ﻣﺣﺎﻓظﺔ اﻟﺣدﯾدة- ﻣدﯾرﯾﺔ ﺣﯾس- ﺟداول اﻟﻛﻣﯾﺎت ﻷﻋﻣﺎل اﻹﻧﺷﺎء و إﻋﺎدة اﻟﺗﺎھﯾل ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح
Estimated cost of construction and rehabilitation work at Bilal School - Hays district - AlHudayda Governorate
ﺳﻌراﻟوﺣدة
م اﻟوﺣدة اﻟﻛﻣﯾﺔ اﻻﺟﻣﺎﻟﻲ ﺑﺎﻟدوﻻر
ﺑﺎﻟدوﻻر
Description ﺑﯾــﺎن اﻻﻋﻣـــــــــــﺎل
No. Unit Quantity Price Total price
Notes : -:ﻣﻼﺣظﺎت
1. The contractor shall visit the site before elaboration of the tender and study all ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف
circumstances that surround the site, especially eventually existing slopes at the site. اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ
2. During the excavation and in the case of being unable to reach the depth mentioned in the . ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ
drawings and/or finding the soil bearing capacity (structural drawing) in this depth less than ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ أو
the required, the contractor shall contact the project management. General Requirement: ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل
The Environmental and Social Management Frame work is considered the controlling tool for اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول
mitigating environmental and social impacts .And mitigations listed in this are mandatory to be :اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ.ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ
implemented along with the construction, the rehabilitation and maintenance of the schools. ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت
The contractor is obliged to take the following measures to decrease impact of maintenance اﻟﻣدرﺟﺔ ﻓﻲ ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل
work on the environment and beneficiaries: :وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن
1.Provide construction site with protection measures (Barriers, fence, portable scaffold ﻋﻼﻣﺎت اﻟﺗﺣذﯾر )ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص،( اﻟﺳﻘﺎﯾل، اﻟﺳﯾﺎج، ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز.1
sheets), warning signs (authorized persons are only allowed to access work area, Provide . ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ،( اﻟﻣﺳﻣوح ﻟﮭم ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ
necessary light. . ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر.2
2.Provide proper support for excavations to protect against collapse. ﺧوذة( واﻟزاﻣﮭم ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء، أﺣذﯾﺔ اﻟﺳﻼﻣﺔ، ﻗﻔﺎزات، ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ.3
3.Provide his workers with personal protective equipment (masks, gloves, safety shoes, .اﻟﻌﻣل
helmet, overall) ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل ﻣن اﻟﻐﺑﺎر، ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل.4
4.Reduce noise during working hours and do not work at night, and spray site with water اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ اﻟﻌﻣل ﻣن.5
during dust. اﻟﺦ،اﻟزوار
5.Limit work in one area in series and isolate worksite from , visitors, etc... : ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ ﺷﺗراطﺎت ﻋﺎﻣﺔ.6
6.Haul surplus material and oil and grease outside the premises and transport it in closed ( ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت- : ﻣﻼﺣظﺔ
trucks to dump sites.
.(ﺑﻧﺎء ﺛﻼﺛﺔ ﻓﺻول دراﺳﯾﺔ )ﻓﺻول ﺷﺑﮫ داﺋﻣﺔ
1
Building three classrooms (semi-permanent classrooms).
1.1 Site Works : : اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم
General Requirement: :اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ
The Environmental and Social Management Frame work is considered the ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ
controlling tool for mitigating environmental and social impacts .And mitigations واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت اﻟﻣدرﺟﺔ ﻓﻲ ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ
listed in this are mandatory to be implemented along with the construction, the إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ
rehabilitation and maintenance of the schools. :ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن
The contractor is obliged to take the following measures to decrease impact of ﻋﻼﻣﺎت اﻟﺗﺣذﯾر،( اﻟﺳﻘﺎﯾل، اﻟﺳﯾﺎج، ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز.1
maintenance work on the environment and beneficiaries: . ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ،( )ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص اﻟﻣﺳﻣوح ﻟﮭم ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ
1.Provide construction site with protection measures (Barriers, fence, portable . ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر.2
scaffold sheets), warning signs (authorized persons are only allowed to access ﺧوذة( واﻟزاﻣﮭم، أﺣذﯾﺔ اﻟﺳﻼﻣﺔ، ﻗﻔﺎزات، ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ.3
work area, Provide necessary light. .ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء اﻟﻌﻣل
2.Provide proper support for excavations to protect against collapse. ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل، ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل.4
3.Provide his workers with personal protective equipment (masks, gloves, safety ﻣن اﻟﻐﺑﺎر
shoes, helmet, overall) اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ.5
4.Reduce noise during working hours and do not work at night, and spray site اﻟﺦ،اﻟﻌﻣل ﻣن اﻟزوار
with water during dust. ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ.6
5.Limit work in one area in series and isolate worksite from , visitors, etc... :ﺷﺗراطﺎت ﻋﺎﻣﺔ
6.Haul surplus material and oil and grease outside the premises and transport it ( ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت- : ﻣﻼﺣظﺔ
in closed trucks to dump sites.
Site planning and levelling with exvavation and Backfill : :أﻋﻣﺎل اﻟﺗﺳوﯾﺔ ﻟﻸرﺿﯾﺔ اﻟﻣﺷروع ﻣﻊ اﻟﺣﻔر واﻟردم
The Whole Project site have to be leveled according to the levels on the ground, ﻛﺎﻣل وﻓﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب ﻋﻠﻰ اﻟطﺑﯾﻌﺔ وذﻟك ﺑﺈزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت
through removing the surface obstacles, trees, soil surface layers, cutting of the اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ ﺑﺎﻟﺣﻔر واﻟﻘطﻊ ﻟﻠﻣﻧﺎطﻖ اﻟﺗراﺑﯾﺔ أو اﻟﺻﺧرﯾﺔ اﻟﻣرﺗﻔﻌﺔ واﻟردم ﻟﻠﻣﻧﺎطﻖ
rising parts and backfilling the low parts with Gravel soil or that resulted from .اﻟﻣﻧﺧﻔﺿﺔ ﺑﺎﻟﺗرﺑﺔ اﻟزﻟطﯾﺔ أو اﻟﻧﺎﺗﺟﺔ ﻣن اﻟﺣﻔر ﻣﻊ ﻣراﻋﺔ اﻟﻣﯾول ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر
excavations. Slopes for rainwater drainage have to be considered. Trees will وﻋﻧد إزاﻟﺔ اﻷﺷﺟﺎر وﻏﯾرھﺎ ﻣن, وﯾﺟب أن ﻻ ﺗزال اﻷﺷﺟﺎر إﻻ ﺑﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف
not be removed only with supervisor approval. When removing trees and roots ﻓﯾﺟب اﺟﺗﺛﺎﺛﮭﺎ ﺣﺗﻰ ﻋﻣﻖ، ﻣﻠﯾﻣﺗر80 اﻷﺷﯾﺎء اﻟﻧﺎﻣﯾﺔ واﻟﺟذور اﻟﺗﻲ ﯾزﯾد ﻗطر ﺟذوﻋﮭﺎ ﻋن
1.1.1 with a diameter of more than 80 mm, they should be uprooted to a depth of at ﻣﻠﯾﻣﺗر ﻋﻠﻰ اﻷﻗل ﺗﺣت ﺳطﺢ اﻷرض وإﻋﺎدة ردم اﻻﻧﺧﻔﺎﺿﺎت اﻟﻧﺎﺟﻣﺔ ﻋن500 ﯾﺻل إﻟﻲLum sum 1.00
least 500 mm below earth surface, Resulted excavations will be backfilled with اﺳﺗﺑﻌﺎد ﻛﺗل اﻟﺣﺟﺎرة أو اﻟﻌواﺋﻖ اﻷﺧرى ﺑﺗرﺑﺔ ﻣﻧﺎﺳﺑﺔ ودﻛﮭﺎ دون ﺗﻛﺎﻟﯾف إﺿﺎﻓﯾﺔ ورﻓﻊ
Suitable and compacted soil without additional costs and transferring waste to وﯾﺷﻣل اﻟﺳﻌر إزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ, اﻟﻣﺧﻠﻔﺎت اﻟﻰ اﻟﻣﻘﺎﻟب اﻟﻣﺧﺻﺻﺔ ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ
the designated landfills of local authority. The item includes the removal of وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ وأﻋﻣﺎل اﻟدك واﻟرش ﻋﻠﻰ طﺑﻘﺎت ﻟﺗﺣﻘﯾﻖ
surface barriers, plants, surface layers of soil, compacting in layers and curing اﻟﻣﻧﺎﺳﯾب اﻟﻣﻼﺋﻣﺔ ﻟﻠوظﺎﺋف اﻟﻣﺣددة ﺑﻣﺧطط اﻟﻣوﻗﻊ اﻟﻌﺎم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس
with water to reach the appropriate levels of functions defined in the general site .واﻟرﺳوﻣﺎت اﻟﻣرﻓﻘﺔ ﻣﻊ ﺗﻌﻠﯾﻣﺎت ﻣﮭﻧدس اﻟﻣوﻗﻊ
plan according toin
Soil excavation specifications,
meter cubic:drawings attched with the instruction of site :ﺣﻔر اﻟﺗرﺑﺔ ﺑﺎﻟﻣﺗر اﻟﻛﻌب
In cubic meters: digging in any type of soil for building foundations and corridors اﻟﺣﻔر ﻓﻲ أي ﻧوع ﻣن اﻧواع اﻟﺗرﺑﺔ ﻟﻸﺳﺎﺳﺎت اﻟﻣﺑﻧﻰ واﻟﻣﻣرات ﺑﻌﻣﻖ ﻻ: ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
with a depth of not less than 1 meter. Where necessary, even the level suitable وﺣﯾﺛﻣﺎ ﯾﻠزم ﺣﺗﻰ اﻟﻣﻧﺳوب اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس وﻧزع اﻟﻣﯾﺎه إن وﺟدت ﻣﻊ.ﻣﺗر1 ﯾﻘل ﻋن
for establishment and dewatering, if any, while maintaining the aspects of drilling ﻣﯾﺎه ( ﻣﻊ ﻧﻘل ﺟﻣﯾﻊ اﻟﻣﺧﻠﻔﺎت إﻟﻰ- ﺗﻠﻔون-اﻟﺣﻔﺎظ ﻋﻠﻰ ﺟواﻧب اﻟﺣﻔر واﻟﺗﻣدﯾدات )ﻛﮭرﺑﺎء m3
1.1.2 and extensions (electricity - telephone - water) with the transfer of all waste to اﻟﻣواﻗﻊ اﻟﻣﻌﺗﻣدة ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ واﻟﺣﻔرﯾﺗم طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت 42.34
3م
the sites approved by the local authority and drilling in accordance with the وﯾﺗﺣﻣل اﻟﻣﻘﺎول أي أﺿرار ﻗد ﺗﺣدث ﺑﺎﻟﺧدﻣﺎت أو ﺑﺎﻟﻣﻧﺎزل ﺑﺳﺑب اﻟﺣﻔر.اﻟﻣﮭﻧدس اﻟﻣﺷرف
drawings, specifications and instructions of the supervising engineer. The .وﺟﻣﯾﻊ ﻣﺎﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد
contractor shall bear any damages that may occur to the services or houses due
to excavation and all that is necessary to terminate the item.
Backfill around foundations, Sidewalk, water tank and areas that need to اﻟردم ﺣول ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض ﻟﻠﻣﺑﻧﻰ واﻟﺧزان
be in meter cubic: واﻟﻣﻣرات واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
Backfill with valid and clean soil mixed with graded fractions stones resulted اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
from site excavations or brought from outside to be filled around the foundations ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ
as well as inside the building on layers not more than 30 cm using mechanical ﺳم أوﻻ ً ﺑﺄول ﻣﻊ30 ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ ﺗزﯾد ﻋﻠﻰ
compactor, curing with water to achieve the appropriate strength and get a اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ
cohesive soil according to the specified levels. Carry out compacting of narrow وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ
وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن, ﻣﻊ ﻋدم اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ اﻟﻣوﻗﻊ,اﻟﺣﺟرﯾﺔ m3
1.1.3 areas around foundations and external stone walls, causing no damage to the 36.00
works implemented in the site, and transfer of excess dump soil to public dumps اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل 3م
off site. Safe roads for trolleys to transfer materials and equipment used for اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن اﻟﻣﺧﻠﻔﺎت اﻟﻧﺎﺗﺟﺔ ﻋن
implementation within the site to be prepared. Before project handover, site has اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات ﻋﻠﻰ ﺳﻼﻣﺗﮫ ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات
to be free of waste resulting from implementation as well as other factors which اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه
may effect the project safety in future like landslides of various types and others, اﻷﻣطﺎر واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت
taking in considerations preparation of slopes needed to drain rainwater. The . اﻟﻣﮭﻧدس اﻟﻣﺷرف
item includes all the necessary to complete the item in accordance with the
drawings and specifications and instructions of the supervisor..
Rehabilitation of Yard school wall: :إﻋﺎدة ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ
Restoring and rehabilitating the entire school wall. The work includes removing إﻋﺎدة ﺗرﻣﯾم و ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ ﺑﺎﻟﻛﺎﻣل و اﻟﻌﻣل ﯾﺷﻣل إزاﻟﺔ اﻟﺑﻠوك اﻟﺗﺎﻟف وإﻋﺎدة ﺑﻧﺎءه
1.1.4 the damaged block and rebuilding it as before or Rehabilitation , as well as the أو ﺗرﻣﯾﻣﮫ ﻛﺎﻟﺳﺎﺑﻖ و أﻣﺎﻛن اﻟﺿرر ﻓﻲ اﻟﺳور و اﻟﻛورﻧﯾش و طﻼء اﻟﻛورﻧﯾش و اﻻﻋﻣدةlum. Sum 1.00
areas of damage in the wall and cornice according to the instructions of the .ﺑﺎﻟﻠون اﻟﻣطﻠوب ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
supervising engineer.
Mitigation of environmental impact during the project implementation period: -: ﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ ﺧﻼل ﻓﺗرة ﺗﻧﻔﯾذ اﻟﻣﺷروع
The contractor shall supply and carry out the necessary works at the site to mitigate ﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد وﺗﻧﻔﯾذ اﻷﻋﻣﺎل اﻟﺿرورﯾﺔ ﺑﺎﻟﻣوﻗﻊ ﻟﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ:ﺑﺎﻟﻣﻘطوﻋﯾﺔ
environmental impact through implementation the following : -:واﻟﻣﺗﻣﺛﻠﺔ ﺑﺎﻟﺗﺎﻟﻲ
1. Site shall be completely fenced with zinc or wood, etc. to prevent entry of non- . اﻟﺦ ﻟﻣﻧﻊ دﺧول ﻏﯾر اﻟﻌﺎﻣﻠﯾن إﻟﯾﮫ... ﺗﺳوﯾر اﻟﻣوﻗﻊ ﻛﺎﻣﻼ ً ﺑﺎﻟزﻧك أو اﻷﺧﺷﺎب أو-1
workers. ﺗورﯾد ﻣﺳﺗﻠزﻣﺎت وأدوات اﻟﺳﻼﻣﺔ اﻟﺷﺧﺻﯾﺔ ﻣن إﺻﺎﺑﺎت اﻟﻌﻣل وﺗﺷﻣل )اﻟﺟزﻣﺎت-2
2 – Supply of personal safety tools against work injuries (including caps, hats, gloves,
(اﻟﺦ.. واﻟﻘﺑﻌﺎت واﻟﻛﻔوف واﻟﻧظﺎرات اﻟواﻗﯾﺔ اﻟﻛﻣﺎﻣﺎت وﺳدادات اﻷذان وأﺣزﻣﺔ اﻷﻣﺎن
protective glasses, gaskets, earplugs, safety belts, etc.) with adequate numbers for
ﺑﺎﻟﻌدد اﻟﻛﺎﻓﻲ ﻟﻠﻌﻣﺎل اﻟﻌﺎدﯾﯾن واﻟﻣﺎھرة ﻋﻠﻰ ﻧﻔﻘﺔ اﻟﻣﻘﺎول ﺑﺣﺳب ﺣﺟم اﻟﻌﻣﺎﻟﺔ اﻟﺗﻲ ﯾﺗطﻠﺑﮭﺎ
ordinary and skilled workers at the contractor's expense, depending on the size of the
labor force required for the project. They will be oblige to use them. .اﻟﻣﺷروع وإﻟزاﻣﮭم ﺑﺎﺳﺗﺧداﻣﮭﺎ
3 - Construction of a 1.5 x 1 x2.5 meter temporary bath of zinc, wood, bricks, etc an ﻣﺗر ﻣؤﻗت ﻣن اﻟزﻧك أو اﻟﺧﺷب أو2.5 ﻣﺗر وارﺗﻔﺎع1×1.5 ﺗﺷﯾﯾد ﺣﻣﺎم ﺑﺄﺑﻌﺎد-3
eastern toilet, a temporary wash basin, supply of water for bathroom and implement a اﻟﺦ وﻣرﺣﺎض ﻋرﺑﻲ وﻣﻐﺳﻠﺔ اﻷﯾدي اﻟﻣؤﻗﺗﺔ وﺗوﻓﯾر اﻟﻣﯾﺎه ﻟﮭذا اﻟﺣﻣﺎم وﻋﻣل ﺣﻔرة..اﻟﺑﻠك
1.1.5 covered cesspool . All workers and supervisors are obliged to use it. At the completion )ﺑﯾﺎرة ﻣﺻﻐرة أو ﺗرﻧش (ﻣﻊ اﻟﻐطﺎء وإﻟزام ﺟﻣﯾﻊ اﻟﻌﻣﺎل واﻟﻣﺷرﻓﯾن ﺑﺎﺳﺗﺧداﻣﮫ وﯾﺗم إزاﻟﺔLum 1
of the project, the bathroom shall be removed and the cesspool shall be backfilled. . اﻟﺣﻣﺎم وردم اﻟﺑﯾﺎرة ﯾﻌد اﺳﺗﻛﻣﺎل ﺗﻧﻔﯾذ اﻟﻣﺷروعsum
4 - Materials to be separately stored and provide sufficient areas for movement and اﻟﻘﯾﺎم ﺑﺗﺷوﯾن اﻟﻣواد ﺑطرﯾﻘﺔ ﻣﻧﻔﺻﻠﺔ وﺗوﻓﯾر ﻣﺳﺎﺣﺎت ﻛﺎﻓﯾﺔ ﻟﻠﺣرﻛﺔ واﻟﻣﻧﺎورة وﻛذﻟك-4
handling, as well as removal of wood and all waste produced during the implementation إزاﻟﺔ اﻷﺧﺷﺎب ورﻓﻊ ﻛﺎﻓﺔ اﻟﻣﺧﻠﻔﺎت ﺧﻼل ﻓﺗرة اﻟﺗﻧﻔﯾذ إﻟﻰ ﺧﺎرج ﻣﻧطﻘﺔ اﻟﻌﻣل )اﻟﻣﻘﺎﻟب
period outside the work area ( public dumps). .(اﻟﻣﺧﺻﺻﺔ
5 - Terrible equipments will be put away from populated places and to be operated at اﻻﻟﺗزام ﺑوﺿﻊ اﻟﻣﻌدات اﻟﻣزﻋﺟﺔ ﺑﻌﯾدا ً ﻋن اﻷﻣﺎﻛن اﻟﻣﺄھوﻟﺔ وﺗﺷﻐﯾﻠﮭﺎ ﻓﻲ اﻷوﻗﺎت-5
the appropriate times as well as the obligation to store dangerous materials away from اﻟﻣﻧﺎﺳﺑﺔ وﻛذﻟك اﻻﻟﺗزام ﺑﺗﺧزﯾن اﻟﻣواد اﻟﺧطﯾرة ﺑﻌﯾدا ً ﻋن اﻟﻌﺎﻣﻠﯾن واﻟﻌﻣل ﻋﻠﻰ ﻋدم ﺗﻐﯾﯾر
workers and no change of oils or leaving the grease residues in the work area.
