and
staff as given in the schedule of information.
xvi. Contractor's facilities as specified in Specifications.
xvii. Obtaining permission, no objection certificate/ approvals from statutory authorities.
xviii Meeting the requirements during Defects Liability Period as explained in Special
Conditions of Contract.
xiv Any other expense that may be incurred in fulfilling any Contractual Clause, which is not
mentioned specifically here.
General Description
This project is to be constructed At Chaparvad Ta. Singvad Dist Dahod. The construction Works includes
Civil, Plumbing, Electrical works; Steel Fabrication works for School Buildings, Hostel Building and
its allied Infrastructure.
The brief overview of the project details are enlisted below
Sr. Description of Works / Buildings / Block Approximate Total Built-up
No. area in Sq. Mts.
1 School Building 3730.00
2 Hostel Buildings -1 5440.00
3 Staff Quarter 1076.00
4 Class –IV Quarter 165.00
5 Mess Building 730.00
4
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Flooring: Polished kota stone flooring and glazed tiles for Bathrooms
Internal wall surfaces: Mala plaster with Plastic paint with wall putty.
External wall surfaces: Flakes Textured Finish.
Roof: RCC Slab with necessary Water Proofing
Water s upply: PVC pipes with conventional gravit y system/pressurized water system
Electrical works: Open/concealed electrification in conduits with LED and T5 light fixtures
Note: General Description of the Project, Scope of work and Finishes mentioned above with
drawings are indicative and variation is envisaged during detail designing. The above
information must be considered as provisional advance information to assist the bidder.
5
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
SCHEDULE –B
Form-B2
I.
No. Description Quantity Unit RATE Amount
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the excavated
1 stuff upto 50 Meter lead.(A) Loose or soft soil 30.72 Cmt.
Excavation for foundation upto 1.5 m depth including sorting out
and stacking of useful materials and disposing off the excavated
2 stuff upto 50 Meter lead.(B) Dense or Hard soil 7350.451 Cmt.
1
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Add Extra for Disposing off the excavated stuff of above items for
9 lead of 5.0 Km 2156.58 Cumt
Carrying out plinth treament to post constrction/existing
structure by spraying chemjcal solutionfor termite control
treament including labour and materials constituents with I.S.I
10 Specification 5834.84 Smt
Providing and laying cement concrete( 1:4:8)(1 cement : 4 coarse
sand : 8 hand broken stone aggregate 40 MM nominal size) and
curring complete excluding the cost of form work
11 (A)Foundation and plinth 840.99 Cmt.
2
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
3
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
4
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
5
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
6
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing and fixing 35mm thick flush door shutters , solid core
construction with frame of first class hard wood with cross band
and face veneer or plywood face panels and wood polished Teak
wood beading to door shutter iron plug screws plugs and priming
coat on unexposed surface and laminated with 1.5 mm thick high
pressure laminated Sheet of Plain / Wood Grain in Gloss/ Matt
finish with high density protective Surface layer and reverse side
of adhesive bonding quality confirming to IS 2046 including cost of
Adhesive of appoved quality and with C P Brass fixturesand
fastenings ( Hinges, handles, secrews,Aldrop and latches etc of
approved make)and providing and fixing in 40x40x6 mm MS
Angle section frame with 15cm long hold fast of 20x5mm 6 nos
and 12mm square spacer bars as per drawing with three coats of
44 oil painting . etc complete. 550.69 Smt
7
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
8
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
9
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
10
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
11
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing & applying Wall painting with ( Two Coats) with Plastic
Emulsion Paint of Approved brand and manufacture on
undecorated wall surface to give an even shade including
thoroughly brushing the surface free from mortar dropping and
other foreign matter and making smooth by levelling the surface
with approved wall putty ( Birla or Equivalent), applying one coat
of primer & then applying two coats of plastic emulsion paint.
Cost should be inclusive of supply & application of Putty & Primer
, scaffolding , remove the dirt, making the surface clean etc.