.اﻟزﯾوت أو ﺗرك ﺑﻘﺎﯾﺎ اﻟﺷﺣوم ﻓﻲ ﻣﻧطﻘﺔ اﻟﻌﻣل
6 - Commitment to reform public services (electricity - telephone - water - sewage),
ﻣﺟﺎري ( اﻟﺗﻲ ﺗﺗﻌرض ﻟﻠﻛﺳر-ﻣﯾﺎه- ﺗﻠﻔون-اﻻﻟﺗزام ﺑﺈﺻﻼح اﻟﺧدﻣﺎت اﻟﻌﺎﻣﺔ )ﻛﮭرﺑﺎء-6
which were damaged during the implementation as a first.z
7- First aid kits for workers. . إﺛﻧﺎء ﺗﻧﻔﯾذ اﻟﻣﺷروع أوﻻ ً ﺑﺄول
. ﺣﻘﯾﺑﺔ اﺳﻌﺎﻓﺎت أوﻟﯾﺔ ﻟﻠﻌﻣﺎﻟﺔ-7
"Helson's school yard mattress: :ﻓرﺷﺔ ھﻠﺳن ﻟﺣوش اﻟﻣدرﺳﺔ
Supplying and furnishing a graded helsen layer for the courtyard and the inner ﺗورﯾد وﻓرش طﺑﻘﺔ ھﻠﺳن ﻣﺗدرج ﻟﻠﻔﻧﺎء واﻟﺳﺎﺣﺔ اﻟداﺧﻠﯾﺔ واﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت اﻟﻣوﺿﺣﺔ
courtyard, as shown in the drawings, and the work includes the following: ـ: واﻟﻌﻣل ﯾﺷﻣل اﻵﺗﻲ
ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ ﻣﻊ اﻟدك واﻟرش ﺑﺎﻟﻣﯾﺎه وﻋﻣل ﻣﯾول ﻟﻠﺳﺎﺣﺔ ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗﺑل- Lum
1.1.6 - Leveling the site with tamping and spraying with water, and making slopes for 1.00
the yard to drain rainwater before laying the paver, according to the instructions ﺳم5 ﺗورﯾد وﻓرش طﺑﻘﺔ ﻛري ﺑﺳﻣك-. ﻓرش اﻟﻛري وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف sum
of the supervising engineer. - Supplying and spreading a layer of paver with a .ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
thickness of 5 cm according to the instructions of the supervising engineer.”
Planting works:- In number: The supply and implementation of Plants with 2 -: أﻋﻣﺎل اﻟﺗﺷﺟﯾر
meter length in pavement square that has dimention of ( 2M * 1.3 M). so every ﺳم70 ﻣﺗر ﺑﻌﻣﻖ1.3 ﻣﺗر وﻋرض2 ﺗورﯾد وﺗﻧﻔﯾذ اﺣواض أﺷﺟﺎر ﻣﻧﺎﺳﺑﺔ طول: ﺑﺎﻟﻌدد
two tree in one poll. The price includes planting seedlings, agricultural soil and . ﺳم ﺑﺣﯾث ﯾﺗم ﻏرس ﺷﺟرﺗﯾن ﻓﻲ ﻛل ﺣوض40*20*20 ﺗﻧﻔﯾذ ﺑﻠوك ﺻم ﺗﻛون ﺑﻣﻘﯾﺎس
all that is needed according to the attached and according to drawings and وﻋﻣل اﻟردﻣﯾﺎت ﻣﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ ﻻﺻﻘﺔ ﻓﯾﻣﺎ ﺑﯾﻧﮭﺎ ﺑﻣوﻧﺔ ﺧرﺳﺎﻧﯾﺔ ذو ﻧﺳﺑﺔ ﺧﻠط ﺑﻣﻘدار
أﯾﺎم ﻣﻊ ﺗﻠﺑﯾس اﻟﺑﻠوك ﻣن5 ( ﻧﯾس إﻟﻰ اﺳﻣﻧت ﺑﺣﯾث ﯾﺗم رﺷﮭﺎ ﺑﺎﻟﻣﯾﺎه ﻛل ﯾوم ﺑﻣﻘدار1:3) pcs
1.1.7 specifications and the instructions of the supervisor engineershall be in a scale 8.00
of 25 * 10 * 50 cm. And the work of the backfill with concrete works adhesive اﻟداﺧل واﻟﺧﺎرج إﺿﺎﻓﺔ اﻷﻟوان ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف ﺑﻣﺎ ﯾﺗﻧﺎﺳﻖ ﻣﻊ أﻟوان ﻋدد
between them with concrete mortar with a mixing ratio of (1:3) fine sand with اﻟﻣدرﺳﺔ وﺷﻌﺎرات اﻟﻣﻧظﻣﺔ واﻟﺛﻣن ﯾﺷﻣل ﻏرس اﻟﺷﺗﻼت واﻟﺗرﺑﺔ اﻟزراﻋﯾﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم
cement so that it is sprinkled with water every day by 5 days with the addition of .ﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣﺧططﺎت اﻟﻣروﻓﻘﺔ وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
colors according to the instructions of the supervising engineer in line with the
colors of the school and the logos of the organization.
Sidewalk around the building: Sidewalk around the building, height shall be at : رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ
least 30 cm and width 1 M to be according to the detailed drawings attached. ﻣﺗر ﺑﺣﺳب1 وﻋرض، ﺳم30 رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ ﺑﺎرﺗﻔﺎع ﻻ ﯾﻘل ﻋن:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Excavation, backfilling, compaction and curing with water to be executed. A اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ ﻣﻊ اﻟﺣﻔر واﻟردم واﻟدك واﻟرش وطﺑﻘﺔ ﻣن اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ
layer of plain concrete thickness of 10 cm, casted on a layer of stone fractions ﻣﻊ ﻋﻣل ﺑﻼط أرﺻﻔﺔ ﻣﻠون, ﺳم15ﻣﻊ ﻋﻣل طﺑﻘﺔ ﻣن اﻟﺻوﻟﻧﺞ ﺗﺣﺗﮭﺎ ﺑﺳﻣك،ﺳم10 ﺳﻣك m2
1.1.8 15 cm thickness. The layer of pavement cement tiles to be installed taking into ﻣﺑﺎﻧﻲ ﺣﺟر ﻣرﺑوع ﻣﻊ، ﻣﺗر4 ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول اﻟﻸزم ﻣﻊ ﻋﻣل ﻓواﺻل اﻟﺗﻣدد ﻛل 21.50
2م
account slopes , expansion joints and concrete curbstones or squared stone as وﺗﻌﻠﯾﻣﺎت، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، اﻟﺗﻛﺣﯾل واﻟﺗدرﯾز وﯾﺷﻣل ﻣﻊ اﻟﺣﻔر واﻟﺗﺎﺳﯾس
well as excavation and foundation according to the drawings and specifications, .اﻟﻣﮭﻧدس اﻟﻣﺷرف
and the instructions of the supervisor.
Total Amount Of Excavation and Backfilling Works إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟردم و اﻟﺣﻔر
1.2 Concrete Works : اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت
Notes : :ﻣﻠﺣوظﺔ
The prices for reinforced concrete include the following: -:أﺳﻌﺎر اﻟﺧرﺳﺎﻧﺎت ﺗﺷﻣل اﻷﺗﻲ
1- Form works and reinforcement . أﻋﻣﺎل اﻟﺷدات اﻟﺧﺷﺑﯾﺔ واﻟﺣدﯾد-1
2- Mixing the concrete and the watering up to a period of 2 weeks and all related works . اﺳﺑوﻋﯾن وﻛل اﻷﻋﻣﺎل ﺑﺣﺳب اﻟرﺳوﻣﺎت2 أﻋﻣﺎل اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔﻣﻊ اﻟرش ﻟﻔﺗرة-2
mentioned in the drawings . ﻋﻣل ﻣﻛﻌﺑﺎت اﺧﺗﺑﺎر واﺧﺗﺑﺎرھﺎ-3
3- Producing sample and their testing. .ﺳم أﺳﻔل اﻟﻣﯾدات اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ15 طﺑﻘﺔ ﻛري ﺳﻣك-4
4- A layer of aggregate of 15cm thickness under the internal and the external TB's. أى طﻠﺑﺎت إﺿﺎﻓﯾﺔ ﯾطﻠﺑﮭﺎ اﻟﻣﮭﻧدس-5
5- Any additional requests by the Engineer . ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد اﻟﻣواد اﻟﺗﻲ ﺗﺗطﺎﺑﻖ ﻣﻊ اﻟﻣواﺻﻔﺎت اﻟﺧﺎﺻﺔ واﻟﻌﺎﻣﺔ6
6- The contractor shall only use materials corresponding with the general or special ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻣﺳﺋوﻟﯾﺔ ﻧﻘل وﺗﺧزﯾن اﻟﻣواد ﺑﺎﻟطرﯾﻘﺔ اﻟﻣﻧﺎﺳﺑﺔ اﻟﺗﻰ ﻵﺗﻌرﺿﮭﺎ ﻟﻠﺗﻠف وﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻘﯾﺎم-7
specifications. .ﺑﺳرﻋﺔ ﻧﻘل اﻟﻣواد اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﻣوﻗﻊ ﻣﺑﺎﺷرة ﺑﻌﺑﺎرة أﺧرى ﻣﻣﻧوع ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﺳﺗﺧدام أي ﻣواد ﺗﺎﻟﻔﺔ
7- The contractor shall deliver the material to the site, store it in a proper way to prevent any ﯾﻠزم إﺳﺗﺧدام اﺳﻣﻧت ﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت اﻟﻌﺎدﯾﺔ واﻟﻣﺳﻠﺣﺔ ﺑﺎﻷﺳﺎﺳﺎت-8
damage and remove any surplus from the site after finishing. No spoiled material has to be .واﻷرﺿﯾﺎت ﻓﻲ اﻟﻣﻧﺎطﻖ اﻟﺳﺎﺣﻠﯾﺔ
used. اﻟﻛري اﻟﻣﺳﺗﺧدم ﻟﻠﺻﺑﯾﺎت اﻟﻣﺳﻠﺣﺔ ﻛري ﻛﺳﺎرة وﯾﺳﺗﺧدم اﻟﮭزاز اﻟﻣﯾﻛﺎﻧﯾﻛﻲ أﺛﻧﺎء اﻟﺻب-9
8- Sulphate resistant cement shall be used for plain and reinforced concrete of the 3 م/ ﻛﺟم أﺳﻣﻧت350 ﻧﯾس و3م0.40 ﻛري و3م0.80 ﺧرﺳﺎﻧﺔ اﻟﺗﺳﻠﯾﺢ ﯾﺟب أن ﺗﺗﻛون ﻣن-10
foundations and floors in the coastal areas. . ﻛري/ ﻧﯾس/ ( اﺳﻣﻧت3:2:1) ﺧرﺳﺎﻧﺔ
9- Aggregate used for reinforced concrete shall be broken stones. A mechanical device shall 3م1 ﻛﺟم أﺳﻣﻧت ﻟﻛل250 ﻧﯾس و3م0.40 ﻛري و3م0.80 اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﯾﺟب أن ﺗﺗﻛون ﻣن-11
be used during concreting for proper compaction. . ﻛري/ ﻧﯾس/( أﺳﻣﻧت6:3:1) ﺧرﺳﺎﻧﺔ
10- Reinforced concrete shall generally, as long as no other specification is mentioned, . ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻣن أﻋﻠﻰ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ-12
consist of 0,80m3 aggregate, 0,40m3 sand and 350kg cement/m3 of concrete (1:2:3)
11- Plain concrete shall generally, as long as no other specification is mentioned, consist of
0,80m3 aggregate, 0,40m3 sand and 250kg cement/m3 of concrete (1:3:6).
12- The concealled pipes for electricity connection should be installed above the concrete
Plain concrete for floors 10 cm with stone fractions, Portland Cement: : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺳم ﻣﻊ ﺻوﻟﻧﺞ10 ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت
Plain concrete with a minimum thickness of 150 kg / cm 2, to be casted above a وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن، ﺳم إﺳﻣﻧت ﺑورﺗﻼﻧدي10 ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت ﺳﻣك-: ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
stone fractions layer of not less than 10 cm thickness, according to the ً طﺑﻘﺎ،ﺳم10 ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر اﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺑﺳﻣك ﻻ ﯾﻘل ﻋن،2ﺳم/ ﻛﺟم150 m2
1.2.1 .ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 104.00
drawings, specifications and instructions of the supervising engineer. 2م
Reinforced concrete 250 kg / cm 2, for ground beam: : اﻟﻣﯾد إﺳﻣﻧت ﺑورﺗﻼﻧدي،2ﺳم/ ﻛﺟم250 ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ
Reinforced concrete for cemells (ground beams) using Portland Cement, with ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ھز، اﻟﺻب، ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250ﻻ ﺗﻘل ﻋن m3
1.2.2 8.20
and cutting, casting, vibrating concrete using a vibration machine and spattering وﺗﻌﻠﯾﻣﺎت، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،( وﻛل ﻣﺎ ﯾﻠزم،اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز واﻟرش 3م
of water.( and all necessary) .All works to be done according to drawings, . اﻟﻣﮭﻧدس اﻟﻣﺷرف
specifications, and engineer supervisor instructions .
Reinforced concrete for columns and lintels of 250 kg / cm 2 Resistant : إﺳﻣﻧت ﺑورﺗﻼﻧدي2 ﺳم/ﻛﺟم250ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب
Portland Cement: ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
Reinforced concrete for columns, lintels using Resistant Portland Cement, with ، ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن m3
1.2.3 6.20
resistance of not less than 250 kg / cm 2. Item includes wood formwork, steel ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز واﻟرش ﻣﻊ إﺳﺗﺧدام اﻟﺗﻘﻣﯾص ﺑﺎﻟﺷواﻻت ﻟﻣدة ﻻ ﺗﻘل ﻋن،اﻟﺻب 3م
supply and cutting, casting, vibrating concrete using a vibration machine, Curing . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،( وﻛل ﻣﺎ ﯾﻠزم،إﺳﺑوع
with water in addition to cover columns with sackcloth for not less than a week.(
and all necessary)
Reinforced .All for
concrete works to be done
ceilings according
and beams, 250tokg
drawings,
/ cm 2, specifications,
Portland : إﺳﻣﻧت ﺑورﺗﻼﻧدي،2ﺳم/ ﻛﺟم250 ،ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور
Cement: ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
m2
1.2.4 Reinforced concrete for ceilings and beams using Portland Cement:with ﺗورﯾد وﻗص ووﺿﻊ، وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ،2ﺳم/ ﻛﺟم250 اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن 22.60
2م
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت،( واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم، ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز، اﻟﺻب،اﻟﺣدﯾد
and cutting, casting, vibrating concrete using a vibration machine and curing of . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،واﻟﻣواﺻﻔﺎت
water.( and all necessary) .All works to be done according to drawings,
Total Amount of Concrete Works. إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ
1.3 Masonary and Block Works أﻋﻣﺎل اﻟﺣﺟر و اﻟﺑﻠوك
أﻋﻣﺎل اﻷﺣﺟﺎر واﻟﺑﻠوك
Building works 3م/ﻛﺟم300 أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ﺗﻧﻔذ درﺟﺔ أوﻟﻰ ﻣﺗراﺑطﺔ وﺑﺎﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم وﺑﻣﺣﺗوى أﺳﻣﻧت ﻻ ﯾﻘل ﻋن.1
1. Construction works shall be carried out first-class, interconnected, Resistant Portland cement, to be used with a cement وﯾﺟب ﺗرﻛﯾب وإﺣﻛﺎم اﻟﻠﺣﺎﻣﺎت اﻷﻓﻘﯾﺔ واﻟراﺳﯾﺔ، رﻣل ﺑﺎﻟﺣﺟم ( أو ﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف3 : أﺳﻣﻧت1 ) أو, رﻣل
content of not less than 300 kg / m3 of sand, or (1 cement: 3 Sand),Horizontal and vertical joints are properly implemented. واﻟﻌﻣل ﯾﺷﻣل اﻟﺳﻘﺎﯾل اﻟﻼزﻣﺔ واﻟﺗﻧﻌﯾم واﻟﺟﻠﻲ وﺟﻣﯾﻊ ﻣﺎ,ﺟﯾدا ً ﻣﻊ اﺳﺗواء اﻷوﺟﮫ واﺳﺗﻘﺎﻣﺔ اﻷرﻛﺎن ﺑﺎﺳﺗﺧدام اﻟﺧﯾط واﻟﻣﯾزان
Leveling of wall faces and straightening of corners using the thread and balance. The item price include scaffolding,
. ﯾﻠزم ﻹﻧﮭﺎء اﻟﻌﻣل
smoothness, glossiness and all necessary to finish the work.