61 completed. 33972.42 Smt
Wall painting with weather proof acrylic emulsion APEX type paint
of approved brand & manufacturer and of required shade of
exterior wall surface to give an even shade over and including a
priming coat of approved brand after thoroughly brushing the
surface to remove all dirt and remains of loose powdered material
62 etc. complete for all heights. 6914.59 smt
Providing throating of plaster drip and moulding(Tapak) to RCC
63 chajjas and slab projections 1655.72 Rmt
Providing & Making 10 mm wide and 8 mm deep evenly smooth
finished Groove in External Plaster as per drawing & instructions
given by Engineer in charge including cost of scaffolding etc.
64 Completed, 5538.42 Rmt
Providing & fixing 15 cm wide chicken mesh jali with nails & then
application of 15 mm plaster on R.C.C. & masonary joints as per
66 dir. of engg. In charge. 10674.68 Rmt
12
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
P & L 24" x 24" vitrified 8 mm thick tile flooring and skirting over
20 mm (average) base of cement mortar 1:6 ( 1 cement: 6 coarse
sand) on new surface or fixing on existing flooring by adhesive
material including dismentaling of existing flooring and jointed
with color cement slurry including finised with flush pointing &
68 cleaning the surface etc. complete for antiskit (more than 10 ton) 7610.8 Sqm
13
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
14
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
15
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
16
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing and laying Expose Brick work using common burnt clay
building brick size 220X75X21 mm thick having crushing strength
not less than 35 kg/sq.cm. in superstructure in Cement mortar 1:4
(1 Cement : 4 fine sand) including groove 10mm in Cement mortar
and including 10mm groove pointing with Cement mortar 1:2 (1
Cement : 2 sand) and including Fixoplus Cladding Epoxy Adhesive
in proposaion of 1:3.5 (1Liter water : 3.5Kg Adhesive) in with all
floor (B) Conventional with all labor, tools, takel. Equipment,
required scaffolding and machinery laid on 12 mm thick cenent
83 plaster Cement Mortor 1:3(1Cement : 3 Coarse sand). 1787.51 Sqm
17
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
18
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
19
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
20
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
21
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
22
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing and fixing Rajula stone 75mm thick 60mm x 45mm size
124 including fixing in cement mortar as directed. 105 Smt
Providing and laying Yellow Kota stone slab flooring over 20mm(
avrage thick base of cement mortar 1:6(1cement : 6 coarse sand)
or L.M.lime mortar 1:1.5 laid over and jointed with grey cement
129 including rubbing and polishing etc. complete.‐‐‐30m.m thick. ‐‐ 525 Cum
23
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing and Fixing 0.60 mt high fencing with 0.75 mt long M.S
Angle posts of 40 x 40 x 6 mm size including oilpainting 3 coats
fixed at about 3.0 mt c/c with four Horizontal lines and two
diagonals of Galvanized steel barbered wire weighing 9.38 kg per
100 mt strained and fixed to posts with G.I.staples including fixing
the post in existing R C C/Masonry cloumns in line and levels etc
complete.including providing and fixing brocken glass pieces on
130 the top surface of compound wall with cement mortar CM(1:3) 682.5 Rmt
24
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
25
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
26
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
(B) Extra stagging height above 12 mt onward for each 1000 liter
per meter height Esr of 50,000 Litres capacity & 20 mt Hight(3).