اﻟﺦ( ﻟﻠﻣواد اﻟﻣطﻠوﺑﺔ ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻓﻲ اﻟﻣﺷروع ﻻﻋﺗﻣﺎدھﺎ وأﺧذ ﻣواﻓﻘﺔ...رﻣل-ﯾﺎﺟور-ﺑﻠك-ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻘدﯾم ﻋﯾﻧﺎت)اﺣﺟﺎر.2
2. The contractor shall submit samples of materials to be used (stones, bricks, sand, etc.) for written approval.
3. All stones have to be laid on their natural length as to be pressed vertically where they are in the building. spraying with .ﺧطﯾﺔ ﻋﻠﯾﮭﺎ
water twice a day for a week. ﺗﺑﻧﻰ ﺟﻣﯾﻊ اﻷﺣﺟﺎر ﻋﻠﻰ ﻣراﻗدھﺎ اﻟطﺑﯾﻌﯾﺔ ﻟﯾﻛون اﻟﺿﻐط ﻋﻣودﯾﺎ ً ﻋﻠﻰ ھذه اﻟﻣراﻗد ﻣﮭﻣﺎ ﻛﺎن ﻣوﻗﻌﮭﺎ ﻓﻲ اﻟﺑﻧﺎء وﺗرش اﻟﻣﺑﺎﻧﻲ.3
4. Stones have to be hard, solid, free of impurities, veins, sand holes, fractions and homogeneous in terms of origin and color .ﺟﯾدا ً ﻣرﺗﯾن ﻓﻲ اﻟﯾوم وﻟﻣدة أﺳﺑوع
(one quarry). ﯾﺟب أن ﺗﻛون اﻷﺣﺟﺎر ﻗوﯾﮫ وﺻﻠﺑﮫ ﺧﺎﻟﯾﺔ ﻣن اﻟﺷواﺋب واﻟﻌروق واﻟﻔﺟوات اﻟرﻣﻠﯾﺔ واﻟﻛﺳور و ﻣﺗﺟﺎﻧﺳﺔ ﻣن ﺣﯾث اﻟﻧوع.4
5. Construction must be regular in terms of straightening of construction lines, joints and height of courses which shall not .(واﻟﻠون)ﻣﺣﺟر واﺣد
exceed (20-25-30)cm .Spaces between fronting and lining stones (course stones) are well filled with cement mortar and stone (ﺳم ﻟﺳرع30-25-20) ﯾﺟب أن ﯾﻛون اﻟﺑﻧﺎء ﻣﻧﺗظﻣﺎ ً ﻣن ﺣﯾث اﺳﺗﻘﺎﻣﺔ ﺧطوط اﻟﺑﻧﺎء واﻟﻔواﺻل وارﺗﻔﺎﻋﺎت اﻟﺳروع ﻻ ﯾزﯾد ﻋن.5
fractions according to the drawings and specifications and the instructions of the supervisor .اﻟواﺣد ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﺑﯾن اﻟﻣداﻣﯾك ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ واﻟﺷﻠف اﻟﺻﻐﯾر طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
6. The height of fronting stone construction without lining should not exceed 60 cm. .ﺳم ﺑدون ﺑطﺎﻧﺔ60 ﯾﺟب أن ﻻ ﯾزﯾد ارﺗﻔﺎع اﻟﺑﻧﺎء ﻟﻠواﺟﮭﺎت ﻋن.6
7. Granite stone constructions should be according to the sizes shown in the drawings.
. ﯾﺟب أن ﺗﻛون ﻣﺑﺎﻧﻲ اﻟﺣﺟر اﻟﺟراﻧﯾت ﺣﺳب اﻟﻣﻘﺎﺳﺎت اﻟﻣوﺿﺣﺔ ﻓﻲ اﻟرﺳوﻣﺎت.7
8. The Engineer shall check and review the construction work properly (ensure that the balance and the thread is used
properly, thread is tighten and check the room diameters)
ﻋﻠﻰ اﻟﻣﮭﻧدس اﺳﺗﻼم أﻋﻣﺎل اﻟﺑﻧﺎء ﺑﺷﻛل ﺻﺣﯾﺢ واﻟﺗﺄﻛد ﻣن ﻣﯾزان اﻟﺧﯾط وﺷد اﻟﺧﯾط واﻟﺗرﺑﯾﻊ واﺳﺗﻼم أﻗطﺎر اﻟﻐرف واﻟﺗﺄﻛد.8
9. The water balance and the plumb bob to be used in all courses of the constructions (in all work stages) . .ﻣن ﺻﺣﺔ اﻟﺑﻧﺎء
10.Stones specially cut for edges will be used in all openings construction either fronting or lining stone. Edge stone height . ﯾﺟب اﺳﺗﺧدام ﻣﯾزان اﻟﻣﺎء ﻓﻲ ﻛل ﻣدﻣﺎك ﯾﺑﻧﻰ وﻋﻠﻰ اﻟﺑﻧﺎء اﺳﺗﺧدام اﻟﺑﻠﺑل ﻓﻲ ﻛﺎﻓﺔ ﻣراﺣل اﻟﻌﻣل.9
(front height) not less than 15 cm minimum. .ﺳم15 وﺑﺣﯾث ﻻ ﯾﻘل ﺑﻌد اﻟﺟﺑﮭﺔ اﻟﺻﻐﯾرة ﻟﻠرﻛن ﻋن. ﯾﺟب اﺳﺗﺧدام أﺣﺟﺎر اﻷرﻛﺎن ﻓﻲ ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺑطﺎﻧﺔ واﻟظﮭﺎرة.10
11. The cladding stones should be applied from top and bottom for consistency, smooth back stones will not be used for . وﯾﻣﻧﻊ اﺳﺗﺧدام اﻷﺣﺟﺎر ذات اﻟظﮭر اﻷﻣﻠس، ﯾراﻋﻰ ﺗﻧﻔﯾذ أﺣﺟﺎر اﻟﺗﻛﺳﯾﺔ ﻣن أﻋﻠﻰ وﻣن أﺳﻔل ﺑﺷﻛل ﻛﺎف ﻣن اﺟل اﻟﺗﻣﺎﺳك.11
cladding . . رﻣل(ﻣﻊ اﻟرش ﻗﺑل اﻟﺗﻛﺳﯾﺔ ﺑﺎﻟﺣﺟر:)اﺳﻣﻧت1:2 ﯾﻠزم طرطﺷﺔ اﻟﺟﺳور واﻷﻋﻣدة ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط.12
12. Concrete beams and columns have to be spattered with cement mortar with mixing ratio of 1: 2 (cement: sand) and ﯾﺟب أن ﺗﻛون اﻟﻣﺛﺎﻧﻲ)اﻟﺑطﺎﻧﺔ( ﻣن اﻟﺣﺟر وﯾﻌﺑﺄ اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ-13
curing with water before stone cladding . .ﻛري( وﻋﻠﻰ إن ﯾﻛون اﻟﻛري ﻣﺗدرج5: رﻣل2.5:اﺳﻣﻧت:1) ﺧﻠط
13 - The lining part shall be constructed of stones. Gaps between fronting and lining stones have to be filled with plain
ﯾوم ﻋﻠﻰ ﺗﺻﻧﯾﻌﮫ وﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد اﻟﺑﻠوك ﻟﻠﻣوﻗﻊ28 ﯾﻣﻧﻊ اﺳﺗﺧدام اﻟﺑﻠوك اﻻﺳﻣﻧﺗﻲ اﻟﻣﺻﻧﻊ أوﺗوﻣﺎﺗﯾﻛﯾﺎ ﻗﺑل ﻣرور.14
concrete of mixing (1: cement: 2.5 sand: 5 aggregate) , Aggregate shall be graded.
14.Automatic concrete blocks will not be used before 28 days of fabrication. After supply to the project site, blocks should be
.وﻣﻌﺎﻟﺟﺗﮫ ﺑﺎﻟﻣﺎء ﻗﺑل اﻟﺑﻧﺎء ﺑﮫ
cured with water before used for construction. ﻛﺟم350ﺳم أو اﻛﺛر ھﻲ25، ﺳم20، ﺳم15 ﻧﺳﺑﺔ اﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﺑﺎﻧﻲ ﺑﺎﻟﺑﻠوﻛﺎت ااﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﻔرﻏﺔ ﺳﻣك.15
15. Mixing ratio of the cement mortar used for constructions with hollow cement blocks of 15 cm, 20 cm, 25 cm or more is . أﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب رﻣل
(350 kg cement per cubic meter of sand.) . ﺟﻣﯾﻊ اﻟﺑﻠك اﻟﻣﺳﺗﺧدم اﺗوﻣﺎﺗﯾﻛﻲ ﺿﻐط ﻋﺎﻟﻲ.16
16. All the concrete block used is high pressure automatic. 2 ﺳم/ ﻛﺟم70 ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن: ﺑﻠك )ﺑردﯾن( ﺻم ﻟﻠﺟدران اﻟﺣﺎﻣﻠﺔ-
- Solid block (Bardeen) for bearing walls: breaking resistance not less than 70 kg / cm 2 2 ﺳم/ ﻛﺟم35 ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن: ﺑﻠك )ﺑردﯾن(ﺻم ﻟﻠﺟدران ﻏﯾر اﻟﺣﺎﻣﻠﺔ-
- Solid block (Bardeen) for non-bearing walls: breaking resistance not less than 35 kg / cm 2 . ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت.17
17. All construction works shall be geometrically measured ,All openings and spaces to be deducted.
Black stone construction (basalt or granite): : ﻣﺑﺎﻧﻲ ﺣﺟر ﻣﻧﺷﺎر أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة
Squared black stone construction 15 cm thickness for the basalt stone base ﺑﻧﺎء ﺣﺟر ﻣﻧﺷﺎر ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
obtained from the project area(basalt or granite) or similar stones. Black stones ﺳم وأن ﺗﻛون15 ﺟراﻧﯾت( ﻣﻧﺷﺎر ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء
have to be tailed, free of the veins and gaps, Rows height not more than 30 cm. ﺳم وان30 اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف ﻻﯾزﯾد ﻋن
Cement mortar solty soil resistance used to be made of 3: 1 (cement: sand) . رﻣل( ﻣﻊ اﻟﺗدرﯾز:)اﺳﻣﻧت3:1 ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ
Starting from the ground level, Wall joints have to be smoothed, recessed واﻟﺗﻛﺣﯾل ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب m3
1.3.1 pointing and then be well cured with water. Fronting and lining stones have to be اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ 5.00
3م
well interconnected using longitudinal stone connecting the entire thickness of .ﻛري( وﻋﻠﻰ ان ﯾﻛون اﻟﻛري ﻣﺗدرج5: رﻣل2.5:اﺳﻣﻧت:1) ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط
the wall every 2 linear meter, spaces have to be well filled with concrete of(1: وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك اﻟﺣﺎﺋط ﻛل
cement: 2.5 sand: 5 graded aggregate), taking into account the interconnection اﺛﻧﯾن ﻣﺗر طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن
of stones when connecting two walls .All stone works have to be well and ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت
enough spattered with water. Item Price includes building to the design levels . اﻟﻣﮭﻧدس اﻟﻣﺷرف
according to the drawings and specifications and instructions of the supervisor.
The buildings of a stone chair under the Ground beam, in cubic meter:- -:ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
In cubic metres: stone chair buildings under the masonry, thickness of 60 cm, ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر60 ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك: ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
must be made of solid stones free of veins and gaps, and the construction must ,اﻟﺻﻠﺑﺔ واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم
be made with resistant Portland cement, in a ratio of 3:1 (cement: sand), and it رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ: )أﺳﻣﻧت1 :3 ﺑﻧﺳﺑﺔ
must be in a regular and cohesive manner, with good filling of the voids with 7 اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدة
m3
1.4.2 seaming, cementing and filling. The spaces between the face and the lining are ﺳم10 اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ ﻣﻊ ﻋﻣل ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻣﻊ أﺣﺟﺎر ﻣﺗوﺳطﺔ اﻟﺣﺟم ﺑﻣﻘدار 33.60
3م
filled with cement mortar and sprayed for a period of 7 days. The work is carried ﻣن أﺳﻔل اﻟﻠﺣﺟر ﺑﻌد رش اﻷرض ﺑﺎﻟﻣﺎء واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل
out professionally, with ordinary concrete made with medium-sized stones 10 .ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
cm from the bottom of the stone, after spraying the ground with water. The price
includes everything necessary to implement the item, and the work is done
according to the specifications, drawings, and directions of the supervising
engineer.
Hollow concrete Block constructions 20 cm, Automatic in meter square: : أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ
Hollow concrete Block 20 cm thickness, used for external walls and internal ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
partitions and where necessary, using cement mortar: 1: 3 (cement: sieved : 1 وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ,اﻟدراوي و اﻟﻣﻣر اﻻﻣﺎﻣﻲ و اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزم m2
1.3.2 sand),and according to drawings and specifications, and instructions of the . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، ( رﻣل ﻣﻐرﺑل:)اﺳﻣﻧت3 32.00
2م
supervisor
Solid concrete Block constructions 20 cm, Automatic: : أﺗوﻣﺎﺗﯾﻛﻲ، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم
Solid concrete Block 20 cm thickness, used for external walls and where ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ، ﺳم20 ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
m2
1.3.3 necessary, using cement mortar: 1: 3 (cement: sieved sand),and according to طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت، ( رﻣل ﻣﻐرﺑل:)اﺳﻣﻧت3 : 1 وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ,ﯾﻠزم 105.00
2م
drawings and specifications, and instructions of the supervisor. . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،واﻟﻣواﺻﻔﺎت
Total Amount of Masonary and Block Works إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺣﺟر و اﻟﺑﻠوك
1.4 Plastering and Painting Works: : اﻟﺗﻠﺑﯾس واﻟدھﺎن
Notes: -: ﻣﻼﺣظﺎت
1-Plastering using Ordinary Resistant Portland cement to wet. Plastering shall consists of ، ﺗﻠﺑﯾس أﺳﻧﻣﺗﻲ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم ﻟﻸﻣﻼح واﻟرطﺑﺔ ﻣﻛون ﻣن ﺛﻼث طﺑﻘﺎت-1
three layers: - Cement spattering layer 0.5 cm thick for all ceilings and walls with a mortar (1:2:1) ﺳم ﻋﻠﻰ ﺟﻣﯾﻊ اﻷﺳﻘف واﻟﺣواﺋط ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن اﻟﺗﺎﻟﻲ0.5 طﺑﻘﺔ طرطﺷﺔ ﺑﺳﻣك
consisting of (1: 2: 1) A Cement bag: 2 trolley of fine aggregate : 1 trolley of sand. It includes . ﻛﻣﺎ ﯾراﻋﻰ اﻟرش اﻟﻐزﯾز ﺑﺎﻟﻣﺎء ﯾوﻣﯾﺎ ً وﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم. ﻋرﺑﯾﺔ ﻧﯾس: ﻋرﺑﯾﺗﯾن ھﻠﺳن:ﻛﯾس اﺳﻣﻧت
the daily curing with water for five days . ﻧﯾس( وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ: )أﺳﻣﻧت3:1 ﺳم ﺑﻧﺳﺑﺔ2-1.5 و طﺑﻘﺗﻲ ظﮭﺎرة وﺑطﺎﻧﺔ ﺑﺳﻣك
- Two layers ( base coat and finish coat) with a thickness of 1.5-2cm by 3: 1 (Cement: sand) ,
طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت، اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم
It includes the spatter dash, the base layer and the finish layer, and curing with water three
.اﻟﻣﮭﻧدس اﻟﻣﺷرف
times a day, according to the drawings and specifications and instructions of the supervisor. 1-
All the work of plastering Is a cement roughening for all walls, internal ceilings, external
ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﯾﺎض ﺗﺧﺷﯾن إﺳﻣﻧﺗﻲ ﻟﺟﻣﯾﻊ اﻟﺟدران واﻟﺣواﺋط واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟﻣظﻼت.2
umbrellas, parapets and staircases of 3: 1 ratio using dots, Bands , leveling spots and ﻣﻊ اﻟﺑؤج واﻷوﺗﺎر واﻟطوارف واﻟﺧدﻣﺔ ﺑﺎﻟﻣﺣﺎرة ﺑﻌد3:1 اﻟﺧﺎرﺟﯾﺔ واﻟدراوي واﻟﺳﻼﻟم ﺑﻣوﻧﺔ ﺑﻧﺳﺑﺔ
finishing with Plastering trowel after roughing. .اﻟﺗﺧﺷﯾن
2-Roofs and walls must be cleaned of wood , suspended impurities and be cured with water ﯾﺟب ﺗﻧظﯾف اﻷﺳﻘف واﻟﺟدران ﻣن ﻗطﻊ اﻷﺧﺷﺎب واﻟﺷواﺋب اﻟﻌﺎﻟﻘﺔ ورﺷﮭﺎ ﺑﺎﻟﻣﺎء ﻗﺑل أﻋﻣﺎل.3
before plastering. .اﻟﺗﻠﺑﯾس
3-Contractor shall implement a rough cement spattering layer (450 kg cement / m3 rough رﻣل ﺧﺷن أو ھﻠﺳن ( ﻣﻊ3م/ﻛﺟم إﺳﻣﻧت450) ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻧﻔﯾذ طﺑﻘﺔ طرطﺷﺔ إﺳﻣﻧﺗﯾﺔ ﺧﺷﻧﺔ.4
sand or fine aggregate) and curing with water for three days for all internal walls, ceilings, .اﻟرش ﻟﻣدة ﺛﻼﺛﺔ أﯾﺎم ﻟﺟﻣﯾﻊ اﻟﺟدران واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟدراوي واﻟواﺟﮭﺎت
parapets and front walls. ﻣﻠم ﻋﻧد اﻟﺗﻘﺎء اﻟﺟدران اﻟﺑﻠك ﺑﺎﻟﺟدران1ﺳم وﺳﻣك ﻻ ﯾﻘل ﻋن20 ﯾﺟب ﻋﻣل ﺷﺑك ﺣدﯾد ﻋرض.5
4. Steel mesh, width 20 cm and thickness of not less than 1 mm should be used at the اﻟﺣﺟر وﺑﺎﻷﺳﻘف واﻷﻋﻣدة وﻓوق ﻣواﺳﯾر اﻟﻛﮭرﺑﺎء وﯾﺛﺑت ﺑﺎﻟﻣﺳﺎﻣﯾر ﻣن اﻟﺟﮭﺗﯾن ﻗﺑل ﺗﻧﻔﯾذ
meeting of block walls with stone walls, ceilings, columns and covering all electrical and water . اﻟطرطﺷﺔ
pipes. ﯾﺟب اﺳﺗﺧدام اﻷوﺗﺎر ﻓﻲ ﻋﻣﻠﯾﺔ اﻟوزن رأﺳﯾﺎ ً وأﻓﻘﯾﺎ ً وﻋﻣل ﻣﺳﺎطر وﻧﻘﺎط ﺗﺛﺑﯾت واﺳﺗﺧدام اﻟﻘدة.6
5. Bands, rulers, the Aluminum panel and water Balance should be used in the vertically and .واﻟﻣﯾزان وﻓﻘﺎ ً ﻟﻸﺻول اﻟﻔﻧﯾﺔ اﻟﻣﺗﺑﻌﺔ
horizontally plastering leveling process and In accordance with established technical
.ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم أﻋﻣﺎل اﻟﺑؤج واﻷوﺗﺎر ﻟﻠﻣﮭﻧدس اﻟﻣﺷرف ﻗﺑل اﻟﺑدء ﻓﻲ اﻋﻣﺎل اﻟﺗﺄﺳﯾس.7
principles.
ﯾﻌﻣل اﻟﺗﺷطﯾب واﻟﻧﮭو ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻠﺑﯾس ﺑﺎﻟﺷﻛل اﻟﺻﺣﯾﺢ ﻣﻊ ﺿرورة إﻧﮭﺎء اﻟزواﯾﺎ اﻟداﺧﻠﯾﺔ.8
6. Dots & Bands works shall be approved by the supervisor engineer before base works
plastering is started. واﻟﺧﺎرﺟﯾﺔ اﻟﻧﺎﺗﺟﺔ ﻣن ﺗﻘﺎﺑل اﻟﺟدران ﻣﻊ ﺑﻌﺿﮭﺎ أو ﻣﻊ ﻋﻧﺎﺻر اﺧري ﺑﺷﻛل ﺟﯾد واﻻﻋﺗﻧﺎء ﺑﮭﺎ
7. All plastering works have to be properly finished, like finishing the internal and external اﻋﺗﻧﺎء ﺧﺎص ﯾﻧﮭو ﺗﻠك اﻟﺗﻘﺎﺑﻼت ﻣﻊ اﻷﺧذ ﻓﻲ اﻻﻋﺗﺑﺎر إن ﺗﻘﺎﺑل اﻷﺳﻘف ﻣﻊ اﻟﺟدران ﯾﻌﻣل ﺑﺷﻛل
angles resulting from meeting the walls with each other or with other elements like ceilings .(ﺳم1 وﻋﻧد اﻟﺣروف ﻟﻸﻋﻣدة واﻟﺟدران ﯾﺗم ﺷطﻔﮭﺎ,ﺳم5ﻣﺳﺗدﯾر)رﺑﻊ داﺋرة ﻧﺻف ﻗطرھﺎ
which shall be made a round(a quarter of circle 5 cm radius), Edges of columns and walls are .(ﻟﺦ...ﺷﺑﺎﺑﯾك- اﻟﻛﻣﯾﺎت اﻟﻣدرﺟﺔ ﺑﺎﻟﺟدول ﻣﺧﺻوﻣﺔ اﻟﻔﺗﺣﺎت)اﺑواب.9
beveled 1 cm).
Plastering of ceilings, columns and stairs Portland cement : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس اﻟﺳﻘوف
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ﺗﻠﺑﯾس اﻟﺳﻘوف واﻷﻋﻣدة وﺑطن اﻟﺳﻼﻟم ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Portland cement. The item includes: Cement spattering, the base layer and the ﻣﻊ3 : 1 وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ
، واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ،اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم m2
1.4.2 finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be 130.00
used at meeting points of constructions and concrete. All works will be cured .طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 2م
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
Internal Wall Plastering, Portland cement: : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس اﻟﺟدران اﻟداﺧﻠﯾﺔ
Internal Wall plastering to be done using Portland cement, The item includes: ﺗﻠﺑﯾس اﻟﺟدران واﻟﺣواﺋط اﻟداﺧﻠﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Cement Spattering, the base layer and the finish layer are made of cement وﻋﻣل اﻷوﺗﺎر،3 : 1 اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ
mortar of 1: 3 ratio, plastering wire mesh will be used at meeting points of واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ، ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم،واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس m2
1.4.3 constructions and concrete. . طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ 220.00
2م
Dots &bands are used for leveling of plastering. Plastering will be cured with
water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
External plastering: External plastering to be done using Portland cement The : إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس ﺧﺎرﺟﻲ
Item includes Cement spattering using cement mortar of 300kg cement/m3 fine وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ، ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي، ﺗﻠﺑﯾس ﺧﺎرﺟﻲ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
aggregate, base layer and the final layer are made of cement mortar of 1: 3 ، ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ300 ﻣﻛوﻧﺔ ﻣن
m2
1.4.4 ratio. Dots &bands are used for leveling of plastering.spraying with water three ﻣﻊ اﻟرش ﺛﻼث ﻣرات، وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس3 : 1 ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ 227.00
2م
times a day for 5 days. Plastering wire mesh will be used at meeting points of وﺗﻌﻠﯾﻣﺎت،طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت, واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس، ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم
constructions and concrete. Plastering works have to be done according to .اﻟﻣﮭﻧدس اﻟﻣﺷرف
drawings, specifications and instructions of the supervisor.
Colored cement spattering in square meter: ﺗورﯾد وﺗﻧﻔﯾذ رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﻟﻠواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ: رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Supply and implementation of a colored cement workshop for external facades اوﺟﮫ ﺑدون ﻟون و وﺟﮭﯾن ﻣﻊ اﻟﻠون اﻟﻣطﻠوب ﺑﺣﯾث ﯾﺗم2 أوﺟﮫ ﺑﺣﯾث ﯾﻛون4 واﻟﻣظﻼت
and umbrellas 4 sides so that it is 2 faces without color and two sides with the ﺗﻌﺑﺋﺔ اﻟﻔراﻏﺎت و اﻟﺧطوط ﺑﺎﻻﺳﻣﻧت و اﻟﻔواﺻل ﺑﺎﺳﺗﺧدام اداة اﻟرش ﻣﻊ اﻟﻣﺳﺢ و اﻟﺗﻌدﯾل
وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ وﻋﻠﻰ ان ﺗﻛون ﻣواد اﻟرﺷﺔ واﻷﻟون, m2
1.4.5 required color so that the spaces and lines are filled with cement and separators 227.00
using the spraying tool with wiping and modification, and where necessary . ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 2م
according to the attached detailed plans and that the spray materials and colors
are according to the instructions of the supervising engineer.
External plastering with painting by dark color : External plastering to be : ﺣول اﻟﺷﺑﺎﺑﯾك ﻣﻊ اﻟدھﺎن ﺑﻠون ﻏﺎﻣﻖ إﺳﻣﻧت ﺑورﺗﻼﻧدي،ﺗﻠﺑﯾس ﺧﺎرﺟﻲ
done using Portland cement with color thikness 4cm. and 12 cm width The Item ﺳم4 ﻣﻊ اﻟﻠون ﺑﺳﻣﺎﻛﺔ، ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي، ﺗﻠﺑﯾس ﺧﺎرﺟﻲ:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
includes Cement spattering using cement mortar of 300kg cement/m3 fine ﻛﺟم إﺳﻣﻧت300 وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن. ﺳم12 ﺣول اﻟﺷﺑﺎﺑﯾك وﺑﻌرض
aggregate, base layer and the final layer are made of cement mortar of 1: 3 : 1 ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ،ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ
ml
1.4.6 ratio. Dots &bands are used for leveling of plastering.spraying with water three ، ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم، وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس3 116.70
مط
times a day for 5 days. Plastering wire mesh will be used at meeting points of . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت,واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس
constructions and concrete. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.7 Carpentry works (wood, aluminum, iron) : ( ﺣدﯾد، أﻟﻣوﻧﯾوم،أﻋﻣﺎل اﻟﻧﺟﺎرة )ﺧﺷب
Notes: :اﻟﻤﻼﺣﻈﺎت
1- Item prices include sanding, kneading, smoothing and painting work for all wooden elements. . ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد أﻋﻤﺎل اﻟﺼﻨﻔﺮة واﻟﻤﻌﺠﻨﺔ واﻟﺘﻨﻌ ﻢ واﻟﺪﻫﺎن ﻟ ﻞ اﻟﻌﻨﺎ اﻟﺨﺸ ﺔ-1
2- Item prices include the supply of all necessary hardware, including hinges, bolts, and hinges, as well
as on-site installation. Door handles must be of the “ISO” type, made in Italy, or its equivalent.
ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد ﺗﻮر ﺪ ﺟﻤﻴﻊ اﻟﺨﺮدوات اﻟﻼزﻣﺔ ﻣﻦ ﻫﻨﺪرا ﺎت وﻣﻐﺎﻟﻖ وﻣﻔﺼﻼت وﻛﺬا-2
3- Work on iron doors must be done according to the designs, including good sanding, a first layer of . ﻣﻬﺎزر اﻷﺑﻮاب ﺠﺐ أن ﺗﻜﻮن ﻣﻦ ﻧ ع" اﻳﺰو" ﺻﻨﻊ ا ﻄﺎ أو ﻣﺎ ﻌﺎدﻟﻪ.اﻟﻤﻮﻗﻊ اﻟ ﻛ ﺐ
rust-resistant paint, and two layers of acrylic paint in the specified color. ذﻟﻚ اﻟﺼﻨﻔﺮة اﻟﺠ ﺪة وﻃ ﻘﺔ اﻷﺑﻮاب اﻟﺤﺪ ﺪة ﺠﺐ أن ﻳﺘﻢ ﻃ ﻘﺎ ﻟﻠﺘﺼﺎﻣ ﻢ ﻤﺎ اﻟﻌﻤﻞ
-3
4- The aluminum windows must be of the highest quality (excellent), provided that the sections are .دﻫﺎن ﻣﻘﺎوم ﻟﻠﺼﺪأ أو وﻃ ﻘﺘ دﻫﺎن أ ﻠ و ﺎﻟﻠﻮن اﻟﻤﺤﺪد
Saudi and their thickness is not less than 1mm, in a bronze or white color (20 microns) (factory
أﻟﻤﻨﻴﻮم اﻟﻨﻮاﻓﺬ ﺠﺐ أن ﻜﻮن أر ﻧﻮﻋ ﺔ )ﻣﻤﺘﺎز(ﻋ أن ﺗﻜﻮن اﻟﻤﻘﺎﻃﻊ ﺳﻌﻮد ﺔ ﻻ ﺗﻘﻞ-4
corners), and the thickness of the glass is 6mm.
Likewise, the nails used in assembling and connecting aluminum sheets and columns and installing ، ﻣﻢ6 ﻣ ﻜﺮو( )زوا ﺎ ﻣﺼﻨﻊ( و ﻜﻮن ﺳﻤﻚ اﻟﺰﺟﺎج20) ﻠﻮن ﺑﺮوﻧﺰي أو أﺑ ﺾ1mm ﺳﻤﺎ ﺘﻬﺎ ﻋﻦ
the handles, shakers, and shutters are iron nails that are resistant to rust and scratching, or nails ﺗﺠﻤﻴﻊ ور ﻂ ﺻﻔﺎﺋﺢ وﻗﻮاﺋﻢ اﻷﻟﻤﻨﻴﻮم وﺗ ﺒ ﺖ اﻟﻬﻨﺪرا ﺎت وﻛﺬا ﺗﻜﻮن اﻟﻤﺴﺎﻣ اﻟﻤﺴﺘﺨﺪﻣﺔ
coated with nickel-chrome. .واﻟﻤﻬﺎزر واﻟﻤﻐﺎﻟﻖ ﻣﺴﺎﻣ ﺣﺪ ﺪ ﺿﺪ اﻟﺼﺪأ واﻟﺨﺪش أو ﻣﺴﺎﻣ ﻣﻐﻠﻔﺔ ﻤﺎدة اﻟﻨ ﻞ ﻛﺮوم
All sharp edges must be smoothed to avoid injury during use or cleaning as well ﺟﻤﻴﻊ اﻟﺤﻮاف اﻟﺤﺎدة ﺠﺐ أن ﻳﺘﻢ ﺗﻨﻌ ﻤﻪ ﻟﺘﻔﺎدي اﻻﺻﺎ ﺎت ﻋﻨﺪ اﻻﺳﺘﺨﺪام أو اﻟﺘﻨﻈ ﻒ أ ﻀﺎ
5-The window must be fixed 3 times on each side using 5 mm coated nails and at least 7 mm anchors
(dowels or similar). The joints must also be filled with putty. ﻣﻢ واﻟﺨﻮاﺑ ) وﺗﺪ5 ﻣﺮات ﻣﻦ ﻞ ﺟﺎﻧﺐ ﺎﺳﺘﺨﺪام اﻟﻤﺴﺎﻣ اﻟﻤﻐﻠﻔﺔ3 ﺠﺐ أن ﺗ ﺖ اﻟﻨﺎﻓﺬة-5
6 - Samples of doors, windows, and safety nets must be brought to the organization’s administration . وﻛﺬﻟﻚ ﺠﺐ ﻣ ء اﻟﻔﻮاﺻﻞ ﺎﻟﻤﻌﺠﻮن. ﻣﻢ ﻋ اﻷﻗﻞ7 (أو ﻣﺎﺷﺎ ﻪ
To be approved before starting implementation. ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﻣﻧظﻣﺔ- 6
7- Samples of each of the doors, windows, and safety nets must be brought to the company’s .ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ
management for approval before starting implementation.” ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﺷرﻛﺔ ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل-7
.اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ
Wooden strips sec.(1”*4”)-Meranti wood : : ﺧﺷب ﻣﯾراﻧﺗﻲ،(ھﻧش4×1) ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع
Supply and installation of wooden strips for walls, red meranti wood, width not ﻋرض ﻻﯾﻘل، ﻣﯾراﻧﺗﻲ أﺣﻣر، ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران:ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ
less than 10 cm and a thickness of not less than 2.5 cm, finely polished and أوﺟﮭﮫ وﺗﺛﺑت3 ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش2.5 ﺳم وﺑﺳﻣك ﻻ ﯾﻘل ﻋن10ﻋن
painted 3 facets and fixed with screws every 0.50 m and a depth of not less than ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب3 م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن0.50 ﺑﺎﻟﺑراﻏﻲ ﻛل ml
1.7.1 3 cm on walls and be free of defects and cracks. They shall be fixed at 70cm وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول، ﺳم ﻣن أﻷرﺿﯾﺎت70 واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع 63.00
ط.م
from floor level, the other strips are fixed at lintels level of classrooms, وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت,واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ
administration, store, library and laboratory and according to the drawings, . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
specifications and instructions of supervisor engineer.
Aluminum windows: : ﻧواﻓذ اﻟوﻣﻧﯾوم
Square meters: aluminum windows bronze excellent quality and have throat ﻧواﻓذ اﻟوﻣﻧﯾوم ﺑروﻧزي ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
aluminum strip not less than 4×8 cm and aluminum thickness not less than 1.2 ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ1.2 ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن8×4ﻋن
mm and uses a special rubber to seal and prevent the leakage of air or water وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع
and all haberdashery of hinges and shutters be original type and handles Laxis ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ6 وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض ﺑﺳﻣك
اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت( وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ m2
1.7.2 and white glass thickness of 6 mm with and iced glass or wooded invisible (in 21.00
the positions specified in the drawings) and the work of netting mosquito insect وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت،ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل 2م
insect for openable shutters and install the throats from all sides Two fixations ،)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت، ﻣﻊ ﺟﻣﯾﻊ اﻟﺧردوات،اﻟﺧﺎﺻﺔ
on The least, fixing the glass with special calves, with all the haberdashery, .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ.وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
(measurement of internal dimensions) according to the drawings, specifications,
and instructions of the supervising engineer. (A sample must be submitted for
approval.)