133 Above 25000 to 50000 liters 10 Stage
27
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
28
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
29
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
30
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Drilling & Assembly lowering charges for 8" Dia bore well up to
minimum 180 Mtr or up to required depth with Gravel Packing
,Air compressor with clay paackingwith sealing with cement with
mud pit digging & removing the mud to make the surface
cleanwith electro logging chart preparation with 8" dia. UPVC
casing pipe with 8" dia strainer UPVC pipe with supply of
submercible pump of 12.5HP of approved make including
installation with supply and installation of control panel board
with necessary fittings like clamp,bolt,coupler etc.& all other
required accessories including supply and installation of 2.5
Sq.mm cable for pump with supply and installation of 2" delivery
pipe ( Column) M.S pipe of Heavy Class with supply and
installation of 2" delivery pipe ( column)M.S pipe of medium class
135 & supply and installation of column accessories. 2 No
31
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
32
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
33
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing & Fixing concealed center point to wall ceiling & floor
CPVC (13.5) pipe having NationalSanitation Foundation (NSF) seal
for potable water of following dia. Nominal bore tube fittings &
clamps making good the wall, cieling, floor,etc complete (C) 25
146 mm 60 Meter
Providing & Fixing concealed center point to wall ceiling & floor
CPVC (13.5) pipe having NationalSanitation Foundation (NSF) seal
for potable water of following dia. Nominal bore tube fittings &
clamps making good the wall, cieling, floor,etc complete (D) 32
147 mm 30 Meter
Providing & Fixing concealed center point to wall ceiling & floor
CPVC (13.5) pipe having NationalSanitation Foundation (NSF) seal
for potable water of following dia. Nominal bore tube fittings &
clamps making good the wall, cieling, floor,etc complete (E) 40
148 mm 25 Meter
Providing & Fixing concealed center point to wall ceiling & floor
CPVC (13.5) pipe having NationalSanitation Foundation (NSF) seal
for potable water of following dia. Nominal bore tube fittings &
149 clamps making good the wall, cieling, floor,etc complete (F) 50 mm 160 Meter
151 Providing & fixing in position cowl vent to pipes of 110 mm 68 Each
34
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing and Laying & Jointing 110 mm dia uPVC Pipe Type B
conforming to IS 13592‐1992 with one end plain & other end
socketed with solvent/rubber ring & fittings conform to IS:14735
with clamps at 2 mtr center to center on wall including testing of
153 pipes, adhesive solvent cement, etc complete 1160 Meter
Providing & Fixing PVC SWR Trap IS 14735 for drain ‐ 100 mm
diameter with jali of 150 mm diameter with self cleansing design
with CI scread down or hinged grating including cost of cutting &
154 making the good walls 139 Each
Providing and fixing water closet squatting pan (Indian type WC)
157 size 580 mm (A) Viterous China long pattern white colour 13 Each
Providing and fixing 100 mm size P or S trap for WC Squatting pan
(Indian type) / Anglo indian type WC including jointing the trap
with the pan and soil pipe with cement mortar 1:1 ( 1 Cement : 1
fine sand)with foot rests
158 A) Vitreous China, white colour 117 Each
159 Providing & fixing 110 mm UPVC P trap with Jali 105 Each
Providing and fixing 25 mm half turn CP flush cock with all
160 accessories 118 Each
35
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing & fixing of Jet spray to each EWC with all accessories &
161 tubing 90 Each
Providing & fixing of Hand Shower (Health Faucet), ABS body, 1
Rmt Long pvc Tube and Wall Hook accessories to complete the
162 item. 54 Each
Providing & fixing in position 15 mm C.P. brass 2 way bib cocks of
163 best quality 104 Each
164 Providing and fixing GI inlet connection for flush pipe with WC pan 97 Each
Providing and fixing plastic seat and cover for wash down water
closet with C.P. brass hinges and rubber buffers A) Black plastic
165 seat and cover 88 Each
Providing and fixing table top type wash basin with single hole for
pillar trap including cutting holes and making good the same but
excluding granite/marble platform
a) Vitreous china table top wash basin 560mm X 400mm size in
166 white colour, oval/rectangular shape 124 Each
Providing and fixing C.P. brass waste for wash basin or sink of 32
167 mm 106 Each
Providing and fixing M.I. fisher union for wash basin or sink. of 32
168 mm 143 Each
Providing & Fixing of Stainless stell AISI 304 wash basin 530x345
169 mm size with one 15 mm CP brass pillar tap 38 Each
Providing and Fixing C.P. brass shower rose with 15mm or 20mm
inlet.