Windows protection steel mesh : ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت
Supply and installation of protective grid steel mesh for windows 12 mm / 15 mm and no ﺳم ﺑﯾن12 ﻣم وﺑﻌرض ﻻ ﯾزﯾد ﻋن15/ﻣم12 ﺗورﯾد وﺗﻧﻔﯾذ ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت-:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
more than 12 cm width between main vertical rods and 15 cm between horizontal rods and "ھﻧش واﻟﺗﺛﺑﯾت ﺑواﺳطﺔ اﻟﻠﺣﺎم ﻣن2 ﺳم ﺑﯾن اﻟﻌوارض اﻷﻓﻘﯾﺔ وﺷﻠﻣﺎﻧﺎت داﺋرﯾﺔ15 اﻟﻘواﺋم اﻟرﺋﯾﺳﯾﺔ وﻋن
circular planks 2 " . It will be fixed by welding from all sides. Deman mesh (2.50 x 2.50) cm is (ﺳم ﻟﺣﻣﺎﯾﺔ اﻟزﺟﺎج ﻣن اﻟﻛﺳر واﻟﻘﻣرﯾﺎت وﯾﺷﻣل اﻟرﻧﺞ2.50×2.50) وﺷﺑك دﯾﻣن, ﺟﻣﯾﻊ اﻟﺟواﻧب
m2
1.7.3 installed to protect window glass and yemeni decoration glass ( Gamaria) . The item includes وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳب
2م
28.20
two coats of primer base and three coats of the desired color with sanding, abrasion, .ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
smoothing, and all necessary, according to the instructions of the supervisor.
Gypsum Qamrya: :اﻟﻘﻣرﯾﺎت
supply and install Gypsum Qamrya studded with colored glass size (1*0.70m) ﻣﺗر( وﺳﻣﺎﻛﺔ0.70*1) ﺗورﯾد وﺗرﻛﯾب ﻗﻣرﯾﺎت ﻣن اﻟﺟص ﻣﻊ اﻟزﺟﺎج اﻟﻣﻠون ﻣﻘﺎس
thickness 5cm approved type, support by appropriate nails, the work must be ﺳم ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﻣﻊ اﻟﺗﺛﺑﯾت اﻟﺟﯾد وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل5 اﻟﻘﻣرﯾﺔ ﻻ ﺗﻘل ﻋن pcs
1.7.4 carried out professionally and the price includes everything necessary to ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس 12.00
ﻋدد
implement the item, and the work must be done according to the specifications, .اﻟﻣﺷرف
drawings, and the directives of the supervising engineer.
Steel Doors (Provide sample to check): .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد رص
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن1.3 ھﻧش ( ﺳﻣك2 × ھﻧش1) اﻟﻣراﺑﯾﻊ
form . Steel angle beam 2” to be welded along the perimeter of the entire door . 2 ﺳم وﺳﻣك20 واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن, "ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل2 دﺋري
Door frame (rectangular section panels )width is not less than 20 cm and ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل
m2
1.7.5 thickness 2 mm with three hinges. The item price Includes the anti-rust paint ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن 6.60
2م
after sanding and well abrasion, two coats of oil paint for door and locks. اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث
Frames are installed before plastering, they have to be fixed to walls by three 16 اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف20 ﻣﻠم وطول
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
Classroom blackboards: :ﺳﺑورات ﺳوداء ﻟﻠﻔﺻول اﻟدراﺳﯾﺔ
Supply and implement cement blackboards by paste and paint size (2.4*1.2m) ﻣﺗر( ﻟون اﺳود1.2*2.4) ﺗورﯾد وﺗﻧﻔﯾذ ﺳﺑورات اﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﻣﻌﺟون واﻟطﻼء ﻣﻘﺎس
chalky black color, with a wooden frame and chalk shelf, the work must be طﺑﺎﺷﯾرﯾﺔ ﻣﻊ اﻟﺑرواز اﻟﺧﺷﺑﻲ وﺟﻠﺳﺎت اﻟطﺑﺎﺷﯾر وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ pcs
1.7.6 carried out professionally and the price includes everything necessary to .ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 3.00
ﻋدد
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
Rainwater drainage pipes : : ﻣواﺳﯾر ﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر
Surface length: Supply and installation of plastic pipes. Medium pressure for ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب ﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﺿﻐط ﻣﺗوﺳط ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗطر pcs
1.7.7 drainage of rainwater. 3 Inches and wall fastening (clip every 1.5 m) according م( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت1.5 ھﻧش واﻟﺗﺛﺑﯾت ﺑﺎﻟﺟدران ﺑﺷﻛل ﺟﯾد )ﻛﻠﯾب ﻛل3 3.00
ﻋدد
to drawings and instructions of the supervisor. . اﻟﻣﮭﻧدس اﻟﻣﺷرف
Total Amount of Door and Windows Works إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻷﺑواب و اﻟﻧواﻓذ
1.8 Electricity Works اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ
Notes : ـ:ﻣﻼﺣظﺎت
- All materials and accessories must be of the highest quality and conform to international standards. . ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ اﻟﻌﺎﻟﻣﯾﺔ-
- All electrical work items will include supply of materials, installation, testing and commission. Internal wiring for all
ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون اﻟﺗﻣدﯾدات داﺧﻠﯾﺔ-
networks shall be concealed inside plastic conduits of PVC type, conforming to British specifications BS-4607 and
shall have electrical insulation resistance of more than 100 Mega ohm.
وأنBS-4607 وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔPVC ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺷﺑﻛﺎت داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع
Independent conduits for each electric circuit shall be used with a diameter not less than 20 cm. Flexible metal ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ. ﻣﯾﺟﺎ أوم100 ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر ﻣن
conduits shall be used to protect wires and movable cables, such as connections of devices and motors and at ﺳم وﺗﺳﺗﻌﻣل اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ20 ﺑﻘطر ﻻ ﯾﻘل ﻋن
the expansion joints of the building, if any. No visible wiring is accepted , The contractor will bear responsibly of وﻻ ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات,.ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد ﻓواﺻل اﻟﺗﻣدد ﻟﻠﻣﺑﻧﻰ إن وﺟدت
any mistakes in the installation and shall re-install them properly . The wiring for each network must be ﻛﻣﺎ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات ﻟﻛل. اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل ﺑﺎﻟﺷﻛل اﻟﺳﻠﯾم
independent of each other (Electrical lighting network, electrical sockets network, telephone network, computer ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر- ﺷﺑﻛﺔ اﻟﺗﻠﻔون- ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ- ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة اﻟﻛﮭرﺑﺎﺋﯾﺔ
network, fire, television, etc.). They are not allowed to be mixed in conduits , partitions or boxes. A minimum
ﻛﻣﺎ ﯾﺟب, ﺗﻠﻔزﯾون وﻏﯾرھﺎ ( وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت واﻟﻌﻠب، ﺣرﯾﻖ،ﻛﻣﺑﯾوﺗر، _
distance of 40 cm should be considered between the power network and the computer and telephone networks. -
The circular and squared assembly boxes used for the switches shall be made of good plastic, Fire resistant and
. ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون40 ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ ﺗﻘل ﻋن
comply with the British specifications BS4662, VDE-3676 and shall have special covers to prevent penetration of ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد واﻟﻣﻘﺎوم ﻟﻠﺣرﯾﻖ-
moisture and insects. Those boxes will be made by the same factory which manufactured the electrical pipes, All ﻋﻠﻰ أن ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ ﺗﻣﻧﻊ ﺗﺳربBS-4662 ، VDE-3676 وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ
sockets shall comply with (IEC 60889, 60309) specifications. اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و ﯾﺟب أن ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ
- The contractor must submit the drawings which illustrate all electrical installations , path of pipes , places of the (IEC 60889, 60309) ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ
circuit breakers and electrical boards before starting any work for approval by the Engineer ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم رﺳوﻣﺎت ﺗوﺿﯾﺣﯾﺔ ﺗﺑﯾن ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت اﻟﻛﮭرﺑﺎﺋﯾﺔ وﻣﺳﺎر اﻟﻣواﺳﯾر وأﻣﺎﻛن اﻟﻘﺳﺎﻣﺎت-
Submitting the As built drawings and bear the cost to the item prices.
وﻟوﺣﺎت اﻟﻛﮭرﺑﺎء ﻗﺑل اﻟﺑدء ﺑﺄي أﻋﻣﺎل ﻟﻼﻋﺗﻣﺎد ﻣن ﻗﺑل اﻟﻣﮭﻧدس
- The electrical circuits of 13A socket are the same of lighting, but that number of sockets does not exceed 6
sockets in the circuit and its wiring is (2.50) mm square. - Each socket of 20A or heater shall have an independent
( وﺗﺣﻣﯾل ﺗﻛﻠﻔﺗﮭﺎ ﻋﻠﻰAs Builte Drawing) وﻋﻣل رﺳوﻣﺎت ﻟﻣﺎ ھو ﻣﻧﻔذ ﺑﺣﺳب ﻣراﺣل ﺗﻧﻔﯾذ اﻷﻋﻣﺎل
circuit, wire (4 mm square), pipe, and circuit breakers. - When connecting wires to each other regular connections . أﺳﻌﺎر اﻟﺑﻧود
are used like connecters. 2.50 ) ﺑﻧﻔس طرﯾﻘﺔ اﻹﻧﺎرة ﺑﺣﯾث ﻻ ﺗزﯾد ﻋدد اﻟﻣﺂﺧذ ﻋن ﺳﺗﺔ ﻣﺂﺧذ ﻓﻲ اﻟداﺋرة وأﺳﻼﻛﮭﺎ13A دواﺋر اﻟﻣﺂﺧذ-
- The executive plan of each area shall be attached to the boards of this area in a way that does not corrode or .( ﻣﻠم ﻣرﺑﻊ
affected by water. ﻣﺎﺳورة وﻗﺎطﻊ،( ﻣﻠم ﻣرﺑﻊ4 ) أو ﺳﺧﺎن داﺋرة ﻣﺳﺗﻘﻠﺔ ﺳﻠك20A ﻛل ﻣﺄﺧذ-
- Samples must be submitted for all materials prior to installation. The Contractor shall bear all responsibility and connecters ﻋﻧد اﻻﺣﺗﯾﺎج إﻟﻰ ﺗوﺻﯾل اﻷﺳﻼك ﻣﻊ ﺑﻌﺿﮭﺎ ﺗﺳﺗﺧدم ﺗوﺻﯾﻼت ﻧظﺎﻣﯾﺔ ﻛﻧﻛﺗرات-
cost of supply before the sample is approved by the Consultant. The
.ﯾﺗم إﻟﺻﺎق اﻟﻣﺧطط اﻟﺗﻧﻔﯾذي ﻟﻛل ﻣﻧطﻘﺔ داﺧل اﻟﻠوﺣﺎت اﻟﺧﺎﺻﺔ ﺑﮭذه اﻟﻣﻧطﻘﺔ ﺑطرﯾﻘﺔ ﻻ ﺗﺗﺂﻛل وﻻ ﺗﺗﺄﺛر ﺑﺎﻟﻣﺎء-
Consultant shall be entitled to reject any quantities installed or supplied before approval.
- All wires in the distribution boards shall be numbered according to the circuits numbers with plastic numbers ﯾﺟب ﺗﻘدﯾم ﻋﯾﻧﺎت ﻟﺟﻣﯾﻊ اﻟﻣواد ﻗﺑل اﻟﺗﻧﻔﯾذ واﻟﺗرﻛﯾب وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳؤوﻟﯾﺔ وﺗﻛﻠﻔﺔ اﻟﺗورﯾد ﻗﺑل-
designated for this purpose. These numbers will be pasted inside the switches and sockets. .اﻋﺗﻣﺎد اﻟﻌﯾﻧﺔ ﻣن ﻗﺑل اﻹﺳت ﺷﺎري وﯾﺣﻖ ﻟﻼﺳﺗﺷﺎري رﻓض أي ﻛﻣﯾﺎت ﯾﺗم ﺗﻧﻔﯾذھﺎ أو ﺗورﯾدھﺎ ﻗﺑل اﻋﺗﻣﺎدھﺎ
-All wires and cables to be made of copper with a conductivity of at least ﯾﺗم ﺗرﻗﯾم ﺟﻣﯾﻊ اﻷﺳﻼك ﻓﻲ ﻟوﺣﺎت اﻟﺗوزﯾﻊ اﻟﻔرﻋﯾﺔ وﻓﻘﺎ ﻷرﻗﺎم اﻟدواﺋر ﺑﺄرﻗﺎم ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﺧﺻﺻﺔ ﻟﮭذا-
99%and manufactured according to the specifications of the International .اﻟﻐرض وﯾﺗم ﻋﻣل ھذه اﻷرﻗﺎم داﺧل اﻟﻣﻔﺎﺗﯾﺢ و اﻟﻣﺂﺧذ
Electricity Authority (IEC-28). Connectors and cables of motor and the like shall be flexible type to resist vibrations. ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ ﻣوﺻﻼت اﻷﺳﻼك واﻟﻛواﺑل ﻣﺻﻧوﻋﺔ ﻣن اﻟﻧﺣﺎس اﻟذي ﻻ ﺗﻘل ﻣوﺻﻠﯾﺗﮫ-
These cables and wires must be 1000/600 volts, with suitable sections and capacity. The standard colors of wires ( وﺗﻛون ﻣوﺻﻼتIEC-28) وﻣﺻﻧﻊ طﺑﻘﺎ ﻟﻣواﺻﻔﺎت ھﯾﺋﺔ اﻟﻛﮭرﺑﺎء اﻟدوﻟﯾﺔ%99 ( ﻋنConductivity)
and cables must be adhered. (red, yellow, blue) for power, black for neutral ,(green, green and yellow) for ground,
و ﯾﺟب أن ﺗﻛون ھذه اﻟﻛﺎﺑﻼت. وﻛﺎﺑﻼت اﻟﻣﺣرﻛﺎت وﻣﺎ ﺷﺎﺑﮫ ﻣن اﻟﻧوع اﻟﻣﺷﻌر اﻟﻣرن ﻟﺗﺣﻣل اﻻھﺗزازات
so that, there is no confusion between multiple wires. -Testing: Operation of all electric equipment, fittings,
insulated circuits, insulated cables, all main and subsidiary circuit breakers, earthing. ﻓوﻟت وﺑﻣﻘﺎطﻊ واﺳﺗطﺎﻋﺎت ﺗﯾﺎرﯾﮫ ﻣﻧﺎﺳﺑﺔ1000/600 واﻷﺳﻼك ﻣن ﻓﺋﺔ
- Wiring through wall should be made vertically. It is strictly forbidden to break walls horizontally. ، أزرق (ﻟﻠﻔﺎزات أﺳود ﻟﻠﺣﯾﺎدي )أﺧﺿر، أﺻﻔر،وﯾﺟب اﻻﻟﺗزام ﺑﺎﻷﻟوان اﻟﻘﯾﺎﺳﯾﺔ ﻟﻸﺳﻼك واﻟﻛﺎﺑﻼت )أﺣﻣر
-Testing: All electric equipment , fittings, insulated circuits, insulated cables, all main and sub circuit breakers, and أﺧﺿر وأﺻﻔر(ﻟﻸرﺿﻲ ﺑﺣﯾث ﻻ ﯾﻧﺷﺄ اﻟﺗﺑﺎس ﺑﯾن اﻷﺳﻼك اﻟﻣﺗﻌددة
earthing have to be operationalized - Work includes the installation of plastic pipes (PVC) of orange color for , ﺟﻣﯾﻊ اﻟﻘواطﻊ اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ, ﻋﺎزﻟﯾﮫ اﻟﻛﺎﺑﻼت, ﻋﺎزﻟﯾﮫ اﻟدواﺋر, ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻷﺟﮭزة واﻟﺗرﻛﯾﺑﺎت: اﺧﺗﺑﺎر-
ceilings and black for walls with diameters ¾” & 1”, which to be placed before wiring. Wiring to be manufactured اﻟﺗﺄرﯾض
of copper 2.5 mm high quality, insulated by plastic material with the boxes size (7 cm × 7 cm) and junction points. . وﯾﻣﻧﻊ ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﻟﺗﻛﺳﯾر ﻓﻲ اﻟﺟدران ﺑﺷﻛل أﻓﻘﻲ.. ﯾراﻋﻰ أن ﺗﻛون ھذه اﻟﺗﻣدﯾدات رأﺳﯾﮫ--
- Work includes all installations from the distribution board to the distribution boxes with wires 2.5 mm and 4 mm
ﯾﺟب ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻟﻣﻌدات اﻟﻛﮭرﺑﺎﺋﯾﺔ واﻟﺗﺟﮭﯾزات واﻟدواﺋر اﻟﻣﻌزوﻟﺔ واﻟﻛﺎﺑﻼت اﻟﻣﻌزوﻟﺔ وﺟﻣﯾﻊ: اﻻﺧﺗﺑﺎر-
- At the intersection of a water line or a sewage line with the path of an electrical cable, the power cable should be
above and not below the installation ( ﺑﺎﻟﻠون اﻟﺑرﺗﻘﺎﻟﻲPVC) ﯾﺷﻣل اﻟﻌﻣل ﺗرﻛﯾب اﻷﻧﺎﺑﯾب اﻟﺑﻼﺳﺗﯾﻛﯾﺔ- ﻗواطﻊ اﻟداﺋرة اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ واﻟﺗﺄرﯾض
- The item includes everything necessary ﯾﺻﻧﻊ اﻻﺳﻼك ﻣن. واﻟﺗﻲ ﯾﺟب وﺿﻌﮭﺎ ﻗﺑل ﺗوﺻﯾل اﻷﺳﻼك، "1 &" ¾ ﻟﻸﺳﻘف واﻷﺳود ﻟﻠﺟدران ﺑﺄﻗطﺎر
to carry out the work to the fullest according to the attached technical specifications and engineering drawings and . ﺳم( وﻧﻘﺎط اﻟوﺻل7 × ﺳم7) ﻣم ﺑﺟودة ﻋﺎﻟﯾﺔ وﻣﻌزوﻟﺔ ﺑﻣﺎدة ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺣﺟم اﻟﺻﻧﺎدﯾﻖ2.5 ﻧﺣﺎس
the instructions of the supervisor ﻣم4 ﻣم و2.5 ﯾﺷﻣل اﻟﻌﻣل ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت ﻣن ﻟوﺣﺔ اﻟﺗوزﯾﻊ إﻟﻰ ﺻﻧﺎدﯾﻖ اﻟﺗوزﯾﻊ ﺑﺄﺳﻼك-
ﯾﺟب أن ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ، ﻋﻧد ﺗﻘﺎطﻊ ﺧط اﻟﻣﯾﺎه أو ﺧط اﻟﺻرف اﻟﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ-
وﻟﯾس أﺳﻔل اﻟﺗرﻛﯾب
ﯾﺗﺿﻣن اﻟﻌﻧﺻر ﻛل ﻣﺎ ھو ﺿروري ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻋﻠﻰ أﻛﻣل وﺟﮫ ﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ اﻟﻣرﻓﻘﺔ واﻟرﺳوﻣﺎت-
ﯾﺟب أن، ﻋﻧد ﺗﻘﺎطﻊ ﺧط ﻣﯾﺎه أو ﺧط ﺻرف ﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ- اﻟﮭﻧدﺳﯾﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف
.ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ و ﻟﯾس ﺗﺣت اﻟﺗﺛﺑﯾت
Socket 13 A: : A 13 ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة
Supply and installation of a socket 13A with a switch, It shall be concealed ﯾرﻛب داﺧل اﻟﺣﺎﺋط،( ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗشA 13 ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة:ﺑﺎﻟﻌدد
inside the wall with all requirements of black PVC conduits which will be bent in _( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲPVC) ﻣﻊ ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء
pcs
1.8.1 the bending points using spiral spring, wires and boxes. Screws are used for واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ، وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ،ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ 6.00
ﻋدد
fixation. Item includes all connection to the distribution board according to . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،اﻟﺗوزﯾﻊ
drawings and specifications , And the supervisor's instructions.
Economical ceiling fans: : ﻣراوح ﺳﻘف اﻗﺗﺻﺎدﯾﺔ اﻹﺳﺗﮭﻼك
In number: Supply and installation of economical ceiling fans that operate on the ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺳﻘف اﻗﺗﺻﺎدﯾﺔ ﺗﻌﻣل ﻋﻠﻰ ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ ﻧوع: ﺑﺎﻟﻌدد
solar energy system, excellent type, with the switch and all supplies, and ﻣﻣﺗﺎز ﻣﻊ اﻟﻣﻔﺗﺎح وﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر pcs
1.8.2 connection to the electrical outlet, including plastic pipes for making electrical اﻟﺑﻼﺳﺗﯾﻛﯾﺔ ﻟﻌﻣل اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس 6.00
ﻋدد
installations and everything necessary according to the specifications, .وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
standards, and instructions of the supervising engineer.
12 line electrical distribution board: وات10 وﺣدة اﺿﺎءة اﻗﺗﺻﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻛروي
In number: Sub-distribution panel (single phase) Crabtree or its equivalent with واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﺗواﺑﻊ2D وات10 وﺣدة اﺿﺎءة اﻗﺗﺻﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻛروي: ﺑﺎﻟﻌدد
a cupboard installed inside the wall with 12 lines, according to the drawings, واﻟﺗﻰPVC "4/3 اﻟﻼزﻣﮫ ﻟﯾﺻﺑﺢ اﻟﺑﻧد ﺟﺎھزا ﻟﻠﻌﻣل وﻣﻧﮭﺎ ) ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ اﺳود pcs
1.8.3 specifications, and instructions of the supervising engineer. ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وﺗﻐطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ 15.00
ﻋدد
. وﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت. اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ
Supply and installation of a regular lighting unit with a hemispherical : ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي
cover: ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي وﺗﺷﻣل اﻟﻣﻔﺗﺎح:ﺑﺎﻟﻌدد
In numbers: Supply and installation of a regular lighting unit with a hemispherical ،( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞPVC) واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء pcs
1.8.4 cover, including the switch and black plastic pipes (PVC). It is bent - in the واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ 4.00
ﻋدد
bending areas - using spring, which is placed before casting, the cans and their . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ
covers, and fixed with screws and wires from the point to the distribution panel,
according to the drawings and specifications, and the instructions of the
Total Amount of Electricity Works إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ
Steel Doors(Sample needed to be check): .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد رص
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن1.3 ھﻧش ( ﺳﻣك2 × ھﻧش1) اﻟﻣراﺑﯾﻊ
form . Steel angle beam 2” to be welded along the perimeter of the entire door . 2 ﺳم وﺳﻣك20 واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن, "ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل2 دﺋري
Door frame (rectangular section panels )width is not less than 20 cm and ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل
ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن m2
2.8 thickness 2 mm with three hinges. The item price Includes the anti-rust paint 22.00
after sanding and well abrasion, two coats of oil paint for door and locks. اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث 2م
Frames are installed before plastering, they have to be fixed to walls by three 16 اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف20 ﻣﻠم وطول
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
Supply and installation of a single fluorescent lighting unit, 120 cm, 40 : وات40 ﺳم120 ﺗورٌ د وﺗرﻛٌب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد
watts: 40 ﺳم120 ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد: ﺑﺎﻟﻌدد
In number: Supply and installation of a single fluorescent lighting unit, 120 cm 40 ( واﻟﺗﻲ ﺗوﺿﻊPVC) وات ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ
pcs
2.9 It comes with the key and includes plastic pipes (PVC) which are placed ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطﯾﺗﮭﺎ وﻣﺳﺎﻣﯾر اﻟﻘﻠووظ واﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ 16.00
ﻋدد
Before molding, cans and their lids are secured with screws and wires .ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
From the point to the distribution board according to the specification and
standards and with the instructions of the site engineer.
Supply and installation of a regular outdoor lighting unit with a semi-oval : "ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي
cover: ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل:ﺑﺎﻟﻌدد
In numbers: Supply and installation of a regular external lighting unit with a semi- ( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدامPVC) اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء
واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك،اﻻﺳﺑرﻧﺞ pcs
2.10 oval cover, including the switch and black plastic pipes (PVC). It is bent - in the 9.00
bending areas - using spring, which is placed before pouring. The cans and their . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ ﻋدد
covers are fixed with screws and wires from the point to the distribution panel,
according to the drawings, specifications, and with the instruction of site
engineer.
Ceiling fans: : ﻣراوح ﺳﻘف
In number: Supply and installation of fans fixed to the ceilings, excellent type, ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺗﺛﺑت ﺑﺎﻟﺳﻘوف ﻧوع ﻣﻣﺗﺎز اﺗوﻣﺎﺗﯾﻛﻲ ﻧظﺎﻣﯾن طﺎﻗﺔ ﺷﻣﺳﯾﺔ: ﺑﺎﻟﻌدد
automatic, two systems solar energy and electricity systems, with the switch and وﻛﮭرﺑﺎء ﻣﻊ اﻟﻣﻔﺗﺎح وﺟﻣٌﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻٌﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر
all supplies, and connection to the electrical outlet, including plastic pipes, which واﻟﺑﻼﺳﺗﯾﻛﯾﺔ واﻟﺗﻲ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطٌﯾﺗﮭﺎ وﺗﺛﺑٌﯾﺗﮭﺎ واﻟﻣﺳﺎﻣﯾر اﻟﻘﺎﻟووظ
pcs
2.11 are placed before pouring, cans and their covers, and fixed with screws and واﻟﺗﺳﻠﯾك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ وﯾﺗم اﻋﺗﻣﺎد اﻟﻌﯾﻧﮫ ﻣن ﻗﺑل ادارة اﻟﻣﺷروع واﻟﺛﻣن 8.00
ﻋدد
wires from the point to the distribution panel. The sample is approved by the .◌ٌ ﯾﺷﻣل ﻛل ﻣﺎ ٌﯾﻠزم ﻻﻧﮭﺎء اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾٌﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
project management, and the price includes everything. What is necessary to
complete the work according to the specifications and instructions of the
supervising engineer..
12 line electrical distribution board: : ﺧط12 ﻟوﺣﺔ ﺗوزﯾﻊ ﻛﮭرﺑﺎﺋﯾﺔ
In number: Sub-distribution panel (single phase) Crabtree or its equivalent with ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ ﺗوزﯾﻊ ﻓرﻋﯾﺔ )طور اﺣﺎدي( ﻛراﺑﺗري أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ ﺑدوﻻب:ﺑﺎﻟﻌدد
pcs
2.12 a cupboard installed inside the wall with 12 lines, according to the drawings, طﺑﻘﺎ ً ﻣﻊ ﻋﻣل اﻟﺗﻣدﯾدات اﻟﻼزﻣﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب، ﺧط12 ﺗرﻛب داﺧل اﻟﺣﺎﺋط 1.00
ﻋدد
specifications, and instructions of the supervising engineer. .اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
Mosaico tiles, 30 x 1.2 m, with broken marble, automatic (for stairs) in : أﺗوﻣﺎﺗﯾﻛﻲ)ﻟدرج اﻟﺳﻠم( ﺑﺎﻟﻌدد، ﺑﻛﺳر اﻟرﺧﺎم، م1.2×.30 ﺑﻼط ﻣوزاﯾﻛو
numbers: ، ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض، ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ، ﺳم3 وﺳﻣك، م1×.30 ﺑﻼط ﻣوزاﯾﻛو
Mosaico tiles, 30 x 1, 3m and 3 thick, with automatic marble breakage, with وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ،وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس( ﺗﺣﺗﮫ, وﻣوﺣد اﻟﻠون
white cement, uniform colour, including a bed of holsun or sand (gneiss) واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ، ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض3 : 1 ﺑﻧﺳﺑﺔ pcs
2.23 underneath, and placed on cement mortar in a ratio of 1:3 with the joints 12.00
وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف،طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت.ﻓﻲ اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب ﻋدد
impregnated with white cement, and scouring, smoothing and mechanical
polishing on site. After installation. According to the drawings, specifications,
and instructions of the supervising engineer
Supply and install main gate according to drawings. The price includes: -:ﺗورﯾد وﺗرﻛﯾب ﺑواﺑﺔ رﺋﯾﺳﯾﺔ ﻛﺎﻣﻠﺔ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﺛﻣن ﯾﺷﻣل اﻷﺗﻲ
1- Graded hardcore iron gate of …3.00…..x…2.50….m, according to the م ﺑﺣﺳب..3.00.......×...2.50..... ﺑواﺑﺔ ﻣن اﻟﺣدﯾد اﻟرص واطﺎر ﺷﻠﻣﺎن زاوﯾﺔ-1
drawings .اﻟرﺳوﻣﺎت
2- Light reinforced concrete layer 20cm, below the door swing, with 5 Ø 8mm/m م/ﻣم8Ø5 ﺳم أﺳﻔل ﻣﺣﺎور اﻟﺑﺎب ﺑﺗﺳﻠﯾﺢ20 طﺑﻘﺔ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﺗﺳﻠﯾﺢ ﺧﻔﯾف ﺳﻣك-2
in both directions, incl.20 cm hardcore layer. .ﺳم20 ﻓﻲ ﻛﻼ اﻹﺗﺟﺎھﯾن ﺑﺎﻻﺿﺎﻓﺔ إﻟﻰ طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺳﻣك
Lum
2.24 3- Excavation for column footing 100 x 100 x 90cm. ﺳم90×100×100 ﺣﻔر ﻟﻘواﻋد اﻷﻋﻣدة ﺑﺄﺑﻌﺎد-3 1.00
Sum
4- Plain concrete layer of 10 cm for foundation. . ﺳم أﺳﻔل اﻷﺳﺎﺳﺎت10 ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣك-4
5- Reinforced concrete for foundation 80 x 80 x 40cm, with 8 Ø 14. .م/ﻣم14Ø8 ﺳم وﺗﺳﻠﯾﺢ40×80×80 ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﻘواﻋد ﺑﺄﺑﻌﺎد-5
6- 2 columns 40 x 40 x 340cm, reinforcement 8Ø 14 and 5 Ø 8 ea m, incl. cap- واﻟﺗﻠﺑﯾس واﻟدھﺎن. م/ﻣم10Ø3 م و ﻛرﻧﯾش ﺑﺗﺳﻠﯾﺢ/ﻣم14Ø8 ﺗﻧﻔﯾذ ﻋﻣودﯾن ﺑﺗﺳﻠﯾﺢ-6
tie-beam,reinforced with 3 Ø 10. All plastered and painted with 3 coats of water ﺑﺣﺳب اﻟرﺳوﻣﺎت و ﺗﻌﻠﯾﻣﺎﺗﺎﻟﻣﮭﻧدس, طﺑﻘﺎت ﻣن اﻟدھﺎن اﻷﻣﻠﺷن اﻟﻣﻘﺎوم ﻟﻠرطوﺑﺔ3 ﻟﻠﻛل ﺑـ
resistant emulsion paint. .اﻟﻣﺷرف
Total summation اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة اﻟﺗﺄھﯾل ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح
ﺣﻣﺎﻣﺎت2 ﺑﻧﺎء
3
Building of Two bathroom
Backfill around foundations, Bathrooms and areas that need to be: : اﻟردم ﺣول أﺳﺎﺳﺎت اﻟﺣﻣﺎﻣﺎت واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك
Backfill with valid and clean soil mixed with graded fractions stones resulted اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول:ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب
from site excavations or brought from outside to be filled around the foundations اﻷﺳﺎﺳﺎت وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ
as well as inside the building on layers not more than 30 cm using mechanical ﺳم أوﻻ ً ﺑﺄول ﻣﻊ اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و30 ﺗزﯾد ﻋﻠﻰ
compactor, curing with water to achieve the appropriate strength and get a اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ
cohesive soil according to the specified levels. Carry out compacting of narrow ﻣﻊ ﻋدم اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ اﻟﻣوﻗﻊ,ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟرﯾﺔ
areas around foundations and external stone walls, causing no damage to the وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك,
m3
3.1.2 works implemented in the site, and transfer of excess dump soil to public dumps اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن 6.50
3م
off site. Safe roads for trolleys to transfer materials and equipment used for اﻟﻣﺧﻠﻔﺎت اﻟﻧﺎﺗﺟﺔ ﻋن اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات ﻋﻠﻰ ﺳﻼﻣﺗﮫ
implementation within the site to be prepared. Before project handover, site has ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول
to be free of waste resulting from implementation as well as other factors which اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت
may effect the project safety in future like landslides of various types and others, . واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
taking in considerations preparation of slopes needed to drain rainwater. The
item includes all the necessary to complete the item in accordance with the
drawings and specifications and instructions of the supervisor..
Pavement bathroom surrounding in square meter: :أرﺻﻔﺔ ﺧﺎرﺟﯾﺔ ﺣول اﻟﺣﻣﺎﻣﺎت ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Supply and construct external side pavement around the building according to اﻟﺛﻣن.ﺗورﯾد وإﻧﺷﺎء أرﺻﻔﺔ ﺧﺎرﺟﯾﺔ ﺣول اﻟﻣﺑﻧﻰ طﺑﻘﺎ ﻟﻠﻣرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس
drawings and/or instructions by the Engineer. The price includes the following ــ.ﺳم20 ــ طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك. ﺳم30 ــ ﺑﻧﺎء ﺣﺟر ﻣرﺑوع ﻋرض:ﯾﺗﺿﻣن اﻟﺗﺎﻟﻲ m2
3.1.3 :Regulated stone walls 30cm thickness, hardcore (crushed stone) layer 20cm ــ ﺑﻼط ﺧرﺳﺎﻧﻲ ﻣﻠون.ﺳم10 ــ طﺑﻘﺔ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣك.ﺳم20 طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك 8.00
2م
thickness, plain concrete layer 10cm thickness, Colored concrete tiles .ﺳم ﻋﻠﻰ ﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﻻﺻﻘﺔ3×30×30
30x30x3cm on cement mortar.
Stairs and ramps for Bathrooms entrance: :إﻧﺷﺎء درج وﻣﯾول ﺧرﺳﺎﻧﻲ ﻣﻊ ﺑﻼط ﻣوزاﯾﻛو ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ
Provide and construct entrance stairs & RAMP for the disabled The price ﺳم وﺑﻌرض5 ﺗورﯾد وإﻧﺷﺎء درج ﻟﻠﻣداﺧل ﻣﻊ رﻣب ﻟﻠﻣﻌﺎﻗﯾن ﻣن اﻟﺑﻼط اﻟﻣوزاﯾﻛو ﺑﺳﻣك
includes the following :hardcore (crushed stone) layer 20cm thickness, - -: ( و اﻟﻌﻣل ﯾﺷﻣل اﻷﺗﻲ3.0 ﻋرض و طول1.2) ﺳم15 ﺳم وإرﺗﻔﺎع اﻟﻘﺎﺋﻣﺔ30 اﻟﻧﺎﺋﻣﺔ
foundations of plain concrete , compacted stone, and squared stones, Terrazzo اﺳﺎﺳﺎت ﻣن اﻟﺟﻌم واﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟر- ,ﺳم20 طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك ml
3.1.4 9.00
tiles (concrete with marble fragments) for stair treads and risers on cement ﺗﻠﺑﯾس ﺑﻼط ﻣوزاﯾﻛو )ﻣطﻌم ﺑﻛﺳر اﻟرﺧﺎم( ﻟﻠﻘواﺋم و اﻟﻧواﺋم ﻋﻠﻰ ﻣوﻧﺔ اﺳﻣﻧﺗﯾﺔ.اﻟﻣرﺑوع ط.م
mortar, inclusive all related works according to drawings and/or instructions of ﻣﻊ اﻟﺟﻠﻲ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﺗﻧﻌﯾم اﻟﺗﺎم و ﻛل ﻣﺎﯾﻠزم ﻷﻧﮭﺎء اﻟﺑﻧد طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت
the Engineer. .وأﺻول اﻟﻌﻣل وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
Total Amount of Flooring & Tiling Work إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت
3.6 Metal, Aluminum & Wood Works: اﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎره
3.6.1 Aluminum windows for bathrooms (special type): :(ﻧواﻓذ اﻟﻣﻧﯾوم ﻟﻠﺣﻣﺎﻣﺎت )ﻧوﻋﯾﺔ ﻗطﺎع ﺧﺎص
supply and install Aluminum windows size (0.6*0.6m) for bathrooms special and ﻗطﺎع ﺧﺎص ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة،ﻣﺗر( ﻟﻠﺣﻣﺎﻧﺎت0.6*0.6) ﺗورﯾد وﺗرﻛﯾب ﻧواﻓذ اﻟﻣﻧﯾوم ﻣﻘﺎس
approved type, support by appropriate nails, closing, install all belongings ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺧواﺑﯾر ﻣﻧﺎﺳﺑﺔ واﻟﺗﻛﺗﯾم وﺗرﻛﯾب ﻣﻠﺣﻘﺎت اﺻﻠﯾﺔ ﻣﻌﺗﻣدة )ﻣﻔﺻﻼت ورﺑﻼت
excellent quality (hands, rapper, nails, ..etc.), the work must be carried out وﻣﺳﻛﺎت وﻣﺳﺎﻣﯾر وﻛل ﻣﺎ ﯾﻠزم( وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد pcs
2.00
professionally and the price includes everything necessary to implement the .وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف ﻋدد
item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.