170 (A) 100mm dia. Each 20 Each
36
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing and fixing CP brass towel rail complete with C.P. brass
brackets fix to wooden plug with CP brass screws. I) 600 mm X 20
173 mm 27 Each
Providing and fixing of CP angle valve of following size
174 15 mm 182 Each
Providing and fixing gun metal check or non return full way wheel
179 valve of 40 mm 4 Each
180 Providing and fixing gun metal full way wheel valve of 20 mm 4 Each
181 Providing and fixing gun metal full way wheel valve of 25 mm 35 Each
182 Providing and fixing gun metal full way wheel valve of 32 mm 15 Each
183 Providing and fixing gun metal full way wheel valve of 40 mm 29 Each
37
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
184 Providing and fixing gun metal full way wheel valve of 50 mm 19 Each
185 Providing and fixing gun metal full way wheel valve of 65 mm 12 Each
186 Providing and fixing gun metal full way wheel valve of 75 mm 5 Each
187 Providing and fixing 50 mm Float Velve 8 Each
38
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing & erecting water cooler with inbuilt RO & having storage
tank capacity 80 Ltr. & cooling capacity 40 Ltr.per hour @ an
ambient temp of 45 deg C. The outlet temp. of the water should
drop by 15 deg C within a hour, The water cooler should be
comprising of hermetically sealed compressor, fan motor,
condensing unit, water tank surrounded by evaporating, coil,
thermostats, relay etc.complete with necessary inlet & outlet
connection. The body of water cooler will be made from Stainless
Steel. The scope shall cover inbuilt reverse osmosis plant of 50
192 ltr./hr purification capacity 13 Each
39
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
40
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
Providing and fixing S.W. gully trap with C.I. grating brick masonry
chamber and water tight C.I. cover with frame of 300mmX300mm
size (inside) with standard weight. I) Square mouth traps.
209 a) 150mmX110mm size P type 106 Each
210 Providing & fixing 3/4" PVC graden hose taps for irrigation 40 Each
Providing & Laying ( to level or Slope) and jointing reinforced
concrete Light Duty NoN Pressure I.S. Class NP2 of the following
internal diameter with collars and butt ends prepared for collar
joints including testing of joints for of
211 150 mm 600 Meter
41
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
42
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
43
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
44
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
45
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
47
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
48
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
49
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
50
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
51
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
52
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
53
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
54
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
55
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
56
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
57
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
58
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
59
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
60
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
61
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
62
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
63
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
64
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
65
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
66
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
67
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
68
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
69
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
70
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
71
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
72
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
73
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
74
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
75
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
76
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
77
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
78
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
79
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
80
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
81
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
82
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
83
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
84
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
85
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
86
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
87
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
88
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
89
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
90
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
91
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
92
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
93
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
94
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
95
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
96
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
97
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
98
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
99
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
100
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
101
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
102
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
103
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
104
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
105
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
106
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
107
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
108
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
109
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
110
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
EXTERNAL LIGHTINGCABLING :
Supply, laying, testing and connecting of medium voltage cable for
290 external lighting4C X 16 SQ. MM. AL XLPE 1040 Mtr.
111
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
EARTHINGEarthing Stations
Supply, installation, connection and testing of plate type / pipe
type earthing station for various electrical equipments and
systems as per IS with following.
1) Excavation in soft soil / hard marrum
2) 'Supply of copper plate electode / G.I. Pipe electrode.
3) Supply & fixing of watering 'B'Class pipe.
4) Supply of civil material and preperation of brick masonry earth
pit chamber with Heayy Duty C.I. frame and hinged covers of
suitable size as per drawing.
5) Supply and providing of charcoal and salt for filling in earth pit.
6) Supply of tools and tackles necessary for excavation to a desire
depth and doing necessary civil work etc.
7) Testing earth resistivity before earthing and electrode
resistance after completion of work.
8) Supply and fixing of Equipotential bar with housing alongwith
necessary mounting accessories.600mm x 600mm x 3.15 mm Cu
292 Plate type earthing station. 2 Each
112
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
EARTHINGEarthing Stations
Supply, installation, connection and testing of plate type / pipe
type earthing station for various electrical equipments and
systems as per IS with following.
1) Excavation in soft soil / hard marrum
2) 'Supply of copper plate electode / G.I. Pipe electrode.
3) Supply & fixing of watering 'B'Class pipe.
4) Supply of civil material and preperation of brick masonry earth
pit chamber with Heayy Duty C.I. frame and hinged covers of
suitable size as per drawing.
5) Supply and providing of charcoal and salt for filling in earth pit.
6) Supply of tools and tackles necessary for excavation to a desire
depth and doing necessary civil work etc.
7) Testing earth resistivity before earthing and electrode
resistance after completion of work.
8) Supply and fixing of Equipotential bar with housing alongwith
necessary mounting accessories.150 mm. N.B., 'B' Class 3.0 mtr.
293 long G.I. Pipe type earthing station. 14 Each
113
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
EARTHINGEarthing Conductor
Supply, laying, connection and testing bare earthing conductor for
inter‐connecting the earthing stations and various equipment in
built up trenches, walls/ceiling, buried in ground generally as
specified and shown on the drawing complete with :
1) Supply & fixing accessories like earthing clamp, saddle, etc.
2) Supply of corrosion protection of buried conductors with
bituminous coating
3) 'Supply of Test links (Copper/GI) etc.
4) Supply and installation on Equipotential bar.8 to 16 SWG. GI
294 wire 400 Mtr
EARTHINGEarthing Conductor
Supply, laying, connection and testing bare earthing conductor for
inter‐connecting the earthing stations and various equipment in
built up trenches, walls/ceiling, buried in ground generally as
specified and shown on the drawing complete with :
1) Supply & fixing accessories like earthing clamp, saddle, etc.
2) Supply of corrosion protection of buried conductors with
bituminous coating
3) 'Supply of Test links (Copper/GI) etc.
4) Supply and installation on Equipotential bar.50 X 6 MM Hot
295 dipped ( 86 micron Zinc thicness min.) GI Strip 460 Mtr
114
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
EARTHINGEarthing Conductor
Supply, laying, connection and testing bare earthing conductor for
inter‐connecting the earthing stations and various equipment in
built up trenches, walls/ceiling, buried in ground generally as
specified and shown on the drawing complete with :
1) Supply & fixing accessories like earthing clamp, saddle, etc.
2) Supply of corrosion protection of buried conductors with
bituminous coating
3) 'Supply of Test links (Copper/GI) etc.
4) Supply and installation on Equipotential bar.25 X 6 MM CU
296 Strips 60 Mtr
115
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
116
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
117
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
118
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
CCTV SYSTEMS ,Supply & laying of the CAT‐6 cable for the CCTV
data system in rigid PVC conduit / or channel or raceway. The
same wire will be utilised to transfer data and power demand of
camera PoIP. (the cost of channel/raceway/PVC conduit not to be
303 included in the rates) 1950 Mtr
CCTV SYSTEMS ,Supply, laying, testing and commisioning of 25 mm
304 dia rigid PVC medium duty conduit. 1560 Mtr
CCTV SYSTEMS ,Supply, Installation, Testing and Commssioining of
16 Channel Duplex Color IP based Digital Video Multiplex
305 Recorder (NVR) with 2 TB HDD 3 Each
119
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
120
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
VOICE AND DATA SYSTEM , Supplying & erecting Push button type
321 telephone instrument 0 Each
121
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
CABLE TV SYSTEM ,Supply & laying of 25mm dia. Heavy duty PVC
331 conduit for laying the above cable. 240 Rmt.
CABLE TV SYSTEM ,Supply ,testing and commissioning 3 way
332 splitter. 16 Each
CABLE TV SYSTEM ,Supply ,testing and commissioning 4 way
333 splitter. 2 Each
122
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
123
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
124
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
125
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
126
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
128
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
129
Gujarat Integrated Tribal Educational Project GITEP- 88 GLRS School Complex at Babarghat
130