3.6.2 “Harden iron doors: (a sample must be submitted for approval): :( )وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد رص
Per square meter: Supply and installation of galvanized iron doors (1.0 * 2.2) ( ﻣﺗر ﻣﻊ ﻋﻣل2.2 * 1.0) ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
meters, with the shutter made of square iron (1 inch It is not less than 20 cm ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ1.3 ھﻧش ( ﺳﻣك2 × ھﻧش1) اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ
and 2 mm thick, with three hinges, including anti-rust paint after sanding and 20 واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن, "ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل2 ﻋﻣل ﺷﻠﻣﺎن دﺋري
good grinding of the welding traces, with two other sides of oil paint for the door ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل2 ﺳم وﺳﻣك
pcs
and shutters, provided that the shavings are executed before the paneling work اﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن 2.00
ﻋدد
and the shavings are fixed to the walls at least three points on each side with اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث
iron staples, 16 mm in diameter and 20 cm long, placed inside the stone and 16 اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر
welded accordingly. Directions and instructions of the supervising engineer. .ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف20 ﻣﻠم وطول
"
3.6.3 Steel Doors (Sample needed to approve): .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد رص
Galvanized iron doors, shutter is made of steel tubes - rectangular section (0.8” ( ﻣﻊ ﻋﻣل اﻟدرﻓﮫ2.0 * 0.8) ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
× 2”) , Thickness 1.3 mm, Steel panels are placed together in excellent ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل1.3 ھﻧش ( ﺳﻣك2 × ھﻧش1) ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ
technical form . Steel angle beam 2” to be welded along the perimeter of the ﺳم20 واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن, "ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل2 ﺷﻠﻣﺎن دﺋري
entire door . Door frame (rectangular section panels )width is not less than 20 ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل2 وﺳﻣك pcs
cm and thickness 2 mm with three hinges. The item price Includes the anti-rust ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن 2.00
ﻋدد
paint after sanding and well abrasion, two coats of oil paint for door and locks. اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث
Frames are installed before plastering, they have to be fixed to walls by three 16 اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف20 ﻣﻠم وطول
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
3.6.4 Metal steel mesh for windows: :ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ
supply and install Security steel grills for windows size (0.6*0.6m)approved type, ﻣﺗر( ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﺷﻠﻣﺎﻧﺎت وﻣﺻﺑﻌﺎت0.6*0.6) ﺗورﯾد وﺗرﻛﯾب ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻣﻘﺎس
heavy steel frames and bars, include paint and support by appropriate nails,, the ﻣن اﻟﺣدﯾد اﻟﺟﺎﻓﻲ ﻣﻊ اﻟطﻼء واﻟﺗﺛﺑﯾت ﺑﺧواﺑﯾر ﻣﻧﺎﺳﺑﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل pcs
work must be carried out professionally and the price includes everything .ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف 2.00
ﻋدد
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.
Total Amount of Metal, Aluminum & Wood Works إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎره
3.7 Sanitary Works اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ
Notes: -:ﻣﻼﺣظﺎت
Internal and external drainage works أﻋﻣﺎل اﻟﺻرف اﻟداﺧﻠﻲ واﻟﺧﺎرﺟﻲ
1- All drainage and ventilation pipes shall be UPVC. ( ﻣﻊ أﻏطﯾﺔ ﺗﻧظﯾف ﻗﺎﺑﻠﺔ ﻟﻠﻔك ﻓﻰ اﻷﻛواعUPVC) ﺟﻣﯾﻊ ﻣواﺳﯾر اﻟﺻرف اﻟﺻﺣﻲ واﻟﺗﮭوﯾﺔ ﯾﺟب أن ﺗﻛون ﻧوع-1
All drainage pipes shall have a removeable cleaning cap at the elbow outside the building. . ﺧﺎرج اﻟﻣﺑﻧﻰ
2- The contractor shall construct manholes outside the building if a 90 degree change in flow direction درﺟﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول ﺑﻧﺎء ﻏرﻓﺔ اﻟﺗﻔﺗﯾش ﺧﺎرج اﻟﻣﺑﻧﻰ ﻟﺗﺣﺎﺷﻲ ذﻟك90 إذا ﻛﺎن ﻻﺑد ان ﺗﻛون زاوﯾﺔ ﺗﻐﯾﯾر اﻹﺗﺟﺎه-2
is not avoidable. .ﺳم وﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻠﻘﺎﻋﺔ ﻣﻊ اﻟﺗﻠﺑﯾس اﻷﺳﻣﻧﺗﻲ40×20×20 ﻛل ﻏرف اﻟﺗﻔﺗﯾش ﯾﺗم ﺑﻧﺎءھﺎ ﻣن اﻟﺑﻠك اﻟﺻم ﺑﺄﺑﻌﺎد-3
3- All manholes shall be constructed of solid concrete blocks 20x20x40cm, with 15cm subbase of plain درﺟﺔ45 ﺗﻐﯾﯾر اﺗﺟﺎه اﻟﻣواﺳﯾر ﯾﺟب ان ﯾﺗم ﺑﺎﺳﺗﺧدام رﻛﺑﺗﯾن ﺑزاوﯾﺔ-4
concrete,and cement plaster. . ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ أدوات اﻟﺳﺑﺎﻛﺔ ﻣﻐطﺎة ﺑﺎﻟﻛروم-5
4- Changing the drainage pipe direction shall be done only with two 45 degree elements. ﺗورﯾد وﺗرﻛﯾب ﺻﻧﺎدﯾﻖ طرد ﻟﻠﺣﻣﺎﻣﺎت وﻛل ﻣﺎ ﯾﻠزم-6
5- All fittings and accessories shall be chrome-plated. -:أﻋﻣﺎل اﻟﺗﻐذﯾﺔ
6- Supply & install syphons for WC's with all related works. ﺑﻼﺳﺗﯾك ﻟﻠﺗﻣدﯾداتPVC ﺟﻣﯾﻊ ﻣواﺳﯾراﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ ﻟﻠﻣﯾﺎه ﯾﺟب أن ﺗﻛون ﻣن اﻟﺣدﯾد اﻟﻣﺟﻠﻔن و ﻣواﺳﯾر-1
Water Supply Works: (ﺑوﺷﺎت وﺧﻼﻓﺔ، ﻣﺷﺗرﻛﺎت، -ﻣﺣﺎﺑس، ﻟواﻛﯾر، اﻟداﺧﻠﯾﺔ واﻟﺛﻣن ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﻘطﻊ واﻟﺗوﺻﯾﻼت ﻣن)ﻛﯾﻌﺎن
1- All external water supply pipes shall be galvanized steel and PVC for internal connections . They . ﻛل ﻛﻠﯾﺑﺎت اﻟﺗﺛﺑﯾت ﯾﺟب أن ﺗﻛون ﻣن اﻟﺣدﯾد اﻟﻣﺟﻠﻔن-2
shall be installed concealed. The price includes all required materials. . ﯾﺟب إﺳﺗﺧدام ﺧﯾوط اﻟﻛﺗﺎن ﻓﻲ ﺟﻣﯾﻊ اﻟرﺑطﯾﺎت واﻟﺗوﺻﯾﻼت أو اﻟﻠﺻﻘﺔ اﻟﺑﯾﺿﺎء-3
2- All fixing clips shall be galvanized steel. ﺳﺎﻋﺔ24 ﺑﺎر ﻟﻣدة10 اﻟﺗرﻛﯾب ﯾﺗﺿﻣن ﺗﺟرﺑﺔ ﺷﺑﻛﺔ اﻟﺗﻐذﯾﺔ ﺗﺣت ﺿﻐط-4
3- Connection threats shall be fixed by either using flax or thread-tape. -:ﻣﻼﺣظﺔ ﻋﺎﻣﺔ
4- The installation includes the testing of the complete water supply net under the pressure of 10 bar ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول اﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻠرﺑطﯾﺎت اﻟﻣﺳﺗﺧدﻣﺔ ﻓﻰ ﺗﺛﺑﯾت اﻷدوات اﻟﺻﺣﯾﺔ ﻗﺑل اﻟﺗرﻛﯾب-1
for 24 hours. ﻛل اﻷدوات واﻟﻣواد ﻓﻰ اﻟﺣﻣﺎﻣﺎت وأﺣواض اﻟﻐﺳﯾل. ﺟﻣﯾﻊ اﻟﺣﻧﻔﯾﺎت ﯾﺟب أن ﺗﻛون ﻣﺻﻧوﻋﺔ ﻣن ﻧﯾﻛل اﻟﻛروم-2
General notes: . ﯾﺟب أن ﺗﻛون ﻧظﯾﻔﺔ أﺛﻧﺎء اﻟﺗرﻛﯾب.اﻟﺦ
1- The Contractor shall submit samples for all sanitary fixtures before installation.
2- All internal taps shall be nickel-chrome plated.
Fixtures like toilet bowls, wash basins etc. shall be kept clean during installation.
Steel Doors: (Sample is needed to be provided). .(. ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ: أﺑواب ﺣدﯾد رص
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × 2”) , أﺗورﯾد و ﺗرﻛﯾب ﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد:ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ
Thickness 1.3 mm, Steel panels are placed together in excellent technical form . Steel ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن1.3 ھﻧش ( ﺳﻣك2 × ھﻧش1) اﻟﻣراﺑﯾﻊ
angle beam 2” to be welded along the perimeter of the entire door . Door frame 2 ﺳم وﺳﻣك20 واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن, "ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل2 دﺋري
(rectangular section panels )width is not less than 20 cm and thickness 2 mm with three ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل
m2
4.6 hinges. The item price Includes the anti-rust paint after sanding and well abrasion, two ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن 7.70
2م
coats of oil paint for door and locks. Frames are installed before plastering, they have to اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث
be fixed to walls by three points of each side at least using steel dowels 16 mm 16 اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر
diameter and 20 cm long, planted in wall and welded In accordance with the .ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف20 ﻣﻠم وطول
instruc ons of the supervisor engineer.
Chrome faucets, half-hench: :ﺣﻧﻔﯾﺎت ﻛروم ﻧص ھﻧش
In number: Supply and installation of chrome faucets with a diameter of 1/2", including وﺗﺷﻣل ﺟﻣﯾﻊ اﻟﺗوﺻﯾﻼت اﻟﻼزﻣﺔ،"1/2 ﺗورﯾد وﺗرﻛﯾب ﺣﻧﻔﯾﺎت ﻛروم ﻗطر:ﺑﺎﻟﻌدد pcs
4.8 all necessary connections, hardware, and everything necessary, according to طﺑﻘﺎ ً ﻟﻠﻣواﺻﻔﺎت،واﻟﺧردوات وﻛل ﻣﺎ ﯾﻠزم 5.00
ﻋدد
specifications.
Replace the External & internal sewage extensions include excavation and backfill: :اﺳ ﺪال اﻟﺘﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ و اﻟﺪاﺧﻠ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم
Supply, install, and operate external sewage extensions include excavation and backfill ﺗﻮر ﺪ وﺗﺮﻛ ﺐ و ﺸﻐ ﻞ ﺗﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم ﻤﻮاﺳ
by plastic pipes dim= 6" (0.5 of total pressure) between sewage inspection rooms, ﻫ ﺶ )ﻧﺼﻒ ﺿﻐﻂ(ﺑ ﻏﺮف اﻟﺘﻔﺘ ﺶ ﺣ اﻟﺒ ﺎرة واﻟﻌﻤﻞ ﺸﻤﻞ ﺟﻤﻴﻊ6 ﻼﺳ ﻚ ﻗﻄﺮ
including ventilation pipes (ventilation pipe for each bathroom), the work include ﺳﻢ ﻣﻊ60 ﻣﺎ ﻠﺰم ﻣﻦ ﻗﻄﻊ وﻣﺴﺘﻠﺰﻣﺎت اﻟﺴ ﺎ ﺔ و ﺘﻢ اﻟﺤﻔﺮ ﻌﻤﻖ ﻣﻨﺎﺳﺐ ﻻ ﻘﻞ ﻋﻦ
everything necessary such as fittings, and support on walls by steel clips, excavation ﺿ ﻂ اﻟﻤﻴﻮل وﺗﻜﻮن ﺟﻤﻴﻊ اﻟﻤﻮاد اﺻﻠ ﺔ ﻣﻌﺘﻤﺪة و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ
Lum
4.9 must be at less 60cm and accurate the slope, all items must be excellent quality and ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪسSum 1.00
approved, the work must be carried out professionally and the price includes everything .اﻟﻤ ف
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.
Supply and installation of standard lighting unit with hemispherical cover: : ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي
Supply and installation of a standard lighting unit with a hemispherical cover, ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي وﺗﺷﻣل اﻟﻣﻔﺗﺎح:ﺑﺎﻟﻌدد
include the switch and PVC pipes which can be bent ( at bending points) using ،( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞPVC) واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء
pcs
4.13 spiral spring, pipes are placed before casting .The item shall include boxes and واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ 5.00
ﻋدد
their covers which they shall be fixed with screws as well as wires from the point . وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف، طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت،اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ
to the distribution board according to drawings and specifications.
Total summation اﻹﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة ﺗﺄھﯾل و إﻋﺎدة ﺗرﻣﯾم اﻟﺣﻣﺎﻣﺎت ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح
أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه ارﺿﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح
5
Construction work on a Underground water tank at Bialal bin rabah School
5.1 Site Work : اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم
Notes : -:ﻣﻼﺣظﺎت
1. The contractor shall visit the site before elaboration of the tender and study all ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ
circumstances that surround the site, especially eventually existing slopes at the ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ
site. . ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ
2. During the excavation and in the case of being unable to reach the depth ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود
mentioned in the drawings and/or finding the soil bearing capacity (structural أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل
drawing) in this depth less than the required, the contractor shall contact the ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول
project management. .اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ
5.1.1 Site leveling: :ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ
implement leveling for site dim=(3*3*depth 2.8m) in site this include remove for ﻣﺗر( ﻓﻲ اﻟﻣوﻗﻊ ﻣﻊ2.8 *ﻋﻣﻖ3*3) ﺗﻧﻔﯾذ ﺗﺳوﯾﺔ ﺳطﺣﯾﺔ ﻟﻣوﻗﻊ اﻟﺧزان ﺑﺎﻻﺑﻌﺎد اﻟﺻﺎﻓﻲ
trees, soil, stones, ..etc. from the site giving well level, the price includes واﻟﺳﻌر،اﻟﺦ ﻣن اﻟﻣوﻗﻊ ﺑﺣﯾث ﯾﺻﺑﺢ اﻟﻣوﻗﻊ ﻣﺳﺗوي...ازاﻟﺔ اﻟﺣﺷﺎﺋش واﻟﺗرﺑﺔ واﻻﺣﺟﺎر و
everything necessary to implement the item with the disposal of the resulting ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر m2
materials to a suitable place with no harm or affect agricultural lands, water ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر 20.00
2م
streams and private property, the work must be carried out professionally and ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت
the price includes everything necessary to implement the item, and the work .اﻟﻣﮭﻧدس اﻟﻣﺷرف
must be done according to the specifications, drawings, and the directives of the
5.1.2 supervising engineer.
Soil excavations: :اﻟﺣﻔر اﻟﺗراﺑﻲ
Implement soil excavation dim=(4*4*depth 3.2 m) in ground this include stones ﻣﺗر( ﻓﻲ اﻻرض وﯾﺷﻣل اي اﺣﺟﺎر3.2 *ﻋﻣﻖ4*4) ﺗﻧﻔﯾذ ﺣﻔر ﺗراﺑﻲ ﻟﻠﺧزان ﺑﺎﻻﺑﻌﺎد
mixed with soil reaching valid rock for foundation (rock layer near ground ﻣﺧﺗﻠطﺔ ﺿﻣن اﻟﺗرﺑﺔ ﺣﺗﻰ اﻟوﺻول اﻟﻰ اﻟﺻﺧر اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس )اﻟﺻﺧر ﻗرﯾب ﻣن ﺳطﺢ
surface) using appropriate tools and appropriate support for excavation sides so اﻻرض( وﯾﺗم اﻟﻌﻣل ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﻣﻊ اﻟﺣﻔﺎظ ﻋﻠﻰ اﺳﻧﺎد ﺟواﻧب اﻟﺣﻔر ﺑﺣﯾث ﻻ
as to not cause harm the nearly buildings, the price includes everything ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد m3
10.00
necessary to implement the item with the disposal of the resulting materials to a اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك 3م
suitable place with no harm or affect agricultural lands, water streams and اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب
private property, the work must be carried out professionally and the price .اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
includes everything necessary to implement the item, and the work must be
done according to the specifications, drawings, and the directives of the
5.1.3 Rock excavations: :اﻟﺣﻔر اﻟﺻﺧري
Implement excavations in the rock dim=(4*4*depth 3.2 m) reaching foundation ﻣﺗر( ﺣﺗﻰ اﻟوﺻول اﻟﻰ ﻣﻧﺳوب اﻟﺗﺄﺳﯾس3.2 *ﻋﻣﻖ4*4) ﺗﻧﻔﯾذ ﺣﻔر ﻓﻲ اﻟﺻﺧر ﺑﺎﻻﺑﻌﺎد
level using appropriate tools which will not harm the nearly buildings, the price وﯾﺗم اﻟﻌﻣل ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة واﻟﺳﻌر ﯾﺷﻣل ﻛل
includes everything necessary to implement the item with the disposal of the ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ m3
resulting materials to a suitable place with no harm or affect agricultural lands, اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل 10.00
3م
water streams and private property, the work must be carried out professionally ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس
and the price includes everything necessary to implement the item, and the work .اﻟﻣﺷرف
must be done according to the specifications, drawings, and the directives of the
supervising engineer.
Total Amount of site work إﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم
Total amount of Metal & Wood Works اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﺧﺷﺑﯾﺔ
5.6.1 Rainwater harvesting pipes from ceilings to tank: :اﻧﺎﺑﯾﺑب ﺣﺻﺎد ﻣﯾﺎه اﻻﻣطﺎر ﻣن اﺳطﺢ اﻟﻣدرﺳﺔ اﻟﻰ اﻟﺧزان
Supply and install rainwater harvisting pipe network by plastic pipes UPVC ( ﻟﺗﺻرﯾفUPVC) ﺗورﯾد وﺗرﻛﯾب ﺷﺑﻛﺔ ﺣﺻﺎد ﻣﯾﺎه اﻟﻰ اﻟﺧزان ﺑواﺳطﺔ اﻧﺎﺑﯾب ﺑﻼﺳﺗﯾك
dim=4" (0.5 of full pressure) from the roofs to the ground tank with glow in " )ﻧﺻف ﺿﻐط( ﻣﻊ اﺳﺗﺧدام4 ﻣﯾﺎه اﻷﻣطﺎر ﻣن اﻻﺳطﺢ ﺣﺗﻰ اﻟﺧزان اﻟﺗﺟﻣﯾﻌﻰ ﻗطر
plumbing and fixing on walls by steel clips, the work must be carried out وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ،اﻟﺷﻠك اﻟذاﺋب ﻓﻲ اﻟﺳﺑﺎﻛﺔ ﻣﻊ اﻟﺗﺛﺑﯾت ﻓﻲ اﻟﺟدران ﺑواﺳطﺔ ﻛﻠﯾﺑﺎت ﺣدﯾد ml
professionally and the price includes everything necessary to implement the واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت 30.00
ط.م
item, and the work must be done according to the specifications, drawings, and .اﻟﻣﮭﻧدس اﻟﻣﺷرف
the directives of the supervising engineer.
Total amount of Damp Proofing Works اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟطﺑﻘﺎت اﻟﻌﺎزﻟﺔ
Total of water tank work اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه
With cable rolls wire (The length of the roll is 70 metres) and necessary accessories ﻣ (ﻣﻊ اﻟﺘﻮاﺑﻊ اﻟﻼزﻣﺔ ﻟ ﺸﻐ ﻞ اﻟﻤﻨﻀﻮﻣﺔ70 ﺗﻮر ﺪ ﻋﺪد ﻟﻔﻪ ﺎ ﻼت )ﻃﻮل اﻟﻠﻔﺔ
Roll
7.1.4 needs to operate the system in schools اﻟﻤﺪارس 1.00
ﻟﻔﺔ
- The applicant must attach the data that guarantees the performance of the panels for ﺳﻨﺔ ﺤ ﺚ ﻻ ﺗﻘﻞ ﺴ ﺔ10ﻋ اﻟﻤﺘﻘﺪم ارﻓﺎق اﻟﺒ ﺎﻧﺎت اﻟ ﺗﻀﻤﻦ أداء اﻷﻟﻮاح ل-
10 years, so that the rate of decline in performance is not less than 80% after 25 years, . وﻋ ﺳﻨﻮات ﻷي ﺧـﻠﻞ ﻓ، ﺳﻨﺔ25 ﻌﺪ%80 اﻧﺨﻔﺎض اﻷداء ﻋﻦ
and ten years for any technical defect. %16 اﻟ ﻔﺎءة اﻟﺪﻧ ﺎ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺠﺐ أﻻ ﺗﻘﻞ ﻋﻦ-
The minimum efficiency of solar panels should not be less than 16%. %75 ( ﺠﺐ أﻻ ﻘﻞ ﻋﻦFill Factor) ﻣﻌﺎﻣﻞ اﻟﻤﻸ-
Fill factor must not be less than 75%. ﺠﺐ أن ﺠﻬﺰ ﺼﻨﺪوق ﻗﺎ ﻞ ﻟﻠﻔﺘﺢ ﻟﻮﺻﻞ واﺳ ﺪال اﻟ ﻴ ﻼت ﻋﻨﺪ ﻞ إﻃﺎر ﻟ ح ﺿﻮ-
- Each light panel frame must be equipped with an openable box to connect and replace ﻫﺬا اﻟﺼﻨﺪوق ﺠﺐ أن ﻜﻮن ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت. اﻟﻠﺰوم وﻣﻨﻪ ﻳﺆﺧﺬ ﻣﺨ ج اﻟﻠ ح اﻟﻀﻮ
cables when necessary, from which the light panel output is taken. This box must be و ﺤﺘﻮي اﻟﺼﻨﺪوق ﻋ ﻓﻴﻮازات اﻟﺤﻤﺎ ﺔ،اﻟ ﻄﺎﻧ ﺔ أو ﻣﺎ ﻌﺎدﻟﻬﺎ و ﺘﺤﻤﻞ اﻟﻌﻮاﻣﻞ اﻟﺠ ﺔ
according to British specifications or its equivalent and bear weather factors, and the . ﻣﻦ اﻟﺸﻮرت اﻟ ﻬ ﺎ و اﻟﺘ ﺎر اﻟﻌﻜ
box contains protection fuses from electrical shorts and reverse current. 2018 ﺳﻨﺔ ﺗﺼ ﻴﻊ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ واﻷﻟﻮاح ﺠﺐ أﻻ ﺗﻜﻮن ﻗ ﻞ-
- The year of manufacture of solar cells and panels should not be earlier than 2018 .ﺳﺎﻋﺔ/ ﻢ120 ﻗﻮاﻋﺪ ﺗ ﺒ ﺖ اﻟﻠﻮاﻗﻂ ﻣﺠﻠﻔﻨﺔ وﺗﺘﺤﻤﻞ ﻋﺔ ر ﺎح-
- The bases for fixing the coils are galvanized and withstand a wind speed of 120 km/h. ﻄ ﻘﺔ ﻏ ﻗﺎ ﻠﺔ ﻞ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘﺎﻟ ﺔ ﺠﺐ أن ﺗﻜﻮن ﻣﻨﺤﻮﺗﺔ ﻋ ﻞ ﻟ ح ﺷﻤ-
- All of the following information must be engraved on each solar panel in an indelible :ﻟﻠﻤﺤـﻲ
way: . اﺳﻢ اﻟﺠﻬﺔ اﻟﻤﺼﻨﻌﺔ-
- The name of the manufacturer. اﻟﺮﻗﻢ اﻟ ﺴﻠﺴ ﻟﻠ ح ورﻗﻢ ﻣﻮد ﻠﻪ-
- Serial number and model number of the board ﺷﻬﺮ وﺳﻨﺔ اﻟﺼﻨﻊ-
Month and year of manufacture ﻣﻨﺤ اﻟﺘ ﺎر واﻟﻔﻮﻟﺘ ﺔ-
- current and voltage curve (Peak Wattage) اﻟﻮاﺗ ﺔ اﻟﻘﺼﻮى-
Peak Wattage (Im, Vm and FF) اﻟﺘ ﺎر اﻷﻋﻈ واﻟﺠﻬﺪ اﻷﻋﻈ وﻣﻌﺎﻣﻞ اﻟﻤ-
7.2.6 Note ﻣﻼﺣﻈﺔ
Supply and installation of a Gel battery type C10 - Deep cycle (high quality storage, an ) ﺗﺨ ﻦ ذات ﺟﻮدة ﻋﺎﻟ ﺔ ﻣﺎرﻛﺔC10 - Deep cycle ﻧ عGel ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻄﺎر ﺔ
original brand), where the cell is the main component of the battery. Such as the وﺗ ﺘﺞ اﻟﺨﻠ ﺔ ﻏﺎﻟ ﺎ ﺟﻬﺪا, ﺗﺠﺎر ﺔ أﺻﻠ ﺔ ( ﺣ ﺚ ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﻤﻜﻮن اﻟﺮﺋ ﺴ ﺔ ﻟﻠ ﻄﺎر ﺔ
internal resistance and drain current of the cell. The battery can consist of one cell or و ﻌﺘﻤﺪ ﻣﻘﺪار، ﻓﻮﻟﺖ ﺑ ﻨﻤﺎ اﻷﻣﺒ اﻟﻤﺴﺘﻮﻋﺐ ﻓﻴﻬﺎ ﻳﺘﻐ ﺑﺘﻐ ﻣﺴﺎﺣﺘﻬﺎ2 ﻛﻬ ﺎﺋ ﺎ ﻣﻘﺪارە
several cells, and the common type is six cells (6 cells x 2 volts = 12 volts) - it is of a deep- .ﺷﺤﻦ اﻷﻣﺒ ﻋ ﺧﺼﺎﺋﺺ أﺧﺮى ﻣﺜﻞ اﻟﻤﻘﺎوﻣﺔ اﻟﺪاﺧﻠ ﺔ وﺗ ﺎر اﻻﺳﺘ اف ﻟﻠﺨﻠ ﺔ/ﺗﻔ ــﻎ
cycle type and provided with gel as a medium to transfer the reactions between the ﺧﻼ ﺎ6) واﻟﻨ ع اﻟﺸﺎﺋﻊ ﺳﺘﺔ ﺧﻼ ﺎ،واﻟ ﻄﺎر ﺔ ﻤﻜﻦ أن ﺗﺘﻜﻮن ﻣﻦ ﺧﻠ ﺔ واﺣﺪة أو ﻋﺪة ﺧﻼ ﺎ
lead plates. أن ﺗﻜﻮن ﻣﻦ ﻧ ع ﻋﻤ ﻘﺔ اﻟﺪورة وﻣﺰودة ﻤﺎدة اﻟﺠﻞ ﻛﻮﺳ ﻂ ﻟﻨﻘﻞ- ( ﻓﻮﻟﺖ12 = ﻓﻮﻟﺖx 2
- That the battery production period should not be more than a year. The efficiency of .اﻟﺘﻔﺎﻋﻼت ﺑ أﻟﻮاح اﻟﺮﺻﺎص
charging and discharging is not less than 90% of the charge in the battery. - The number ﻛﻔﺎءة اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﻻ ﺗﻘﻞ. ان ﻻ ﻜﻮن ﻗﺪ ﻣﺮ ﻋ ﻓ ة اﻧﺘﺎج اﻟ ﻄﺎر ﺔ أ ﻣﻦ ﻋﺎم-
of charging and discharging cycles should not be less than 3000 cycles at 50% of the load ﻋﺪد دورات اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﺠﺐ ان ﻻ ﺗﻘﻞ-. ﻣﻦ اﻟﺸﺤﻨﺔ اﻟﻤﻮﺟﻮدة ﺎﻟ ﻄﺎر ﺔ%90 ﻋﻦ
According to the following specifications:- -: ﻣﻦ اﻟﺤﻤﻞ وﻓﻘﺄ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﺔ% 50 دورة ﻋﻨﺪ3000 ﻋﻦ
Moisture-proof iron solar battery base:In number: Supplying a moisture-resistant iron ﺗﻮر ﺪ ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ: ﺎﻟﻌﺪد:ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ
solar battery base (original brand - at least one full year guarantee) and the price ﺿﻤﺎن ﺳﻨﺔ ﺎﻣﻠﺔ ﻋ اﻻﻗﻞ( واﻟﺴﻌﺮ ﺸﻤﻞ- ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ )ﻣﺎرﻛﺔ ﺗﺠﺎر ﺔ أﺻﻠ ﺔ pcs
includes all that is needed to complete the item according to the specifications and .ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﺠﺎز اﻟﺒﻨﺪ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف 2
ﻋدد
instructions of the supervising engineer.
Battery Gel Deep cycle 150Ah : :Deep cycle أﻣﺑﯾر150 ﺑطﺎرﯾﺔ ﺟل
Number: Supply and installation of a 150 amp deep cycle gel battery (original brand -Gel )ﻣﺎرﻛﺔ ﺗﺟﺎرﯾﺔ أﺻﻠﯾﺔDeep cycle أﻣﺑﯾر150 ﺗورﯾد وﺗرﻛﯾب ﺑطﺎرﯾﺔ ﺟل:ﺑﺎﻟﻌدد pcs
ﺿﻣﺎن ﺳﻧﺗﯾن ﻛﺎﻣﻠﺔ ﻋﻠﻰ اﻻﻗل( واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت 2
Gel - full two years warranty at least) and the price includes all necessary according to ﻋدد
.اﻟﻣﮭﻧدس اﻟﻣﺷرف
the attached specifications and instructions of the supervising engineer.
note :- Inverters Supply, installation, commissioning and testing of a String inverter. The word ﻛﻠﻣﺔ, (String inverter ) ﻟﻌواﻛس ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل وإﺧﺗﺑﺎر ﻣﺣول اﻟﻌﻛس: ﻣﻼﺣظﺔ
“Inverter” means reversing the current from DC to alternating current (AC). The direct current comes اﻟﺗﯾﺎر اﻟﻣﺳﺗﻣر,(AC) ( إﻟﻰ ﻣﺗرددDC) ( ﺗﻌﻧﻲ ﻋﻛس اﻟﺗﯾﺎر ﻣن ﻣﺳﺗﻣرInverter) اﻟﻌﺎﻛس
from either batteries or solar panels or both according to the following specifications:-
-:ﻣﺻدره إﻣﺎ ﻣن اﻟﺑطﺎرﯾﺎت أو اﻷﻟواح اﻟﺷﻣﺳﯾﺔ أو ﻛﻠﯾﮭﻣﺎ وﻓﻘﺄ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ
Inverter works in two systems (24V-240V (Hybrid solar inverter) with a capacity of 2500VA: :2500VA ( وﺑﻘدرة24V-240V(Hybrid solar inverter) اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن
Quantity: Supply, installation, commissioning and testing of an inverter operating in two systems 24V-240V(Hybrid solar ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل واﺧﺗﺑﺎر اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن:ﺑﺎﻟﻌدد
24V-240V (Hybrid solar inverter) with a capacity of 2500VA so that it can withstand at least twice ﺑﺣﯾث ﯾﺗﺣﻣل ﻣﺎ ﻻ ﯾﻘل ﻋن ﺿﻌف ﻗدرﺗﮫ ﻟﺑﺿﻊ ﺛواﻧﻲ وذو ﺣﻣﺎﯾﺔ2500VA ( وﺑﻘدرةinverter
its capacity for a few seconds and has an automatic protection that disconnects in the event of an pcs
واﻟﻌﻣل ﯾﺷﻣل%95 وﻛﻔﺎءه ﻻ ﺗﻘل ﻋن.اﺗوﻣﺎﺗﯾﻛﯾﺔ ﯾﻔﺻل ﻓﻲ ﺣﺎل زﯾﺎدة اﻟﺣﻣل او ارﺗﻔﺎع اﻟﺣرارة 1
increase in the load or an increase in temperature. And an efficiency of not less than 95%, and the ﻋدد
work includes everything needed to complete the work, according to the attached specifications
ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﻌﻣل وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
and the instructions of the supervisin
Solar system installation accessories: ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل: ﺑﺎﻟﻣﻘطوﻋﯾﺔ:ﻣﻠﺣﻘﺎت ﺗرﻛﯾب ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ
In the cut: the supply, installation and processing of applications for the supply وإﺧﺗﺑﺎر ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻹﺗﻣﺎم ﺗرﻛﯾب وﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ
and processing of energy - :وﻓﻘﺎ ً ﻟﻠﻧظم واﻟﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ ﻛﻣﺎ ﯾﻠﻲ
1. Two 63 amp circuit breakers. . أﻣﺑﯾر63 ﻗواطﻊ2 ﻋدد.1
2. 1 MCCB breaker, 150 amps. . اﻣﺑﯾر150 ﻗوةMCCB ﻗﺎطﻊ1 ﻋدد.2
3. 3-line assembly box. . ﺧط3 ﺻﻧدوق ﺗﺟﻣﯾﻊ.3
4. 2-line arrester. .ﺧط2 ﻗﺎطﻊ ﺻواﻋﻖ.4 Ls
1
5. amps and amps amps amps. . أﻣﺑﯾر6 أﻣﺑﯾر و20 أﻣﺑﯾر و63 ﺑول2 ﻗواطﻊ ﺣﻣﺎﯾﺔ.5 ﻣﻘطوﻋﯾﺔ
6. A voltage monitor 100 amps 275 volts. . ﻓوﻟت275 أﻣﺑﯾر100 ﻣراﻗب ﻓوﻟﺗﯾﺔ.6
7... DC and AC insulated copper wires with sizes suitable for the amounts of ﻣن اﻟﻧﺣﺎس ﺑﻣﻘﺎﺳﺎت ﻣﻧﺎﺳﺑﺔ ﻟﻛﻣﯾﺎت اﻟﺗﯾﺎر اﻟﻛﮭرﺑﺎﺋﻲ اﻟﻣﺎرAC وDC اﺳﻼك ﻣﻌزوﻟﺔ. .7
electric current passing through them. .ﻓﯾﮭﺎ
And the price includes all the services and accessories required to supply the واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻟﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ
solar energy as required. ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب وﻓﻘﺎ ﻟﻠﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ وان ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت ذات ﺟودة ﻋﺎﻟﯾﺔ وﺧﺎﺿﻌﺔ
ﻟﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف
Total Amount of solar energy system work إﺟﻣﺎﻟﻲ اﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ
Total summation اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ+ إﻻﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ
اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم