You are on page 1of 41

Vision Hope International

‫رؤﯾﺎ أﻣﻞ اﻟﺪوﻟﯿﺔ‬


,Project Name: Enable gender-responsive and inclusive access to safe learning environments, and quality education services for school-aged children in four schools in Hays d district
Hudaydah governorate. Funded by the Yemen Humanitarian Fund (YHF)
‫ ﺗﻤﻮﯾﻞ ﻣﻦ ﺻﻨﺪوق اﻟﺘﻤﻮﯾﻞ اﻹﻧﺴﺎﻧﻲ ﻓﻲ اﻟﯿﻤﻦ‬- ‫ ﺗﻤﻜﯿﻦ اﻟﻮﺻﻮل اﻟﺸﺎﻣﻞ واﻻﺳﺘﺠﺎﺑﺔ اﻟﺴﺮﯾﻌﺔ ﻟﻠﻨﻮع اﻻﺟﺘﻤﺎﻋﻲ إﻟﻰ ﺑﯿﺌﺎت ﺗﻌﻠﯿﻤﯿﺔ آﻣﻨﺔ وﺧﺪﻣﺎت ﺗﻌﻠﯿﻤﯿﺔ ﻋﺎﻟﯿﺔ اﻟﺠﻮدة ﻟﻸطﻔﺎل ﻓﻲ ﺳﻦ اﻟﻤﺪرﺳﺔ ﻓﻲ أرﺑﻊ ﻣﺪارس ﻓﻲ ﻣﺪﯾﺮﯾﺔ ﺣﯿﺲ – ﻣﺤﺎﻓﻈﺔ اﻟﺤﺪﯾﺪة‬:‫اﺳﻢ اﻟﻤﺸﺮوع‬
Project Code: YEM-23-S-INGO-25967 ‫رﻗﻢ اﻟﻤﺸﺮوع‬:

‫ ﻣﺣﺎﻓظﺔ اﻟﺣدﯾدة‬- ‫ ﻣدﯾرﯾﺔ ﺣﯾس‬- ‫ﺟداول اﻟﻛﻣﯾﺎت ﻷﻋﻣﺎل اﻹﻧﺷﺎء و إﻋﺎدة اﻟﺗﺎھﯾل ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬
Estimated cost of construction and rehabilitation work at Bilal School - Hays district - AlHudayda Governorate
‫ﺳﻌراﻟوﺣدة‬
‫م‬ ‫اﻟوﺣدة‬ ‫اﻟﻛﻣﯾﺔ‬ ‫اﻻﺟﻣﺎﻟﻲ ﺑﺎﻟدوﻻر‬
‫ﺑﺎﻟدوﻻر‬
Description ‫ﺑﯾــﺎن اﻻﻋﻣـــــــــــﺎل‬
No. Unit Quantity Price Total price
Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف‬
circumstances that surround the site, especially eventually existing slopes at the site. ‫اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ‬
2. During the excavation and in the case of being unable to reach the depth mentioned in the . ‫ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
drawings and/or finding the soil bearing capacity (structural drawing) in this depth less than ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ أو‬
the required, the contractor shall contact the project management. General Requirement: ‫ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل‬
The Environmental and Social Management Frame work is considered the controlling tool for ‫اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول‬
mitigating environmental and social impacts .And mitigations listed in this are mandatory to be :‫اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ‬.‫ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬
implemented along with the construction, the rehabilitation and maintenance of the schools. ‫ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت‬
The contractor is obliged to take the following measures to decrease impact of maintenance ‫اﻟﻣدرﺟﺔ ﻓﻲ ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل‬
work on the environment and beneficiaries: :‫وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن‬
1.Provide construction site with protection measures (Barriers, fence, portable scaffold ‫ ﻋﻼﻣﺎت اﻟﺗﺣذﯾر )ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص‬،(‫ اﻟﺳﻘﺎﯾل‬،‫ اﻟﺳﯾﺎج‬،‫ ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز‬.1
sheets), warning signs (authorized persons are only allowed to access work area, Provide .‫ ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ‬،( ‫اﻟﻣﺳﻣوح ﻟﮭم ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ‬
necessary light. .‫ ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر‬.2
2.Provide proper support for excavations to protect against collapse. ‫ ﺧوذة( واﻟزاﻣﮭم ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء‬،‫ أﺣذﯾﺔ اﻟﺳﻼﻣﺔ‬،‫ ﻗﻔﺎزات‬،‫ ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ‬.3
3.Provide his workers with personal protective equipment (masks, gloves, safety shoes, .‫اﻟﻌﻣل‬
helmet, overall) ‫ ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل ﻣن اﻟﻐﺑﺎر‬،‫ ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل‬.4
4.Reduce noise during working hours and do not work at night, and spray site with water ‫ اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ اﻟﻌﻣل ﻣن‬.5
during dust. ‫اﻟﺦ‬،‫اﻟزوار‬
5.Limit work in one area in series and isolate worksite from , visitors, etc... :‫ ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ ﺷﺗراطﺎت ﻋﺎﻣﺔ‬.6
6.Haul surplus material and oil and grease outside the premises and transport it in closed ( ‫ ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت‬- : ‫ﻣﻼﺣظﺔ‬
trucks to dump sites.
.(‫ﺑﻧﺎء ﺛﻼﺛﺔ ﻓﺻول دراﺳﯾﺔ )ﻓﺻول ﺷﺑﮫ داﺋﻣﺔ‬
1
Building three classrooms (semi-permanent classrooms).
1.1 Site Works : : ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬
General Requirement: :‫اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ‬
The Environmental and Social Management Frame work is considered the ‫ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ‬
controlling tool for mitigating environmental and social impacts .And mitigations ‫واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت اﻟﻣدرﺟﺔ ﻓﻲ ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ‬
listed in this are mandatory to be implemented along with the construction, the ‫إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ‬
rehabilitation and maintenance of the schools. :‫ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن‬
The contractor is obliged to take the following measures to decrease impact of ‫ ﻋﻼﻣﺎت اﻟﺗﺣذﯾر‬،(‫ اﻟﺳﻘﺎﯾل‬،‫ اﻟﺳﯾﺎج‬،‫ ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز‬.1
maintenance work on the environment and beneficiaries: .‫ ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ‬،( ‫)ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص اﻟﻣﺳﻣوح ﻟﮭم ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ‬
1.Provide construction site with protection measures (Barriers, fence, portable .‫ ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر‬.2
scaffold sheets), warning signs (authorized persons are only allowed to access ‫ ﺧوذة( واﻟزاﻣﮭم‬،‫ أﺣذﯾﺔ اﻟﺳﻼﻣﺔ‬،‫ ﻗﻔﺎزات‬،‫ ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ‬.3
work area, Provide necessary light. .‫ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء اﻟﻌﻣل‬
2.Provide proper support for excavations to protect against collapse. ‫ ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل‬،‫ ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل‬.4
3.Provide his workers with personal protective equipment (masks, gloves, safety ‫ﻣن اﻟﻐﺑﺎر‬
shoes, helmet, overall) ‫ اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ‬.5
4.Reduce noise during working hours and do not work at night, and spray site ‫اﻟﺦ‬،‫اﻟﻌﻣل ﻣن اﻟزوار‬
with water during dust. ‫ ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ‬.6
5.Limit work in one area in series and isolate worksite from , visitors, etc... :‫ﺷﺗراطﺎت ﻋﺎﻣﺔ‬
6.Haul surplus material and oil and grease outside the premises and transport it ( ‫ ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت‬- : ‫ﻣﻼﺣظﺔ‬
in closed trucks to dump sites.

Site planning and levelling with exvavation and Backfill : :‫أﻋﻣﺎل اﻟﺗﺳوﯾﺔ ﻟﻸرﺿﯾﺔ اﻟﻣﺷروع ﻣﻊ اﻟﺣﻔر واﻟردم‬
The Whole Project site have to be leveled according to the levels on the ground, ‫ﻛﺎﻣل وﻓﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب ﻋﻠﻰ اﻟطﺑﯾﻌﺔ وذﻟك ﺑﺈزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت‬
through removing the surface obstacles, trees, soil surface layers, cutting of the ‫اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ ﺑﺎﻟﺣﻔر واﻟﻘطﻊ ﻟﻠﻣﻧﺎطﻖ اﻟﺗراﺑﯾﺔ أو اﻟﺻﺧرﯾﺔ اﻟﻣرﺗﻔﻌﺔ واﻟردم ﻟﻠﻣﻧﺎطﻖ‬
rising parts and backfilling the low parts with Gravel soil or that resulted from .‫اﻟﻣﻧﺧﻔﺿﺔ ﺑﺎﻟﺗرﺑﺔ اﻟزﻟطﯾﺔ أو اﻟﻧﺎﺗﺟﺔ ﻣن اﻟﺣﻔر ﻣﻊ ﻣراﻋﺔ اﻟﻣﯾول ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر‬
excavations. Slopes for rainwater drainage have to be considered. Trees will ‫وﻋﻧد إزاﻟﺔ اﻷﺷﺟﺎر وﻏﯾرھﺎ ﻣن‬, ‫وﯾﺟب أن ﻻ ﺗزال اﻷﺷﺟﺎر إﻻ ﺑﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
not be removed only with supervisor approval. When removing trees and roots ‫ ﻓﯾﺟب اﺟﺗﺛﺎﺛﮭﺎ ﺣﺗﻰ ﻋﻣﻖ‬، ‫ ﻣﻠﯾﻣﺗر‬80 ‫اﻷﺷﯾﺎء اﻟﻧﺎﻣﯾﺔ واﻟﺟذور اﻟﺗﻲ ﯾزﯾد ﻗطر ﺟذوﻋﮭﺎ ﻋن‬
1.1.1 with a diameter of more than 80 mm, they should be uprooted to a depth of at ‫ﻣﻠﯾﻣﺗر ﻋﻠﻰ اﻷﻗل ﺗﺣت ﺳطﺢ اﻷرض وإﻋﺎدة ردم اﻻﻧﺧﻔﺎﺿﺎت اﻟﻧﺎﺟﻣﺔ ﻋن‬500 ‫ ﯾﺻل إﻟﻲ‬Lum sum 1.00
least 500 mm below earth surface, Resulted excavations will be backfilled with ‫اﺳﺗﺑﻌﺎد ﻛﺗل اﻟﺣﺟﺎرة أو اﻟﻌواﺋﻖ اﻷﺧرى ﺑﺗرﺑﺔ ﻣﻧﺎﺳﺑﺔ ودﻛﮭﺎ دون ﺗﻛﺎﻟﯾف إﺿﺎﻓﯾﺔ ورﻓﻊ‬
Suitable and compacted soil without additional costs and transferring waste to ‫وﯾﺷﻣل اﻟﺳﻌر إزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ‬, ‫اﻟﻣﺧﻠﻔﺎت اﻟﻰ اﻟﻣﻘﺎﻟب اﻟﻣﺧﺻﺻﺔ ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ‬
the designated landfills of local authority. The item includes the removal of ‫وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ وأﻋﻣﺎل اﻟدك واﻟرش ﻋﻠﻰ طﺑﻘﺎت ﻟﺗﺣﻘﯾﻖ‬
surface barriers, plants, surface layers of soil, compacting in layers and curing ‫اﻟﻣﻧﺎﺳﯾب اﻟﻣﻼﺋﻣﺔ ﻟﻠوظﺎﺋف اﻟﻣﺣددة ﺑﻣﺧطط اﻟﻣوﻗﻊ اﻟﻌﺎم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس‬
with water to reach the appropriate levels of functions defined in the general site .‫واﻟرﺳوﻣﺎت اﻟﻣرﻓﻘﺔ ﻣﻊ ﺗﻌﻠﯾﻣﺎت ﻣﮭﻧدس اﻟﻣوﻗﻊ‬
plan according toin
Soil excavation specifications,
meter cubic:drawings attched with the instruction of site :‫ﺣﻔر اﻟﺗرﺑﺔ ﺑﺎﻟﻣﺗر اﻟﻛﻌب‬
In cubic meters: digging in any type of soil for building foundations and corridors ‫ اﻟﺣﻔر ﻓﻲ أي ﻧوع ﻣن اﻧواع اﻟﺗرﺑﺔ ﻟﻸﺳﺎﺳﺎت اﻟﻣﺑﻧﻰ واﻟﻣﻣرات ﺑﻌﻣﻖ ﻻ‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
with a depth of not less than 1 meter. Where necessary, even the level suitable ‫ وﺣﯾﺛﻣﺎ ﯾﻠزم ﺣﺗﻰ اﻟﻣﻧﺳوب اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس وﻧزع اﻟﻣﯾﺎه إن وﺟدت ﻣﻊ‬.‫ﻣﺗر‬1 ‫ﯾﻘل ﻋن‬
for establishment and dewatering, if any, while maintaining the aspects of drilling ‫ﻣﯾﺎه ( ﻣﻊ ﻧﻘل ﺟﻣﯾﻊ اﻟﻣﺧﻠﻔﺎت إﻟﻰ‬- ‫ﺗﻠﻔون‬-‫اﻟﺣﻔﺎظ ﻋﻠﻰ ﺟواﻧب اﻟﺣﻔر واﻟﺗﻣدﯾدات )ﻛﮭرﺑﺎء‬ m3
1.1.2 and extensions (electricity - telephone - water) with the transfer of all waste to ‫اﻟﻣواﻗﻊ اﻟﻣﻌﺗﻣدة ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ واﻟﺣﻔرﯾﺗم طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬ 42.34
3‫م‬
the sites approved by the local authority and drilling in accordance with the ‫ وﯾﺗﺣﻣل اﻟﻣﻘﺎول أي أﺿرار ﻗد ﺗﺣدث ﺑﺎﻟﺧدﻣﺎت أو ﺑﺎﻟﻣﻧﺎزل ﺑﺳﺑب اﻟﺣﻔر‬.‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
drawings, specifications and instructions of the supervising engineer. The .‫وﺟﻣﯾﻊ ﻣﺎﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد‬
contractor shall bear any damages that may occur to the services or houses due
to excavation and all that is necessary to terminate the item.
Backfill around foundations, Sidewalk, water tank and areas that need to ‫اﻟردم ﺣول ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض ﻟﻠﻣﺑﻧﻰ واﻟﺧزان‬
be in meter cubic: ‫واﻟﻣﻣرات واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Backfill with valid and clean soil mixed with graded fractions stones resulted ‫ اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
from site excavations or brought from outside to be filled around the foundations ‫ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ‬
as well as inside the building on layers not more than 30 cm using mechanical ‫ ﺳم أوﻻ ً ﺑﺄول ﻣﻊ‬30 ‫ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ ﺗزﯾد ﻋﻠﻰ‬
compactor, curing with water to achieve the appropriate strength and get a ‫اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ‬
cohesive soil according to the specified levels. Carry out compacting of narrow ‫وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ‬
‫وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن‬, ‫ ﻣﻊ ﻋدم اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ اﻟﻣوﻗﻊ‬,‫اﻟﺣﺟرﯾﺔ‬ m3
1.1.3 areas around foundations and external stone walls, causing no damage to the 36.00
works implemented in the site, and transfer of excess dump soil to public dumps ‫اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل‬ 3‫م‬
off site. Safe roads for trolleys to transfer materials and equipment used for ‫اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن اﻟﻣﺧﻠﻔﺎت اﻟﻧﺎﺗﺟﺔ ﻋن‬
implementation within the site to be prepared. Before project handover, site has ‫اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات ﻋﻠﻰ ﺳﻼﻣﺗﮫ ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات‬
to be free of waste resulting from implementation as well as other factors which ‫اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه‬
may effect the project safety in future like landslides of various types and others, ‫اﻷﻣطﺎر واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬
taking in considerations preparation of slopes needed to drain rainwater. The . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
item includes all the necessary to complete the item in accordance with the
drawings and specifications and instructions of the supervisor..
Rehabilitation of Yard school wall: :‫إﻋﺎدة ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ‬
Restoring and rehabilitating the entire school wall. The work includes removing ‫إﻋﺎدة ﺗرﻣﯾم و ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ ﺑﺎﻟﻛﺎﻣل و اﻟﻌﻣل ﯾﺷﻣل إزاﻟﺔ اﻟﺑﻠوك اﻟﺗﺎﻟف وإﻋﺎدة ﺑﻧﺎءه‬
1.1.4 the damaged block and rebuilding it as before or Rehabilitation , as well as the ‫أو ﺗرﻣﯾﻣﮫ ﻛﺎﻟﺳﺎﺑﻖ و أﻣﺎﻛن اﻟﺿرر ﻓﻲ اﻟﺳور و اﻟﻛورﻧﯾش و طﻼء اﻟﻛورﻧﯾش و اﻻﻋﻣدة‬lum. Sum 1.00
areas of damage in the wall and cornice according to the instructions of the .‫ﺑﺎﻟﻠون اﻟﻣطﻠوب ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
supervising engineer.
Mitigation of environmental impact during the project implementation period: -: ‫ﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ ﺧﻼل ﻓﺗرة ﺗﻧﻔﯾذ اﻟﻣﺷروع‬
The contractor shall supply and carry out the necessary works at the site to mitigate ‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد وﺗﻧﻔﯾذ اﻷﻋﻣﺎل اﻟﺿرورﯾﺔ ﺑﺎﻟﻣوﻗﻊ ﻟﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ‬:‫ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬
environmental impact through implementation the following : -:‫واﻟﻣﺗﻣﺛﻠﺔ ﺑﺎﻟﺗﺎﻟﻲ‬
1. Site shall be completely fenced with zinc or wood, etc. to prevent entry of non- . ‫ اﻟﺦ ﻟﻣﻧﻊ دﺧول ﻏﯾر اﻟﻌﺎﻣﻠﯾن إﻟﯾﮫ‬... ‫ ﺗﺳوﯾر اﻟﻣوﻗﻊ ﻛﺎﻣﻼ ً ﺑﺎﻟزﻧك أو اﻷﺧﺷﺎب أو‬-1
workers. ‫ ﺗورﯾد ﻣﺳﺗﻠزﻣﺎت وأدوات اﻟﺳﻼﻣﺔ اﻟﺷﺧﺻﯾﺔ ﻣن إﺻﺎﺑﺎت اﻟﻌﻣل وﺗﺷﻣل )اﻟﺟزﻣﺎت‬-2
2 – Supply of personal safety tools against work injuries (including caps, hats, gloves,
(‫اﻟﺦ‬.. ‫واﻟﻘﺑﻌﺎت واﻟﻛﻔوف واﻟﻧظﺎرات اﻟواﻗﯾﺔ اﻟﻛﻣﺎﻣﺎت وﺳدادات اﻷذان وأﺣزﻣﺔ اﻷﻣﺎن‬
protective glasses, gaskets, earplugs, safety belts, etc.) with adequate numbers for
‫ﺑﺎﻟﻌدد اﻟﻛﺎﻓﻲ ﻟﻠﻌﻣﺎل اﻟﻌﺎدﯾﯾن واﻟﻣﺎھرة ﻋﻠﻰ ﻧﻔﻘﺔ اﻟﻣﻘﺎول ﺑﺣﺳب ﺣﺟم اﻟﻌﻣﺎﻟﺔ اﻟﺗﻲ ﯾﺗطﻠﺑﮭﺎ‬
ordinary and skilled workers at the contractor's expense, depending on the size of the
labor force required for the project. They will be oblige to use them. .‫اﻟﻣﺷروع وإﻟزاﻣﮭم ﺑﺎﺳﺗﺧداﻣﮭﺎ‬
3 - Construction of a 1.5 x 1 x2.5 meter temporary bath of zinc, wood, bricks, etc an ‫ﻣﺗر ﻣؤﻗت ﻣن اﻟزﻧك أو اﻟﺧﺷب أو‬2.5 ‫ﻣﺗر وارﺗﻔﺎع‬1×1.5 ‫ ﺗﺷﯾﯾد ﺣﻣﺎم ﺑﺄﺑﻌﺎد‬-3
eastern toilet, a temporary wash basin, supply of water for bathroom and implement a ‫اﻟﺦ وﻣرﺣﺎض ﻋرﺑﻲ وﻣﻐﺳﻠﺔ اﻷﯾدي اﻟﻣؤﻗﺗﺔ وﺗوﻓﯾر اﻟﻣﯾﺎه ﻟﮭذا اﻟﺣﻣﺎم وﻋﻣل ﺣﻔرة‬..‫اﻟﺑﻠك‬
1.1.5 covered cesspool . All workers and supervisors are obliged to use it. At the completion ‫ )ﺑﯾﺎرة ﻣﺻﻐرة أو ﺗرﻧش (ﻣﻊ اﻟﻐطﺎء وإﻟزام ﺟﻣﯾﻊ اﻟﻌﻣﺎل واﻟﻣﺷرﻓﯾن ﺑﺎﺳﺗﺧداﻣﮫ وﯾﺗم إزاﻟﺔ‬Lum 1
of the project, the bathroom shall be removed and the cesspool shall be backfilled. . ‫ اﻟﺣﻣﺎم وردم اﻟﺑﯾﺎرة ﯾﻌد اﺳﺗﻛﻣﺎل ﺗﻧﻔﯾذ اﻟﻣﺷروع‬sum
4 - Materials to be separately stored and provide sufficient areas for movement and ‫ اﻟﻘﯾﺎم ﺑﺗﺷوﯾن اﻟﻣواد ﺑطرﯾﻘﺔ ﻣﻧﻔﺻﻠﺔ وﺗوﻓﯾر ﻣﺳﺎﺣﺎت ﻛﺎﻓﯾﺔ ﻟﻠﺣرﻛﺔ واﻟﻣﻧﺎورة وﻛذﻟك‬-4
handling, as well as removal of wood and all waste produced during the implementation ‫إزاﻟﺔ اﻷﺧﺷﺎب ورﻓﻊ ﻛﺎﻓﺔ اﻟﻣﺧﻠﻔﺎت ﺧﻼل ﻓﺗرة اﻟﺗﻧﻔﯾذ إﻟﻰ ﺧﺎرج ﻣﻧطﻘﺔ اﻟﻌﻣل )اﻟﻣﻘﺎﻟب‬
period outside the work area ( public dumps). .(‫اﻟﻣﺧﺻﺻﺔ‬
5 - Terrible equipments will be put away from populated places and to be operated at ‫اﻻﻟﺗزام ﺑوﺿﻊ اﻟﻣﻌدات اﻟﻣزﻋﺟﺔ ﺑﻌﯾدا ً ﻋن اﻷﻣﺎﻛن اﻟﻣﺄھوﻟﺔ وﺗﺷﻐﯾﻠﮭﺎ ﻓﻲ اﻷوﻗﺎت‬-5
the appropriate times as well as the obligation to store dangerous materials away from ‫اﻟﻣﻧﺎﺳﺑﺔ وﻛذﻟك اﻻﻟﺗزام ﺑﺗﺧزﯾن اﻟﻣواد اﻟﺧطﯾرة ﺑﻌﯾدا ً ﻋن اﻟﻌﺎﻣﻠﯾن واﻟﻌﻣل ﻋﻠﻰ ﻋدم ﺗﻐﯾﯾر‬
workers and no change of oils or leaving the grease residues in the work area.
.‫اﻟزﯾوت أو ﺗرك ﺑﻘﺎﯾﺎ اﻟﺷﺣوم ﻓﻲ ﻣﻧطﻘﺔ اﻟﻌﻣل‬
6 - Commitment to reform public services (electricity - telephone - water - sewage),
‫ﻣﺟﺎري ( اﻟﺗﻲ ﺗﺗﻌرض ﻟﻠﻛﺳر‬-‫ﻣﯾﺎه‬- ‫ﺗﻠﻔون‬-‫اﻻﻟﺗزام ﺑﺈﺻﻼح اﻟﺧدﻣﺎت اﻟﻌﺎﻣﺔ )ﻛﮭرﺑﺎء‬-6
which were damaged during the implementation as a first.z
7- First aid kits for workers. . ‫إﺛﻧﺎء ﺗﻧﻔﯾذ اﻟﻣﺷروع أوﻻ ً ﺑﺄول‬
. ‫ ﺣﻘﯾﺑﺔ اﺳﻌﺎﻓﺎت أوﻟﯾﺔ ﻟﻠﻌﻣﺎﻟﺔ‬-7
"Helson's school yard mattress: :‫ﻓرﺷﺔ ھﻠﺳن ﻟﺣوش اﻟﻣدرﺳﺔ‬
Supplying and furnishing a graded helsen layer for the courtyard and the inner ‫ﺗورﯾد وﻓرش طﺑﻘﺔ ھﻠﺳن ﻣﺗدرج ﻟﻠﻔﻧﺎء واﻟﺳﺎﺣﺔ اﻟداﺧﻠﯾﺔ واﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت اﻟﻣوﺿﺣﺔ‬
courtyard, as shown in the drawings, and the work includes the following: ‫ـ‬: ‫واﻟﻌﻣل ﯾﺷﻣل اﻵﺗﻲ‬
‫ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ ﻣﻊ اﻟدك واﻟرش ﺑﺎﻟﻣﯾﺎه وﻋﻣل ﻣﯾول ﻟﻠﺳﺎﺣﺔ ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗﺑل‬- Lum
1.1.6 - Leveling the site with tamping and spraying with water, and making slopes for 1.00
the yard to drain rainwater before laying the paver, according to the instructions ‫ ﺳم‬5 ‫ ﺗورﯾد وﻓرش طﺑﻘﺔ ﻛري ﺑﺳﻣك‬-. ‫ﻓرش اﻟﻛري وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ sum
of the supervising engineer. - Supplying and spreading a layer of paver with a .‫ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
thickness of 5 cm according to the instructions of the supervising engineer.”
Planting works:- In number: The supply and implementation of Plants with 2 -: ‫أﻋﻣﺎل اﻟﺗﺷﺟﯾر‬
meter length in pavement square that has dimention of ( 2M * 1.3 M). so every ‫ ﺳم‬70 ‫ﻣﺗر ﺑﻌﻣﻖ‬1.3 ‫ﻣﺗر وﻋرض‬2 ‫ ﺗورﯾد وﺗﻧﻔﯾذ اﺣواض أﺷﺟﺎر ﻣﻧﺎﺳﺑﺔ طول‬: ‫ﺑﺎﻟﻌدد‬
two tree in one poll. The price includes planting seedlings, agricultural soil and .‫ ﺳم ﺑﺣﯾث ﯾﺗم ﻏرس ﺷﺟرﺗﯾن ﻓﻲ ﻛل ﺣوض‬40*20*20 ‫ﺗﻧﻔﯾذ ﺑﻠوك ﺻم ﺗﻛون ﺑﻣﻘﯾﺎس‬
all that is needed according to the attached and according to drawings and ‫وﻋﻣل اﻟردﻣﯾﺎت ﻣﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ ﻻﺻﻘﺔ ﻓﯾﻣﺎ ﺑﯾﻧﮭﺎ ﺑﻣوﻧﺔ ﺧرﺳﺎﻧﯾﺔ ذو ﻧﺳﺑﺔ ﺧﻠط ﺑﻣﻘدار‬
‫ أﯾﺎم ﻣﻊ ﺗﻠﺑﯾس اﻟﺑﻠوك ﻣن‬5 ‫( ﻧﯾس إﻟﻰ اﺳﻣﻧت ﺑﺣﯾث ﯾﺗم رﺷﮭﺎ ﺑﺎﻟﻣﯾﺎه ﻛل ﯾوم ﺑﻣﻘدار‬1:3) pcs
1.1.7 specifications and the instructions of the supervisor engineershall be in a scale 8.00
of 25 * 10 * 50 cm. And the work of the backfill with concrete works adhesive ‫اﻟداﺧل واﻟﺧﺎرج إﺿﺎﻓﺔ اﻷﻟوان ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف ﺑﻣﺎ ﯾﺗﻧﺎﺳﻖ ﻣﻊ أﻟوان‬ ‫ﻋدد‬
between them with concrete mortar with a mixing ratio of (1:3) fine sand with ‫اﻟﻣدرﺳﺔ وﺷﻌﺎرات اﻟﻣﻧظﻣﺔ واﻟﺛﻣن ﯾﺷﻣل ﻏرس اﻟﺷﺗﻼت واﻟﺗرﺑﺔ اﻟزراﻋﯾﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم‬
cement so that it is sprinkled with water every day by 5 days with the addition of .‫ﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣﺧططﺎت اﻟﻣروﻓﻘﺔ وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
colors according to the instructions of the supervising engineer in line with the
colors of the school and the logos of the organization.
Sidewalk around the building: Sidewalk around the building, height shall be at : ‫رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ‬
least 30 cm and width 1 M to be according to the detailed drawings attached. ‫ ﻣﺗر ﺑﺣﺳب‬1 ‫وﻋرض‬،‫ ﺳم‬30 ‫ رﺻﯾف ﺣول اﻟﻣﺑﻧﻰ ﺑﺎرﺗﻔﺎع ﻻ ﯾﻘل ﻋن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Excavation, backfilling, compaction and curing with water to be executed. A ‫اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ ﻣﻊ اﻟﺣﻔر واﻟردم واﻟدك واﻟرش وطﺑﻘﺔ ﻣن اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ‬
layer of plain concrete thickness of 10 cm, casted on a layer of stone fractions ‫ﻣﻊ ﻋﻣل ﺑﻼط أرﺻﻔﺔ ﻣﻠون‬, ‫ﺳم‬15‫ﻣﻊ ﻋﻣل طﺑﻘﺔ ﻣن اﻟﺻوﻟﻧﺞ ﺗﺣﺗﮭﺎ ﺑﺳﻣك‬،‫ﺳم‬10 ‫ﺳﻣك‬ m2
1.1.8 15 cm thickness. The layer of pavement cement tiles to be installed taking into ‫ ﻣﺑﺎﻧﻲ ﺣﺟر ﻣرﺑوع ﻣﻊ‬،‫ ﻣﺗر‬4 ‫ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول اﻟﻸزم ﻣﻊ ﻋﻣل ﻓواﺻل اﻟﺗﻣدد ﻛل‬ 21.50
2‫م‬
account slopes , expansion joints and concrete curbstones or squared stone as ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬، ‫اﻟﺗﻛﺣﯾل واﻟﺗدرﯾز وﯾﺷﻣل ﻣﻊ اﻟﺣﻔر واﻟﺗﺎﺳﯾس‬
well as excavation and foundation according to the drawings and specifications, .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
and the instructions of the supervisor.

Total Amount Of Excavation and Backfilling Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟردم و اﻟﺣﻔر‬
1.2 Concrete Works : ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت‬
Notes : :‫ﻣﻠﺣوظﺔ‬
The prices for reinforced concrete include the following: -:‫أﺳﻌﺎر اﻟﺧرﺳﺎﻧﺎت ﺗﺷﻣل اﻷﺗﻲ‬
1- Form works and reinforcement .‫ أﻋﻣﺎل اﻟﺷدات اﻟﺧﺷﺑﯾﺔ واﻟﺣدﯾد‬-1
2- Mixing the concrete and the watering up to a period of 2 weeks and all related works .‫ اﺳﺑوﻋﯾن وﻛل اﻷﻋﻣﺎل ﺑﺣﺳب اﻟرﺳوﻣﺎت‬2 ‫ أﻋﻣﺎل اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔﻣﻊ اﻟرش ﻟﻔﺗرة‬-2
mentioned in the drawings .‫ ﻋﻣل ﻣﻛﻌﺑﺎت اﺧﺗﺑﺎر واﺧﺗﺑﺎرھﺎ‬-3
3- Producing sample and their testing. .‫ﺳم أﺳﻔل اﻟﻣﯾدات اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ‬15 ‫ طﺑﻘﺔ ﻛري ﺳﻣك‬-4
4- A layer of aggregate of 15cm thickness under the internal and the external TB's. ‫ أى طﻠﺑﺎت إﺿﺎﻓﯾﺔ ﯾطﻠﺑﮭﺎ اﻟﻣﮭﻧدس‬-5
5- Any additional requests by the Engineer .‫ ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد اﻟﻣواد اﻟﺗﻲ ﺗﺗطﺎﺑﻖ ﻣﻊ اﻟﻣواﺻﻔﺎت اﻟﺧﺎﺻﺔ واﻟﻌﺎﻣﺔ‬6
6- The contractor shall only use materials corresponding with the general or special ‫ ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻣﺳﺋوﻟﯾﺔ ﻧﻘل وﺗﺧزﯾن اﻟﻣواد ﺑﺎﻟطرﯾﻘﺔ اﻟﻣﻧﺎﺳﺑﺔ اﻟﺗﻰ ﻵﺗﻌرﺿﮭﺎ ﻟﻠﺗﻠف وﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻘﯾﺎم‬-7
specifications. .‫ﺑﺳرﻋﺔ ﻧﻘل اﻟﻣواد اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﻣوﻗﻊ ﻣﺑﺎﺷرة ﺑﻌﺑﺎرة أﺧرى ﻣﻣﻧوع ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﺳﺗﺧدام أي ﻣواد ﺗﺎﻟﻔﺔ‬
7- The contractor shall deliver the material to the site, store it in a proper way to prevent any ‫ ﯾﻠزم إﺳﺗﺧدام اﺳﻣﻧت ﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت اﻟﻌﺎدﯾﺔ واﻟﻣﺳﻠﺣﺔ ﺑﺎﻷﺳﺎﺳﺎت‬-8
damage and remove any surplus from the site after finishing. No spoiled material has to be .‫واﻷرﺿﯾﺎت ﻓﻲ اﻟﻣﻧﺎطﻖ اﻟﺳﺎﺣﻠﯾﺔ‬
used. ‫ اﻟﻛري اﻟﻣﺳﺗﺧدم ﻟﻠﺻﺑﯾﺎت اﻟﻣﺳﻠﺣﺔ ﻛري ﻛﺳﺎرة وﯾﺳﺗﺧدم اﻟﮭزاز اﻟﻣﯾﻛﺎﻧﯾﻛﻲ أﺛﻧﺎء اﻟﺻب‬-9
8- Sulphate resistant cement shall be used for plain and reinforced concrete of the 3‫ م‬/ ‫ ﻛﺟم أﺳﻣﻧت‬350 ‫ ﻧﯾس و‬3‫م‬0.40 ‫ ﻛري و‬3‫م‬0.80 ‫ ﺧرﺳﺎﻧﺔ اﻟﺗﺳﻠﯾﺢ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-10
foundations and floors in the coastal areas. .‫ ﻛري‬/ ‫ ﻧﯾس‬/ ‫( اﺳﻣﻧت‬3:2:1) ‫ﺧرﺳﺎﻧﺔ‬
9- Aggregate used for reinforced concrete shall be broken stones. A mechanical device shall 3‫م‬1 ‫ﻛﺟم أﺳﻣﻧت ﻟﻛل‬250‫ ﻧﯾس و‬3‫م‬0.40‫ ﻛري و‬3‫م‬0.80 ‫ اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-11
be used during concreting for proper compaction. .‫ ﻛري‬/ ‫ ﻧﯾس‬/‫( أﺳﻣﻧت‬6:3:1) ‫ﺧرﺳﺎﻧﺔ‬
10- Reinforced concrete shall generally, as long as no other specification is mentioned, . ‫ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻣن أﻋﻠﻰ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ‬-12
consist of 0,80m3 aggregate, 0,40m3 sand and 350kg cement/m3 of concrete (1:2:3)
11- Plain concrete shall generally, as long as no other specification is mentioned, consist of
0,80m3 aggregate, 0,40m3 sand and 250kg cement/m3 of concrete (1:3:6).
12- The concealled pipes for electricity connection should be installed above the concrete
Plain concrete for floors 10 cm with stone fractions, Portland Cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺳم ﻣﻊ ﺻوﻟﻧﺞ‬10 ‫ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت‬
Plain concrete with a minimum thickness of 150 kg / cm 2, to be casted above a ‫ وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬، ‫ﺳم إﺳﻣﻧت ﺑورﺗﻼﻧدي‬10 ‫ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت ﺳﻣك‬-: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
stone fractions layer of not less than 10 cm thickness, according to the ً ‫ طﺑﻘﺎ‬،‫ﺳم‬10 ‫ ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر اﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬،2‫ﺳم‬/‫ ﻛﺟم‬150 m2
1.2.1 .‫ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 104.00
drawings, specifications and instructions of the supervising engineer. 2‫م‬

Reinforced concrete 250 kg / cm 2, for ground beam: : ‫ اﻟﻣﯾد إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ‬
Reinforced concrete for cemells (ground beams) using Portland Cement, with ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ ھز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫ﻻ ﺗﻘل ﻋن‬ m3
1.2.2 8.20
and cutting, casting, vibrating concrete using a vibration machine and spattering ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز واﻟرش‬ 3‫م‬
of water.( and all necessary) .All works to be done according to drawings, . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications, and engineer supervisor instructions .
Reinforced concrete for columns and lintels of 250 kg / cm 2 Resistant : ‫إﺳﻣﻧت ﺑورﺗﻼﻧدي‬2 ‫ﺳم‬/‫ﻛﺟم‬250‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب‬
Portland Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Reinforced concrete for columns, lintels using Resistant Portland Cement, with ،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬ m3
1.2.3 6.20
resistance of not less than 250 kg / cm 2. Item includes wood formwork, steel ‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز واﻟرش ﻣﻊ إﺳﺗﺧدام اﻟﺗﻘﻣﯾص ﺑﺎﻟﺷواﻻت ﻟﻣدة ﻻ ﺗﻘل ﻋن‬،‫اﻟﺻب‬ 3‫م‬
supply and cutting, casting, vibrating concrete using a vibration machine, Curing .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫إﺳﺑوع‬
with water in addition to cover columns with sackcloth for not less than a week.(
and all necessary)
Reinforced .All for
concrete works to be done
ceilings according
and beams, 250tokg
drawings,
/ cm 2, specifications,
Portland :‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ،‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور‬
Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
m2
1.2.4 Reinforced concrete for ceilings and beams using Portland Cement:with ‫ ﺗورﯾد وﻗص ووﺿﻊ‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬ 22.60
2‫م‬
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،(‫ واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم‬،‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫اﻟﺣدﯾد‬
and cutting, casting, vibrating concrete using a vibration machine and curing of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
water.( and all necessary) .All works to be done according to drawings,
Total Amount of Concrete Works. ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ‬
1.3 Masonary and Block Works ‫أﻋﻣﺎل اﻟﺣﺟر و اﻟﺑﻠوك‬
‫أﻋﻣﺎل اﻷﺣﺟﺎر واﻟﺑﻠوك‬
Building works 3‫م‬/‫ﻛﺟم‬300 ‫أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ﺗﻧﻔذ درﺟﺔ أوﻟﻰ ﻣﺗراﺑطﺔ وﺑﺎﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم وﺑﻣﺣﺗوى أﺳﻣﻧت ﻻ ﯾﻘل ﻋن‬.1
1. Construction works shall be carried out first-class, interconnected, Resistant Portland cement, to be used with a cement ‫ وﯾﺟب ﺗرﻛﯾب وإﺣﻛﺎم اﻟﻠﺣﺎﻣﺎت اﻷﻓﻘﯾﺔ واﻟراﺳﯾﺔ‬،‫ رﻣل ﺑﺎﻟﺣﺟم ( أو ﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬3 :‫ أﺳﻣﻧت‬1 ) ‫أو‬, ‫رﻣل‬
content of not less than 300 kg / m3 of sand, or (1 cement: 3 Sand),Horizontal and vertical joints are properly implemented. ‫واﻟﻌﻣل ﯾﺷﻣل اﻟﺳﻘﺎﯾل اﻟﻼزﻣﺔ واﻟﺗﻧﻌﯾم واﻟﺟﻠﻲ وﺟﻣﯾﻊ ﻣﺎ‬,‫ﺟﯾدا ً ﻣﻊ اﺳﺗواء اﻷوﺟﮫ واﺳﺗﻘﺎﻣﺔ اﻷرﻛﺎن ﺑﺎﺳﺗﺧدام اﻟﺧﯾط واﻟﻣﯾزان‬
Leveling of wall faces and straightening of corners using the thread and balance. The item price include scaffolding,
. ‫ﯾﻠزم ﻹﻧﮭﺎء اﻟﻌﻣل‬
smoothness, glossiness and all necessary to finish the work.
‫اﻟﺦ( ﻟﻠﻣواد اﻟﻣطﻠوﺑﺔ ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻓﻲ اﻟﻣﺷروع ﻻﻋﺗﻣﺎدھﺎ وأﺧذ ﻣواﻓﻘﺔ‬...‫رﻣل‬-‫ﯾﺎﺟور‬-‫ﺑﻠك‬-‫ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻘدﯾم ﻋﯾﻧﺎت)اﺣﺟﺎر‬.2
2. The contractor shall submit samples of materials to be used (stones, bricks, sand, etc.) for written approval.
3. All stones have to be laid on their natural length as to be pressed vertically where they are in the building. spraying with .‫ﺧطﯾﺔ ﻋﻠﯾﮭﺎ‬
water twice a day for a week. ‫ﺗﺑﻧﻰ ﺟﻣﯾﻊ اﻷﺣﺟﺎر ﻋﻠﻰ ﻣراﻗدھﺎ اﻟطﺑﯾﻌﯾﺔ ﻟﯾﻛون اﻟﺿﻐط ﻋﻣودﯾﺎ ً ﻋﻠﻰ ھذه اﻟﻣراﻗد ﻣﮭﻣﺎ ﻛﺎن ﻣوﻗﻌﮭﺎ ﻓﻲ اﻟﺑﻧﺎء وﺗرش اﻟﻣﺑﺎﻧﻲ‬.3
4. Stones have to be hard, solid, free of impurities, veins, sand holes, fractions and homogeneous in terms of origin and color .‫ﺟﯾدا ً ﻣرﺗﯾن ﻓﻲ اﻟﯾوم وﻟﻣدة أﺳﺑوع‬
(one quarry). ‫ ﯾﺟب أن ﺗﻛون اﻷﺣﺟﺎر ﻗوﯾﮫ وﺻﻠﺑﮫ ﺧﺎﻟﯾﺔ ﻣن اﻟﺷواﺋب واﻟﻌروق واﻟﻔﺟوات اﻟرﻣﻠﯾﺔ واﻟﻛﺳور و ﻣﺗﺟﺎﻧﺳﺔ ﻣن ﺣﯾث اﻟﻧوع‬.4
5. Construction must be regular in terms of straightening of construction lines, joints and height of courses which shall not .(‫واﻟﻠون)ﻣﺣﺟر واﺣد‬
exceed (20-25-30)cm .Spaces between fronting and lining stones (course stones) are well filled with cement mortar and stone ‫(ﺳم ﻟﺳرع‬30-25-20)‫ ﯾﺟب أن ﯾﻛون اﻟﺑﻧﺎء ﻣﻧﺗظﻣﺎ ً ﻣن ﺣﯾث اﺳﺗﻘﺎﻣﺔ ﺧطوط اﻟﺑﻧﺎء واﻟﻔواﺻل وارﺗﻔﺎﻋﺎت اﻟﺳروع ﻻ ﯾزﯾد ﻋن‬.5
fractions according to the drawings and specifications and the instructions of the supervisor .‫اﻟواﺣد ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﺑﯾن اﻟﻣداﻣﯾك ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ واﻟﺷﻠف اﻟﺻﻐﯾر طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
6. The height of fronting stone construction without lining should not exceed 60 cm. .‫ﺳم ﺑدون ﺑطﺎﻧﺔ‬60‫ ﯾﺟب أن ﻻ ﯾزﯾد ارﺗﻔﺎع اﻟﺑﻧﺎء ﻟﻠواﺟﮭﺎت ﻋن‬.6
7. Granite stone constructions should be according to the sizes shown in the drawings.
.‫ ﯾﺟب أن ﺗﻛون ﻣﺑﺎﻧﻲ اﻟﺣﺟر اﻟﺟراﻧﯾت ﺣﺳب اﻟﻣﻘﺎﺳﺎت اﻟﻣوﺿﺣﺔ ﻓﻲ اﻟرﺳوﻣﺎت‬.7
8. The Engineer shall check and review the construction work properly (ensure that the balance and the thread is used
properly, thread is tighten and check the room diameters)
‫ ﻋﻠﻰ اﻟﻣﮭﻧدس اﺳﺗﻼم أﻋﻣﺎل اﻟﺑﻧﺎء ﺑﺷﻛل ﺻﺣﯾﺢ واﻟﺗﺄﻛد ﻣن ﻣﯾزان اﻟﺧﯾط وﺷد اﻟﺧﯾط واﻟﺗرﺑﯾﻊ واﺳﺗﻼم أﻗطﺎر اﻟﻐرف واﻟﺗﺄﻛد‬.8
9. The water balance and the plumb bob to be used in all courses of the constructions (in all work stages) . .‫ﻣن ﺻﺣﺔ اﻟﺑﻧﺎء‬
10.Stones specially cut for edges will be used in all openings construction either fronting or lining stone. Edge stone height .‫ ﯾﺟب اﺳﺗﺧدام ﻣﯾزان اﻟﻣﺎء ﻓﻲ ﻛل ﻣدﻣﺎك ﯾﺑﻧﻰ وﻋﻠﻰ اﻟﺑﻧﺎء اﺳﺗﺧدام اﻟﺑﻠﺑل ﻓﻲ ﻛﺎﻓﺔ ﻣراﺣل اﻟﻌﻣل‬.9
(front height) not less than 15 cm minimum. .‫ﺳم‬15‫ وﺑﺣﯾث ﻻ ﯾﻘل ﺑﻌد اﻟﺟﺑﮭﺔ اﻟﺻﻐﯾرة ﻟﻠرﻛن ﻋن‬.‫ ﯾﺟب اﺳﺗﺧدام أﺣﺟﺎر اﻷرﻛﺎن ﻓﻲ ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺑطﺎﻧﺔ واﻟظﮭﺎرة‬.10
11. The cladding stones should be applied from top and bottom for consistency, smooth back stones will not be used for .‫ وﯾﻣﻧﻊ اﺳﺗﺧدام اﻷﺣﺟﺎر ذات اﻟظﮭر اﻷﻣﻠس‬،‫ ﯾراﻋﻰ ﺗﻧﻔﯾذ أﺣﺟﺎر اﻟﺗﻛﺳﯾﺔ ﻣن أﻋﻠﻰ وﻣن أﺳﻔل ﺑﺷﻛل ﻛﺎف ﻣن اﺟل اﻟﺗﻣﺎﺳك‬.11
cladding . .‫ رﻣل(ﻣﻊ اﻟرش ﻗﺑل اﻟﺗﻛﺳﯾﺔ ﺑﺎﻟﺣﺟر‬:‫)اﺳﻣﻧت‬1:2‫ ﯾﻠزم طرطﺷﺔ اﻟﺟﺳور واﻷﻋﻣدة ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬.12
12. Concrete beams and columns have to be spattered with cement mortar with mixing ratio of 1: 2 (cement: sand) and ‫ ﯾﺟب أن ﺗﻛون اﻟﻣﺛﺎﻧﻲ)اﻟﺑطﺎﻧﺔ( ﻣن اﻟﺣﺟر وﯾﻌﺑﺄ اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ‬-13
curing with water before stone cladding . .‫ﻛري( وﻋﻠﻰ إن ﯾﻛون اﻟﻛري ﻣﺗدرج‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫ﺧﻠط‬
13 - The lining part shall be constructed of stones. Gaps between fronting and lining stones have to be filled with plain
‫ ﯾوم ﻋﻠﻰ ﺗﺻﻧﯾﻌﮫ وﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد اﻟﺑﻠوك ﻟﻠﻣوﻗﻊ‬28 ‫ ﯾﻣﻧﻊ اﺳﺗﺧدام اﻟﺑﻠوك اﻻﺳﻣﻧﺗﻲ اﻟﻣﺻﻧﻊ أوﺗوﻣﺎﺗﯾﻛﯾﺎ ﻗﺑل ﻣرور‬.14
concrete of mixing (1: cement: 2.5 sand: 5 aggregate) , Aggregate shall be graded.
14.Automatic concrete blocks will not be used before 28 days of fabrication. After supply to the project site, blocks should be
.‫وﻣﻌﺎﻟﺟﺗﮫ ﺑﺎﻟﻣﺎء ﻗﺑل اﻟﺑﻧﺎء ﺑﮫ‬
cured with water before used for construction. ‫ﻛﺟم‬350‫ﺳم أو اﻛﺛر ھﻲ‬25، ‫ﺳم‬20، ‫ﺳم‬15‫ ﻧﺳﺑﺔ اﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﺑﺎﻧﻲ ﺑﺎﻟﺑﻠوﻛﺎت ااﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﻔرﻏﺔ ﺳﻣك‬.15
15. Mixing ratio of the cement mortar used for constructions with hollow cement blocks of 15 cm, 20 cm, 25 cm or more is . ‫أﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب رﻣل‬
(350 kg cement per cubic meter of sand.) .‫ ﺟﻣﯾﻊ اﻟﺑﻠك اﻟﻣﺳﺗﺧدم اﺗوﻣﺎﺗﯾﻛﻲ ﺿﻐط ﻋﺎﻟﻲ‬.16
16. All the concrete block used is high pressure automatic. 2‫ ﺳم‬/ ‫ ﻛﺟم‬70 ‫ ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن‬:‫ ﺑﻠك )ﺑردﯾن( ﺻم ﻟﻠﺟدران اﻟﺣﺎﻣﻠﺔ‬-
- Solid block (Bardeen) for bearing walls: breaking resistance not less than 70 kg / cm 2 2‫ ﺳم‬/ ‫ ﻛﺟم‬35 ‫ ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن‬:‫ ﺑﻠك )ﺑردﯾن(ﺻم ﻟﻠﺟدران ﻏﯾر اﻟﺣﺎﻣﻠﺔ‬-
- Solid block (Bardeen) for non-bearing walls: breaking resistance not less than 35 kg / cm 2 .‫ ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت‬.17
17. All construction works shall be geometrically measured ,All openings and spaces to be deducted.

Black stone construction (basalt or granite): : ‫ﻣﺑﺎﻧﻲ ﺣﺟر ﻣﻧﺷﺎر أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة‬
Squared black stone construction 15 cm thickness for the basalt stone base ‫ ﺑﻧﺎء ﺣﺟر ﻣﻧﺷﺎر ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
obtained from the project area(basalt or granite) or similar stones. Black stones ‫ ﺳم وأن ﺗﻛون‬15 ‫ﺟراﻧﯾت( ﻣﻧﺷﺎر ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء‬
have to be tailed, free of the veins and gaps, Rows height not more than 30 cm. ‫ﺳم وان‬30 ‫اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف ﻻﯾزﯾد ﻋن‬
Cement mortar solty soil resistance used to be made of 3: 1 (cement: sand) . ‫رﻣل( ﻣﻊ اﻟﺗدرﯾز‬:‫)اﺳﻣﻧت‬3:1 ‫ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ‬
Starting from the ground level, Wall joints have to be smoothed, recessed ‫واﻟﺗﻛﺣﯾل ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب‬ m3
1.3.1 pointing and then be well cured with water. Fronting and lining stones have to be ‫اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ‬ 5.00
3‫م‬
well interconnected using longitudinal stone connecting the entire thickness of .‫ﻛري( وﻋﻠﻰ ان ﯾﻛون اﻟﻛري ﻣﺗدرج‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬
the wall every 2 linear meter, spaces have to be well filled with concrete of(1: ‫وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك اﻟﺣﺎﺋط ﻛل‬
cement: 2.5 sand: 5 graded aggregate), taking into account the interconnection ‫اﺛﻧﯾن ﻣﺗر طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن‬
of stones when connecting two walls .All stone works have to be well and ‫ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬
enough spattered with water. Item Price includes building to the design levels . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
according to the drawings and specifications and instructions of the supervisor.
The buildings of a stone chair under the Ground beam, in cubic meter:- -:‫ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
In cubic metres: stone chair buildings under the masonry, thickness of 60 cm, ‫ ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر‬60 ‫ ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
must be made of solid stones free of veins and gaps, and the construction must ,‫اﻟﺻﻠﺑﺔ واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم‬
be made with resistant Portland cement, in a ratio of 3:1 (cement: sand), and it ‫ رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ‬:‫ )أﺳﻣﻧت‬1 :3 ‫ﺑﻧﺳﺑﺔ‬
must be in a regular and cohesive manner, with good filling of the voids with 7 ‫اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدة‬
m3
1.4.2 seaming, cementing and filling. The spaces between the face and the lining are ‫ ﺳم‬10 ‫اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ ﻣﻊ ﻋﻣل ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻣﻊ أﺣﺟﺎر ﻣﺗوﺳطﺔ اﻟﺣﺟم ﺑﻣﻘدار‬ 33.60
3‫م‬
filled with cement mortar and sprayed for a period of 7 days. The work is carried ‫ﻣن أﺳﻔل اﻟﻠﺣﺟر ﺑﻌد رش اﻷرض ﺑﺎﻟﻣﺎء واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل‬
out professionally, with ordinary concrete made with medium-sized stones 10 .‫ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
cm from the bottom of the stone, after spraying the ground with water. The price
includes everything necessary to implement the item, and the work is done
according to the specifications, drawings, and directions of the supervising
engineer.
Hollow concrete Block constructions 20 cm, Automatic in meter square: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ‬
Hollow concrete Block 20 cm thickness, used for external walls and internal ‫ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
partitions and where necessary, using cement mortar: 1: 3 (cement: sieved : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫اﻟدراوي و اﻟﻣﻣر اﻻﻣﺎﻣﻲ و اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزم‬ m2
1.3.2 sand),and according to drawings and specifications, and instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 32.00
2‫م‬
supervisor

Solid concrete Block constructions 20 cm, Automatic: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم‬
Solid concrete Block 20 cm thickness, used for external walls and where ‫ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
1.3.3 necessary, using cement mortar: 1: 3 (cement: sieved sand),and according to ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫ﯾﻠزم‬ 105.00
2‫م‬
drawings and specifications, and instructions of the supervisor. .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬

Total Amount of Masonary and Block Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺣﺟر و اﻟﺑﻠوك‬
1.4 Plastering and Painting Works: : ‫اﻟﺗﻠﺑﯾس واﻟدھﺎن‬
Notes: -: ‫ﻣﻼﺣظﺎت‬
1-Plastering using Ordinary Resistant Portland cement to wet. Plastering shall consists of ، ‫ ﺗﻠﺑﯾس أﺳﻧﻣﺗﻲ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم ﻟﻸﻣﻼح واﻟرطﺑﺔ ﻣﻛون ﻣن ﺛﻼث طﺑﻘﺎت‬-1
three layers: - Cement spattering layer 0.5 cm thick for all ceilings and walls with a mortar (1:2:1)‫ ﺳم ﻋﻠﻰ ﺟﻣﯾﻊ اﻷﺳﻘف واﻟﺣواﺋط ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن اﻟﺗﺎﻟﻲ‬0.5 ‫طﺑﻘﺔ طرطﺷﺔ ﺑﺳﻣك‬
consisting of (1: 2: 1) A Cement bag: 2 trolley of fine aggregate : 1 trolley of sand. It includes . ‫ﻛﻣﺎ ﯾراﻋﻰ اﻟرش اﻟﻐزﯾز ﺑﺎﻟﻣﺎء ﯾوﻣﯾﺎ ً وﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬. ‫ ﻋرﺑﯾﺔ ﻧﯾس‬:‫ ﻋرﺑﯾﺗﯾن ھﻠﺳن‬:‫ﻛﯾس اﺳﻣﻧت‬
the daily curing with water for five days . ‫ ﻧﯾس( وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ‬:‫ )أﺳﻣﻧت‬3:1‫ ﺳم ﺑﻧﺳﺑﺔ‬2-1.5 ‫و طﺑﻘﺗﻲ ظﮭﺎرة وﺑطﺎﻧﺔ ﺑﺳﻣك‬
- Two layers ( base coat and finish coat) with a thickness of 1.5-2cm by 3: 1 (Cement: sand) ,
‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬، ‫اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬
It includes the spatter dash, the base layer and the finish layer, and curing with water three
.‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
times a day, according to the drawings and specifications and instructions of the supervisor. 1-
All the work of plastering Is a cement roughening for all walls, internal ceilings, external
‫ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﯾﺎض ﺗﺧﺷﯾن إﺳﻣﻧﺗﻲ ﻟﺟﻣﯾﻊ اﻟﺟدران واﻟﺣواﺋط واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟﻣظﻼت‬.2
umbrellas, parapets and staircases of 3: 1 ratio using dots, Bands , leveling spots and ‫ ﻣﻊ اﻟﺑؤج واﻷوﺗﺎر واﻟطوارف واﻟﺧدﻣﺔ ﺑﺎﻟﻣﺣﺎرة ﺑﻌد‬3:1 ‫اﻟﺧﺎرﺟﯾﺔ واﻟدراوي واﻟﺳﻼﻟم ﺑﻣوﻧﺔ ﺑﻧﺳﺑﺔ‬
finishing with Plastering trowel after roughing. .‫اﻟﺗﺧﺷﯾن‬
2-Roofs and walls must be cleaned of wood , suspended impurities and be cured with water ‫ﯾﺟب ﺗﻧظﯾف اﻷﺳﻘف واﻟﺟدران ﻣن ﻗطﻊ اﻷﺧﺷﺎب واﻟﺷواﺋب اﻟﻌﺎﻟﻘﺔ ورﺷﮭﺎ ﺑﺎﻟﻣﺎء ﻗﺑل أﻋﻣﺎل‬.3
before plastering. .‫اﻟﺗﻠﺑﯾس‬
3-Contractor shall implement a rough cement spattering layer (450 kg cement / m3 rough ‫ رﻣل ﺧﺷن أو ھﻠﺳن ( ﻣﻊ‬3‫م‬/‫ﻛﺟم إﺳﻣﻧت‬450)‫ ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻧﻔﯾذ طﺑﻘﺔ طرطﺷﺔ إﺳﻣﻧﺗﯾﺔ ﺧﺷﻧﺔ‬.4
sand or fine aggregate) and curing with water for three days for all internal walls, ceilings, .‫اﻟرش ﻟﻣدة ﺛﻼﺛﺔ أﯾﺎم ﻟﺟﻣﯾﻊ اﻟﺟدران واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟدراوي واﻟواﺟﮭﺎت‬
parapets and front walls. ‫ ﻣﻠم ﻋﻧد اﻟﺗﻘﺎء اﻟﺟدران اﻟﺑﻠك ﺑﺎﻟﺟدران‬1‫ﺳم وﺳﻣك ﻻ ﯾﻘل ﻋن‬20 ‫ﯾﺟب ﻋﻣل ﺷﺑك ﺣدﯾد ﻋرض‬.5
4. Steel mesh, width 20 cm and thickness of not less than 1 mm should be used at the ‫اﻟﺣﺟر وﺑﺎﻷﺳﻘف واﻷﻋﻣدة وﻓوق ﻣواﺳﯾر اﻟﻛﮭرﺑﺎء وﯾﺛﺑت ﺑﺎﻟﻣﺳﺎﻣﯾر ﻣن اﻟﺟﮭﺗﯾن ﻗﺑل ﺗﻧﻔﯾذ‬
meeting of block walls with stone walls, ceilings, columns and covering all electrical and water . ‫اﻟطرطﺷﺔ‬
pipes. ‫ﯾﺟب اﺳﺗﺧدام اﻷوﺗﺎر ﻓﻲ ﻋﻣﻠﯾﺔ اﻟوزن رأﺳﯾﺎ ً وأﻓﻘﯾﺎ ً وﻋﻣل ﻣﺳﺎطر وﻧﻘﺎط ﺗﺛﺑﯾت واﺳﺗﺧدام اﻟﻘدة‬.6
5. Bands, rulers, the Aluminum panel and water Balance should be used in the vertically and .‫واﻟﻣﯾزان وﻓﻘﺎ ً ﻟﻸﺻول اﻟﻔﻧﯾﺔ اﻟﻣﺗﺑﻌﺔ‬
horizontally plastering leveling process and In accordance with established technical
.‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم أﻋﻣﺎل اﻟﺑؤج واﻷوﺗﺎر ﻟﻠﻣﮭﻧدس اﻟﻣﺷرف ﻗﺑل اﻟﺑدء ﻓﻲ اﻋﻣﺎل اﻟﺗﺄﺳﯾس‬.7
principles.
‫ﯾﻌﻣل اﻟﺗﺷطﯾب واﻟﻧﮭو ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻠﺑﯾس ﺑﺎﻟﺷﻛل اﻟﺻﺣﯾﺢ ﻣﻊ ﺿرورة إﻧﮭﺎء اﻟزواﯾﺎ اﻟداﺧﻠﯾﺔ‬.8
6. Dots & Bands works shall be approved by the supervisor engineer before base works
plastering is started. ‫واﻟﺧﺎرﺟﯾﺔ اﻟﻧﺎﺗﺟﺔ ﻣن ﺗﻘﺎﺑل اﻟﺟدران ﻣﻊ ﺑﻌﺿﮭﺎ أو ﻣﻊ ﻋﻧﺎﺻر اﺧري ﺑﺷﻛل ﺟﯾد واﻻﻋﺗﻧﺎء ﺑﮭﺎ‬
7. All plastering works have to be properly finished, like finishing the internal and external ‫اﻋﺗﻧﺎء ﺧﺎص ﯾﻧﮭو ﺗﻠك اﻟﺗﻘﺎﺑﻼت ﻣﻊ اﻷﺧذ ﻓﻲ اﻻﻋﺗﺑﺎر إن ﺗﻘﺎﺑل اﻷﺳﻘف ﻣﻊ اﻟﺟدران ﯾﻌﻣل ﺑﺷﻛل‬
angles resulting from meeting the walls with each other or with other elements like ceilings .(‫ﺳم‬1 ‫ وﻋﻧد اﻟﺣروف ﻟﻸﻋﻣدة واﻟﺟدران ﯾﺗم ﺷطﻔﮭﺎ‬,‫ﺳم‬5‫ﻣﺳﺗدﯾر)رﺑﻊ داﺋرة ﻧﺻف ﻗطرھﺎ‬
which shall be made a round(a quarter of circle 5 cm radius), Edges of columns and walls are .(‫ﻟﺦ‬...‫ﺷﺑﺎﺑﯾك‬- ‫اﻟﻛﻣﯾﺎت اﻟﻣدرﺟﺔ ﺑﺎﻟﺟدول ﻣﺧﺻوﻣﺔ اﻟﻔﺗﺣﺎت)اﺑواب‬.9
beveled 1 cm).
Plastering of ceilings, columns and stairs Portland cement : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺳﻘوف‬
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ‫ ﺗﻠﺑﯾس اﻟﺳﻘوف واﻷﻋﻣدة وﺑطن اﻟﺳﻼﻟم ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Portland cement. The item includes: Cement spattering, the base layer and the ‫ ﻣﻊ‬3 : 1 ‫وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
،‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬،‫اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬ m2
1.4.2 finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be 130.00
used at meeting points of constructions and concrete. All works will be cured .‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
Internal Wall Plastering, Portland cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺟدران اﻟداﺧﻠﯾﺔ‬
Internal Wall plastering to be done using Portland cement, The item includes: ‫ ﺗﻠﺑﯾس اﻟﺟدران واﻟﺣواﺋط اﻟداﺧﻠﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Cement Spattering, the base layer and the finish layer are made of cement ‫ وﻋﻣل اﻷوﺗﺎر‬،3 : 1 ‫اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
mortar of 1: 3 ratio, plastering wire mesh will be used at meeting points of ‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ‬،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬،‫واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬ m2
1.4.3 constructions and concrete. .‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬ 220.00
2‫م‬
Dots &bands are used for leveling of plastering. Plastering will be cured with
water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.

External plastering: External plastering to be done using Portland cement The : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬
Item includes Cement spattering using cement mortar of 300kg cement/m3 fine ‫ وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ‬،‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬،‫ ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
aggregate, base layer and the final layer are made of cement mortar of 1: 3 ،‫ ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ‬300 ‫ﻣﻛوﻧﺔ ﻣن‬
m2
1.4.4 ratio. Dots &bands are used for leveling of plastering.spraying with water three ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات‬،‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬3 : 1 ‫ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬ 227.00
2‫م‬
times a day for 5 days. Plastering wire mesh will be used at meeting points of ‫ وﺗﻌﻠﯾﻣﺎت‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬، ‫ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬
constructions and concrete. Plastering works have to be done according to .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
drawings, specifications and instructions of the supervisor.
Colored cement spattering in square meter: ‫ﺗورﯾد وﺗﻧﻔﯾذ رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﻟﻠواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ‬: ‫رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Supply and implementation of a colored cement workshop for external facades ‫ اوﺟﮫ ﺑدون ﻟون و وﺟﮭﯾن ﻣﻊ اﻟﻠون اﻟﻣطﻠوب ﺑﺣﯾث ﯾﺗم‬2 ‫ أوﺟﮫ ﺑﺣﯾث ﯾﻛون‬4 ‫واﻟﻣظﻼت‬
and umbrellas 4 sides so that it is 2 faces without color and two sides with the ‫ﺗﻌﺑﺋﺔ اﻟﻔراﻏﺎت و اﻟﺧطوط ﺑﺎﻻﺳﻣﻧت و اﻟﻔواﺻل ﺑﺎﺳﺗﺧدام اداة اﻟرش ﻣﻊ اﻟﻣﺳﺢ و اﻟﺗﻌدﯾل‬
‫ وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ وﻋﻠﻰ ان ﺗﻛون ﻣواد اﻟرﺷﺔ واﻷﻟون‬, m2
1.4.5 required color so that the spaces and lines are filled with cement and separators 227.00
using the spraying tool with wiping and modification, and where necessary . ‫ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
according to the attached detailed plans and that the spray materials and colors
are according to the instructions of the supervising engineer.
External plastering with painting by dark color : External plastering to be : ‫ﺣول اﻟﺷﺑﺎﺑﯾك ﻣﻊ اﻟدھﺎن ﺑﻠون ﻏﺎﻣﻖ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬
done using Portland cement with color thikness 4cm. and 12 cm width The Item ‫ﺳم‬4 ‫ ﻣﻊ اﻟﻠون ﺑﺳﻣﺎﻛﺔ‬،‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬،‫ ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
includes Cement spattering using cement mortar of 300kg cement/m3 fine ‫ ﻛﺟم إﺳﻣﻧت‬300 ‫ وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن‬. ‫ ﺳم‬12 ‫ﺣول اﻟﺷﺑﺎﺑﯾك وﺑﻌرض‬
aggregate, base layer and the final layer are made of cement mortar of 1: 3 : 1 ‫ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ‬
ml
1.4.6 ratio. Dots &bands are used for leveling of plastering.spraying with water three ، ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬،‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬3 116.70
‫مط‬
times a day for 5 days. Plastering wire mesh will be used at meeting points of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬
constructions and concrete. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.

1.5 Painting Works (‫أﻋﻣﺎل اﻟدھﺎﻧﺎت )اﻟرﻧﺞ‬


1- Surfaces must be completely dry before painting, moisture less than 15%. ,%15 ‫( ﯾﺟب أن ﺗﻛون ھذه اﻷﺳطﺢ ﺟﺎﻓﺔ ﺗﻣﺎﻣﺎ ً ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟدھﺎن و ﻧﺳﺑﺔ اﻟرطوﺑﺔ اﻗل ﻣن‬1
2- Walls, ceilings and other parts which need to be painted have to be well cleaned and free from ‫(ﯾﺗم ﺗﻧظﯾف اﻟﺣواﺋط واﻷﺳﻘف واﻷﺟزاء اﻟﻣطﻠوب دھﺎﻧﮭﺎ ﺟﯾدا ً ﻣن اﻷﺗرﺑﺔ واﻟﻐﺑﺎر واﻟﺷواﺋب وﻣﺧﻠﻔﺎت‬2
Dust, impurities and wastes using sandstone for rubbing. Ceilings are treated by mechanical rubbing ‫اﻟﺑﯾﺎض ﺑواﺳطﺔ اﻟﺣف ﺑﺣﺟر اﻟﻣﺳن وﺗﺗم ﻣﻌﺎﻟﺟﺔ ﺑﻼطﺎت اﻷﺳﻘف ﺑواﺳطﺔ اﻟﺣف اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﻣوﻧﺔ‬
and cement mortar then, sandpaper is used for smoothening. ( ‫)ﺛم ﻋﻣﻠﯾﺔ اﻟﺗﻧﻌﯾم ﺟﻣﯾﻊ اﻟﻣﺳﺎﺣﺎت ﺑورق اﻟﺻﻧﻔرة‬.‫اﻹﺳﻣﻧﺗﯾﺔ‬
3- Base layer of primer is used for to all surfaces need to be painted. .‫ ( ﯾﺗم ﻋﻣل طﺑﻘﺔ اﻷﺳﺎس ﻟﻸﺳطﺢ اﻟﻣراد دھﺎﻧﮭﺎ ﺣﺗﻰ ﺗﺗﺷﺑﻊ‬3
4- After base layer is dried, putty layer is done to the entire surfaces and left to dry, sanding and
‫( ﺑﻌد ﺟﻔﺎف طﺑﻘﺔ اﻷﺳﺎس ﯾﺗم ﻋﻠم طﺑﻘﺔ اﻟﻣﻌﺟون ﻟﻛﺎﻣل اﻟﺳطﺢ ﺣﺳب ﻧوع اﻟدھﺎن وﺗﺗرك ﻟﺗﺟف ﺛم ﺗﺗم‬4
cleaning by carton paper for the putty layer to be done. Dust on surface resulted from sanding and
‫ ﻣﻊ ﻧظﺎﻓﺔ اﻟﻐﺑﺎر ﻣن اﻟﺳطﺢ اﻟﻧﺎﺟم ﻋن‬،‫اﻟﺻﻧﻔرة اﻟﺗﻧﻌﯾم ﺑواﺳطﺔ اﻟورق اﻟﻛرﺗوﻧﻲ اﻟﻣﺧﺻص ﻟﮭذا اﻟﻐرض‬
softening to be cleaned, then another layer of putty with the same way is done.
5- Surfaces are painted with white primer paint and left to dry, followed by two faces of the desired .‫أﻋﻣﺎل اﻟﺻﻧﻔرة واﻟﺗﻧﻌﯾم وﺗﻌﺎد طﺑﻘﺔ ﺛﺎﻧﯾﺔ ﻣن اﻟﻣﻌﺟون ﺑﻧﻔس اﻟطرﯾﻘﺔ اﻷوﻟﻰ‬
color paint with sufficient time for each layer to dry. The final coat must be done after all other works ‫( ﯾﺗم دھﺎن اﻟﺳطﺢ ﺑوﺟﮫ دھﺎن ﺗﺣﺿﯾري أﺑﯾض ﺛم ﯾﺗرك ﻟﯾﺟف ﺗﻣﺎﻣﺎ ً وﯾﻠﯾﮫ وﺟﮭﯾن ﻣن اﻟدھﺎن ﺑﺎﻟﻠون‬5
on the surfaces is completed. ‫اﻟﻣطﻠوب ﻣﻊ اﻟوﻗت اﻟﻛﺎﻓﻲ ﻟﺟﻔﺎف ﻛل طﺑﻘﺔ ﻋﻠﻣﺎ ً ﺑﺄن اﻟوﺟﮫ اﻷﺧﯾر ﯾﺟب أن ﯾﺗم ﺑﻌد اﻛﺗﻣﺎل ﻛﺎﻓﺔ اﻷﻋﻣﺎل‬
6- The paint works shall be carried out according to the instructions of the paint manufacturer, All paint .‫اﻷﺧرى ﺑﺎﻷﺳطﺢ اﻟﻣراد دھﻧﮭﺎ‬
materials are from the same factory. ‫ ( ﯾﺗم ﺗﻧﻔﯾذ أﻋﻣﺎل اﻟدھﺎﻧﺎت ﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﺷرﻛﺔ اﻟﻣﺻﻧﻌﺔ ﻟﻠدھﺎﻧﺎت ﻋﻠﻰ أن ﺗﻛون ﻛﺎﻓﺔ ﻣواد اﻟدھﺎن ﻣن‬6
7- Interior paints consist of (6) stages. .‫ﻧﻔس اﻟﻣﺻﻧﻊ‬
8- External paints consists of (3) stages. .‫ ( ﻣراﺣل‬6 ) ‫( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟداﺧﻠﯾﺔ ﻣن‬7
9- The appropriate putty for oil paints should be used. .‫ ( ﻣراﺣل‬3 ) ‫( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟﺧﺎرﺟﯾﺔ ﻣن‬8
10- Moisture-proof plastic paint is used for exterior facades and umbrellas . .‫ ( ﯾﺟب اﺳﺗﻌﻣﺎل اﻟﻣﻌﺟون اﻟﻣﻧﺎﺳب واﻟﺧﺎص ﺑﺎﻟدھﺎﻧﺎت اﻟزﯾﺗﯾﺔ‬9
11- All samples of required paints must be approved before supply and implementation. Contractor .‫(اﻟواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت ﻟﻠطرﻗﺎت دھﺎن ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠرطوﺑﺔ‬10
shall be responsible of violation. ‫(ﯾﺟب ﺿرورة اﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻟدھﺎﻧﺎت اﻟﻣطﻠوﺑﺔ اﻟﻣﺧﺗﻠﻔﺔ ﻗﺑل اﻟﺗورﯾد واﻟﺗﻧﻔﯾذ وﯾﺗﺣﻣل اﻟﻣﻘﺎول‬11
12- Materials used in paints must be of the highest quality and certified by the Specifications and
.‫ﻣﺳؤوﻟﯾﺔ اﻟﻣﺧﺎﻟﻔﺔ‬
Metrology Authority.
‫( اﻟﻣواد اﻟﻣﺳﺗﺧدﻣﺔ ﻓﻲ اﻟدھﺎﻧﺎت ﯾﺟب أن ﺗﻛون ﻣن أﺟود اﻻﻧواع وﻣﻌﺗﻣدة ﻣن ھﯾﺋﺔ اﻟﻣواﺻﻔﺎت‬12
13- The paint shall be supplied inside its sealed original packaging, indicating the name of the
manufacturer, the type of paint, the date of production, the expiry date, the usage manual and the like. .‫واﻟﻣﻘﺎﯾﯾس‬
Paints will be stored in a suitable place and in an appropriate manner. ‫(ﯾورد اﻟدھﺎن اﻟﻰ اﻟﻣوﻗﻊ داﺧل ﻋﺑواﺗﮫ اﻷﺻﻠﯾﺔ اﻟﻣﺧﺗوﻣﺔ واﻟﻣﺑﯾن ﻋﻠﯾﮭﺎ اﺳم اﻟﺷرﻛﺔ اﻟﺻﺎﻧﻌﺔ وﻧوع‬13
14- The contractor must remove the paint stains first by first before drying and cohesion on ground or ‫ وإرﺷﺎد اﻻﺳﺗﻌﻣﺎل وﻣﺎ ﺷﺎﺑﮭﮭﺎ ﻋﻠﻰ أن ﯾﺟري ﺗﺧزﯾﻧﮭﺎ ﻓﻲ‬،‫اﻟدھﺎن وﺗﺎرﯾﺦ اﻹﻧﺗﺎج وﺗﺎرﯾﺦ اﻧﺗﮭﺎء اﻟﺻﻼﺣﯾﺔ‬
glass and have to use nylon paper or any similar on floors during the process of painting according to .‫ﻣﻛﺎن ﻣﻧﺎﺳب وﺑطرﯾﻘﺔ ﻣﻧﺎﺳﺑﺔ‬
the instructions of the engineer and after the completion of the paint to clean the stains on tiles and ‫( ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾزﯾل ﺑﻘﻊ اﻟدھﺎن أوﻻ ﺑﺄول ﻗﺑل ﺟﻔﺎﻓﮭﺎ وﺗﻣﺎﺳﻛﮭﺎ ﻋﻠﻰ اﻷرض أو اﻟزﺟﺎج وﻋﻠﯾﮫ أن‬14
glass. ‫ﯾﻘوم ﺑﻔرش ﻧﺎﯾﻠون اوﺣﻼﻓﮫ ﻋﻠﻰ اﻻرﺿﯾﺎت أﺛﻧﺎء ﻋﻣﻠﯾﺔ اﻟدھﺎن ﺗﺑﻌﺎ ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس وﺑﻌد اﻧﺟﺎز اﻋﻣﺎل‬
.‫اﻟدھﺎن ﻋﻠﯾﮫ أن ﯾﻘوم ﺑﺗﻧظﯾف اﻟﺑﻘﻊ اﻟﺗﻲ ﻋﻠﻘت ﻋﻠﻰ اﻟﺑﻼط واﻟزﺟﺎج‬

1.5.1 Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬


Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
required color , three layers of putty and sanding to be done before painting and ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬ m2
130.00
according to the drawings and specifications, and the instructions of the .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
supervisor.
Oil matte paint: : ‫دھﺎن زﯾﺗﻲ ﻣطﻔﻲ‬
Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
1.5.2 color painted above 3 coats of putty and sanding and according to the drawings ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬ 214.20
2‫م‬
and specifications, and the instructions of the supervisor .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬

1.6 Flooring & Tiling Works: :‫اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت‬


Notes : : ‫ﻣﻼﺣظﺎت‬
1.Cement mortar to be used for Installation of tiles with a mixing ratio of 3: 1. Tiles to be laid ‫ ﻣﻊ اﻟﻔرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟﻧﯾس ﺗﺣﺗﮫ‬3:1 ‫ﯾﺗم ﺗﻧﻔﯾذ اﻟﺑﻼط ﺑﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬.1
on a bedding of fine aggregate or sand . Joins between tiles are straight and regular
.‫وﺑﺣﯾث ﺗﻛون اﻟﻔواﺻل ﻣﺳﺗﻘﯾﻣﺔ وﻣﻧﺗظﻣﺔ‬
2. Tiles must be automatically fabricated and regularly cut.
3. Mosaic tiles with marble fractions is automatic made, size (25 x 25) cm , Half of the . ‫ﯾﺟب أن ﯾﻛون اﻟﺑﻼط أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ وﺑﻘص ﻣﻧﺗظم‬.2
thickness of this type made with white cement and is uniformed color. ‫(ﺳم وﯾﻛون ﻧﺻف‬25×25)‫ اﻟﺑﻼط اﻟﻣوزﯾﻛو ﺑﻛﺳر رﺧﺎم أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ ﻣﻘﺎس‬.3
4. An aluminum panel & water balance is used to ensure that the surface of tiles is leveled . ‫اﻟﺳﻣﺎﻛﺔ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض وﻣوﺣد اﻟﻠون‬
taking into account the slopes needed. ‫اﻟﺗﺄﻛد ﻣن اﺳﺗواء ﺳطﺢ اﻟﺑﻼط أﺛﻧﺎء اﻟﺗﻧﻔﯾذﺑﺎﺳﺗﺧدام اﻟﻘدة وﻣﯾزان اﻟﻣﺎء ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول‬.4
5. Joints should be cleaned thoroughly from cement residues and dust, grouted with white ‫ﯾﺟب ﺗﻧظﯾف اﻟﻔواﺻل ﺟﯾدا ً ﻣن ﺑﻘﺎﯾﺎ اﻷﺳﻣﻧت واﻷﺗرﺑﮫ وﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻷﺳﻣﻧت‬.5
cement, mechanically glazed and polished, curing with water must be done for at least 4 days
4 ‫اﻷﺑﯾض واﻟﺟﻠﻰ واﻟﺻﻘل اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻣﻊ ﺿرورة اﻟرش ﻟﻸﻋﻣﺎل اﻟﻣﻧﻔذة ﻣدة ﻻ ﺗﻘل ﻋن‬
(morning & evening).
6. Floor tiling work of bathrooms, kitchens and buffets, to be installed on a damp-proof layer
. ً‫أﯾﺎم ﺻﺑﺎﺣﺎ ً وﻣﺳﺎء‬
consists of a sackcloth layer between two faces of asphalt. A fine aggregate layer to be made ‫ﺑﺎﻟﻧﺳﺑﺔ ﻟﺑﻼط ارﺿﯾﺔ اﻟﺣﻣﺎﻣﺎت واﻟﻣطﺎﺑﺦ واﻟﺑوﻓﯾﺎت ﯾﻠزم ﺗورﯾدوﺗﻧﻔﯾذ طﺑﻘﺔ ﻋزل‬- .6
above the damp-proof layer. ‫ﺛم ﺗﻧﻔﯾذ ﺑﻧد اﻟﻌﻣل وﻓﻘﺎ ً ﻟﻣﺎ ذﻛر‬, ‫)وﺟﮭﯾن ﻣن اﻟزﻓﻠت ﺑﯾﻧﮭﻣﺎ طﺑﻘﺔ ﺧﯾش( ﺗﺣت طﺑﻘﺔ اﻟﮭﻠﺳن‬
7 - Interlock tiles bear high pressures and loads 250: 300 kg / cm2 and its strong resistance to .ً ‫ﻟﺣﻘﺎ‬
corrosion, less than 0.5 mm. ‫ وﻣﻘﺎوﻣﺗﮫ‬2‫ ﺳم‬/ ‫ ﻛﺟم‬300 : 250 ‫ ﺑﻼط اﻹﻧﺗرﻟوك ﯾﺗﺣﻣل اﻟﺿﻐوط واﻷﺣﻣﺎل اﻟﻌﺎﻟﯾﺔ‬-7
8- All tiling works shall be measured geometrically and all openings and spaces will be
. ‫ ﻣم‬0.5 ‫اﻟﺷدﯾدة ﻟﻠﺗﺂﻛل أﻗل ﻣن‬
deducted.
‫ ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﻼط ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت‬-8
Mosaic tiles 25 x 25 cm, with marble fractions, automatic in sqare meter: (‫ أﺗوﻣﺎﺗﯾﻛﻲ)ﻟﻠﻔﺻول و اﻟﻣﻣر ﯾﺗﺿﻣن اﻟراﻣب‬،‫ ﺑﻛﺳر اﻟرﺧﺎم‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
Supply and installation of Mosaic tile 25 x 25 cm, 2.5 cm thickness, mixed with : ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
marble fractions. Half thickness to be made of white and uniform color. The ‫ وﯾﻛون ﻧﺻف‬،‫ ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬2.5 ‫ وﺳﻣك‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
m2
1.6.6 item includes a bedding of sand or fine aggregate. Mosaic tiles are installed on (‫وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس‬, ‫ وﻣوﺣد اﻟﻠون‬،‫اﻟﺳﻣﺎﻛﺔ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬ 108.75
a concrete mortar of 1: 3. , Joints between tiles to be grouted using White ،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫ﺗﺣﺗﮫ‬ 2‫م‬
cement and tile surface is mechanically polished and smoothed according to ،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬.‫واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻓﻲ اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب‬
drawings and specifications, instructions of the supervisor engineer. .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Skirting Tiles : :‫أﻋﻣﺎل اﻟوزرات اﻟﺳﯾراﻣﯾك‬
Supply and apply Ceramic skirts (10cm*40cm*2cm), beveled from one of the ‫(ﺳم ﻣﺷطوﻓﺔ ﻣن اﺣد‬2*40*10) ‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب وزرات ﺳﯾراﻣﯾك ﻣﻘﺎس‬
edges (industrial rinse) for the classess, and where necessary according to the ‫ وذﻟك ﻟﻠﻔﺻول وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب ﻣﺎ ﺗﺑﯾﻧﮫ اﻟرﺳوﻣﺎت ﻣﻊ‬،(‫اﻟﺣروف )ﺷطﻔﺔ ﺻﻧﺎﻋﯾﺔ‬
drawings shown and with the approval of the provided samples before delivery :‫إﻋﺗﻣﺎد اﻟﻌﯾﻧﺎت ﻗﺑل اﻟﺗورﯾد واﻟﺛﻣن ﯾﺷﻣل‬
and the price includes: .‫ اﻟﺗﺧﺷﯾن اﻟﻸزم ﺧﻠف اﻟﻧﻌﻼت ﻓﻲ اﻟﺟدران أو اﻟﺧرﺳﺎﻧﺔ واﻟﺗﻧظﯾف‬-
- Scrapping behind the insoles in walls or concrete and cleaning. .‫وذﻟك ﻟﺗرﻛﯾب وﻟﺻﻖ اﻟﻧﻌﻼت‬، (3:1) ‫ ﻋﻣل ﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳب ﺧﻠط‬- ml
1.6.7 - Cement mortar with mixing ratios (1:3), in order to install and paste the insole. .ً ‫ اﻟﺗروﯾب ﺑﻣوﻧﺔ اﻷﺳﻣﻧت اﻷﺑﯾض وﺗﻌﺑﺋﺔ اﻟﻔواﺻل ﺟﯾدا‬- 77.00
‫ط‬.‫م‬
- Wet with white cement mortar and fill joints well. ‫ اﻟرش ﺑﺎﻟﻣﺎء ﻛﻣﺎ ﯾﺷﻣل اﻟﺛﻣن ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻧظﯾف واﻟﺗﺷطﯾب وﺗﺳﻠﯾم اﻟﻌﻣل ﻋﻠﻰ اﻛﻣل‬-
- The final treatment of the final surface and heavy spraying with water and the .‫وﺟﮫ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
price includes all the work of cleaning and finishing and delivery of work to the
fullest according to specifications and drawings and the instructions of the
supervisor engineer.
Staircase and ramp of mosaic tiles for entrances (precast). : ‫ﻣﺻﺑوب ﻟﻠﻣداﺧل‬,‫درج وﻣﻧﺣدر ﻣوزاﯾﻛواﻟﻠﻣداﺧل‬
Supply and tiling of staircase and ramp of mosaic tiles for entrance stairs, mixed ‫ﺳم)ﻗﺎﺋم‬30‫ﺳم و‬15 ‫ درج وﻣﻧﺣدر ﻣوزاﯾﻛوا ﻟﻠﻣداﺧل اﻟﻣطﻌم ﺑﻛﺳر اﻟرﺧﺎم‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
with marble fractions,15 cm for riser and 30 cm for tread, precast molded. well ‫ وﯾﺟب‬،‫ﻣﺻﺑوب ﻟﻠﻣداﺧل‬، ‫وﻧﺎﺋم ﻋﻠﻰ اﻟﺗواﻟﻲ( وﻣﻧﺣدر ﺧﺎص ﺑذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬ ml
1.6.8 mixing, curing, glazing and polishing. The item includes excavation, backfill, ‫ و ﯾﺷﻣل اﻟﻌﻣل اﻟﺣﻔر و اﻟردم و اﻟﺑﻧﺎء و‬،‫ واﻟﺟﻠﻲ واﻟﺗﻠﻣﯾﻊ‬،‫ واﻟرش‬،‫اﻟﻌﻧﺎﯾﺔ ﺑﻧﺳب اﻟﺧﻠط‬ 10.00
‫ط‬.‫م‬
construction, stone fractions layer, concrete casting and mosaic tiling according ‫ وﺗﻌﻠﯾﻣﺎت‬،‫وﺿﻊ اﻟﺷﻠف و ﺻب اﻟﺧرﺳﺎﻧﺔ و ﻋﻣل اﻟﻣوزاﯾﻛو طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
to the drawings. Specifications, and supervisor's instructions .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Total Amount of Finishing Works. ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺗﺷطﯾﺑﺎت‬

1.7 Carpentry works (wood, aluminum, iron) : (‫ ﺣدﯾد‬،‫ أﻟﻣوﻧﯾوم‬،‫أﻋﻣﺎل اﻟﻧﺟﺎرة )ﺧﺷب‬
Notes: :‫اﻟﻤﻼﺣﻈﺎت‬
1- Item prices include sanding, kneading, smoothing and painting work for all wooden elements. .‫ ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد أﻋﻤﺎل اﻟﺼﻨﻔﺮة واﻟﻤﻌﺠﻨﺔ واﻟﺘﻨﻌ ﻢ واﻟﺪﻫﺎن ﻟ ﻞ اﻟﻌﻨﺎ اﻟﺨﺸ ﺔ‬-1
2- Item prices include the supply of all necessary hardware, including hinges, bolts, and hinges, as well
as on-site installation. Door handles must be of the “ISO” type, made in Italy, or its equivalent.
‫ ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد ﺗﻮر ﺪ ﺟﻤﻴﻊ اﻟﺨﺮدوات اﻟﻼزﻣﺔ ﻣﻦ ﻫﻨﺪرا ﺎت وﻣﻐﺎﻟﻖ وﻣﻔﺼﻼت وﻛﺬا‬-2
3- Work on iron doors must be done according to the designs, including good sanding, a first layer of . ‫ ﻣﻬﺎزر اﻷﺑﻮاب ﺠﺐ أن ﺗﻜﻮن ﻣﻦ ﻧ ع" اﻳﺰو" ﺻﻨﻊ ا ﻄﺎ أو ﻣﺎ ﻌﺎدﻟﻪ‬.‫اﻟﻤﻮﻗﻊ‬ ‫اﻟ ﻛ ﺐ‬
rust-resistant paint, and two layers of acrylic paint in the specified color. ‫ذﻟﻚ اﻟﺼﻨﻔﺮة اﻟﺠ ﺪة وﻃ ﻘﺔ‬ ‫اﻷﺑﻮاب اﻟﺤﺪ ﺪة ﺠﺐ أن ﻳﺘﻢ ﻃ ﻘﺎ ﻟﻠﺘﺼﺎﻣ ﻢ ﻤﺎ‬ ‫اﻟﻌﻤﻞ‬
-3
4- The aluminum windows must be of the highest quality (excellent), provided that the sections are .‫دﻫﺎن ﻣﻘﺎوم ﻟﻠﺼﺪأ أو وﻃ ﻘﺘ دﻫﺎن أ ﻠ و ﺎﻟﻠﻮن اﻟﻤﺤﺪد‬
Saudi and their thickness is not less than 1mm, in a bronze or white color (20 microns) (factory
‫ أﻟﻤﻨﻴﻮم اﻟﻨﻮاﻓﺬ ﺠﺐ أن ﻜﻮن أر ﻧﻮﻋ ﺔ )ﻣﻤﺘﺎز(ﻋ أن ﺗﻜﻮن اﻟﻤﻘﺎﻃﻊ ﺳﻌﻮد ﺔ ﻻ ﺗﻘﻞ‬-4
corners), and the thickness of the glass is 6mm.
Likewise, the nails used in assembling and connecting aluminum sheets and columns and installing ، ‫ ﻣﻢ‬6 ‫ﻣ ﻜﺮو( )زوا ﺎ ﻣﺼﻨﻊ( و ﻜﻮن ﺳﻤﻚ اﻟﺰﺟﺎج‬20) ‫ ﻠﻮن ﺑﺮوﻧﺰي أو أﺑ ﺾ‬1mm ‫ﺳﻤﺎ ﺘﻬﺎ ﻋﻦ‬
the handles, shakers, and shutters are iron nails that are resistant to rust and scratching, or nails ‫ﺗﺠﻤﻴﻊ ور ﻂ ﺻﻔﺎﺋﺢ وﻗﻮاﺋﻢ اﻷﻟﻤﻨﻴﻮم وﺗ ﺒ ﺖ اﻟﻬﻨﺪرا ﺎت‬ ‫وﻛﺬا ﺗﻜﻮن اﻟﻤﺴﺎﻣ اﻟﻤﺴﺘﺨﺪﻣﺔ‬
coated with nickel-chrome. .‫واﻟﻤﻬﺎزر واﻟﻤﻐﺎﻟﻖ ﻣﺴﺎﻣ ﺣﺪ ﺪ ﺿﺪ اﻟﺼﺪأ واﻟﺨﺪش أو ﻣﺴﺎﻣ ﻣﻐﻠﻔﺔ ﻤﺎدة اﻟﻨ ﻞ ﻛﺮوم‬
All sharp edges must be smoothed to avoid injury during use or cleaning as well ‫ﺟﻤﻴﻊ اﻟﺤﻮاف اﻟﺤﺎدة ﺠﺐ أن ﻳﺘﻢ ﺗﻨﻌ ﻤﻪ ﻟﺘﻔﺎدي اﻻﺻﺎ ﺎت ﻋﻨﺪ اﻻﺳﺘﺨﺪام أو اﻟﺘﻨﻈ ﻒ أ ﻀﺎ‬
5-The window must be fixed 3 times on each side using 5 mm coated nails and at least 7 mm anchors
(dowels or similar). The joints must also be filled with putty. ‫ ﻣﻢ واﻟﺨﻮاﺑ ) وﺗﺪ‬5 ‫ ﻣﺮات ﻣﻦ ﻞ ﺟﺎﻧﺐ ﺎﺳﺘﺨﺪام اﻟﻤﺴﺎﻣ اﻟﻤﻐﻠﻔﺔ‬3 ‫ ﺠﺐ أن ﺗ ﺖ اﻟﻨﺎﻓﺬة‬-5
6 - Samples of doors, windows, and safety nets must be brought to the organization’s administration .‫ وﻛﺬﻟﻚ ﺠﺐ ﻣ ء اﻟﻔﻮاﺻﻞ ﺎﻟﻤﻌﺠﻮن‬.‫ ﻣﻢ ﻋ اﻷﻗﻞ‬7 (‫أو ﻣﺎﺷﺎ ﻪ‬
To be approved before starting implementation. ‫ ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﻣﻧظﻣﺔ‬- 6
7- Samples of each of the doors, windows, and safety nets must be brought to the company’s .‫ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ‬
management for approval before starting implementation.” ‫ ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﺷرﻛﺔ ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل‬-7
.‫اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ‬
Wooden strips sec.(1”*4”)-Meranti wood : : ‫ ﺧﺷب ﻣﯾراﻧﺗﻲ‬،‫(ھﻧش‬4×1) ‫ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع‬
Supply and installation of wooden strips for walls, red meranti wood, width not ‫ ﻋرض ﻻﯾﻘل‬،‫ ﻣﯾراﻧﺗﻲ أﺣﻣر‬،‫ ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
less than 10 cm and a thickness of not less than 2.5 cm, finely polished and ‫ أوﺟﮭﮫ وﺗﺛﺑت‬3 ‫ ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش‬2.5 ‫ ﺳم وﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬10‫ﻋن‬
painted 3 facets and fixed with screws every 0.50 m and a depth of not less than ‫ ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب‬3 ‫م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬0.50 ‫ﺑﺎﻟﺑراﻏﻲ ﻛل‬ ml
1.7.1 3 cm on walls and be free of defects and cracks. They shall be fixed at 70cm ‫ وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول‬،‫ ﺳم ﻣن أﻷرﺿﯾﺎت‬70 ‫واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع‬ 63.00
‫ط‬.‫م‬
from floor level, the other strips are fixed at lintels level of classrooms, ‫ وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ‬
administration, store, library and laboratory and according to the drawings, . ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications and instructions of supervisor engineer.
Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬
Square meters: aluminum windows bronze excellent quality and have throat ‫ ﻧواﻓذ اﻟوﻣﻧﯾوم ﺑروﻧزي ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
aluminum strip not less than 4×8 cm and aluminum thickness not less than 1.2 ‫ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ‬1.2 ‫ ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬8×4‫ﻋن‬
mm and uses a special rubber to seal and prevent the leakage of air or water ‫وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع‬
and all haberdashery of hinges and shutters be original type and handles Laxis ‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ‬6 ‫وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض ﺑﺳﻣك‬
‫اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت( وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ‬ m2
1.7.2 and white glass thickness of 6 mm with and iced glass or wooded invisible (in 21.00
the positions specified in the drawings) and the work of netting mosquito insect ‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت‬،‫ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬ 2‫م‬
insect for openable shutters and install the throats from all sides Two fixations ،‫)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ ﻣﻊ ﺟﻣﯾﻊ اﻟﺧردوات‬،‫اﻟﺧﺎﺻﺔ‬
on The least, fixing the glass with special calves, with all the haberdashery, .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
(measurement of internal dimensions) according to the drawings, specifications,
and instructions of the supervising engineer. (A sample must be submitted for
approval.)
Windows protection steel mesh : ‫ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬
Supply and installation of protective grid steel mesh for windows 12 mm / 15 mm and no ‫ﺳم ﺑﯾن‬12 ‫ﻣم وﺑﻌرض ﻻ ﯾزﯾد ﻋن‬15/‫ﻣم‬12‫ ﺗورﯾد وﺗﻧﻔﯾذ ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
more than 12 cm width between main vertical rods and 15 cm between horizontal rods and ‫"ھﻧش واﻟﺗﺛﺑﯾت ﺑواﺳطﺔ اﻟﻠﺣﺎم ﻣن‬2 ‫ ﺳم ﺑﯾن اﻟﻌوارض اﻷﻓﻘﯾﺔ وﺷﻠﻣﺎﻧﺎت داﺋرﯾﺔ‬15 ‫اﻟﻘواﺋم اﻟرﺋﯾﺳﯾﺔ وﻋن‬
circular planks 2 " . It will be fixed by welding from all sides. Deman mesh (2.50 x 2.50) cm is ‫ (ﺳم ﻟﺣﻣﺎﯾﺔ اﻟزﺟﺎج ﻣن اﻟﻛﺳر واﻟﻘﻣرﯾﺎت وﯾﺷﻣل اﻟرﻧﺞ‬2.50×2.50) ‫ وﺷﺑك دﯾﻣن‬, ‫ﺟﻣﯾﻊ اﻟﺟواﻧب‬
m2
1.7.3 installed to protect window glass and yemeni decoration glass ( Gamaria) . The item includes ‫وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳب‬
2‫م‬
28.20
two coats of primer base and three coats of the desired color with sanding, abrasion, .‫ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
smoothing, and all necessary, according to the instructions of the supervisor.
Gypsum Qamrya: :‫اﻟﻘﻣرﯾﺎت‬
supply and install Gypsum Qamrya studded with colored glass size (1*0.70m) ‫ﻣﺗر( وﺳﻣﺎﻛﺔ‬0.70*1) ‫ﺗورﯾد وﺗرﻛﯾب ﻗﻣرﯾﺎت ﻣن اﻟﺟص ﻣﻊ اﻟزﺟﺎج اﻟﻣﻠون ﻣﻘﺎس‬
thickness 5cm approved type, support by appropriate nails, the work must be ‫ﺳم ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﻣﻊ اﻟﺗﺛﺑﯾت اﻟﺟﯾد وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل‬5 ‫اﻟﻘﻣرﯾﺔ ﻻ ﺗﻘل ﻋن‬ pcs
1.7.4 carried out professionally and the price includes everything necessary to ‫ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬ 12.00
‫ﻋدد‬
implement the item, and the work must be done according to the specifications, .‫اﻟﻣﺷرف‬
drawings, and the directives of the supervising engineer.
Steel Doors (Provide sample to check): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟﻣراﺑﯾﻊ‬
form . Steel angle beam 2” to be welded along the perimeter of the entire door . 2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫دﺋري‬
Door frame (rectangular section panels )width is not less than 20 cm and ‫ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬
m2
1.7.5 thickness 2 mm with three hinges. The item price Includes the anti-rust paint ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬ 6.60
2‫م‬
after sanding and well abrasion, two coats of oil paint for door and locks. ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬
Frames are installed before plastering, they have to be fixed to walls by three 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
Classroom blackboards: :‫ﺳﺑورات ﺳوداء ﻟﻠﻔﺻول اﻟدراﺳﯾﺔ‬
Supply and implement cement blackboards by paste and paint size (2.4*1.2m) ‫ﻣﺗر( ﻟون اﺳود‬1.2*2.4) ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺳﺑورات اﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﻣﻌﺟون واﻟطﻼء ﻣﻘﺎس‬
chalky black color, with a wooden frame and chalk shelf, the work must be ‫طﺑﺎﺷﯾرﯾﺔ ﻣﻊ اﻟﺑرواز اﻟﺧﺷﺑﻲ وﺟﻠﺳﺎت اﻟطﺑﺎﺷﯾر وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬ pcs
1.7.6 carried out professionally and the price includes everything necessary to .‫ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 3.00
‫ﻋدد‬
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
Rainwater drainage pipes : : ‫ﻣواﺳﯾر ﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر‬
Surface length: Supply and installation of plastic pipes. Medium pressure for ‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب ﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﺿﻐط ﻣﺗوﺳط ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗطر‬ pcs
1.7.7 drainage of rainwater. 3 Inches and wall fastening (clip every 1.5 m) according ‫م( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت‬1.5 ‫ ھﻧش واﻟﺗﺛﺑﯾت ﺑﺎﻟﺟدران ﺑﺷﻛل ﺟﯾد )ﻛﻠﯾب ﻛل‬3 3.00
‫ﻋدد‬
to drawings and instructions of the supervisor. . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Total Amount of Door and Windows Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻷﺑواب و اﻟﻧواﻓذ‬
1.8 Electricity Works ‫اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
Notes : ‫ـ‬:‫ﻣﻼﺣظﺎت‬
- All materials and accessories must be of the highest quality and conform to international standards. .‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ اﻟﻌﺎﻟﻣﯾﺔ‬-
- All electrical work items will include supply of materials, installation, testing and commission. Internal wiring for all
‫ ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون اﻟﺗﻣدﯾدات داﺧﻠﯾﺔ‬-
networks shall be concealed inside plastic conduits of PVC type, conforming to British specifications BS-4607 and
shall have electrical insulation resistance of more than 100 Mega ohm.
‫ وأن‬BS-4607 ‫ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬PVC ‫ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺷﺑﻛﺎت داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع‬
Independent conduits for each electric circuit shall be used with a diameter not less than 20 cm. Flexible metal ‫ ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ‬. ‫ ﻣﯾﺟﺎ أوم‬100 ‫ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر ﻣن‬
conduits shall be used to protect wires and movable cables, such as connections of devices and motors and at ‫ﺳم وﺗﺳﺗﻌﻣل اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ‬20 ‫ﺑﻘطر ﻻ ﯾﻘل ﻋن‬
the expansion joints of the building, if any. No visible wiring is accepted , The contractor will bear responsibly of ‫ وﻻ ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات‬,.‫ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد ﻓواﺻل اﻟﺗﻣدد ﻟﻠﻣﺑﻧﻰ إن وﺟدت‬
any mistakes in the installation and shall re-install them properly . The wiring for each network must be ‫ ﻛﻣﺎ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات ﻟﻛل‬. ‫اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل ﺑﺎﻟﺷﻛل اﻟﺳﻠﯾم‬
independent of each other (Electrical lighting network, electrical sockets network, telephone network, computer ‫ ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر‬- ‫ ﺷﺑﻛﺔ اﻟﺗﻠﻔون‬- ‫ ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ‬- ‫ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
network, fire, television, etc.). They are not allowed to be mixed in conduits , partitions or boxes. A minimum
‫ ﻛﻣﺎ ﯾﺟب‬, ‫ﺗﻠﻔزﯾون وﻏﯾرھﺎ ( وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت واﻟﻌﻠب‬، ‫ ﺣرﯾﻖ‬،‫ﻛﻣﺑﯾوﺗر‬، _
distance of 40 cm should be considered between the power network and the computer and telephone networks. -
The circular and squared assembly boxes used for the switches shall be made of good plastic, Fire resistant and
. ‫ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون‬40 ‫ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ ﺗﻘل ﻋن‬
comply with the British specifications BS4662, VDE-3676 and shall have special covers to prevent penetration of ‫ ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد واﻟﻣﻘﺎوم ﻟﻠﺣرﯾﻖ‬-
moisture and insects. Those boxes will be made by the same factory which manufactured the electrical pipes, All ‫ ﻋﻠﻰ أن ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ ﺗﻣﻧﻊ ﺗﺳرب‬BS-4662 ، VDE-3676 ‫وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
sockets shall comply with (IEC 60889, 60309) specifications. ‫اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و ﯾﺟب أن ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ‬
- The contractor must submit the drawings which illustrate all electrical installations , path of pipes , places of the (IEC 60889, 60309) ‫ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
circuit breakers and electrical boards before starting any work for approval by the Engineer ‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم رﺳوﻣﺎت ﺗوﺿﯾﺣﯾﺔ ﺗﺑﯾن ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت اﻟﻛﮭرﺑﺎﺋﯾﺔ وﻣﺳﺎر اﻟﻣواﺳﯾر وأﻣﺎﻛن اﻟﻘﺳﺎﻣﺎت‬-
Submitting the As built drawings and bear the cost to the item prices.
‫وﻟوﺣﺎت اﻟﻛﮭرﺑﺎء ﻗﺑل اﻟﺑدء ﺑﺄي أﻋﻣﺎل ﻟﻼﻋﺗﻣﺎد ﻣن ﻗﺑل اﻟﻣﮭﻧدس‬
- The electrical circuits of 13A socket are the same of lighting, but that number of sockets does not exceed 6
sockets in the circuit and its wiring is (2.50) mm square. - Each socket of 20A or heater shall have an independent
‫( وﺗﺣﻣﯾل ﺗﻛﻠﻔﺗﮭﺎ ﻋﻠﻰ‬As Builte Drawing) ‫وﻋﻣل رﺳوﻣﺎت ﻟﻣﺎ ھو ﻣﻧﻔذ ﺑﺣﺳب ﻣراﺣل ﺗﻧﻔﯾذ اﻷﻋﻣﺎل‬
circuit, wire (4 mm square), pipe, and circuit breakers. - When connecting wires to each other regular connections . ‫أﺳﻌﺎر اﻟﺑﻧود‬
are used like connecters. 2.50 ) ‫ ﺑﻧﻔس طرﯾﻘﺔ اﻹﻧﺎرة ﺑﺣﯾث ﻻ ﺗزﯾد ﻋدد اﻟﻣﺂﺧذ ﻋن ﺳﺗﺔ ﻣﺂﺧذ ﻓﻲ اﻟداﺋرة وأﺳﻼﻛﮭﺎ‬13A ‫دواﺋر اﻟﻣﺂﺧذ‬-
- The executive plan of each area shall be attached to the boards of this area in a way that does not corrode or .‫( ﻣﻠم ﻣرﺑﻊ‬
affected by water. ‫ﻣﺎﺳورة وﻗﺎطﻊ‬،(‫ ﻣﻠم ﻣرﺑﻊ‬4 )‫ أو ﺳﺧﺎن داﺋرة ﻣﺳﺗﻘﻠﺔ ﺳﻠك‬20A ‫ﻛل ﻣﺄﺧذ‬-
- Samples must be submitted for all materials prior to installation. The Contractor shall bear all responsibility and connecters ‫ﻋﻧد اﻻﺣﺗﯾﺎج إﻟﻰ ﺗوﺻﯾل اﻷﺳﻼك ﻣﻊ ﺑﻌﺿﮭﺎ ﺗﺳﺗﺧدم ﺗوﺻﯾﻼت ﻧظﺎﻣﯾﺔ ﻛﻧﻛﺗرات‬-
cost of supply before the sample is approved by the Consultant. The
.‫ﯾﺗم إﻟﺻﺎق اﻟﻣﺧطط اﻟﺗﻧﻔﯾذي ﻟﻛل ﻣﻧطﻘﺔ داﺧل اﻟﻠوﺣﺎت اﻟﺧﺎﺻﺔ ﺑﮭذه اﻟﻣﻧطﻘﺔ ﺑطرﯾﻘﺔ ﻻ ﺗﺗﺂﻛل وﻻ ﺗﺗﺄﺛر ﺑﺎﻟﻣﺎء‬-
Consultant shall be entitled to reject any quantities installed or supplied before approval.
- All wires in the distribution boards shall be numbered according to the circuits numbers with plastic numbers ‫ ﯾﺟب ﺗﻘدﯾم ﻋﯾﻧﺎت ﻟﺟﻣﯾﻊ اﻟﻣواد ﻗﺑل اﻟﺗﻧﻔﯾذ واﻟﺗرﻛﯾب وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳؤوﻟﯾﺔ وﺗﻛﻠﻔﺔ اﻟﺗورﯾد ﻗﺑل‬-
designated for this purpose. These numbers will be pasted inside the switches and sockets. .‫اﻋﺗﻣﺎد اﻟﻌﯾﻧﺔ ﻣن ﻗﺑل اﻹﺳت ﺷﺎري وﯾﺣﻖ ﻟﻼﺳﺗﺷﺎري رﻓض أي ﻛﻣﯾﺎت ﯾﺗم ﺗﻧﻔﯾذھﺎ أو ﺗورﯾدھﺎ ﻗﺑل اﻋﺗﻣﺎدھﺎ‬
-All wires and cables to be made of copper with a conductivity of at least ‫ﯾﺗم ﺗرﻗﯾم ﺟﻣﯾﻊ اﻷﺳﻼك ﻓﻲ ﻟوﺣﺎت اﻟﺗوزﯾﻊ اﻟﻔرﻋﯾﺔ وﻓﻘﺎ ﻷرﻗﺎم اﻟدواﺋر ﺑﺄرﻗﺎم ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﺧﺻﺻﺔ ﻟﮭذا‬-
99%and manufactured according to the specifications of the International .‫اﻟﻐرض وﯾﺗم ﻋﻣل ھذه اﻷرﻗﺎم داﺧل اﻟﻣﻔﺎﺗﯾﺢ و اﻟﻣﺂﺧذ‬
Electricity Authority (IEC-28). Connectors and cables of motor and the like shall be flexible type to resist vibrations. ‫ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ ﻣوﺻﻼت اﻷﺳﻼك واﻟﻛواﺑل ﻣﺻﻧوﻋﺔ ﻣن اﻟﻧﺣﺎس اﻟذي ﻻ ﺗﻘل ﻣوﺻﻠﯾﺗﮫ‬-
These cables and wires must be 1000/600 volts, with suitable sections and capacity. The standard colors of wires ‫( وﺗﻛون ﻣوﺻﻼت‬IEC-28) ‫ وﻣﺻﻧﻊ طﺑﻘﺎ ﻟﻣواﺻﻔﺎت ھﯾﺋﺔ اﻟﻛﮭرﺑﺎء اﻟدوﻟﯾﺔ‬%99 ‫ ( ﻋن‬Conductivity)
and cables must be adhered. (red, yellow, blue) for power, black for neutral ,(green, green and yellow) for ground,
‫ و ﯾﺟب أن ﺗﻛون ھذه اﻟﻛﺎﺑﻼت‬. ‫وﻛﺎﺑﻼت اﻟﻣﺣرﻛﺎت وﻣﺎ ﺷﺎﺑﮫ ﻣن اﻟﻧوع اﻟﻣﺷﻌر اﻟﻣرن ﻟﺗﺣﻣل اﻻھﺗزازات‬
so that, there is no confusion between multiple wires. -Testing: Operation of all electric equipment, fittings,
insulated circuits, insulated cables, all main and subsidiary circuit breakers, earthing. ‫ ﻓوﻟت وﺑﻣﻘﺎطﻊ واﺳﺗطﺎﻋﺎت ﺗﯾﺎرﯾﮫ ﻣﻧﺎﺳﺑﺔ‬1000/600 ‫واﻷﺳﻼك ﻣن ﻓﺋﺔ‬
- Wiring through wall should be made vertically. It is strictly forbidden to break walls horizontally. ،‫ أزرق (ﻟﻠﻔﺎزات أﺳود ﻟﻠﺣﯾﺎدي )أﺧﺿر‬،‫ أﺻﻔر‬،‫وﯾﺟب اﻻﻟﺗزام ﺑﺎﻷﻟوان اﻟﻘﯾﺎﺳﯾﺔ ﻟﻸﺳﻼك واﻟﻛﺎﺑﻼت )أﺣﻣر‬
-Testing: All electric equipment , fittings, insulated circuits, insulated cables, all main and sub circuit breakers, and ‫أﺧﺿر وأﺻﻔر(ﻟﻸرﺿﻲ ﺑﺣﯾث ﻻ ﯾﻧﺷﺄ اﻟﺗﺑﺎس ﺑﯾن اﻷﺳﻼك اﻟﻣﺗﻌددة‬
earthing have to be operationalized - Work includes the installation of plastic pipes (PVC) of orange color for , ‫ﺟﻣﯾﻊ اﻟﻘواطﻊ اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ‬, ‫ﻋﺎزﻟﯾﮫ اﻟﻛﺎﺑﻼت‬, ‫ﻋﺎزﻟﯾﮫ اﻟدواﺋر‬, ‫ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻷﺟﮭزة واﻟﺗرﻛﯾﺑﺎت‬: ‫اﺧﺗﺑﺎر‬-
ceilings and black for walls with diameters ¾” & 1”, which to be placed before wiring. Wiring to be manufactured ‫اﻟﺗﺄرﯾض‬
of copper 2.5 mm high quality, insulated by plastic material with the boxes size (7 cm × 7 cm) and junction points. .‫ وﯾﻣﻧﻊ ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﻟﺗﻛﺳﯾر ﻓﻲ اﻟﺟدران ﺑﺷﻛل أﻓﻘﻲ‬.. ‫ ﯾراﻋﻰ أن ﺗﻛون ھذه اﻟﺗﻣدﯾدات رأﺳﯾﮫ‬--
- Work includes all installations from the distribution board to the distribution boxes with wires 2.5 mm and 4 mm
‫ ﯾﺟب ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻟﻣﻌدات اﻟﻛﮭرﺑﺎﺋﯾﺔ واﻟﺗﺟﮭﯾزات واﻟدواﺋر اﻟﻣﻌزوﻟﺔ واﻟﻛﺎﺑﻼت اﻟﻣﻌزوﻟﺔ وﺟﻣﯾﻊ‬:‫ اﻻﺧﺗﺑﺎر‬-
- At the intersection of a water line or a sewage line with the path of an electrical cable, the power cable should be
above and not below the installation ‫( ﺑﺎﻟﻠون اﻟﺑرﺗﻘﺎﻟﻲ‬PVC) ‫ ﯾﺷﻣل اﻟﻌﻣل ﺗرﻛﯾب اﻷﻧﺎﺑﯾب اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬- ‫ﻗواطﻊ اﻟداﺋرة اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ واﻟﺗﺄرﯾض‬
- The item includes everything necessary ‫ ﯾﺻﻧﻊ اﻻﺳﻼك ﻣن‬.‫ واﻟﺗﻲ ﯾﺟب وﺿﻌﮭﺎ ﻗﺑل ﺗوﺻﯾل اﻷﺳﻼك‬، "1 &" ¾ ‫ﻟﻸﺳﻘف واﻷﺳود ﻟﻠﺟدران ﺑﺄﻗطﺎر‬
to carry out the work to the fullest according to the attached technical specifications and engineering drawings and .‫ ﺳم( وﻧﻘﺎط اﻟوﺻل‬7 × ‫ ﺳم‬7) ‫ ﻣم ﺑﺟودة ﻋﺎﻟﯾﺔ وﻣﻌزوﻟﺔ ﺑﻣﺎدة ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺣﺟم اﻟﺻﻧﺎدﯾﻖ‬2.5 ‫ﻧﺣﺎس‬
the instructions of the supervisor ‫ ﻣم‬4 ‫ ﻣم و‬2.5 ‫ ﯾﺷﻣل اﻟﻌﻣل ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت ﻣن ﻟوﺣﺔ اﻟﺗوزﯾﻊ إﻟﻰ ﺻﻧﺎدﯾﻖ اﻟﺗوزﯾﻊ ﺑﺄﺳﻼك‬-
‫ ﯾﺟب أن ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط اﻟﻣﯾﺎه أو ﺧط اﻟﺻرف اﻟﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬-
‫وﻟﯾس أﺳﻔل اﻟﺗرﻛﯾب‬
‫ ﯾﺗﺿﻣن اﻟﻌﻧﺻر ﻛل ﻣﺎ ھو ﺿروري ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻋﻠﻰ أﻛﻣل وﺟﮫ ﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ اﻟﻣرﻓﻘﺔ واﻟرﺳوﻣﺎت‬-
‫ ﯾﺟب أن‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط ﻣﯾﺎه أو ﺧط ﺻرف ﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬- ‫اﻟﮭﻧدﺳﯾﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف‬
.‫ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ و ﻟﯾس ﺗﺣت اﻟﺗﺛﺑﯾت‬
Socket 13 A: : A 13 ‫ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬
Supply and installation of a socket 13A with a switch, It shall be concealed ‫ ﯾرﻛب داﺧل اﻟﺣﺎﺋط‬،(‫ ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗش‬A 13 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬:‫ﺑﺎﻟﻌدد‬
inside the wall with all requirements of black PVC conduits which will be bent in _‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ‬PVC) ‫ﻣﻊ ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء‬
pcs
1.8.1 the bending points using spiral spring, wires and boxes. Screws are used for ‫ واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ‬،‫ وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ‬،‫ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬ 6.00
‫ﻋدد‬
fixation. Item includes all connection to the distribution board according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗوزﯾﻊ‬
drawings and specifications , And the supervisor's instructions.
Economical ceiling fans: : ‫ﻣراوح ﺳﻘف اﻗﺗﺻﺎدﯾﺔ اﻹﺳﺗﮭﻼك‬
In number: Supply and installation of economical ceiling fans that operate on the ‫ ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺳﻘف اﻗﺗﺻﺎدﯾﺔ ﺗﻌﻣل ﻋﻠﻰ ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ ﻧوع‬: ‫ﺑﺎﻟﻌدد‬
solar energy system, excellent type, with the switch and all supplies, and ‫ﻣﻣﺗﺎز ﻣﻊ اﻟﻣﻔﺗﺎح وﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر‬ pcs
1.8.2 connection to the electrical outlet, including plastic pipes for making electrical ‫اﻟﺑﻼﺳﺗﯾﻛﯾﺔ ﻟﻌﻣل اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس‬ 6.00
‫ﻋدد‬
installations and everything necessary according to the specifications, .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
standards, and instructions of the supervising engineer.
12 line electrical distribution board: ‫وات‬10 ‫وﺣدة اﺿﺎءة اﻗﺗﺻﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻛروي‬
In number: Sub-distribution panel (single phase) Crabtree or its equivalent with ‫ واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﺗواﺑﻊ‬2D ‫وات‬10 ‫ وﺣدة اﺿﺎءة اﻗﺗﺻﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻛروي‬: ‫ﺑﺎﻟﻌدد‬
a cupboard installed inside the wall with 12 lines, according to the drawings, ‫ واﻟﺗﻰ‬PVC "4/3 ‫اﻟﻼزﻣﮫ ﻟﯾﺻﺑﺢ اﻟﺑﻧد ﺟﺎھزا ﻟﻠﻌﻣل وﻣﻧﮭﺎ ) ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ اﺳود‬ pcs
1.8.3 specifications, and instructions of the supervising engineer. ‫ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وﺗﻐطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ‬ 15.00
‫ﻋدد‬
. ‫وﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬. ‫اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬

Supply and installation of a regular lighting unit with a hemispherical : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي وﺗﺷﻣل اﻟﻣﻔﺗﺎح‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular lighting unit with a hemispherical ،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬ pcs
1.8.4 cover, including the switch and black plastic pipes (PVC). It is bent - in the ‫واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ‬ 4.00
‫ﻋدد‬
bending areas - using spring, which is placed before casting, the cans and their .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬
covers, and fixed with screws and wires from the point to the distribution panel,
according to the drawings and specifications, and the instructions of the
Total Amount of Electricity Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬

Total summation .(‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﺑﻧﺎء اﻟﻔﺻول )ﺷﺑﮫ اﻟداﺋﻣﺔ‬


Restoration and rehabilitation of bialal bin Rabah School. ‫ﺗرﻣﯾم و إﻋﺎدة ﺗﺄھﯾل ﻟﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬
2

Oil matte paint: : ‫دھﺎن زﯾﺗﻲ‬


Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
‫وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت و اﻟﻌﻣل ﯾﺷﻣل ﻣﻌﺎﻟﺟﺔ‬ m2
2.1 color painted above 3 coats of putty and sanding and according to the drawings 590.00
and specifications, and the instructions of the supervisor ،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗﻠﺑﯾس ﻓﻲ ﺣواف اﻟﻧواﻓد و ﻏﯾرھﺎ ﻣن اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺟدران‬ 2‫م‬
.‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬
Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
2.2 required color , three layers of putty and sanding to be done before painting and ،‫اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت ﺑﻌد اﻟﺗﻧﺿﯾف واﻟﻘﺷط وﺗرﻣﯾم اﻟﺗﻠﯾﯾس اﻟﺳﺎﺑﻖ‬ 380.00
2‫م‬
according to the drawings and specifications, and the instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
supervisor.
Water- Resistant Plastic Paint: : ‫دھﺎن ﻣﺎﺋﻲ ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠﻣﺎء‬
Water emulsion paint for exterior walls consists of base layer and three coats of ‫دھﺎن ﻣﺳﺗﺣﻠب ﻣﺎﺋﻲ ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ ﯾﺗﻛون ﻣن طﺑﻘﺔ أﺳﺎﺳﯾﺔ وﺛﻼث طﺑﻘﺎت ﻣن اﻟﻠون‬
‫ اﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻷﻋﻣﺎل اﻟﻼزﻣﺔ ﻟﺗﺟﮭﯾز اﻷﺳطﺢ ﻣن اﻟﺻﻧﻔرة واﻟﻣﻌﺟﻧﺔ و‬،‫اﻟﻣطﻠوب‬ m2
2.3 the required color , the price includes all the work necessary to prepare the 130.00
surfaces of sanding and kneading and all that is necessary. according to the ‫ ﺣﺳب‬.‫ﻣﻌﺎﻟﺟﺔ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺗﻠﯾﯾس ﺑﺎﻻﺳﻣﻧت ﻗﺑل اﻟدھﺎن و اﻟﻣﻌﺟﻧﺔ وﻛل ﻣﺎ ﯾﻠزم‬ 2‫م‬
drawings and specifications, and the instructions of the supervisor. . ‫اﻟﻣﺧططﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف‬
Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬
Bronze aluminum windows , excellent quality are installed. Frame section be at ‫ ﺗورﯾد و ﺗرﻛﯾب ﻧواﻓذ اﻟوﻣﻧﯾوم و درﻓﺎت ﻟﻠﻧواﻓذ اﻟﻣﻔﻘودة ﺑروﻧزي ﻧوﻋﯾﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
least 4 x 8 cm , thickness shall not be less than 1.2 mm. Special rubber shall be ‫ ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬8×4‫ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل ﻋن‬
used for sealing and preventing leakage of air or water. All fittings like hinges ‫ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ‬1.2
and locks be original types. Knobs are laxis, glass 6mm white or opaque ‫اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض‬ m2
2.4 24.00
(according to locations specified in drawings) openable-shutters are provided (‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت‬6 ‫ﺑﺳﻣك‬ 2‫م‬
with insect-resistant nets. All sides of frames are fixed with at least two rivets, ‫وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ‬
with all fittings, according Specifications, and instructions of the supervisor ‫ ﻣﻊ ﺟﻣﯾﻊ‬،‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت اﻟﺧﺎﺻﺔ‬،‫اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬
engineer (Samples needed to be provided). ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺧردوات‬
.(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫اﻟﻣﺷرف‬
Sanding and re-painting of the protective grille. :‫ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﺷﺑك ﺣﻣﺎﯾﺔ‬
Per square meter: - Sanding and repainting the protective nets using abrasives ‫ ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﻟﺷﺑﺎك اﻟﺣﻣﺎﯾﺔ ﺑﺎﻟﺟﻠﺦ و اﻟﺑرﺷﺎت و اﻟﻌﻣل ﯾﺷﻣل طﻼء‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
and sprays. The work includes painting two sides with a base primer and three ‫وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل‬ m2
2.5 sides in the required color, sanding, grinding the excess, smoothing, and .‫ﻣﺎ ﯾﻠزم وﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 24.00
2‫م‬
everything necessary, according to the directives of the supervising engineer..

Gypsum Qamrya: :‫اﻟﻘﻣرﯾﺎت‬


supply and install Gypsum Qamrya studded with colored glass size (1*0.70m) ‫ﻣﺗر( وﺳﻣﺎﻛﺔ‬0.70*1) ‫ﺗورﯾد وﺗرﻛﯾب ﻗﻣرﯾﺎت ﻣن اﻟﺟص ﻣﻊ اﻟزﺟﺎج اﻟﻣﻠون ﻣﻘﺎس‬
thickness 5cm approved type, support by appropriate nails, the work must be ‫ﺳم ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﻣﻊ اﻟﺗﺛﺑﯾت اﻟﺟﯾد وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل‬5 ‫اﻟﻘﻣرﯾﺔ ﻻ ﺗﻘل ﻋن‬ pcs
2.6 carried out professionally and the price includes everything necessary to ‫ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬ 28.00
‫ﻋدد‬
implement the item, and the work must be done according to the specifications, .‫اﻟﻣﺷرف‬
drawings, and the directives of the supervising engineer.
Wooden strips sec.(1”*4”)-Meranti wood : : ‫ ﺧﺷب ﻣﯾراﻧﺗﻲ‬،‫(ھﻧش‬4×1) ‫ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع‬
Supply and installation of wooden strips for walls, red meranti wood, width not ‫ ﻋرض ﻻﯾﻘل‬،‫ ﻣﯾراﻧﺗﻲ أﺣﻣر‬،‫ ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
less than 10 cm and a thickness of not less than 2.5 cm, finely polished and ‫ أوﺟﮭﮫ وﺗﺛﺑت‬3 ‫ ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش‬2.5 ‫ ﺳم وﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬10‫ﻋن‬
painted 3 facets and fixed with screws every 0.50 m and a depth of not less than ‫ ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب‬3 ‫م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬0.50 ‫ﺑﺎﻟﺑراﻏﻲ ﻛل‬ ml
2.7 3 cm on walls and be free of defects and cracks. They shall be fixed at 70cm ‫ وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول‬،‫ ﺳم ﻣن أﻷرﺿﯾﺎت‬70 ‫واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع‬ 204.00
‫مط‬
from floor level, the other strips are fixed at lintels level of classrooms, ‫ وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ‬
administration, store, library and laboratory and according to the drawings, . ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications and instructions of supervisor engineer.

Steel Doors(Sample needed to be check): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟﻣراﺑﯾﻊ‬
form . Steel angle beam 2” to be welded along the perimeter of the entire door . 2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫دﺋري‬
Door frame (rectangular section panels )width is not less than 20 cm and ‫ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬
‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬ m2
2.8 thickness 2 mm with three hinges. The item price Includes the anti-rust paint 22.00
after sanding and well abrasion, two coats of oil paint for door and locks. ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬ 2‫م‬
Frames are installed before plastering, they have to be fixed to walls by three 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
Supply and installation of a single fluorescent lighting unit, 120 cm, 40 : ‫ وات‬40 ‫ﺳم‬120 ‫ﺗورٌ د وﺗرﻛٌب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد‬
watts: 40 ‫ﺳم‬120 ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد‬: ‫ﺑﺎﻟﻌدد‬
In number: Supply and installation of a single fluorescent lighting unit, 120 cm 40 ‫ ( واﻟﺗﻲ ﺗوﺿﻊ‬PVC) ‫وات ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬
pcs
2.9 It comes with the key and includes plastic pipes (PVC) which are placed ‫ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطﯾﺗﮭﺎ وﻣﺳﺎﻣﯾر اﻟﻘﻠووظ واﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ‬ 16.00
‫ﻋدد‬
Before molding, cans and their lids are secured with screws and wires .‫ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
From the point to the distribution board according to the specification and
standards and with the instructions of the site engineer.
Supply and installation of a regular outdoor lighting unit with a semi-oval : ‫"ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular external lighting unit with a semi- ‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام‬PVC) ‫اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬
‫ واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك‬،‫اﻻﺳﺑرﻧﺞ‬ pcs
2.10 oval cover, including the switch and black plastic pipes (PVC). It is bent - in the 9.00
bending areas - using spring, which is placed before pouring. The cans and their .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ ‫ﻋدد‬
covers are fixed with screws and wires from the point to the distribution panel,
according to the drawings, specifications, and with the instruction of site
engineer.
Ceiling fans: : ‫ﻣراوح ﺳﻘف‬
In number: Supply and installation of fans fixed to the ceilings, excellent type, ‫ ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺗﺛﺑت ﺑﺎﻟﺳﻘوف ﻧوع ﻣﻣﺗﺎز اﺗوﻣﺎﺗﯾﻛﻲ ﻧظﺎﻣﯾن طﺎﻗﺔ ﺷﻣﺳﯾﺔ‬: ‫ﺑﺎﻟﻌدد‬
automatic, two systems solar energy and electricity systems, with the switch and ‫وﻛﮭرﺑﺎء ﻣﻊ اﻟﻣﻔﺗﺎح وﺟﻣٌﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻٌﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر‬
all supplies, and connection to the electrical outlet, including plastic pipes, which ‫واﻟﺑﻼﺳﺗﯾﻛﯾﺔ واﻟﺗﻲ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطٌﯾﺗﮭﺎ وﺗﺛﺑٌﯾﺗﮭﺎ واﻟﻣﺳﺎﻣﯾر اﻟﻘﺎﻟووظ‬
pcs
2.11 are placed before pouring, cans and their covers, and fixed with screws and ‫واﻟﺗﺳﻠﯾك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ وﯾﺗم اﻋﺗﻣﺎد اﻟﻌﯾﻧﮫ ﻣن ﻗﺑل ادارة اﻟﻣﺷروع واﻟﺛﻣن‬ 8.00
‫ﻋدد‬
wires from the point to the distribution panel. The sample is approved by the .‫◌ٌ ﯾﺷﻣل ﻛل ﻣﺎ ٌﯾﻠزم ﻻﻧﮭﺎء اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾٌﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
project management, and the price includes everything. What is necessary to
complete the work according to the specifications and instructions of the
supervising engineer..
12 line electrical distribution board: :‫ ﺧط‬12 ‫ﻟوﺣﺔ ﺗوزﯾﻊ ﻛﮭرﺑﺎﺋﯾﺔ‬
In number: Sub-distribution panel (single phase) Crabtree or its equivalent with ‫ ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ ﺗوزﯾﻊ ﻓرﻋﯾﺔ )طور اﺣﺎدي( ﻛراﺑﺗري أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ ﺑدوﻻب‬:‫ﺑﺎﻟﻌدد‬
pcs
2.12 a cupboard installed inside the wall with 12 lines, according to the drawings, ‫ طﺑﻘﺎ ً ﻣﻊ ﻋﻣل اﻟﺗﻣدﯾدات اﻟﻼزﻣﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب‬،‫ ﺧط‬12 ‫ﺗرﻛب داﺧل اﻟﺣﺎﺋط‬ 1.00
‫ﻋدد‬
specifications, and instructions of the supervising engineer. .‫اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Socket 13 A: : A 13 ‫ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬


Supply and installation of a socket 13A with a switch, It shall be concealed ‫ ﯾرﻛب داﺧل اﻟﺣﺎﺋط‬،(‫ ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗش‬A 13 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬:‫ﺑﺎﻟﻌدد‬
inside the wall with all requirements of black PVC conduits which will be bent in _‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ‬PVC) ‫ﻣﻊ ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء‬
pcs
2.13 the bending points using spiral spring, wires and boxes. Screws are used for ‫ واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ‬،‫ وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ‬،‫ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬ 15.00
‫ﻋدد‬
fixation. Item includes all connection to the distribution board according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗوزﯾﻊ‬
drawings and specifications , And the supervisor's instructions.

Rehabilitation basalt stone: :‫ﺗرﻣﯾم ﺣﺟر ﺑﺎزﻟت‬


Restoration and rebuilding of the eastern wall of the school. The work includes ‫ﺗرﻣﯾم و إﻋﺎدة ﺑﻧﺎء ﻟﺟدار اﻟﺷرﻗﻲ ﻟﻠﻣدرﺳﺔ و اﻟﻌﻣل ﯾﺷﻣل ﻗﻠﻊ اﻟﺣﺟر و ﺗرﻛﯾب ﺣﺟر ﺟدﯾد‬ m2
2.14 quarrying stone, installing new stone, and everything necessary to complete the .‫و ﻛل وﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد ﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 22.70
2‫م‬
item according to the instructions of the supervising engineer.

Repair and Repaint balustrades ‫إﻋﺎدة ﺗرﻣﯾم ودھﺎن اﻟدرﺑزﯾﻧﺎت‬


Per square meter: Repair and repaint the balustrades in the desired color, after ‫ ﺑﻌد ﺗﻘﺷﯾر‬،‫ ﻋﻣل ﺻﻧﻔرة وﺻﯾﺎﻧﺔ وإﻋﺎدة دھﺎن اﻟدرﺑزﯾﻧﺎت ﺑﺎﻟﻠون اﻟﻣطﻠوب‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
..‫ طﺑﻘﺎ ً ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ ﺛم ﻋﻣل وﺟﮭﯾن‬،‫ ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة‬،‫اﻟدھﺎن اﻟﻘدﯾم‬ ml
2.15 peeling off the old paint, using kneading and sanding, then making two sides, 10.00
according to the instructions of the supervising engineer. ‫مط‬

Rehabilitation of classroom roof: :‫ﺗرﻣﯾم ﺳﻘف اﻟﻔﺻل اﻟﺣﺎﻟﻲ‬


Restoring the roof hatch in the classroom and the work includes cleaning and ‫ﺗرﻣﯾم ﻓﺗﺣﺔ اﻟﺳﻘف ﻓﻲ اﻟﻔﺻل و اﻟﻌﻣل ﯾﺷﻣل ﺗﻧظﯾف و ﻛﺷط اﻟطﺑﻘﺔ اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﺣدﯾد‬
scraping the damaged layer, cleaning the iron, adding iron where possible, and ‫ واﻟﺧرﺳﺎة وإﺿﺎﻓﺔ ﺣدﯾد ﻓﻲ اﻷﻣﺎﻛن اﻟﻣطﻠوﺑﺔ و ﻋﻣل ﺗﺧﺷﺑﯾﺔ و ﯾﺗم اﻟﺻب ﺑﺧرﺳﺎﻧﺔ ﻣﻊ‬.lum
2.16 1.00
making woodwork, and pouring with concrete with additions (grout) and ‫ ﻋﻣل إﺿﺎﻓﺎت )ﺟراوت( و ﻣواد ﻻﺻﻘﺔ ﻟﻠﺧرﺳﺎﻧﺔ و ﻛل ﻣﺎ ﯾﻠزﻣﻼﻧﮭﺎء اﻟﺑﻧد ﺣﺳب ﺗﻌﻠﯾﻣﺎت‬.Sum
concrete adhesives (SPR) and everything necessary to finish the item according .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
to the structural engineer.
Moving the school’s main gate: Moving the school’s main gate from its main ‫ ﻧﻘل ﺑواﺑﺔ اﻟﻣدرﺳﺔ اﻟرﺋﯾﺳﯾﺔ ﻣن ﻣوﻗﻌﮭﺎ اﻟرﺋﯾﺳﻲ اﻟﻰ‬:‫ﻧﻘل ﺑواﺑﺔ اﻟﻣدرﺳﺔ اﻟرﺋﯾﺳﯾﺔ‬
location to a location determined by the supervising engineer. The work includes ‫ﻣوﻗﻊ ﯾﺣددھﺎ ﻣﮭﻧدس اﻟﻣﺷرف ﯾﺷﻣل اﻟﻌﻣل ﻓﺗﺢ ﻓﻲ اﻟﺳور ﻟﻠﺑواﺑﺔ و ﻋﻣل أﻋﻣدة ﺧرﺳﺎﻧﯾﺔ‬
opening the Yard wall for the gate and making concrete columns, along with -: ‫م وذﻟك ﺑﻌﻣل اﻵﺗﻲ‬2.2 × ‫ م‬2.8 ‫ﻣﻊ ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻟﺑواﺑﺔ اﻟﺣدﯾد ﻟﻠﻣدرﺳﺔ ﺑﺎﻷﺑﻌﺎد‬
maintaining and inspecting the school’s iron gate with dimensions of 2.8m x ‫ ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة‬-
2.2m, by doing the following: - . ‫اﻷﺟزاء اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ‬
- Replacing rusted parts of the gates and others in the door body, and plumbing ‫ اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ‬- .lum
2.17 the other parts by repairing or replacing them. ‫ ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد ﻗﻔﻠﯾن ﻛﺑﯾرﯾن أﺻﻠﻲ‬.Sum 1.00
- Replacing damaged shutters and hinges with others, making three hinges on ‫ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل‬-
each side and what is needed, and supplying two large original locks. ‫ وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر‬، ‫اﻟﻣطﻠوب‬
- Adjusting the weight and other necessary maintenance work to ensure that the ‫ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
gate is restarted as required. The contractor must visit the site before submitting
the price offer.
The item includes everything necessary according to generally accepted work
Remove the concrete water tank in the middle of the square: :‫ھدم ﺧزان اﻟﻣﺎء اﻟﺧرﺳﺎﻧﻲ ﻓﻲ وﺳط اﻟﺳﺎﺣﺔ‬
Remove of the concrete water tank in the middle of the School yard, leveling it ‫أﻋﻣﺎل ھدم ﺧزان اﻟﻣﺎء اﻟﺧرﺳﺎﻧﻲ ﻓﻲ وﺳط اﻟﺳﺎﺣﺔ ﻣﻊ ﻋﻣل اﻟﺗﺳوﯾﺔ ﻣﻊ اﻷرض اﻟطﺑﯾﻌﯾﺔ‬
2.18 with the natural land, covering it with suitable soil, and transporting the waste to ‫ وﺗﻐطﯾﺗﮭﺎ ﺑﺎﻟﺗرﺑﺔ اﻟﻣﻧﺎﺳﺑﺔ وﻧﻘل اﻟﻣﺧﻠﻔﺎت إﻟﻰ اﻟﻣوﻗﻊ اﻟﻣﻧﺎﺳب وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬.lum 1.00
the appropriate location determined and according to the instructions of the .‫ اﻟﻣﺷرف‬.Sum
supervising engineer.
Building the school wall: :‫ﺑﻨﺎء ﺳﻮر اﻟﻤﺪرﺳﺔ‬
Building the school wall where the school’s current gate is located: Building the ‫ ﺑﻨﺎء ﺳﻮر اﻟﻤﺪرﺳﺔ ﺣ ﺚ ﻣﻮﻗﻊ‬: ‫ﺑﻨﺎء ﺳﻮر اﻟﻤﺪرﺳﺔ ﺣ ﺚ ﻣﻮﻗﻊ اﻟﺒﻮا ﺔ اﻟﺤﺎﻟ ﺔ ﻟﻠﻤﺪرﺳﺔ‬
ml
2.19 school wall where the current main gate to the school’s gate is located. The ‫اﻟﺒﻮا ﺔ اﻟﺮﺋ ﺴ ﺔ اﻟﺤﺎﻟ ﺔ ﻟﺴﻮر اﻟﻤﺪرﺳﺔ و اﻟﻌﻤﻞ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻣﻦ ﺻ ﺔ ﻧﻀﺎﻓﺔ و ﺑﻨﺎء‬ 3.50
work includes all the necessary additions, building stone, building a block, and .‫ﺣﺠﺮ و ﺑﻨﺎء ﻠﻮك و اﻧﻬﺎء اﻟﺒﻨﺪ ﺑﺘﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف ﻟﻠﻤﻮﻗﻊ‬ ‫مط‬
finishing the item according to the instructions of the site’s supervising engineer.

Classroom blackboards: :‫ﺳﺑورات ﺳوداء ﻟﻠﻔﺻول اﻟدراﺳﯾﺔ‬


Supply and implement cement blackboards by paste and paint size (2.4*1.2m) ‫ﻣﺗر( ﻟون اﺳود‬1.2*2.4) ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺳﺑورات اﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﻣﻌﺟون واﻟطﻼء ﻣﻘﺎس‬
chalky black color, with a wooden frame and chalk shelf, the work must be ‫طﺑﺎﺷﯾرﯾﺔ ﻣﻊ اﻟﺑرواز اﻟﺧﺷﺑﻲ وﺟﻠﺳﺎت اﻟطﺑﺎﺷﯾر وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬
pcs
2.20 carried out professionally and the price includes everything necessary to .‫ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 6.00
‫ﻋدد‬
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
Skirting Tiles : :‫أﻋﻣﺎل اﻟوزرات اﻟﺳﯾراﻣﯾك‬
Supply and apply Ceramic skirts (10cm*40cm*2cm), beveled from one of the ‫(ﺳم ﻣﺷطوﻓﺔ ﻣن اﺣد‬2*40*10) ‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب وزرات ﺳﯾراﻣﯾك ﻣﻘﺎس‬
edges (industrial rinse) for the classess, and where necessary according to the ‫ وذﻟك ﻟﻠﻔﺻول وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب ﻣﺎ ﺗﺑﯾﻧﮫ اﻟرﺳوﻣﺎت ﻣﻊ‬،(‫اﻟﺣروف )ﺷطﻔﺔ ﺻﻧﺎﻋﯾﺔ‬
drawings shown and with the approval of the provided samples before delivery :‫إﻋﺗﻣﺎد اﻟﻌﯾﻧﺎت ﻗﺑل اﻟﺗورﯾد واﻟﺛﻣن ﯾﺷﻣل‬
and the price includes: .‫ اﻟﺗﺧﺷﯾن اﻟﻸزم ﺧﻠف اﻟﻧﻌﻼت ﻓﻲ اﻟﺟدران أو اﻟﺧرﺳﺎﻧﺔ واﻟﺗﻧظﯾف‬-
.‫وذﻟك ﻟﺗرﻛﯾب وﻟﺻﻖ اﻟﻧﻌﻼت‬، (3:1) ‫ ﻋﻣل ﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳب ﺧﻠط‬- ml
2.21 - Scrapping behind the insoles in walls or concrete and cleaning. 65.00
- Cement mortar with mixing ratios (1:3), in order to install and paste the insole. .ً ‫ اﻟﺗروﯾب ﺑﻣوﻧﺔ اﻷﺳﻣﻧت اﻷﺑﯾض وﺗﻌﺑﺋﺔ اﻟﻔواﺻل ﺟﯾدا‬- ‫مط‬
- Wet with white cement mortar and fill joints well. ‫ اﻟرش ﺑﺎﻟﻣﺎء ﻛﻣﺎ ﯾﺷﻣل اﻟﺛﻣن ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻧظﯾف واﻟﺗﺷطﯾب وﺗﺳﻠﯾم اﻟﻌﻣل ﻋﻠﻰ اﻛﻣل‬-
- The final treatment of the final surface and heavy spraying with water and the .‫وﺟﮫ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
price includes all the work of cleaning and finishing and delivery of work to the
fullest according to specifications and drawings and the instructions of the
supervisor
Mosaic engineer.
tiles 25 x 25 cm, with marble fractions, automatic in sqare meter: (‫ أﺗوﻣﺎﺗﯾﻛﻲ)ﻟﻠﻔﺻول و اﻟﻣﻣر ﯾﺗﺿﻣن اﻟراﻣب‬،‫ ﺑﻛﺳر اﻟرﺧﺎم‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
Supply and installation of Mosaic tile 25 x 25 cm, 2.5 cm thickness, mixed with : ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
marble fractions. Half thickness to be made of white and uniform color. The ‫ وﯾﻛون ﻧﺻف‬،‫ ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬2.5 ‫ وﺳﻣك‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
item includes a bedding of sand or fine aggregate. Mosaic tiles are installed on (‫وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس‬, ‫ وﻣوﺣد اﻟﻠون‬،‫اﻟﺳﻣﺎﻛﺔ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬ m2
2.22 6.00
a concrete mortar of 1: 3. , Joints between tiles to be grouted using White ،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫ﺗﺣﺗﮫ‬ 2‫م‬
cement and tile surface is mechanically polished and smoothed according to ،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬.‫واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻓﻲ اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب‬
drawings and specifications, instructions of the supervisor engineer. .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Mosaico tiles, 30 x 1.2 m, with broken marble, automatic (for stairs) in : ‫ أﺗوﻣﺎﺗﯾﻛﻲ)ﻟدرج اﻟﺳﻠم( ﺑﺎﻟﻌدد‬،‫ ﺑﻛﺳر اﻟرﺧﺎم‬،‫ م‬1.2×.30 ‫ﺑﻼط ﻣوزاﯾﻛو‬
numbers: ،‫ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬،‫ ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬3 ‫ وﺳﻣك‬،‫ م‬1×.30 ‫ﺑﻼط ﻣوزاﯾﻛو‬
Mosaico tiles, 30 x 1, 3m and 3 thick, with automatic marble breakage, with ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ‬،‫وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس( ﺗﺣﺗﮫ‬, ‫وﻣوﺣد اﻟﻠون‬
white cement, uniform colour, including a bed of holsun or sand (gneiss) ‫ واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ‬،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ﺑﻧﺳﺑﺔ‬ pcs
2.23 underneath, and placed on cement mortar in a ratio of 1:3 with the joints 12.00
‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬.‫ﻓﻲ اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب‬ ‫ﻋدد‬
impregnated with white cement, and scouring, smoothing and mechanical
polishing on site. After installation. According to the drawings, specifications,
and instructions of the supervising engineer

Supply and install main gate according to drawings. The price includes: -:‫ﺗورﯾد وﺗرﻛﯾب ﺑواﺑﺔ رﺋﯾﺳﯾﺔ ﻛﺎﻣﻠﺔ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﺛﻣن ﯾﺷﻣل اﻷﺗﻲ‬
1- Graded hardcore iron gate of …3.00…..x…2.50….m, according to the ‫ م ﺑﺣﺳب‬..3.00.......×...2.50..... ‫ ﺑواﺑﺔ ﻣن اﻟﺣدﯾد اﻟرص واطﺎر ﺷﻠﻣﺎن زاوﯾﺔ‬-1
drawings .‫اﻟرﺳوﻣﺎت‬
2- Light reinforced concrete layer 20cm, below the door swing, with 5 Ø 8mm/m ‫م‬/‫ﻣم‬8Ø5 ‫ﺳم أﺳﻔل ﻣﺣﺎور اﻟﺑﺎب ﺑﺗﺳﻠﯾﺢ‬20 ‫ طﺑﻘﺔ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﺗﺳﻠﯾﺢ ﺧﻔﯾف ﺳﻣك‬-2
in both directions, incl.20 cm hardcore layer. .‫ﺳم‬20 ‫ﻓﻲ ﻛﻼ اﻹﺗﺟﺎھﯾن ﺑﺎﻻﺿﺎﻓﺔ إﻟﻰ طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺳﻣك‬
Lum
2.24 3- Excavation for column footing 100 x 100 x 90cm. ‫ ﺳم‬90×100×100 ‫ ﺣﻔر ﻟﻘواﻋد اﻷﻋﻣدة ﺑﺄﺑﻌﺎد‬-3 1.00
Sum
4- Plain concrete layer of 10 cm for foundation. .‫ ﺳم أﺳﻔل اﻷﺳﺎﺳﺎت‬10 ‫ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣك‬-4
5- Reinforced concrete for foundation 80 x 80 x 40cm, with 8 Ø 14. .‫م‬/‫ﻣم‬14Ø8 ‫ﺳم وﺗﺳﻠﯾﺢ‬40×80×80 ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﻘواﻋد ﺑﺄﺑﻌﺎد‬-5
6- 2 columns 40 x 40 x 340cm, reinforcement 8Ø 14 and 5 Ø 8 ea m, incl. cap- ‫ واﻟﺗﻠﺑﯾس واﻟدھﺎن‬. ‫م‬/‫ﻣم‬10Ø3 ‫م و ﻛرﻧﯾش ﺑﺗﺳﻠﯾﺢ‬/‫ﻣم‬14Ø8 ‫ ﺗﻧﻔﯾذ ﻋﻣودﯾن ﺑﺗﺳﻠﯾﺢ‬-6
tie-beam,reinforced with 3 Ø 10. All plastered and painted with 3 coats of water ‫ ﺑﺣﺳب اﻟرﺳوﻣﺎت و ﺗﻌﻠﯾﻣﺎﺗﺎﻟﻣﮭﻧدس‬,‫ طﺑﻘﺎت ﻣن اﻟدھﺎن اﻷﻣﻠﺷن اﻟﻣﻘﺎوم ﻟﻠرطوﺑﺔ‬3 ‫ﻟﻠﻛل ﺑـ‬
resistant emulsion paint. .‫اﻟﻣﺷرف‬

Total summation ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة اﻟﺗﺄھﯾل ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬
‫ ﺣﻣﺎﻣﺎت‬2 ‫ﺑﻧﺎء‬
3
Building of Two bathroom

3.1 Site Works ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬


Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ‬
circumstances that surround the site, especially eventually existing slopes at the ‫ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ‬
site. . ‫ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
2. During the excavation and in the case of being unable to reach the depth ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود‬
mentioned in the drawings and/or finding the soil bearing capacity (structural ‫أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل‬
drawing) in this depth less than the required, the contractor shall contact the ‫ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول‬
project management. .‫اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬

Soil excavations: :‫ﺣﻔر اﻟﺗرﺑﺔ ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬


implement soil excavation width 0.5m till the rock (the rock near ground surface) ‫ﻣﺗر ﺣﺗﻰ اﻟوﺻول اﻟﺻﺧر )اﻟﺻﺧر ﻗرﯾب ﻣن ﺳطﺢ‬0.5 ‫ﺗﻧﻔﯾذ ﺣﻔر ﺗراﺑﻲ ﺑﻌرض‬
for foundation works The price includes everything necessary to implement the ‫اﻻرض( ﻟزوم اﻟﺗﺄﺳﯾس واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ‬
item with the disposal of the resulting materials to a suitable place with no harm ‫اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك‬ m3
3.1.1 or affect agricultural lands, water streams and private property, the work must ‫اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ 8.00
3‫م‬
be carried out professionally and the price includes everything necessary to .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.

Backfill around foundations, Bathrooms and areas that need to be: : ‫اﻟردم ﺣول أﺳﺎﺳﺎت اﻟﺣﻣﺎﻣﺎت واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك‬
Backfill with valid and clean soil mixed with graded fractions stones resulted ‫ اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
from site excavations or brought from outside to be filled around the foundations ‫اﻷﺳﺎﺳﺎت وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ‬
as well as inside the building on layers not more than 30 cm using mechanical ‫ ﺳم أوﻻ ً ﺑﺄول ﻣﻊ اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و‬30 ‫ﺗزﯾد ﻋﻠﻰ‬
compactor, curing with water to achieve the appropriate strength and get a ‫اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ‬
cohesive soil according to the specified levels. Carry out compacting of narrow ‫ ﻣﻊ ﻋدم اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ اﻟﻣوﻗﻊ‬,‫ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟرﯾﺔ‬
areas around foundations and external stone walls, causing no damage to the ‫وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك‬,
m3
3.1.2 works implemented in the site, and transfer of excess dump soil to public dumps ‫اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن‬ 6.50
3‫م‬
off site. Safe roads for trolleys to transfer materials and equipment used for ‫اﻟﻣﺧﻠﻔﺎت اﻟﻧﺎﺗﺟﺔ ﻋن اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات ﻋﻠﻰ ﺳﻼﻣﺗﮫ‬
implementation within the site to be prepared. Before project handover, site has ‫ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول‬
to be free of waste resulting from implementation as well as other factors which ‫اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬
may effect the project safety in future like landslides of various types and others, . ‫واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
taking in considerations preparation of slopes needed to drain rainwater. The
item includes all the necessary to complete the item in accordance with the
drawings and specifications and instructions of the supervisor..
Pavement bathroom surrounding in square meter: :‫أرﺻﻔﺔ ﺧﺎرﺟﯾﺔ ﺣول اﻟﺣﻣﺎﻣﺎت ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Supply and construct external side pavement around the building according to ‫ اﻟﺛﻣن‬.‫ﺗورﯾد وإﻧﺷﺎء أرﺻﻔﺔ ﺧﺎرﺟﯾﺔ ﺣول اﻟﻣﺑﻧﻰ طﺑﻘﺎ ﻟﻠﻣرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬
drawings and/or instructions by the Engineer. The price includes the following ‫ــ‬.‫ﺳم‬20 ‫ ــ طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك‬. ‫ﺳم‬30 ‫ــ ﺑﻧﺎء ﺣﺟر ﻣرﺑوع ﻋرض‬:‫ﯾﺗﺿﻣن اﻟﺗﺎﻟﻲ‬ m2
3.1.3 :Regulated stone walls 30cm thickness, hardcore (crushed stone) layer 20cm ‫ ــ ﺑﻼط ﺧرﺳﺎﻧﻲ ﻣﻠون‬.‫ﺳم‬10 ‫ ــ طﺑﻘﺔ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣك‬.‫ﺳم‬20 ‫طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك‬ 8.00
2‫م‬
thickness, plain concrete layer 10cm thickness, Colored concrete tiles .‫ﺳم ﻋﻠﻰ ﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﻻﺻﻘﺔ‬3×30×30
30x30x3cm on cement mortar.
Stairs and ramps for Bathrooms entrance: :‫إﻧﺷﺎء درج وﻣﯾول ﺧرﺳﺎﻧﻲ ﻣﻊ ﺑﻼط ﻣوزاﯾﻛو ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
Provide and construct entrance stairs & RAMP for the disabled The price ‫ﺳم وﺑﻌرض‬5 ‫ﺗورﯾد وإﻧﺷﺎء درج ﻟﻠﻣداﺧل ﻣﻊ رﻣب ﻟﻠﻣﻌﺎﻗﯾن ﻣن اﻟﺑﻼط اﻟﻣوزاﯾﻛو ﺑﺳﻣك‬
includes the following :hardcore (crushed stone) layer 20cm thickness, - -:‫ ( و اﻟﻌﻣل ﯾﺷﻣل اﻷﺗﻲ‬3.0‫ ﻋرض و طول‬1.2) ‫ﺳم‬15 ‫ﺳم وإرﺗﻔﺎع اﻟﻘﺎﺋﻣﺔ‬30 ‫اﻟﻧﺎﺋﻣﺔ‬
foundations of plain concrete , compacted stone, and squared stones, Terrazzo ‫اﺳﺎﺳﺎت ﻣن اﻟﺟﻌم واﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ واﻟﻣﺑﺎﻧﻲ اﻟﺣﺟر‬- ,‫ﺳم‬20 ‫طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك‬ ml
3.1.4 9.00
tiles (concrete with marble fragments) for stair treads and risers on cement ‫ ﺗﻠﺑﯾس ﺑﻼط ﻣوزاﯾﻛو )ﻣطﻌم ﺑﻛﺳر اﻟرﺧﺎم( ﻟﻠﻘواﺋم و اﻟﻧواﺋم ﻋﻠﻰ ﻣوﻧﺔ اﺳﻣﻧﺗﯾﺔ‬.‫اﻟﻣرﺑوع‬ ‫ط‬.‫م‬
mortar, inclusive all related works according to drawings and/or instructions of ‫ﻣﻊ اﻟﺟﻠﻲ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﺗﻧﻌﯾم اﻟﺗﺎم و ﻛل ﻣﺎﯾﻠزم ﻷﻧﮭﺎء اﻟﺑﻧد طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
the Engineer. .‫وأﺻول اﻟﻌﻣل وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Total Amount of site work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﻣوﻗﻊ‬

3.2 Concrete Works ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ‬


Reinforced concrete 250 kg / cm 2, for cemells (ground beams): : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﻟﻠﻣﯾد اﻷرﺿﯾﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ‬
Reinforced concrete for footings, foundations, column necks and cemells ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
(ground beams) using Portland Cement, with resistance of not less than 250 kg ‫ ھز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫ﻻ ﺗﻘل ﻋن‬
m3
3.2.1 / cm 2. Item includes (shuttering, steel supply and cutting, casting, vibrating ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز واﻟرش‬ 1.51
3‫م‬
concrete using a vibration machine and spattering of water.( and all necessary) . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
.All works to be done according to drawings, specifications, and engineer
supervisor instructions .
Reinforced concrete for ceilings and beams, 250 kg / cm 2, Portland :‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ،‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور‬
Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Reinforced concrete for ceilings and beams using Portland Cement:with ‫ ﺗورﯾد وﻗص ووﺿﻊ‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬ m3
3.2.2 resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،(‫ واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم‬،‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫اﻟﺣدﯾد‬ 3.06
3‫م‬
and cutting, casting, vibrating concrete using a vibration machine and curing of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
water.( and all necessary) .All works to be done according to drawings,
specifications, and engineer supervisor instructions.
Light reinforcement concrete for Bathrooms, Portland cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺧرﺳﺎﻧﺔ ﺧﻔﯾﻔﺔ اﻟﺗﺳﻠﯾﺢ ﻟزوم اﻟﺣﻣﺎﻣﺎت‬
Light reinforcement concrete with Portland cement, with not less than 200 200 ‫ ﺧرﺳﺎﻧﺔ ﺧﻔﯾﻔﺔ اﻟﺗﺳﻠﯾﺢ إﺳﻣﻧت ﺑورﺗﻼﻧدي ﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
kg/cm2 resistance, using Portland cement, Number of steel bars used not less ‫م‬/12 ‫ ق‬5 ‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑروﺗﻼﻧدي اﻟﻣﻘﺎوم ﻋﻠﻰ أﻻ ّ ﯾﻘل ﻋدد اﻷﺳﯾﺎخ ﻋن‬،2‫ﺳم‬/‫ﻛﺟم‬
than (5 bars12mm Dia/m) in both directions (top and bottom). Mechanical 20 ‫ﻓﻲ اﻹﺗﺟﺎھﯾن ) ﻓرش وﻏطﺎء( ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر أﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺳﻣك‬ m3
3.2.3 Casting shall be used on a rock fractions layer of 20 cm thickness, Item ،‫ اﻟرش‬،‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،‫ﺳم‬ 0.81
3‫م‬
includes (shuttering, steel supply and cutting, casting, vibrating concrete using a .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ‬،(‫وﻛل ﻣﺎ ﯾﻠزم‬
vibration machine and spraying of water.( and all necessary) .All works to be
done according to drawings, specifications, and engineer supervisor instructions.

Total Amount of concrete work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ‬


3.3 Stone and Brick Works ‫اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬
3.3.1 Black stone construction (basalt or granite) in meter cubic: :‫ﻣﺑﺎﻧﻲ ﺣﺟر ﻣﻧﺷﺎر أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻛﻌب‬
Squared black stone construction 15 cm thickness for the basalt stone base ‫ ﺑﻧﺎء ﺣﺟر ﻣﻧﺷﺎر ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
obtained from the project area(basalt or granite) or similar stones. Black stones ‫ ﺳم وأن ﺗﻛون‬15 ‫ﺟراﻧﯾت( ﻣﻧﺷﺎر ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء‬
have to be tailed, free of the veins and gaps, Rows height not more than 30 cm. ‫ﺳم وان‬30 ‫اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف ﻻﯾزﯾد ﻋن‬
Cement mortar solty soil resistance used to be made of 3: 1 (cement: sand) . ‫رﻣل( ﻣﻊ اﻟﺗدرﯾز‬:‫)اﺳﻣﻧت‬3:1 ‫ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ‬
Starting from the ground level, Wall joints have to be smoothed, recessed ‫واﻟﺗﻛﺣﯾل ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب‬
pointing and then be well cured with water. Fronting and lining stones have to be ‫اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ‬ m3
2.11
well interconnected using longitudinal stone connecting the entire thickness of .‫ﻛري( وﻋﻠﻰ ان ﯾﻛون اﻟﻛري ﻣﺗدرج‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬ 3‫م‬
the wall every 2 linear meter, spaces have to be well filled with concrete of(1: ‫وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك اﻟﺣﺎﺋط ﻛل‬
cement: 2.5 sand: 5 graded aggregate), taking into account the interconnection ‫اﺛﻧﯾن ﻣﺗر طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن‬
of stones when connecting two walls .All stone works have to be well and ‫ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬
enough spattered with water. Item Price includes building to the design levels . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
according to the drawings and specifications and instructions of the supervisor.
3.3.2 Hollow concrete Block constructions 20 cm, Automatic in meter square: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ‬
Hollow concrete Block 20 cm thickness, used for external walls and internal ‫ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
partitions and where necessary, using cement mortar: 1: 3 (cement: sieved : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫اﻟدراوي و اﻟﻣﻣر اﻻﻣﺎﻣﻲ و اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزم‬
m2
sand),and spraying by water for 7days, the work must be carried out ‫ اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬7 ‫ ﻣﻊ اﻟرش ﻟﻣدة‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 18.00
2‫م‬
professionally and the price includes everything necessary to implement the .‫ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.
3.3.2 Solid concrete Block constructions 20 cm, Automatic: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم‬
Solid concrete Block 20 cm thickness, used for external walls and where ‫ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
necessary, using cement mortar: 1: 3 (cement: sieved sand),and spraying by ‫ اﯾﺎم‬7 ‫ ﻣﻊ اﻟرش ﻟﻣدة‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫ﯾﻠزم‬
m2
water for 7days, the work must be carried out professionally and the price ‫وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬ 55.00
2‫م‬
includes everything necessary to implement the item, and the work must be .‫واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
done according to the specifications, drawings, and the directives of the
supervising engineer.
3.3.3 Stone buildings under the foundation in cubic meter:- -:‫ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻛﻌب‬
In cubic meters: stone chair buildings under the tide thickness of 60 cm and ‫ ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر‬60 ‫ ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
must be of hard stones and free of veins and gaps and that the construction be ,‫اﻟﺻﻠﺑﺔ واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم‬
resistant Portland cement, in a ratio of 3: 1 (cement: sand) with good stuffing ‫ رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ‬:‫ )أﺳﻣﻧت‬1 :3 ‫ﺑﻧﺳﺑﺔ‬ m3
and filling the blanks between face and lining of walls with cement mortar and 7 ‫اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدة‬ 6.40
3‫م‬
spraying by water for 7days, the work must be carried out professionally and the ‫اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬
price includes everything necessary to implement the item, and the work must .‫واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
be done according to the specifications, drawings, and the directives of the
supervising engineer.
Total Amount of concrete work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ‬
3.4 Plastering and Painting Works: : ‫اﻟﺗﻠﺑﯾس واﻟدھﺎن‬

3.4.1 Wall Plastering, Portland cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺟدران اﻟداﺧﻠﯾﺔ‬


Wall plastering to be done using Portland cement, The item includes: Cement ‫ ﺗﻠﺑﯾس اﻟﺟدران واﻟﺣواﺋط ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Spattering, the base layer and the finish layer are made of cement mortar of 1: 3 ‫ وﻋﻣل اﻷوﺗﺎر واﻟودع‬،3 : 1 ‫واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
ratio, plastering wire mesh will be used at meeting points of constructions and ‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء‬،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬،‫ﻟوزن اﻟﺗﻠﺑﯾس‬ m2
28.96
concrete. .‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬ 2‫م‬
Dots &bands are used for leveling of plastering. Plastering will be cured with
water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
3.4.2 Plastering of ceilings, columns and stairs Portland cement : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺳﻘوف‬
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ‫ ﺗﻠﺑﯾس اﻟﺳﻘوف ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Portland cement. The item includes: Cement spattering, the base layer and the ،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬3 : 1 ‫اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬ m2
used at meeting points of constructions and concrete. All works will be cured .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 8.58
2‫م‬
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.

3.4.3 Plastering of Drawi Portland cement : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟدراوي‬


Ceilings, columns and bottom surface of stairs to be plastered with Resistant ‫ ﺗﻠﺑﯾس اﻟدراوي ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Portland cement. The item includes: Cement spattering, the base layer and the ،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬3 : 1 ‫اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬ m2
5.52
used at meeting points of constructions and concrete. All works will be cured .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
3.4.4 Colored cement spattering: : ‫رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ‬
Supply and implementing colored cement spattering for external facades, ‫ﺗورﯾد وﺗﻧﻔﯾذ رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﻟﻠواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت وﺣﯾﺛﻣﺎ ﯾﻠزم‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
umbrellas and where necessary according to the attached detailed drawings. ‫ أوﺟﮫ وﺟﮭﯾن ﺑدون ﻟون و ووﺟﮭﯾن ﻣﻊ اﻟﻠون ﻣﻊ ﺿﻣﺎن ﺗﻐطﯾﺔ ﻓواﺻل اﻟﺑﻧﺎء ﻓﻲ اﻟﺑﻠوك‬4 m2
60.00
The spattering materials and colors shall be made according to the instructions ‫ﻗﺑل اﻟرش ﺑﺣﺳب اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ وﻋﻠﻰ ان ﺗﻛون ﻣواد اﻟرﺷﺔ واﻷﻟون‬ 2‫م‬
of the supervising engineer. . ‫ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
3.4.5 Oil matte paint in square meter: :‫دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Oil matte paint for walls consists of a primer coat and three coats of the required ‫دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ‬ m2
color painted above 3 coats of putty and sanding and according to the drawings ،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬، ‫ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬ 49.00
2‫م‬
and specifications, and the instructions of the supervisor .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
3.4.6 Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬
Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬ m2
required color , three layers of putty and sanding to be done before painting and ‫اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت ﺑﻌد ﺗﻧﺿﯾف و ﻗﺷط اﻻﺳﻘف و ﻣﻌﺎﻟﺟﺔ اﻟﺗﻠﺑﯾس‬ 9.00
2‫م‬
according to the drawings and specifications, and the instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗﺎﻟف‬
supervisor.
Total Amount of Plastering and Painting Work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻟﺗﻠﺑﯾس و اﻟدھﺎن‬
3.5 Flooring & Tiling Works: :‫اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت‬
Granulated Ceramic Tiles : ‫ﺑﻼط ﺳﯾراﻣﯾك ﻣﺣﺑب‬
Supply and installation of Granulated Ceramic tiles for floors similar to the quality of the Spanish ‫ﻣﺎﻧﻊ ﻟﻠﺗزﺣﻠﻖ‬،‫ ﺑﻼط ﺳﯾراﻣﯾك ﻣﺣﺑب ﻟﻸرﺿﯾﺎت ﻣﺎﯾﻣﺎﺛل ﺟودة اﻟﺑﻼط اﻷﺳﺑﺎﻧﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
tile and is anti skidding. Tiles to be installed using cement mortar 1:3 on a layer of fine aggregate : 1 ‫ وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن او اﻟرﻣل اﻟﺧﺷن ﺗﺣﺗﮫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,(‫)ﻣﺧﺷن‬ m2
2.5.1 and sand . Joints between tiles to be grouted with White cement according to drawings and 9.00
‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 2‫م‬
specifications, instructions of the supervisor engineer.
.‫اﻟﻣﺷرف‬
Ceramic Qaishani tiles: : ‫ﺑﻼط ﺳﯾراﻣﯾك ﻗﯾﺷﺎﻧﻲ‬
Supply and installation of Ceramic tiles for walls, similar to the Spanish tiles size 15 × 15 cm or 10 ‫ ﺳم‬10×10 ‫ ﺳم أو‬15×15 ‫ ﺑﻼط ﻗﯾﺷﺎﻧﻲ ﻣﺎﯾﻣﺎﺛل ﺟودة اﻟﺑﻼط اﻷﺳﺑﺎﻧﻲ ﻣﻘﺎس‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬ m2
2.5.2 × 10 cm , It shall be installed on cement mortar of 1: 3, Joints are grouted with white cement ً ‫ طﺑﻘﺎ‬،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ﻟﻠﺟدران وﯾﺛﺑت ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬ 28.20
according to the drawings and specifications, and the instructions of the supervisor. 2‫م‬
.‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬

Total Amount of Flooring & Tiling Work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت‬
3.6 Metal, Aluminum & Wood Works: ‫اﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎره‬
3.6.1 Aluminum windows for bathrooms (special type): :(‫ﻧواﻓذ اﻟﻣﻧﯾوم ﻟﻠﺣﻣﺎﻣﺎت )ﻧوﻋﯾﺔ ﻗطﺎع ﺧﺎص‬
supply and install Aluminum windows size (0.6*0.6m) for bathrooms special and ‫ ﻗطﺎع ﺧﺎص ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة‬،‫ﻣﺗر( ﻟﻠﺣﻣﺎﻧﺎت‬0.6*0.6) ‫ﺗورﯾد وﺗرﻛﯾب ﻧواﻓذ اﻟﻣﻧﯾوم ﻣﻘﺎس‬
approved type, support by appropriate nails, closing, install all belongings ‫ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺧواﺑﯾر ﻣﻧﺎﺳﺑﺔ واﻟﺗﻛﺗﯾم وﺗرﻛﯾب ﻣﻠﺣﻘﺎت اﺻﻠﯾﺔ ﻣﻌﺗﻣدة )ﻣﻔﺻﻼت ورﺑﻼت‬
excellent quality (hands, rapper, nails, ..etc.), the work must be carried out ‫وﻣﺳﻛﺎت وﻣﺳﺎﻣﯾر وﻛل ﻣﺎ ﯾﻠزم( وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد‬ pcs
2.00
professionally and the price includes everything necessary to implement the .‫وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.

3.6.2 “Harden iron doors: (a sample must be submitted for approval): :(‫ )وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Per square meter: Supply and installation of galvanized iron doors (1.0 * 2.2) ‫( ﻣﺗر ﻣﻊ ﻋﻣل‬2.2 * 1.0) ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
meters, with the shutter made of square iron (1 inch It is not less than 20 cm ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ‬
and 2 mm thick, with three hinges, including anti-rust paint after sanding and 20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫ﻋﻣل ﺷﻠﻣﺎن دﺋري‬
good grinding of the welding traces, with two other sides of oil paint for the door ‫ ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬2 ‫ﺳم وﺳﻣك‬
pcs
and shutters, provided that the shavings are executed before the paneling work ‫اﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬ 2.00
‫ﻋدد‬
and the shavings are fixed to the walls at least three points on each side with ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬
iron staples, 16 mm in diameter and 20 cm long, placed inside the stone and 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
welded accordingly. Directions and instructions of the supervising engineer. .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
"

3.6.3 Steel Doors (Sample needed to approve): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (0.8” ‫( ﻣﻊ ﻋﻣل اﻟدرﻓﮫ‬2.0 * 0.8) ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
× 2”) , Thickness 1.3 mm, Steel panels are placed together in excellent ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ‬
technical form . Steel angle beam 2” to be welded along the perimeter of the ‫ﺳم‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫ﺷﻠﻣﺎن دﺋري‬
entire door . Door frame (rectangular section panels )width is not less than 20 ‫ ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬2 ‫وﺳﻣك‬ pcs
cm and thickness 2 mm with three hinges. The item price Includes the anti-rust ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬ 2.00
‫ﻋدد‬
paint after sanding and well abrasion, two coats of oil paint for door and locks. ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬
Frames are installed before plastering, they have to be fixed to walls by three 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
3.6.4 Metal steel mesh for windows: :‫ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ‬
supply and install Security steel grills for windows size (0.6*0.6m)approved type, ‫ﻣﺗر( ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﺷﻠﻣﺎﻧﺎت وﻣﺻﺑﻌﺎت‬0.6*0.6) ‫ﺗورﯾد وﺗرﻛﯾب ﺷﺑك ﺣدﯾد ﺣﻣﺎﯾﺔ ﻣﻘﺎس‬
heavy steel frames and bars, include paint and support by appropriate nails,, the ‫ﻣن اﻟﺣدﯾد اﻟﺟﺎﻓﻲ ﻣﻊ اﻟطﻼء واﻟﺗﺛﺑﯾت ﺑﺧواﺑﯾر ﻣﻧﺎﺳﺑﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل‬ pcs
work must be carried out professionally and the price includes everything .‫ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2.00
‫ﻋدد‬
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.

Total Amount of Metal, Aluminum & Wood Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎره‬
3.7 Sanitary Works ‫اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ‬
Notes: -:‫ﻣﻼﺣظﺎت‬
Internal and external drainage works ‫أﻋﻣﺎل اﻟﺻرف اﻟداﺧﻠﻲ واﻟﺧﺎرﺟﻲ‬
1- All drainage and ventilation pipes shall be UPVC. ‫( ﻣﻊ أﻏطﯾﺔ ﺗﻧظﯾف ﻗﺎﺑﻠﺔ ﻟﻠﻔك ﻓﻰ اﻷﻛواع‬UPVC) ‫ ﺟﻣﯾﻊ ﻣواﺳﯾر اﻟﺻرف اﻟﺻﺣﻲ واﻟﺗﮭوﯾﺔ ﯾﺟب أن ﺗﻛون ﻧوع‬-1
All drainage pipes shall have a removeable cleaning cap at the elbow outside the building. . ‫ﺧﺎرج اﻟﻣﺑﻧﻰ‬
2- The contractor shall construct manholes outside the building if a 90 degree change in flow direction ‫درﺟﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول ﺑﻧﺎء ﻏرﻓﺔ اﻟﺗﻔﺗﯾش ﺧﺎرج اﻟﻣﺑﻧﻰ ﻟﺗﺣﺎﺷﻲ ذﻟك‬90 ‫ إذا ﻛﺎن ﻻﺑد ان ﺗﻛون زاوﯾﺔ ﺗﻐﯾﯾر اﻹﺗﺟﺎه‬-2
is not avoidable. .‫ﺳم وﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻠﻘﺎﻋﺔ ﻣﻊ اﻟﺗﻠﺑﯾس اﻷﺳﻣﻧﺗﻲ‬40×20×20 ‫ ﻛل ﻏرف اﻟﺗﻔﺗﯾش ﯾﺗم ﺑﻧﺎءھﺎ ﻣن اﻟﺑﻠك اﻟﺻم ﺑﺄﺑﻌﺎد‬-3
3- All manholes shall be constructed of solid concrete blocks 20x20x40cm, with 15cm subbase of plain ‫ درﺟﺔ‬45 ‫ ﺗﻐﯾﯾر اﺗﺟﺎه اﻟﻣواﺳﯾر ﯾﺟب ان ﯾﺗم ﺑﺎﺳﺗﺧدام رﻛﺑﺗﯾن ﺑزاوﯾﺔ‬-4
concrete,and cement plaster. .‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ أدوات اﻟﺳﺑﺎﻛﺔ ﻣﻐطﺎة ﺑﺎﻟﻛروم‬-5
4- Changing the drainage pipe direction shall be done only with two 45 degree elements. ‫ ﺗورﯾد وﺗرﻛﯾب ﺻﻧﺎدﯾﻖ طرد ﻟﻠﺣﻣﺎﻣﺎت وﻛل ﻣﺎ ﯾﻠزم‬-6
5- All fittings and accessories shall be chrome-plated. -:‫أﻋﻣﺎل اﻟﺗﻐذﯾﺔ‬
6- Supply & install syphons for WC's with all related works. ‫ ﺑﻼﺳﺗﯾك ﻟﻠﺗﻣدﯾدات‬PVC ‫ ﺟﻣﯾﻊ ﻣواﺳﯾراﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ ﻟﻠﻣﯾﺎه ﯾﺟب أن ﺗﻛون ﻣن اﻟﺣدﯾد اﻟﻣﺟﻠﻔن و ﻣواﺳﯾر‬-1
Water Supply Works: (‫ﺑوﺷﺎت وﺧﻼﻓﺔ‬، ‫ ﻣﺷﺗرﻛﺎت‬، -‫ﻣﺣﺎﺑس‬، ‫ ﻟواﻛﯾر‬، ‫اﻟداﺧﻠﯾﺔ واﻟﺛﻣن ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﻘطﻊ واﻟﺗوﺻﯾﻼت ﻣن)ﻛﯾﻌﺎن‬
1- All external water supply pipes shall be galvanized steel and PVC for internal connections . They .‫ ﻛل ﻛﻠﯾﺑﺎت اﻟﺗﺛﺑﯾت ﯾﺟب أن ﺗﻛون ﻣن اﻟﺣدﯾد اﻟﻣﺟﻠﻔن‬-2
shall be installed concealed. The price includes all required materials. .‫ ﯾﺟب إﺳﺗﺧدام ﺧﯾوط اﻟﻛﺗﺎن ﻓﻲ ﺟﻣﯾﻊ اﻟرﺑطﯾﺎت واﻟﺗوﺻﯾﻼت أو اﻟﻠﺻﻘﺔ اﻟﺑﯾﺿﺎء‬-3
2- All fixing clips shall be galvanized steel. ‫ ﺳﺎﻋﺔ‬24 ‫ ﺑﺎر ﻟﻣدة‬10 ‫ اﻟﺗرﻛﯾب ﯾﺗﺿﻣن ﺗﺟرﺑﺔ ﺷﺑﻛﺔ اﻟﺗﻐذﯾﺔ ﺗﺣت ﺿﻐط‬-4
3- Connection threats shall be fixed by either using flax or thread-tape. -:‫ﻣﻼﺣظﺔ ﻋﺎﻣﺔ‬
4- The installation includes the testing of the complete water supply net under the pressure of 10 bar ‫ ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول اﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻠرﺑطﯾﺎت اﻟﻣﺳﺗﺧدﻣﺔ ﻓﻰ ﺗﺛﺑﯾت اﻷدوات اﻟﺻﺣﯾﺔ ﻗﺑل اﻟﺗرﻛﯾب‬-1
for 24 hours. ‫ ﻛل اﻷدوات واﻟﻣواد ﻓﻰ اﻟﺣﻣﺎﻣﺎت وأﺣواض اﻟﻐﺳﯾل‬. ‫ ﺟﻣﯾﻊ اﻟﺣﻧﻔﯾﺎت ﯾﺟب أن ﺗﻛون ﻣﺻﻧوﻋﺔ ﻣن ﻧﯾﻛل اﻟﻛروم‬-2
General notes: .‫ ﯾﺟب أن ﺗﻛون ﻧظﯾﻔﺔ أﺛﻧﺎء اﻟﺗرﻛﯾب‬.‫اﻟﺦ‬
1- The Contractor shall submit samples for all sanitary fixtures before installation.
2- All internal taps shall be nickel-chrome plated.
Fixtures like toilet bowls, wash basins etc. shall be kept clean during installation.

3.7.1 Completed Arabic toilet: :‫ﻣرﺣﺎض ﻋرﺑﻲ ﻣﺗﻛﺎﻣل‬


Supply, install, and operate completed Arabic toilet include elbow, Arabic ‫ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل ﻣرﺣﺎض ﻋرﺑﻲ ﻣﺗﻛﺎﻣل ﻣﻊ اﻟﻛوع وﺳﯾﻔون ﻋرﺑﻲ وﻣﺷن ارﺿﻲ‬
siphon, floor drains, include sewage connection by plastic pipes dim=6" (0.5 of ‫ ھﻧش )ﻧﺻف ﺿﻐط(ﻣﻊ‬6 ‫ﻣﻊ ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
total pressure) with ventlation pipe/bathroom , and the work include water feeds ‫اﻧﺑوب ﺗﮭوﯾﺔ ﻟﻛل ﺣﻣﺎم وﻛذﻟك اﻟﻌﻣل ﯾﺷﻣل ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬ pcs
by plastic pipes diameter 0.5" with heavy steel faucet, valves, ... etc. and all ‫ھﻧش وﻣﻊ ﺗرﻛﯾب ﺣﻧﻔﻲ اﻟﻧﯾﻛل ﻛروم ﺛﻘﯾل وﻣﺣﺎﺑس ﻣﻊ ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ﻗطﻊ‬0.5 2.00
‫ﻋدد‬
fittings, all items must be excellent quality and approved, the work must be ‫ووﺻﻼت وﻣﺣﺎﺑس وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل‬
carried out professionally and the price includes everything necessary to .‫ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
3.7.2 Completed flush toilet: :‫ﻣرﺣﺎض اﻓرﻧﺟﻲ ﻣﺗﻛﺎﻣل‬
Supply, install, and operate completed Arabic toilet include elbow, Arabic ‫ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل ﻣرﺣﺎض اﻓرﻧﺟﻲ ﻣﺗﻛﺎﻣل وﺳﯾﻔون اﻟﺧﺎص ﺑﮫ ﻣﻊ ﺗﻣدﯾدات اﻟﺻرف‬
siphon, floor drains, include sewage connection by plastic pipes dim=6" (0.5 of ‫ ھﻧش )ﻧﺻف ﺿﻐط(ﻣﻊ اﻧﺑوب ﺗﮭوﯾﺔ ﻟﻛل ﺣﻣﺎم‬6 ‫اﻟﺻﺣﻲ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
total pressure) with ventlation pipe/bathroom , and the work include water feeds ‫ھﻧش وﻣﻊ ﺗرﻛﯾب‬0.5 ‫وﻛذﻟك اﻟﻌﻣل ﯾﺷﻣل ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
pcs
by plastic pipes diameter 0.5" with heavy steel faucet, valves, ... etc. and all ‫ﺣﻧﻔﻲ اﻟﻧﯾﻛل ﻛروم ﺛﻘﯾل وﻣﺣﺎﺑس ﻣﻊ ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ﻗطﻊ ووﺻﻼت وﻣﺣﺎﺑس وﺗﻛون‬ 1.00
‫ﻋدد‬
fittings, all items must be excellent quality and approved, the work must be ‫ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم‬
carried out professionally and the price includes everything necessary to .‫اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
3.7.3 Wash Basin: -: ‫ﻣﻐﺳﻠﺔ وﺟﮫ‬
In number: Supply and installation of a countertop sink with dimensions of 40 * ‫ ﺳم ﺑﺎﻟون اﻟﻣطﻠوب ﻣﻊ اﻟﻌﻣود ﻣﻊ‬60 * 40 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﻐﺳﻠﺔ وﺟﮫ ذو أﺑﻌﺎد‬: ‫ﺑﺎﻟﻌدد‬
60 cm, with the required balloon, column and faucets measuring 0.5 inches, ‫ ھﻧش ﯾرﻛب وﯾﺛﺑت ﻋﻠﻰ ﻣواﺳﯾر ﻣﻊ ﺟﻣﯾﻊ ﺗوﺻﯾﻼت اﻟﻣﺎء ﻣن‬0.5 ‫اﻟﺣﻧﻔﯾﺎت ذو ﻣﻘﺎس‬ pcs
2.00
installed and fixed on pipes with all water connections from the external wall, ‫ واﻟﺗﺻرﯾف ﺣﺗﻰ اﻟﻣﺷن اﻷرﺿﻲ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس‬، ‫اﻟﺟدار اﻟﺧﺎرﺟﻲ‬ ‫ﻋدد‬
and draining to the ground basin according to the specifications, standards and ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
instructions of the supervising engineer.
3.7.4 External sewage extensions include excavation and backfill: :‫ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ اﻟﺧﺎرﺟﯾﺔ ﻣﻊ اﻟﺣﻔر واﻟردم‬
Supply, install, and operate external sewage extensions include excavation and ‫ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ اﻟﺧﺎرﺟﯾﺔ ﻣﻊ اﻟﺣﻔر واﻟردم ﺑﻣواﺳﯾر‬
backfill by plastic pipes dim= 6" (0.5 of total pressure) between sewage ‫ ھﻧش )ﻧﺻف ﺿﻐط( ﺑﯾن ﻏرف اﻟﺗﻔﺗﯾش ﺣﺗﻰ اﻟﺑﯾﺎرة واﻟﻌﻣل ﯾﺷﻣل ﺟﻣﯾﻊ‬6 ‫ﺑﻼﺳﺗﯾك ﻗطر‬
inspection rooms, including ventilation pipes (ventilation pipe for each ‫ﺳم ﻣﻊ ﺿﺑط‬60 ‫ﻣﺎ ﯾﻠزم ﻣن ﻗطﻊ وﻣﺳﺗﻠزﻣﺎت اﻟﺳﺑﺎﻛﺔ وﯾﺗم اﻟﺣﻔر ﺑﻌﻣﻖ ﻣﻧﺎﺳب ﻻ ﯾﻘل ﻋن‬
bathroom), the work include everything necessary such as fittings, and support ‫اﻟﻣﯾول وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم‬ ml
30.00
on walls by steel clips, excavation must be at less 60cm and accurate the slope, .‫ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ط‬.‫م‬
all items must be excellent quality and approved, the work must be carried out
professionally and the price includes everything necessary to implement the
item, and the work must be done according to the specifications, drawings, and
the directives of the supervising engineer.
3.7.5 Plastic pipes: :‫ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﻲ‬
Supply and installation of plastic pipes with a diameter of 1 inch to connect the ‫ھﻧش ﻟرﺑط اﻟﻣدرﺳﺔ ﻣن ﺷﺑﻛﺔ ﻣﺷروع اﻟﻣﯾﺎه اﻟﻰ‬1 ‫ﺗورﯾد وﺗرﻛﯾب ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﻲ ﻗطر‬
school from the water project network to the ground tank and then from the ‫اﻟﺧزان اﻷرﺿﻲ وﺑﻌدھﺎ ﻣن دﯾﻧﺎﻣو اﻟﺧزان اﻷرﺿﻲ اﻟﻰ اﻟﺧزان اﻟﻌﻠوي ﻣﻊ ﺟﻣﯾﻊ‬
dynamo of the ground tank to the upper tank with all connections and ‫اﻟوﺻﻼت وﻟوازم اﻟﺗوﺻﯾل وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر‬ ml
40.00
connection supplies. All materials are original and certified and the work is ‫ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬ ‫ط‬.‫م‬
carried out professionally. The price includes everything necessary to implement .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the item and the work is done according to specifications, drawings and the
engineer’s directions. Supervisor.
3.7.6 sewage inspection rooms: : ‫ﻏﺮف ﺗﻔﺘ ﺶ ﻟﻠ ف اﻟﺼ‬
supply and implement sewage inspection rooms size net 0.6*0.6*0.6m by automatic ‫ﻣ وذﻟﻚ ﺑﻮاﺳﻄﺔ‬0.6*0.6*0.6 ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻏﺮف ﺗﻔﺘ ﺶ ﻟﻠ ف اﻟﺼ ﻣﻘﺎس ﺻﺎ‬
solid bricks size 40*20*20cm, work include excavation and implement crushed stones ‫ﺳﻢ واﻟﻌﻤﻞ ﺸﻤﻞ اﻟﺤﻔﺮ وﻋﻤﻞ ﻃ ﻘﻪ ﻛ ﺣﺠﺮ ﻣﻊ‬20*20*40 ‫ﻠﻚ ﺻﻢ ﺗﻤﺎﺗ ﻚ ﻣﻘﺎس‬
with concrete under the inspection room and exterior and interior plaster by cement ‫ﺧﺮﺳﺎﻧﺔ ﻋﺎد ﺔ ﺗﺤﺖ ﻏﺮﻓﺔ اﻟﺘﻔﺘ ﺶ ﺛﻢ ﻳﺘﻢ ﺑﻨﺎء اﻟﺠﺪران وﺗﻠﺒ ﺲ اﻟﻐﺮﻓﺔ ﻣﻦ اﻟﺪاﺧﻞ‬
mortar with Sika include supply and implement concrete lid thickness 10cm by cement ‫ واﻟﻌﻤﻞ ﺸﻤﻞ ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻏﻄﺎء ﺧﺮﺳﺎ‬،‫ واﻟﺨﺎرج ﺎﻟﻤﻮﻧﺔ اﻻﺳﻤﻨ ﺔ ﻣﻊ ﻣﺎدة اﻟﺴ ﺎ‬pcs 4.00
mortar mixture of Portland cement and Sana'a crushed sand or equivalent sand from ‫ﺳﻢ و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ ﻌﺪ ان ﻳﺘﻢ ﺿ ﻂ ﻣﻴﻮل ﻣﻮاﺳ اﻟ ف اﻟﺼ وذﻟﻚ‬10 ‫ﻋدد ﺳﻤﺎ ﺔ‬
nearest area mixing (1:3) and spraying by water for 7days, the work must be carried out ‫ﺎﺳﺘﺨﺪام أﺳﻤﻨﺖ ﺑﻮرﺗﻼﻧﺪي ورﻣﻞ ﻛﺴﺎرە ﺻﻨﻌﺎ او ﻣﺎ ﺎﻓﺌﻪ ﻣﻦ اﻗﺮب ﻣﻨﻄﻘﺔ و ﺴﺘﺨﺪم‬
professionally and the price includes everything necessary to implement the item, and ‫( ﻣﻊ اﻟﺮش و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ‬3:1) ‫ﺑ ﺴ ﺔ ﺧﻠﻂ‬
the work must be done according to the specifications, drawings, and the directives of .‫و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
the supervising engineer.
3.7.7 Water plastic tank with exterior feeding extensions: :‫ﺧزاﻧﺎت ﻣﯾﺎه ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ‬
Supply and install water plastic tank 3 layers (approved type) on roof capacity ‫ ﻟﺗر ﻣﻊ‬2000 ‫ﺗورﯾد وﺗرﻛﯾب ﺧزان ﺑﻼﺳﺗﯾك ﺛﻼث طﺑﻘﺎت )ﻋﯾﻧﺔ ﻣﻌﺗﻣدة( ﻓﻲ اﻟﺳطﺢ ﺳﻌﺔ‬
2000 Liters, include cement foundation under the tank thickness 15cm and ‫ﺳم( و ﻓﺗﺣﺎت ﻓﻲ اﻟذروة ﻟﻣرور اﻟﺗﻣدﯾدات‬15) ‫ﻋﻣل ﻗﺎﻋدة اﺳﻣﻧﺗﯾﺔ ﺗﺣت اﻟﺧزان ﺑﺳﻣﺎﻛﺔ‬
vents in the walls of peak for water extensions, work include float ball, valves, ‫ھﻧش ﻣن‬0.5 ‫واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد ﺗرﻛﯾب ﻋواﻣﺔ وﻣﺣﺑس وﻣواﺳﯾر ﺗﻐذﯾﺔ ﺑﻼﺳﺗﯾك ﻗطر‬
pcs
plastic pipes dim=0.5" from the tank to bathrooms and hand washing basins ‫اﻟﺧزان اﻟﻰ اﻟﺣﻣﺎﻣﺎت واﻟﻣﻐﺎﺳل ﻣﻊ ﺗﺛﺑﯾﺗﮭﺎ ﺑﻛﻠﯾﺑﺎت اﺻﻠﯾﺔ ﻓﻲ اﻟﺟدران وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد‬ 1.00
‫ﻋدد‬
with support in walls by steel clips, all items must be excellent quality and ‫اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬
approved, the work must be carried out professionally and the price includes .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
engineer. a cesspool with internal diameter of 1.2*10 m. from up side. and 0.8 * 10 m
3.7.8 Construct (.‫م‬1.8 ‫ﻣن اﺳﻔل وارﺗﻔﺎع‬. ‫ م‬10 * 0.8 ‫ ﻣن اﻋﻠﻰ و‬.‫ م‬10*1.2 )‫ﺗﻧﻔﯾذ ﺑﯾﺎرة )ﺗرﻧش ﺻﺧرى( ﺑﺎﻷﺑﻌﺎد‬
from under side.1.8 the hight of trench pool. The price includes the following: ‫ـ‬:‫واﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت واﻟﺛﻣن ﯾﺷﻣل اﻟﺗﺎﻟﻲ‬
1- Excavation .‫ اﻟﺣﻔر‬-1
2- Stone masonry 40cm thick and 4.5m high. ‫ م ﻋﻠﻰ ان ﯾﺗم اﺳﺗﺧدام اﻟﻣوﻧﺔ‬2.5 ‫(ﺳم وﻋﻣﻖ‬60-40 )‫ ﻣﺑﺎﻧﻲ ﺣﺟر ﺑﺎزﻟت ﻟﺟدران اﻟﺗرﻧش ﺑﺳﻣك‬-2
3- Reinforced concrete circular beam 40x30cm ; top and bottom reinforcement of 3 Ø 16mm, .‫اﻷﺳﻣﻧﺗﯾﺔ ﻟﻠرﺑط اﻻﻓﻘﻲ ﻓﻘط‬ pcs
1.00
and ties 5 Ø 8mm/m, reinforced concrete slab of 15cm thickness, reinforced with 8Ø14mm/m ‫وﻛﺎﻧﺎت‬. ‫ﻋﻠوي وﺳﻔﻠﻲ‬3Ø 16mm ‫ ﺳم ﺑﺗﺳﻠﯾﺢ‬30×40 ‫ ﺳﻘف ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻣﻛون ﻣن اﻟﺟﺳور‬-3 ‫ﻋدد‬
4- Cast iron cover for 60x60cm clear opening, including all related works. .‫ ﻟﻛل ﻣﺗر ﺣﺳب اﻟرﺳوﻣﺎت‬8Ø 14mm ‫ ﺳم ﺑﺗﺳﻠﯾﺢ‬15 ‫ ﻟﻛل ﻣﺗر وﺑﻼطﺔ ﻣﺳﻠﺣﺔ ﺑﺳﻣك‬5Ø 8mm
5- Plastic pipes 6" for ventilation. .‫ ﺳم ﻟﻐطﺎء اﻟﺑﯾﺎرة واﻟﺛﻣن ﯾﺷﻣل ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻵﻧﮭﺎء اﻷﻋﻣﺎل‬60×60 ‫ ﻏطﺎء ﻣن اﻟﺣدﯾد اﻟزھر‬-4
.‫" ﻟﻠﺗﮭوﯾﺔ‬6 ‫ ﺗرﻛﯾب ﻣواﺻﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻗطر‬-5

Total Amount of Sanitary Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ‬


3.8 Electricity Works ‫اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
3.8.1 Electricity light systems for bathrooms: :‫وﺣدات اﻧﺎرة ﻟﻠﺣﻣﺎﻣﺎت‬
Supply and install electricity normal light systems; (40) watt , completed units ‫( وات ﻣﺗﻛﺎﻣﻠﺔ ﻣﻊ ﺗﻣدﯾد اﻟﻣواﺳﯾر ﻗﺑل اﻟﺻب‬40) ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﻧﺎرة ﻋﺎدﯾﺔ‬
include installation for its plastic pipes before concrete cast, the price include ‫واﻷﺳﻼك اﻟﻣﻌزوﻟﺔ واﻟﻌﻠب واﻟﻣﻔﺎﺗﯾﺢ واﻟﺗوﺻﯾل إﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ ﻣﻊ اﻟﺗﺷﻐﯾل وﯾﻧﻔذ اﻟﻌﻣل‬
the isolated copper wires, connection to board, boxes, switches, include the ‫ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت‬ pcs
4.00
operation, the work must be carried out professionally and the price includes .‫وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
engineer.
3.8.2 Economical lighting unit with ball shade, 36 watts ‫وات‬36 ‫وﺣدة اﺿﺎءة اﻗﺗﺻﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻛروي‬
In number: An economical lighting unit with a 36-watt spherical cover. The price ‫وات واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﺗواﺑﻊ‬36 ‫ وﺣدة اﺿﺎءة اﻗﺗﺻﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻛروي‬: ‫ﺑﺎﻟﻌدد‬
includes all the necessary accessories for the item to be ready for work, ‫ واﻟﺗﻰ‬PVC "3/4 ‫اﻟﻼزﻣﮫ ﻟﯾﺻﺑﺢ اﻟﺑﻧد ﺟﺎھزا ﻟﻠﻌﻣل وﻣﻧﮭﺎ ) ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ اﺳود‬ pcs
2.00
including (black PVC plastic pipes “3/4”, which are placed before pouring and ‫ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وﺗﻐطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ‬ ‫ﻋدد‬
cans, covered and fixed with screws and wires from the point to the distribution . ‫وﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬. ‫اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬
panel. According to the drawings and specifications.

Total Amount of Electricity Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬

Total summation ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﺑﻧﺎء ﺣﻣﺎﻣﺎت‬


‫ﺗرﻣﯾم و إﻋﺎدة ﺗﺄھﯾل ﻟﺣﻣﺎﻣﺎت ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬
4
Restoration and rehabilitation of Bathrooms Bialal bin rabah School.
Renew Oily paint with emery and paste for interior walls: :‫ﻣﻊ اﻟﺼﻨﻔﺮة واﻟﻤﻌﺠﻮن ﻟﻠﺠﺪران‬ ‫ﺗﺠﺪ ﺪ ﻃﻼء ز‬
supply and implement renew oily paint with emery and paste for interior walls (‫ ﻃ ﻘﺎت‬3‫ﻣﻊ اﻟﻤﻌﺠﻮن واﻟﺼﻨﻔﺮة ﻟﻠﺠﺪران )ﻃ ﻘﺔ أﺳﺎس و‬ ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﺗﺠﺪ ﺪ ﻃﻼء ز‬
(foundation layer and 3 layers) and use paint and paste approved excellent quality ‫و ﺴﺘﺨﺪم ﻣﻌﺠﻮن وﻃﻼء ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﺣﺴﺐ اﻟﻠﻮن اﻟﻤﻄﻠﻮب ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس‬
4.1 according to the required color with approval from project engineer, the work must be ‫ اﻟﻤ وع و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ‬m2 20.00
carried out professionally and the price includes everything necessary to implement the .‫اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬ 2‫م‬
item, and the work must be done according to the specifications, drawings, and the
directives of the supervising engineer.
Renew Emulsion paint with emery and paste for ceilings: :‫ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻊ اﻟﺼﻨﻔﺮة ﻟﻠﺴﻘﻒ‬
supply and implement renew emulsion paint with emery for ceilings (foundation layer (‫ ﻃ ﻘﺎت‬3‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﺗﺠﺪ ﺪ ﻃﻼء اﻣﻠﺸﻦ ﻣﻊ اﻟﺼﻨﻔﺮة ﻟﻠﺴﻘﻒ )ﻃ ﻘﺔ أﺳﺎس و‬
and 3 layers) and use paint approved excellent quality according to the required color ‫و ﺴﺘﺨﺪم ﻃﻼء ﻧﻮﻋ ﺔ ﻣﻌﺘﻤﺪة ﺣﺴﺐ اﻟﻠﻮن اﻟﻤﻄﻠﻮب ﻌﺪ ﻣﻮاﻓﻘﺔ ﻣﻬﻨﺪس اﻟﻤ وع و ﻨﻔﺬ‬
m2
4.2 with approval from project engineer, the work must be carried out professionally and ‫اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت‬ 10.00
the price includes everything necessary to implement the item, and the work must be .‫واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬ 2‫م‬
done according to the specifications, drawings, and the directives of the supervising
engineer.
Water- Resistant Plastic Paint: : ‫دھﺎن ﻣﺎﺋﻲ ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠﻣﺎء‬
Water emulsion paint for exterior walls consists of base layer and three coats of ‫دھﺎن ﻣﺳﺗﺣﻠب ﻣﺎﺋﻲ ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ ﯾﺗﻛون ﻣن طﺑﻘﺔ أﺳﺎﺳﯾﺔ وﺛﻼث طﺑﻘﺎت ﻣن اﻟﻠون‬
‫ اﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻷﻋﻣﺎل اﻟﻼزﻣﺔ ﻟﺗﺟﮭﯾز اﻷﺳطﺢ ﻣن اﻟﺻﻧﻔرة واﻟﻣﻌﺟﻧﺔ و‬،‫اﻟﻣطﻠوب‬ m2
4.3 the required color , the price includes all the work necessary to prepare the 10.00
surfaces of sanding and kneading and all that is necessary. according to the ‫ ﺣﺳب‬.‫ﻣﻌﺎﻟﺟﺔ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺗﻠﯾﯾس ﺑﺎﻻﺳﻣﻧت ﻗﺑل اﻟدھﺎن و اﻟﻣﻌﺟﻧﺔ وﻛل ﻣﺎ ﯾﻠزم‬ 2‫م‬
drawings and specifications, and the instructions of the supervisor. . ‫اﻟﻣﺧططﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف‬

Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬


Square meters: aluminum windows bronze excellent quality and have throat ‫ ﻧواﻓذ اﻟوﻣﻧﯾوم ﺑروﻧزي ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
aluminum strip not less than 4×8 cm and aluminum thickness not less than 1.2 ‫ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ‬1.2 ‫ ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬8×4‫ﻋن‬
mm and uses a special rubber to seal and prevent the leakage of air or water ‫وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع‬
and all haberdashery of hinges and shutters be original type and handles Laxis ‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ‬6 ‫وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض ﺑﺳﻣك‬
‫اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت( وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ‬ m2
4.4 and white glass thickness of 6 mm with and iced glass or wooded invisible (in 3.00
the positions specified in the drawings) and the work of netting mosquito insect ‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت‬،‫ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬ 2‫م‬
insect for openable shutters and install the throats from all sides Two fixations ،‫)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ ﻣﻊ ﺟﻣﯾﻊ اﻟﺧردوات‬،‫اﻟﺧﺎﺻﺔ‬
on The least, fixing the glass with special calves, with all the haberdashery, .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
(measurement of internal dimensions) according to the drawings, specifications,
and instructions of the supervising engineer. (A sample must be submitted for
approval.)
Sanding and re-painting of the protective grille. :‫ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﺷﺑك ﺣﻣﺎﯾﺔ‬
Per square meter: - Sanding and repainting the protective nets using abrasives ‫ ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﻟﺷﺑﺎك اﻟﺣﻣﺎﯾﺔ ﺑﺎﻟﺟﻠﺦ و اﻟﺑرﺷﺎت و اﻟﻌﻣل ﯾﺷﻣل طﻼء‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
and sprays. The work includes painting two sides with a base primer and three ‫وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل‬
.‫ﻣﺎ ﯾﻠزم وﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ m2
4.5 sides in the required color, sanding, grinding the excess, smoothing, and 3.00
everything necessary, according to the directives of the supervising engineer. 2‫م‬

Steel Doors: (Sample is needed to be provided). .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × 2”) , ‫ أﺗورﯾد و ﺗرﻛﯾب ﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Thickness 1.3 mm, Steel panels are placed together in excellent technical form . Steel ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟﻣراﺑﯾﻊ‬
angle beam 2” to be welded along the perimeter of the entire door . Door frame 2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫دﺋري‬
(rectangular section panels )width is not less than 20 cm and thickness 2 mm with three ‫ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬
m2
4.6 hinges. The item price Includes the anti-rust paint after sanding and well abrasion, two ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬ 7.70
2‫م‬
coats of oil paint for door and locks. Frames are installed before plastering, they have to ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬
be fixed to walls by three points of each side at least using steel dowels 16 mm 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
diameter and 20 cm long, planted in wall and welded In accordance with the .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
instruc ons of the supervisor engineer.
Chrome faucets, half-hench: :‫ﺣﻧﻔﯾﺎت ﻛروم ﻧص ھﻧش‬
In number: Supply and installation of chrome faucets with a diameter of 1/2", including ‫ وﺗﺷﻣل ﺟﻣﯾﻊ اﻟﺗوﺻﯾﻼت اﻟﻼزﻣﺔ‬،"1/2 ‫ ﺗورﯾد وﺗرﻛﯾب ﺣﻧﻔﯾﺎت ﻛروم ﻗطر‬:‫ﺑﺎﻟﻌدد‬ pcs
4.8 all necessary connections, hardware, and everything necessary, according to ‫ طﺑﻘﺎ ً ﻟﻠﻣواﺻﻔﺎت‬،‫واﻟﺧردوات وﻛل ﻣﺎ ﯾﻠزم‬ 5.00
‫ﻋدد‬
specifications.
Replace the External & internal sewage extensions include excavation and backfill: :‫اﺳ ﺪال اﻟﺘﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ و اﻟﺪاﺧﻠ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم‬
Supply, install, and operate external sewage extensions include excavation and backfill ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ و ﺸﻐ ﻞ ﺗﻤﺪ ﺪات اﻟ ف اﻟﺼ اﻟﺨﺎرﺟ ﺔ ﻣﻊ اﻟﺤﻔﺮ واﻟﺮدم ﻤﻮاﺳ‬
by plastic pipes dim= 6" (0.5 of total pressure) between sewage inspection rooms, ‫ ﻫ ﺶ )ﻧﺼﻒ ﺿﻐﻂ(ﺑ ﻏﺮف اﻟﺘﻔﺘ ﺶ ﺣ اﻟﺒ ﺎرة واﻟﻌﻤﻞ ﺸﻤﻞ ﺟﻤﻴﻊ‬6 ‫ﻼﺳ ﻚ ﻗﻄﺮ‬
including ventilation pipes (ventilation pipe for each bathroom), the work include ‫ﺳﻢ ﻣﻊ‬60 ‫ﻣﺎ ﻠﺰم ﻣﻦ ﻗﻄﻊ وﻣﺴﺘﻠﺰﻣﺎت اﻟﺴ ﺎ ﺔ و ﺘﻢ اﻟﺤﻔﺮ ﻌﻤﻖ ﻣﻨﺎﺳﺐ ﻻ ﻘﻞ ﻋﻦ‬
everything necessary such as fittings, and support on walls by steel clips, excavation ‫ﺿ ﻂ اﻟﻤﻴﻮل وﺗﻜﻮن ﺟﻤﻴﻊ اﻟﻤﻮاد اﺻﻠ ﺔ ﻣﻌﺘﻤﺪة و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ‬
Lum
4.9 must be at less 60cm and accurate the slope, all items must be excellent quality and ‫ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس‬Sum 1.00
approved, the work must be carried out professionally and the price includes everything .‫اﻟﻤ ف‬
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.

Wash Basin: -: ‫ﻣﻐﺳﻠﺔ وﺟﮫ‬


In number: Supply and installation of a countertop sink with dimensions of 40 * ‫ ﺳم ﺑﺎﻟون اﻟﻣطﻠوب ﻣﻊ اﻟﻌﻣود ﻣﻊ‬60 * 40 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﻐﺳﻠﺔ وﺟﮫ ذو أﺑﻌﺎد‬: ‫ﺑﺎﻟﻌدد‬
‫ ھﻧش ﯾرﻛب وﯾﺛﺑت ﻋﻠﻰ ﻣواﺳﯾر ﻣﻊ ﺟﻣﯾﻊ ﺗوﺻﯾﻼت اﻟﻣﺎء ﻣن‬0.5 ‫اﻟﺣﻧﻔﯾﺎت ذو ﻣﻘﺎس‬ pcs
4.10 60 cm, with the required balloon, column and faucets measuring 0.5 inches, 2.00
installed and fixed on pipes with all water connections from the external wall, ‫ واﻟﺗﺻرﯾف ﺣﺗﻰ اﻟﻣﺷن اﻷرﺿﻲ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس‬، ‫اﻟﺟدار اﻟﺧﺎرﺟﻲ‬ ‫ﻋدد‬
and draining to the ground basin according to the specifications, standards and ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
instructions of the supervising engineer.
Water plastic tank with exterior feeding extensions: :‫ﺧزاﻧﺎت ﻣﯾﺎه ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ‬
Supply and install water plastic tank 3 layers (approved type) on roof capacity ‫ ﻟﺗر ﻣﻊ‬2000 ‫ﺗورﯾد وﺗرﻛﯾب ﺧزان ﺑﻼﺳﺗﯾك ﺛﻼث طﺑﻘﺎت )ﻋﯾﻧﺔ ﻣﻌﺗﻣدة( ﻓﻲ اﻟﺳطﺢ ﺳﻌﺔ‬
2000 Liters, include cement foundation under the tank thickness 15cm and ‫ﺳم( و ﻓﺗﺣﺎت ﻓﻲ اﻟذروة ﻟﻣرور اﻟﺗﻣدﯾدات‬15) ‫ﻋﻣل ﻗﺎﻋدة اﺳﻣﻧﺗﯾﺔ ﺗﺣت اﻟﺧزان ﺑﺳﻣﺎﻛﺔ‬
vents in the walls of peak for water extensions, work include float ball, valves, ‫ھﻧش ﻣن‬0.5 ‫واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد ﺗرﻛﯾب ﻋواﻣﺔ وﻣﺣﺑس وﻣواﺳﯾر ﺗﻐذﯾﺔ ﺑﻼﺳﺗﯾك ﻗطر‬
plastic pipes dim=0.5" from the tank to bathrooms and hand washing basins ‫اﻟﺧزان اﻟﻰ اﻟﺣﻣﺎﻣﺎت واﻟﻣﻐﺎﺳل ﻣﻊ ﺗﺛﺑﯾﺗﮭﺎ ﺑﻛﻠﯾﺑﺎت اﺻﻠﯾﺔ ﻓﻲ اﻟﺟدران وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد‬ pcs
4.11 1.00
with support in walls by steel clips, all items must be excellent quality and ‫اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ ‫ﻋدد‬
approved, the work must be carried out professionally and the price includes .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
engineer.
Supply and installation of standard lighting unit: : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬
Supply and installation of a normal lighting units, with switches including black ‫ ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬،‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬:‫ﺑﺎﻟﻌدد‬
plastic conduits (PVC) which can be bent ( at bending points) using spiral ‫ واﻟﺗﻲ ﺗوﺿﻊ ﻗﺑل اﻟﺻب؛‬،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫اﻟﺳوداء‬
spring ,these pipes have to be installed before casting. The item includes boxes ،‫ واﻷﺳﻼك ﻣن اﻟﻧﻘطﺔ إﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬،‫واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ‬ pcs
4.12 2.00
and their covers, screws, and wires from the point to the distribution board, .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬ ‫ﻋدد‬
according to the drawings and specifications, and the instructions of the
supervisor.

Supply and installation of standard lighting unit with hemispherical cover: : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي‬
Supply and installation of a standard lighting unit with a hemispherical cover, ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي وﺗﺷﻣل اﻟﻣﻔﺗﺎح‬:‫ﺑﺎﻟﻌدد‬
include the switch and PVC pipes which can be bent ( at bending points) using ،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬
pcs
4.13 spiral spring, pipes are placed before casting .The item shall include boxes and ‫واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ‬ 5.00
‫ﻋدد‬
their covers which they shall be fixed with screws as well as wires from the point .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬
to the distribution board according to drawings and specifications.

Total summation ‫اﻹﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة ﺗﺄھﯾل و إﻋﺎدة ﺗرﻣﯾم اﻟﺣﻣﺎﻣﺎت ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬
‫أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه ارﺿﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬
5
Construction work on a Underground water tank at Bialal bin rabah School
5.1 Site Work : ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬
Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ‬
circumstances that surround the site, especially eventually existing slopes at the ‫ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ‬
site. . ‫ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
2. During the excavation and in the case of being unable to reach the depth ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود‬
mentioned in the drawings and/or finding the soil bearing capacity (structural ‫أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل‬
drawing) in this depth less than the required, the contractor shall contact the ‫ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول‬
project management. .‫اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬
5.1.1 Site leveling: :‫ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ‬
implement leveling for site dim=(3*3*depth 2.8m) in site this include remove for ‫ ﻣﺗر( ﻓﻲ اﻟﻣوﻗﻊ ﻣﻊ‬2.8 ‫*ﻋﻣﻖ‬3*3) ‫ﺗﻧﻔﯾذ ﺗﺳوﯾﺔ ﺳطﺣﯾﺔ ﻟﻣوﻗﻊ اﻟﺧزان ﺑﺎﻻﺑﻌﺎد اﻟﺻﺎﻓﻲ‬
trees, soil, stones, ..etc. from the site giving well level, the price includes ‫ واﻟﺳﻌر‬،‫اﻟﺦ ﻣن اﻟﻣوﻗﻊ ﺑﺣﯾث ﯾﺻﺑﺢ اﻟﻣوﻗﻊ ﻣﺳﺗوي‬...‫ازاﻟﺔ اﻟﺣﺷﺎﺋش واﻟﺗرﺑﺔ واﻻﺣﺟﺎر و‬
everything necessary to implement the item with the disposal of the resulting ‫ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر‬ m2
materials to a suitable place with no harm or affect agricultural lands, water ‫ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر‬ 20.00
2‫م‬
streams and private property, the work must be carried out professionally and ‫ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬
the price includes everything necessary to implement the item, and the work .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
must be done according to the specifications, drawings, and the directives of the
5.1.2 supervising engineer.
Soil excavations: :‫اﻟﺣﻔر اﻟﺗراﺑﻲ‬
Implement soil excavation dim=(4*4*depth 3.2 m) in ground this include stones ‫ﻣﺗر( ﻓﻲ اﻻرض وﯾﺷﻣل اي اﺣﺟﺎر‬3.2 ‫*ﻋﻣﻖ‬4*4) ‫ﺗﻧﻔﯾذ ﺣﻔر ﺗراﺑﻲ ﻟﻠﺧزان ﺑﺎﻻﺑﻌﺎد‬
mixed with soil reaching valid rock for foundation (rock layer near ground ‫ﻣﺧﺗﻠطﺔ ﺿﻣن اﻟﺗرﺑﺔ ﺣﺗﻰ اﻟوﺻول اﻟﻰ اﻟﺻﺧر اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس )اﻟﺻﺧر ﻗرﯾب ﻣن ﺳطﺢ‬
surface) using appropriate tools and appropriate support for excavation sides so ‫اﻻرض( وﯾﺗم اﻟﻌﻣل ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﻣﻊ اﻟﺣﻔﺎظ ﻋﻠﻰ اﺳﻧﺎد ﺟواﻧب اﻟﺣﻔر ﺑﺣﯾث ﻻ‬
as to not cause harm the nearly buildings, the price includes everything ‫ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد‬ m3
10.00
necessary to implement the item with the disposal of the resulting materials to a ‫اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك‬ 3‫م‬
suitable place with no harm or affect agricultural lands, water streams and ‫اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬
private property, the work must be carried out professionally and the price .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
includes everything necessary to implement the item, and the work must be
done according to the specifications, drawings, and the directives of the
5.1.3 Rock excavations: :‫اﻟﺣﻔر اﻟﺻﺧري‬
Implement excavations in the rock dim=(4*4*depth 3.2 m) reaching foundation ‫ﻣﺗر( ﺣﺗﻰ اﻟوﺻول اﻟﻰ ﻣﻧﺳوب اﻟﺗﺄﺳﯾس‬3.2 ‫*ﻋﻣﻖ‬4*4) ‫ﺗﻧﻔﯾذ ﺣﻔر ﻓﻲ اﻟﺻﺧر ﺑﺎﻻﺑﻌﺎد‬
level using appropriate tools which will not harm the nearly buildings, the price ‫وﯾﺗم اﻟﻌﻣل ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة واﻟﺳﻌر ﯾﺷﻣل ﻛل‬
includes everything necessary to implement the item with the disposal of the ‫ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ‬ m3
resulting materials to a suitable place with no harm or affect agricultural lands, ‫اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل‬ 10.00
3‫م‬
water streams and private property, the work must be carried out professionally ‫ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬
and the price includes everything necessary to implement the item, and the work .‫اﻟﻣﺷرف‬
must be done according to the specifications, drawings, and the directives of the
supervising engineer.
Total Amount of site work ‫إﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬

5.2 Concrete Works : ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت‬


5.2.1 Normal concrete (sub-base concrete) under the body of tank: :‫ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ )ﺧرﺳﺎﻧﺔ ﻧظﺎﻓﺔ( ﺗﺣت ﺟﺳم اﻟﺧزان‬
supply and implement Normal concrete thickness 10cm under the body of tank ‫ ﺳم ﺗﺣت ﺟﺳم اﻟﺧزان ﺑﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ذات‬10 ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣﺎﻛﺔ‬
with concrete of 300kg/m3 cement quantity, by Portland cement and sand and ‫ﻣﺗر ﻣﻛﻌب وذﻟك ﺑﺎﺳﺗﺧدام أﺳﻣﻧت ﺑورﺗﻼﻧدي ورﻣل وﻛري ﻣن‬/‫ﻛﺟم‬300 ‫ﻣﺣﺗوى اﺳﻣﻧﺗﻲ‬
m2
gravel from nearest area, the work must be carried out professionally and the ‫اﻗرب ﻣﻧطﻘﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ 16.00
2‫م‬
price includes everything necessary to implement the item, and the work must .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
be done according to the specifications, drawings, and the directives of the
supervising engineer.
Reinforced concrete for bottom slab, beams, top slab: :‫اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ ﻟﻼرﺿﯾﺔ واﻟﺟﺳور واﻟﺳﻘف‬
supply and implement reinforced concrete forbottom slab, beams, top slab with ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻼرﺿﯾﺔ واﻟﺟﺳور واﻟﺳﻘف وذﻟك ﺑﺧرﺳﺎﻧﺔ ذات ﻣﺣﺗوى‬
concrete of 350kg/m3 cement quantity, using mechanical mixer for concrete, ‫ﻣﺗر ﻣﻛﻌب وﯾﺗم اﻟﺻب ﺑﺎﺳﺗﺧدام ﺧﻼطﺔ ﻣﯾﻛﺎﻧﯾﻛﯾﺔ ﻟﺧﻠط اﻟﺧرﺳﺎﻧﺔ‬/‫ﻛﺟم‬350 ‫اﺳﻣﻧﺗﻲ‬
vibrator, polishing the surface after casting, and adhere to spray and immerse ‫وﯾﺳﺗﺧدم اﻟﮭزاز ﻣﻊ ﻣراﻋﺎة اﻟﺗﺧﺷﯾن ﺑﻌد اﻟﺻب واﻻﻟﺗزام ﺑﺎﻟرش واﻟﻐﻣر ﺑﺎﻟﻣﺎء ﻟﻣدة ﻻ ﺗﻘل‬
the concrete by water for not less than 21day, implement approved materials as ‫ ﺣدﯾد ﺗﺳﻠﯾﺢ ﺟودة‬-1 :‫ وﯾﺗم اﻟﺗﻧﻔﯾذ ﺑﺎﺳﺗﺧدام ﻣواد ﻣﻌﺗﻣدة ﻋﻠﻰ اﻟﻧﺣو اﻟﺗﺎﻟﻲ‬،‫ ﯾوم‬21 ‫ﻋن‬
following: 1- reinforcing steel high quality Grade 40 approved by project ‫ وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع )ﺣدﯾد ﺗرﻛﻲ ﺟودة ﻋﺎﻟﯾﺔ ﻣن وﻛﯾل ﻣﻌﺗﻣد‬Grade40 ‫ﻋﺎﻟﯾﺔ‬
engineer (Turkish steel high quality from authorized agent in Yemen) have to be ‫ﻓﻲ اﻟﺟﻣﮭورﯾﺔ اﻟﯾﻣﻧﯾﺔ( ﺑﺣﯾث ﯾﻛون ﺟدﯾد وﺧﺎﻟﻲ ﻣن اﻟﺻدأ وان ﻻ ﯾﻛون ﻗد ﺗﻌرض ﻟﻠرطوﺑﺔ‬
new and rust free and have not been exposed to moisture in warehouse of ‫ﻋﻧد اﻟوﻛﯾل وﯾﺗم ﻧﻘﻠﮫ ﻟﻠﻣوﻗﻊ ﺑﺻوره ﺳﻠﯾﻣﺔ وﯾﺣﻔظ ﻓﻲ اﻟﻣوﻗﻊ ﺑطرﯾﻘﺔ ﺳﻠﯾﻣﺔ ﻓﻲ ﻣﺧزن‬
agent, transport it to site in proper way and store it in site properly in closed ‫ اﺳﻣﻧت ﺑورﺗﻼﻧدي ﻧوﻋﯾﺔ ﻣﻣﺗﺎز وﻣﻌﺗﻣد‬-2 .‫ﻣﻐﻠﻖ ﺑﺣﯾث ﻻ ﯾﺗﻌرض ﻟﻠﻣطر او رطوﺑﺔ اﻟﺟو‬
store away of rain and moisture. 2-Portland cement excellent quality approved ‫ﻣن ﻣﮭﻧدس اﻟﻣﺷروع )اﺳﻣﻧت ﻋﻣران او اﻟوطﻧﯾﺔ( وان ﯾﻛون اﻻﺳﻣﻧت طري ﻟم ﯾﻣر ﻋﻠﻰ‬ m3
by project engineer (Amran or Alwatanya cement) fresh cement manufactured ‫ﻟﻠﻛﯾس وان ﻻ ﯾﻛون‬/‫ﻛﺟم‬50 ‫إﻧﺗﺎﺟﮫ اﻛﺛر ﻣن ﺷﮭرﯾن وان ﯾﻛون ﻣﺷون ﺑﺄﻛﯾﺎس ﺳﻠﯾﻣﺔ ﺳﻌﺔ‬ 6.10
3‫م‬
date less than 2months, in proper bags capacity 50kg/bag, not stiffened, and ‫ﻣﺗﺣﺟر ﻗد ﺗﻌرض ﻟﻠرطوﺑﺔ وﯾﺗم ﻧﻘﻠﮫ ﻟﻠﻣوﻗﻊ ﺑﺻوره ﺳﻠﯾﻣﺔ وﯾﺣﻔظ ﻓﻲ اﻟﻣوﻗﻊ ﺑطرﯾﻘﺔ ﺳﻠﯾﻣﺔ‬
have not been exposed to moisture, transport it to site in proper way and store it ‫ رﻣل ﻧوﻋﯾﺔ ﻣﺗدرج ﻣن‬-3 .‫ﻓﻲ ﻣﺧزن ﻣﻐﻠﻖ ﺑﺣﯾث ﻻ ﯾﺗﻌرض ﻟﻠﻣطر او رطوﺑﺔ اﻟﺟو‬
in site properly in closed store away of rain and moisture. 3- Gradient Sand from ‫اﻟﻛﺳﺎرة وﯾﻛون ﺧﺎﻟﻲ ﻣن اﻻﺗرﺑﺔ واﻟﺷواﺋب ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع‬
crusher, soil and impurities free, excellent quality approved by project engineer ‫ ﻛري ﻧوﻋﯾﺔ ﺑﺎزﻟﺗﻲ ﻣﺗدرج‬-4 .(‫)رﻣل ﻛﺳﺎره ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ‬
(Sana'a crushed sand or equivalent sand from nearest area). 4- Basalt gradient ‫ﻣن اﻟﻛﺳﺎرة وﯾﻛون ﺧﺎﻟﻲ ﻣن اﻻﺗرﺑﺔ واﻟﺷواﺋب ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع‬
gravel from crusher, soil and impurities free, excellent quality approved by ‫ ﻣﯾﺎه ﻧظﯾﻔﺔ ﻧﻔس ﻧوﻋﯾﺔ اﻟﻣﯾﺎه‬-5 .(‫)ﻛري ﻛﺳﺎره ﺻﻧﻌﺎﻧﻲ او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ‬
project engineer (High quality of crushed gravel or equivalent sand from nearest ‫ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل‬،.‫اﻟﺻﺎﻟﺣﺔ ﻟﻠﺷرب‬
area). 5- Clean water same type of drinking water, the work must be carried out .‫ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
professionally and the price includes everything necessary to implement the ‫ ﯾراﻋﻲ ﻗﺑل اﻟﺻب ﺗرﻛﯾب ﻣﺎﺳورة ﻣﻔﯾض ﻟﻠﺧزان وﻋﻣل ﻓﺗﺣﺎت ﻓﻲ اﻟﺳﻘف‬:‫ﻣﻼﺣظﺔ‬
item,
Total and the work
amount must be done
of Concrete Worksaccording to the specifications, drawings, and .‫اﻟﺧرﺳﺎﻧﺔﻟﺗﺟﻣﯾﻊ اﻟﻣﺎء اﻟﻰ اﻟﺧزان وﻓﺗﺣﺔ ﻻﻧﺑوب اﻟﺗﮭوﯾﺔ‬
‫وﻓﺗﺣﺔ اﺧرى‬
‫اﻟﺷﻔطﻻﻋﻣﺎل‬
‫ﻟﻣﺎﺳورة اﻟﻌﺎم‬
‫اﺟﻣﺎﻟﻲ‬
5.3 Stone and Brick Works: : ‫اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬
5.3.1 Basalt stone walls thickness 50cm (trimmed square basalt stone approved ‫اﺳﻮد ﻣ ع وﻗ ﺺ ﻧﻮﻋ ﺔ‬ ‫ﺣﺠﺮ ﺎزﻟ‬
) ‫ﺳﻢ‬50 ‫ﺳﻤﺎ ﺔ‬ ‫اﻟﺠﺪاران اﻟﺤﺠﺮ اﻟ ﺎزﻟ‬
type): :(‫ﻣﻌﺘﻤﺪة‬
supply and implement stone walls thickness 50cm by trimmed square basalt ‫ﺳﻢ ﻣﻦ اﻟﺤﺠﺮ ﺎزﻟ اﺳﻮد ﻣ ع وﻗ ﺺ ﻧﻮﻋ ﺔ‬50 ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻣ ﺎ ﺟﺪران ﺳﻤﺎ ﺔ‬
stone approved type with normal concrete of of 300kg/m3 cement quantity by ‫ﻣ ﻣﻜﻌﺐ وذﻟﻚ ﺎﺳﺘﺨﺪام‬/‫ﻛﺠﻢ‬300 ‫ ﻣﻌﺘﻤﺪة ﻣﻊ ﺧﺮﺳﺎﻧﺔ ﻋﺎد ﺔ ذات ﻣﺤﺘﻮى اﺳﻤﻨ‬m3
Portland cement and sand and gravel from nearest area with good stuffing and 16.00
‫ أﺳﻤﻨﺖ ﺑﻮرﺗﻼﻧﺪي ورﻣﻞ وﻛﺮي ﻣﻦ اﻗﺮب ﻣﻨﻄﻘﺔ ﻣﻊ اﻟﺘﺪر ﺰ واﻟ ﻏ وﻣﻞء اﻟﻔﺮاﻏﺎت ﺑ‬3‫م‬
filling the blanks between face and lining of walls with cement mortar and ‫ ا ﺎم و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ‬7 ‫اﻟﻮﺟﻪ واﻟ ﻄﺎﻧﺔ ﻣﻊ اﻟﺮش ﻟﻤﺪة‬
spraying by water for 7days, the work must be carried out professionally and the .‫اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
price includes everything necessary to implement the item, and the work must
be done according to the specifications, drawings, and the directives of the
Total amount of Stone and Brick Works : ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬
5.4 Plastering and Painting Works: : ‫اﻟﺗﻠﺑﯾس واﻟدھﺎن‬
5.4.1 Interior plaster for walls with Sicka: :‫اﻟﺗﻠﺑﯾس اﻟداﺧﻠﻲ ﻟﻠﺟدران ﻣﻊ اﻟﺳﯾﻛﺎ‬
supply and implement interior plaster thickness (1-2cm) for walls before the ‫ﺳم( ﻟﻠﺟدران ﻣن اﻟداﺧل ﻗﺑل ﺻﺑﺔ اﻟﺳﻘف ﻣﻊ اﻟطرطﺷﺔ‬2-1) ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺗﻼﺑﯾس ﺑﺳﻣﺎﻛﺔ‬
ceiling work with splashing layer by cement mortar with Sicka using Portland ‫ﻛﯾس ﺳﻣﻧت( وذﻟك ﺑﺎﺳﺗﺧدام أﺳﻣﻧت‬/‫ﻛﺟم‬1) ‫وذﻟك ﺑواﺳطﺔ اﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﺳﯾﻛﺎ‬
cement and Sana'a crushed sand or equivalent sand from nearest area mixing (3:1) ‫ﺑورﺗﻼﻧدي ورﻣل ﻛﺳﺎره ﺻﻧﻌﺎﻧﻲ او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ وﯾﺳﺗﺧدم ﺑﻧﺳﺑﺔ ﺧﻠط‬ m2
(1:3) and spraying by water for 7days, the work must be carried out by strings ‫ أﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑواﺳطﺔ اﻟﺧﯾوط واﻟﻣﺳطرة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ‬7 ‫ﻣﻊ اﻟرش ﻟﻣدة ﻻ ﺗﻘل ﻋن‬ 43.00
2‫م‬
and ruler, the work must be carried out professionally and the price includes ‫واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬
everything necessary to implement the item, and the work must be done .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
according to the specifications, drawings, and the directives of the supervising
5.4.2 engineer.
Intrior paint of walls and floor of tank: :‫دھﺎن ﺟدران وارﺿﯾﺔ اﻟﺧزان ﻣن اﻟداﺧل‬
supply and implement paint by (Master seal 180) or epoxy for intrior walls and ،‫( او اﯾﺑوﻛﺳﻲ ﻷرﺿﯾﺔ وﺟدران اﻟﺧزان ﻣن اﻟداﺧل‬180 ‫ﺗورﯾد وﺗﻧﻔﯾذ دھﺎن )ﻣﺎﺳﺗر ﺳﯾل‬
floor of tank, the work must be carried out professionally and the price includes ‫وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬ m2
43.00
everything necessary to implement the item, and the work must be done .‫واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
according to the specifications, drawings, and the directives of the supervising
engineer.
Total amount of Plastering & Painting Works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﺗﻠﺑﯾس‬
5.5 Metal & Wood Works: : ‫اﻷﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎرة‬
5.5.1 Aluminum ladder inside the tank: :‫ﺳﻠم اﻟﻣﻧﯾوم داﺧل اﻟﺧزان‬
Supply and install Aluminum ladder inside the tank, approved type, length fits ‫ ﺑطول ﯾﺗﻧﺎﺳب ﻣﻊ ارﺗﻔﺎع اﻟﺧزان ﻣﻊ‬،‫ﺗورﯾد وﺗرﻛﯾب ﺳﻠم ﻣن اﻷﻟﻣﻧﯾوم ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة‬
with hight of tank include well fixing, the work must be carried out professionally ‫اﻟﺗﺛﺑﯾت وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ pcs
1.00
and the price includes everything necessary to implement the item, and the work .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
must be done according to the specifications, drawings, and the directives of the
supervising engineer.
5.5.2 Tank led: :‫ﻏطﺎء ﻟﻠﺧزان‬
Supply and install Steel led of heavy sheet size (0.6*0.6m),with heavy steel ‫ﺳم( ﻣﻊ‬60×60)‫ﺗورﯾد وﺗرﻛﯾب ﻏطﺎء ﻣن اﻟﺣدﯾد اﻟﺻﺎج اﻟﻣﺣﺑب اﻟﻘوي ) دﺑل ( ﻣﻘﺎس‬
frames and bars, support the frame before concrete casting, install all ‫ﺑرواز ﺟﺎﻓﻲ و ﻣدﻋم ﺗﺣت اﻟﺻﺎج ﺑﺣدﯾد ﺟﺎﻓﻲ وﯾرﻛﯾب اﻟﺑرواز ﺣول ﻓﺗﺣﺔ اﻟﺧزان أﺛﻧﺎء‬
belongings excellent quality (hands, joints, lock) include anti-moisture paint, the ‫اﻟﺻب وﯾﺷﻣل اﻟﺗﺛﺑﯾت واﻟﻣﻔﺻﻼت واﻟدھﺎن اﻟﻣﻘﺎوم ﻟﻠرطوﺑﺔ ﻣﻊ اﻟﻘﻔل وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ‬ pcs
1.00
work must be carried out professionally and the price includes everything ‫واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬ ‫ﻋدد‬
necessary to implement the item, and the work must be done according to the .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications, drawings, and the directives of the supervising engineer.

Total amount of Metal & Wood Works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﺧﺷﺑﯾﺔ‬

5.6.1 Rainwater harvesting pipes from ceilings to tank: :‫اﻧﺎﺑﯾﺑب ﺣﺻﺎد ﻣﯾﺎه اﻻﻣطﺎر ﻣن اﺳطﺢ اﻟﻣدرﺳﺔ اﻟﻰ اﻟﺧزان‬
Supply and install rainwater harvisting pipe network by plastic pipes UPVC ‫( ﻟﺗﺻرﯾف‬UPVC) ‫ﺗورﯾد وﺗرﻛﯾب ﺷﺑﻛﺔ ﺣﺻﺎد ﻣﯾﺎه اﻟﻰ اﻟﺧزان ﺑواﺳطﺔ اﻧﺎﺑﯾب ﺑﻼﺳﺗﯾك‬
dim=4" (0.5 of full pressure) from the roofs to the ground tank with glow in ‫" )ﻧﺻف ﺿﻐط( ﻣﻊ اﺳﺗﺧدام‬4 ‫ﻣﯾﺎه اﻷﻣطﺎر ﻣن اﻻﺳطﺢ ﺣﺗﻰ اﻟﺧزان اﻟﺗﺟﻣﯾﻌﻰ ﻗطر‬
plumbing and fixing on walls by steel clips, the work must be carried out ‫ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ‬،‫اﻟﺷﻠك اﻟذاﺋب ﻓﻲ اﻟﺳﺑﺎﻛﺔ ﻣﻊ اﻟﺗﺛﺑﯾت ﻓﻲ اﻟﺟدران ﺑواﺳطﺔ ﻛﻠﯾﺑﺎت ﺣدﯾد‬ ml
professionally and the price includes everything necessary to implement the ‫واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬ 30.00
‫ط‬.‫م‬
item, and the work must be done according to the specifications, drawings, and .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the directives of the supervising engineer.

Total amount of Damp Proofing Works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟطﺑﻘﺎت اﻟﻌﺎزﻟﺔ‬

5.7 Sanitary Works : : ‫اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ‬


5.7.1 water pump to lift the water from subground tank to upper tanks in roof: :‫دﯾﻧﺎﻣو ﻟرﻓﻊ اﻟﻣﯾﺎه ﻣن اﻟﺧزان اﻻرﺿﻲ اﻟﻰ اﻟﺧزاﻧﺎت ﻓوق اﻟﺳطﺢ‬
Supply and install water pump original quality with lifting capacity not less than ‫ ﻣﺗر ﻟرﻓﻊ اﻟﻣﯾﺎه ﻣن‬30 ‫ﺗورﯾد وﺗرﻛﯾب دﯾﻧﺎﻣو )ﻣﺿﺧﺔ( ﻧوﻋﯾﺔ اﺻﻠﯾﺔ ﺑﻘدرة رﻓﻊ ﻻ ﺗﻘل ﻋن‬
30 meters to raise water from the subground tank to upper tanks in roof, with its ‫ ﻣﻊ اﻟﺷﻔﺎط ﻣﻊ ﺗرﻛﯾﺑﮭﺎ ﻓﻲ اﻟﺻﻧدوق ﺣدﯾدي ﻟﺣﻣﺎﯾﺔ‬،‫اﻟﺧزان اﻟﺳﻔﻠﻲ إﻟﻰ اﻟﺧزاﻧﺎت اﻟﻌﻠوﯾﺔ‬
suction and install it in steel box to protect the pump, with lock and electrical ‫اﻟﻣﺿﺧﺔ ﻣﻊ اﻟﻘﻔل وﻣﻊ ﻣﻔﺗﺎح ﻛﮭرﺑﺎء ﯾﺛﺑت ﻋﻠﻰ اﻟﺟدار وﻣﺣﻣﻲ ﻣن اﻻﻣطﺎر وﻣن ﻋﺑث‬
pcs
switch fixed to the wall and protected from rain and children, all materials must ‫اﻻطﻔﺎل وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد ﺟودة ﻣﻣﺗﺎزة وﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬ 1.00
‫ﻋدد‬
be excellent and approved, the work must be carried out professionally and the .‫ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
price includes everything necessary to implement the item, and the work must
be done according to the specifications, drawings, and the directives of the
supervising engineer.
Total amount of sanitary works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻟﻼﻋﻣﺎل اﻟﺻﺣﯾﺔ‬

Total of water tank work ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه‬

‫أﻋﻣﺎل ﻣﺗﻔرﻗﺔ ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬


6
Various works inside Bilal School
Metal signboard: :‫ﻟوﺣﺔ ﻣﻌدﻧﯾﺔ‬
Supply and install of a metal signboard for the project, a 4-digit model with ‫ ﺧﺎﻧﺎت ﺗﺣﻣل ﺷﻌﺎر اﻟﻣﻧظﻣﺔ واﻟﻣﻣول‬4 ‫ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ اﺳﻣﯾﺔ ﻣﻌدﻧﯾﺔ ﻟﻠﻣﺷروع ﻧﻣوذج‬
clarification for the name of the project, name and logo of the organization and ‫ وذﻟك ﺧﻼل ﻣدة اﻗﺻﺎھﺎ‬،‫ ﺣﺳب اﻟﻧﻣوذج اﻟﺧﺎص ﺑﺎﻟﻣﻧظﻣﺔ‬،‫واﺳم اﻟﻣﺷروع واﻟﻣوﻗﻊ‬
doner, and the year of implementation, install it within a maximum period of two ‫ وﯾﻧﻔذ‬،‫ ﺷﺎﻣل اﻻﻋﻣدة اﻟﻣﻌدﻧﯾﺔ واﻟﺣﻔر واﻟﻘواﻋد واﻟﺗرﻛﯾب‬،‫اﺳﺑوﻋﯾن ﻣن ﺗﺎرﯾﺦ ﺗﺳﻠﯾم اﻟﻣوﻗﻊ‬
pcs
6.1 weeks from the date of site handover , the price include metal columns, ‫اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬ 1.00
‫ﻋدد‬
excavation, bases and installation .‫واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the work must be carried out professionally and the price includes everything
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.
Total Amount of Seperate Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻣﺗﻔرﻗﺔ‬

Total summation ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم أﻋﻣﺎل اﻟﻣﺗﻔرﻗﺔ داﺧل اﻟﻣدرﺳﺔ‬

‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻹﻧﺷﺎء و إﻋﺎدة اﻟﺗﺎھﯾل ﻓﻲ ﻣدرﺳﺔ ﺑﻼل ﺑن رﺑﺎح‬


‫ اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ ﻣدرﺳﺔ ﺑﻼل‬+ ‫أﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬
7
Various works inside Bilal School
‫ ﻛل ﻣﻧظوﻣﺔ‬،‫ ﻣﻧظوﻣﺔ ﺗﻛﺑﯾر ﺻوﺗﻲ ﻟﻺذاﻋﺔ اﻟﻣدرﺳﯾﺔ ﻧوﻋﯾﺔ ﻣﻣﺗﺎزه‬1 ‫ﺗورﯾد وﺗرﻛﯾب ﻋدد‬
7.1 School sound loudspeaker system:
:‫ﺗﺗﻛون ﻣن اﻟﺗﺎﻟﻲ‬
Wireless Handheld Microphones for at least 150-250 m with rechargeable batteries ‫ ﻣ ﻋ اﻷﻗﻞ ﻣﻊ‬150-250 ‫ ﺟ ﺪ ﺣ‬،‫ﻋﺪد ﺟﻬﺎز ﻣ ﻜﺮوﻓﻮن ﻻﺳﻠ ﻣﺤﻤﻮل ﺎﻟ ﺪ‬ pcs
7.1.1 ‫ﻄﺎر ﺎت ﻗﺎ ﻠﻪ ﻟﻠﺸﺤﻦ‬ 1.00
‫ﻋدد‬
Speakers (trumpet / conical shape) weather resistant 16 inch diameter ‫ ﻫ ﺶ‬16 ‫( ﻣﻘﺎوم ﻟﻠﻄﻘﺲ ﻗﻄﺮ‬ ‫ﺷ ﻞ ﻣﺨﺮو‬/ ‫ﻋﺪد ﺳﻤﺎﻋﺔ ﻣﻜ اﻟﺼﻮت )ﺑﻮق‬ pcs
7.1.2 2.00
‫ﻋدد‬
Audio amplifier (mixer) able to operate the components of system at same time, able to ‫ ﻤﻜﻦ‬،‫ﻧﻔﺲ اﻟﻮﻗﺖ‬ ‫ﺸﻐ ﻞ ﻣﻜﻮﻧﺎت اﻟﻤﻨﻈﻮﻣﺔ‬ ‫ﻋﺪد ﻣﻀﺨﻢ ﺻﻮ )ﺧﻼط(ﻗﺎدر ﻋ‬
work from battery 12V. ‫ ﻓﻮﻟﺖ‬12 ‫ﺸﻐ ﻠﺔ ﻣﻦ ﻄﺎر ﺔ‬
pcs
7.1.3 (It is preferable that the device be able to operate from the solar system, either by 12- ‫ ﻓﻮﻟﺖ‬12 ‫) ﻔﻀﻞ ان ﻜﻮن اﻟﺠﻬﺎز ﻗﺎدر ﻋ اﻟﻌﻤﻞ ﻣﻦ اﻟﻤﻨﻈﻮﻣﺔ اﻟﺸﻤﺴ ﺔ اﻣﺎ ﺑﻨﻈﺎم‬ 1.00
‫ﻋدد‬
volt system or by 220-volt system together) (‫ﻓﻮﻟﺖ ﻣﻌﺎ‬220 ‫او ﻨﻈﺎم‬

With cable rolls wire (The length of the roll is 70 metres) and necessary accessories ‫ ﻣ (ﻣﻊ اﻟﺘﻮاﺑﻊ اﻟﻼزﻣﺔ ﻟ ﺸﻐ ﻞ اﻟﻤﻨﻀﻮﻣﺔ‬70 ‫ﺗﻮر ﺪ ﻋﺪد ﻟﻔﻪ ﺎ ﻼت )ﻃﻮل اﻟﻠﻔﺔ‬
Roll
7.1.4 needs to operate the system in schools ‫اﻟﻤﺪارس‬ 1.00
‫ﻟﻔﺔ‬

Total Amount of Loudspeaker system ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ‬


Grant Total ‫اﻹﺟﻣﺎﻟﻲ اﻟﻌﺎم‬
7.2 Supply and install 1 excellent quality school solar system, each system ‫ ﻛل ﻣﻧظوﻣﺔ ﺗﺗﻛون‬،‫ ﻣﻧظوﻣﺔ طﺎﻗﺔ ﺷﻣﺳﯾﺔ ﻣدرﺳﯾﺔ ﻧوﻋﯾﺔ ﻣﻣﺗﺎزه‬1 ‫ﺗورﯾد وﺗرﻛﯾب ﻋدد‬
contains the following: :‫ﻣن اﻟﺗﺎﻟﻲ‬
Notes : ‫ـ‬:‫ﻣﻼﺣظﺎت‬
- All materials and accessories must be of the highest quality and conform to international ‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ‬-
standards.
.‫اﻟﻌﺎﻟﻣﯾﺔ‬
- All electrical work items will include supply of materials, installation, testing and commission.
Internal wiring for all networks shall be concealed inside plastic conduits of PVC type, ‫ ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون‬-
conforming to British specifications BS-4607 and shall have electrical insulation resistance of ‫ وﻣطﺎﺑﻘﺔ‬PVC ‫اﻟﺗﻣدﯾدات داﺧﻠﯾﺔ ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺷﺑﻛﺎت داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع‬
more than 100 Mega ohm. 100 ‫ وأن ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر ﻣن‬BS-4607 ‫ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
Independent conduits for each electric circuit shall be used with a diameter not less than 20 ‫ﺳم‬20 ‫ ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ ﺑﻘطر ﻻ ﯾﻘل ﻋن‬. ‫ﻣﯾﺟﺎ أوم‬
cm. Flexible metal conduits shall be used to protect wires and movable cables, such as ‫وﺗﺳﺗﻌﻣل اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ‬
connections of devices and motors and at the expansion joints of the building, if any. No
‫ وﻻ‬,.‫ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد ﻓواﺻل اﻟﺗﻣدد ﻟﻠﻣﺑﻧﻰ إن وﺟدت‬
visible wiring is accepted , The contractor will bear responsibly of any mistakes in the
installation and shall re-install them properly . The wiring for each network must be
‫ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل ﺑﺎﻟﺷﻛل‬
independent of each other (Electrical lighting network, electrical sockets network, telephone ‫ ﻛﻣﺎ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات ﻟﻛل ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة‬. ‫اﻟﺳﻠﯾم‬
network, computer network, fire, television, etc.). They are not allowed to be mixed in ‫ ﺣرﯾﻖ‬،‫ﻛﻣﺑﯾوﺗر‬، _ ‫ ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر‬- ‫ ﺷﺑﻛﺔ اﻟﺗﻠﻔون‬- ‫ ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ‬- ‫اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
conduits , partitions or boxes. A minimum distance of 40 cm should be considered between ‫ ﻛﻣﺎ ﯾﺟب‬, ‫ﺗﻠﻔزﯾون وﻏﯾرھﺎ ( وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت واﻟﻌﻠب‬،
the power network and the computer and telephone networks. - The circular and squared . ‫ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون‬40 ‫ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ ﺗﻘل ﻋن‬
assembly boxes used for the switches shall be made of good plastic, Fire resistant and ‫ ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد‬-
comply with the British specifications BS4662, VDE-3676 and shall have special covers to
prevent penetration of moisture and insects. Those boxes will be made by the same factory
‫ ﻋﻠﻰ أن‬BS-4662 ، VDE-3676 ‫واﻟﻣﻘﺎوم ﻟﻠﺣرﯾﻖ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
which manufactured the electrical pipes, All sockets shall comply with (IEC 60889, 60309) ‫ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ ﺗﻣﻧﻊ ﺗﺳرب اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و ﯾﺟب أن ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ‬
specifications. ‫ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ‬
- The contractor must submit the drawings which illustrate all electrical installations , path of (IEC 60889, 60309) ‫ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
pipes , places of the circuit breakers and electrical boards before starting any work for
approval by the Engineer
7.2.1 Integrated grounding unit for lightning rods: L.S: Supply, implementation and testing of ‫ ﺗﻮر ﺪ وﺗﻨﻔ ﺬ واﺧﺘ ﺎر وﺣﺪة ﺗﺄر ﺾ‬:‫ ﺎﻟﻌﺪد‬:‫وﺣﺪة ﺗﺄر ﺾ ﻣﺘ ﺎﻣﻠﺔ ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ‬
an integrated grounding unit for lightning rods, which includes excavation and ‫م‬2 ‫م و ﻌﻤﻖ‬1.5×1.5 ‫ﻣﺘ ﺎﻣﻠﺔ ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ و ﺸﻤﻞ أﻋﻤﺎل اﻟﺤﻔﺮ واﻟﺮدم ﻤﺴﺎﺣﺔ‬
backfilling with an area of 1.5 x 1.5 m and a depth of 2 m, installing two 120 cm long ‫ﺳﻢ ﻋ ﺻﻔﺎﺋﺢ ﻧﺤﺎﺳ ﺔ واﻟﺪﻓﻦ ﺣﻮﻟﻬﺎ ﻣﻊ‬120 ‫وﺗﺮﻛ ﺐ اﺛﻨ أﺳ ﺎخ ﻣﻦ اﻟﻨﺤﺎس ﻄﻮل‬
copper skewers on copper plates, burying around them with coal and salt, connecting ‫ ﺎﻟ ﻠﻴ ﺎت اﻟﺨﺎﺻﺔ وﺗﻮﺻ ﻠﻬﺎ‬2‫ﻣﻢ‬35 ‫اﻟﻔﺤﻢ واﻟﻤﻠﺢ واﻟﺘﻮﺻ ﻞ ﺑ اﻷﺳ ﺎخ ﺴﻠﻚ ﻣﻜﺸﻮف‬
the skewers with open wire 35 mm 2 with special clips and connecting them to an ‫ﺳﻢ وﻣﻦ ﺛﻢ اﻟﺘﻮﺻ ﻞ إ ﺑ ﺎر ﻧﺤﺎس ﻣﻊ اﻟﻠﺤﺎم واﻟﻌﺰل‬30×30 ‫إ ﻏﺮﻓﺔ ﺗﻔﺘ ﺶ‬
inspection room 30 x 30 cm, and then connect to a copper pipe with welding and ‫ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﻣﻦ ﺛﻢ ﺗﻮر ﺪ وﺗﻤﺪ ﺪ ﻂ ﺗﺤﺬﻳﺮ ﻣﻦ اﻟ ﻼﺳ ﻚ اﻷﺻﻔﺮ ﻋﺮض‬ pcs
1
insulation according to the plans, and then supplying and extending a yellow plastic ‫ ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﻬﺎء اﻟﺒﻨﺪ ﻣﻦ ﺗﻜﺴ‬. ‫ﺳﻢ ﻣﻜﺘﻮب ﻋﻠ ﺔ ﻋ ﺎرات ﺗﺤﺬﻳ ﺔ ﻗ ﻞ اﻟﺮدم‬15 ‫ﻋدد‬
warning tape, 15 cm wide, with warning phrases written on it before backfilling. With ‫و ﻋﺎدة ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف ﻣﻊ ﻋﺮض ﻋﻴﻨﺔ ﻣﻦ ﺟﻤﻴﻊ‬
all that is necessary to finish the item of crushing and recycling according to the plans ‫ ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﻬﺎء اﻟﻌﻤﻞ وﻓﻖ‬. ‫اﻟﻤﻮاد ﻗ ﻞ اﻟ ﻛ ﺐ ﻋ اﻟﻤﻬﻨﺪس ﻟﻠﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ‬
and instructions of the supervising engineer, with the presentation of a sample of all ‫ﻣﻊ ﻋﻤﻞ ﻣﺄﺧﺬ ﻓﺤﺺ اﻟﻨﻮازل ﻋ ارﺗﻔﺎع ﻣ ﻦ ﻣﻦ ﺳﻄﺢ‬.IEC 60364 . ‫اﻟ ﻮد اﻟﻘ ﺎ‬
materials before installation to the engineer for approval. With everything needed to .‫اﻷرض‬
finish the work according to the standard code. IEC 60364. With the upstream socket
7.2.2 Metal structure of Holder for solar panels : :‫ﻫ ﻞ ﻣﻌﺪ ﺣﺎﻣﻞ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
lump sum: the supply and installation of a fixed metal structure that must meet the ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻫ ﻞ ﻣﻌﺪ ﺛﺎ ﺖ ﺠﺐ أن ﺗﺘﻮﻓﺮ ﻓﻴﻬﺎ اﻻﺷ اﻃﺎت اﻟﺘﺎﻟ ﺔ‬:‫ﺎﻟﻤﻘﻄﻮﻋ ﺔ‬
following requirements :- ‫ ﺗﺮﺗ ﻂ وﺗﻠﺤﻢ ﻣﻊ‬،‫ﻣﻢ‬2 ‫ﻫ ﺶ وﺳﻤﺎ ﺔ‬2 ‫ اﻟﻬ ﻞ ﻳﺘﻜﻮن ﻣﻦ اﻋﻤﺪە ﺣﺪ ﺪ ﻪ ﺷﻠﻤﺎن ﺄ ﻌﺎد‬-
- The structure consists of Schulman iron columns with dimensions of 2 inches and ‫ﻣﻠﻢ وان ﺗﻜﻮن ﻘﻮە ﺗﺤﻤﻞ‬1.80 ‫ﻫ ﺶ وﺳﻤﺎ ﺔ‬1.50 ‫ﺣﺎﻣﻞ اﻷﻟﻮاح ﺣﺪ ﺪ ﺷﻠﻤﺎن ﺄ ﻌﺎد‬
thickness of 2 mm. They are connected and welded to the Schlman iron plate holder ‫ﻫ ﺶ‬2 ‫ﺎﻓ ﺔ ﻟﺤﻤﻞ اﻷﻟﻮاح وﺗﺤﻤﻞ ﺷﺪة اﻟ ﺎح اﻟﻌﺎﺗ ﺔ ﻣﻊ ﻋﻤﻞ ﻗﻮاﻋﺪ ﻣﻌﺪﻧ ﻪ ﺷﻠﻤﺎن‬
with dimensions of 1.50 inches and thickness of 1.80 mm and to be of sufficient bearing .‫اﻻﺳﻔﻞ‬ ‫ﻣﻢ ﺗ ﺖ ﻧﻬﺎ ﺔ اﻷﻋﻤﺪة‬2 ‫ﺴﻤﺎ ﺔ‬
strength to carry the panels and withstand the intensity of high winds with the work of ‫درﺟﺔ واﻟﻬ ﺎ ﻞ ﻜﻮن ﻣﺼﻨ ع ﻣﻦ اﻟﺤﺪ ﺪ اﻟﻤﻄﺎوع اﻟﻤﻄ‬20‫ ﻳﺘﻢ ﺗ ﺒ ﺖ اﻻﻟﻮاح ﻋ زوا ﺔ‬-
Schulman metal bases 2 inches with a thickness of 2 mm that fix the end of the columns ‫ ﺛﻢ اﻟﻄﻼء ﺎﻟﻠﻮن اﻟﻤﻄﻠﻮب‬.(‫ﻤﺎدة ﻣﻘﺎوﻣﺔ ﻟﻠﺼﺪاء )ﺑ ﻤﺮ‬ Lum
at the bottom. ‫ﺠﺐ أن ﺗﺼﻤﻢ اﻟﻬ ﻞ اﻟﻤﻌﺪ اﻟﺤﺎﻣﻞ ﺤ ﺚ ﺴﻤﺢ ﺎﺳ ﺪال اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺴﻬﻮﻟﻪ‬- 1
Sum
- The panels are installed at an angle of 20 degrees and the structures are made of .‫وﻛﺬ ا ﻟ ﺴﻬ ﻞ ﻋﻤﻠ ﻪ اﻟﺘﻨﻈ ﻒ وﻏﺴﻞ اﻻﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
wrought iron coated with a rust-resistant material (primer). Then paint in the desired ‫ﻟﺘﺄﻣ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﻳ ﺖ ﻗﻔﻞ ﻳ ﻂ ﺑ اﻟﻔﺘﺤﺔ اﻟﺨﻠﻔ ﺔ ﻟﻠ ح اﻟﺸﻤ واﻟﻘﺎﻋﺪة‬-
color ‫واﻟﺜﻤﻦ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت واﻟﺮﺳﻮﻣﺎت اﻟﺘﻔﺼ ﻠ ﺔ اﻟﻤﺮﻓﻘﺔ‬
- The carrier steel structure must be designed to allow easy replacement of the solar ‫وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
panels, as well as to facilitate the process of cleaning and washing the solar panels.
- Secure the solar panels, a lock is installed between the back opening of the solar panel
and the base,The price includes all that is needed according to the attached detailed
plans and drawings and the directions of the supervising engineer
7.2.3 "Note ‫ﻣﻼﺣﻈﺔ‬
: 1. Solar panels ‫ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ‬.1
1.1.The concept of solar panel A solar cell made of semiconductor materials such as ‫ﻣﻔﻬﻮم اﻟﻠ ح اﻟﺸﻤ‬.1.1
silicon is the main component of a solar panel. Many solar cells are connected to ‫اﻟﻠ ح‬ ‫ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻌﺔ ﻣﻦ ﻣﻮاد ﺷ ﺔ ﻣﻮﺻﻠﺔ ﺎﻟﺴﻠ ﻜﻮن اﻟﻤﻜﻮن اﻷﺳﺎ‬
metallic busbars to form an array of cells known as the solar panel. ‫ ﺣ ﺚ ﻳﺘﻢ ﺗﻮﺻ ﻞ اﻟﻌﺪ ﺪ ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ ﺨﻄﻮط ﺗﻮﺻ ﻞ ﻣﻌﺪﻧ ﺔ‬. ‫اﻟﺸﻤ‬
1.2.Types of solar panels made of crystalline silicon . ‫)اﻟ ﺎﺳ ﺎر( ﻟ ﺸ ﻞ ﻣﺼﻔﻮﻓﺔ ﻣﻦ اﻟﺨﻼ ﺎ ﺗﻌﺮف ﺎﻟﻠ ح اﻟﺸﻤ‬
Solar panels made of crystalline silicon cells are divided into two main types: ‫أﻧﻮاع اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﻣﺎدة اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر ﺗﻨﻘﺴﻢ اﻷﻟﻮاح‬.1.2
1. Mono-crystalline: It consists of monocrystalline cells (containing crystals of the same :‫اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر إ ﻧﻮﻋ رﺋ ﺴ ﻫﻤﺎ‬
shape and dimensions and having the same optical and physical properties). ‫ ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ أﺣﺎد ﺔ اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ‬:(Mono-crystalline) ‫أﺣﺎد ﺔ اﻟﺘ ﻠﻮر‬.1
2. Poly-crystalline: It consists of polycrystalline cells (containing crystals of different .(‫ﺔ واﻟﻔ ﺎﺋ ﺔ‬ ‫اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﻤﺘﻠﻚ ﻧﻔﺲ اﻟﺨﺼﺎﺋﺺ اﻟ‬ ‫ﻠﻮرات ﻣﺘﻤﺎﺛﻠﺔ‬
shapes and dimensions, and differing in optical and physical properties). ‫ ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ‬:(Poly-crystalline) ‫ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر‬.2
1.3.Components of solar panels made of silicon cells. .(‫ﺔ واﻟﻔ ﺎﺋ ﺔ‬ ‫اﻟﺨﺼﺎﺋﺺ اﻟ‬ ‫اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﺘﻔﺎوت‬ ‫ﻠﻮرات ﻣﺨﺘﻠﻔﺔ‬
Solar panels: It is a number of solar cells connected in series to obtain the total voltage .‫ﻣﻜﻮﻧﺎت اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن‬.1.3
required for the panel, and is equal to the sum of the voltages for each solar cell, but ‫ ﻋ ﺎرة ﻋﻦ ﻋﺪد ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ اﻟﻤﻮﺻﻠﺔ ﻋ اﻟﺘﻮا ﻟﻠﺤﺼﻮل‬: ‫اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
the total current of the panel is equal to the current of the solar cell since the cells ‫ وﻟ ﻦ اﻟﺘ ﺎر‬،‫ و ﺴﺎوي ﻣﺠﻤ ع اﻟﺠﻬﻮد ﻟ ﻞ ﺧﻠ ﺔ ﺷﻤﺴ ﺔ‬،‫ﻋ اﻟﺠﻬﺪ اﻟ اﻟﻤﻄﻠﻮب ﻟﻠ ح‬
straight connected ‫اﻟ ﻟﻠ ح ﺴﺎوي ﻧﻔﺲ ﺗ ﺎر اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ ﻤﺎ أن اﻟﺨﻼ ﺎ ﻣﻮﺻﻠﺔ ﻋ اﻟﺘﻮا‬
1. It is required that the minimum power that can be obtained from a single panel ‫ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف‬ ‫ﺸ ط أن ﺗﻜﻮن اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ‬.1
under the standard test conditions is not less than the capacity of the panel. .‫اﻟﻔﺤﺺ اﻟﻤﻌ ﺎري ﺤ ﺚ ﻻ ﺗﻘﻞ ﻋﻦ ﻗﺪرة اﻟﻠ ح‬
2. The minimum efficiency of solar panels should not be less than 16% under standard .‫ﯾﺷﺗرط أن ﯾﻛون اﻟوﺟﮫ اﻷﻣﺎﻣﻲ ﻟﻠﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ ﻣﻘﺎوﻣﺎ ً ﻷﺛر اﻟﺻدﻣﺎت‬.18
measurement conditions. ‫ﻛل إطﺎر ﻟوح ﺿوﺋﻲ ﯾﺟب أن ﯾﺟﮭز ﺑﺻﻧدوق ﻗﺎﺑل ﻟﻠﻔﺗﺢ ﻟوﺻل أو اﺳﺗﺑدال اﻟﻛﯾﺑﻼت ﻋﻧد اﻟﻠزوم وﻣﻧﮫ ﯾؤﺧذ‬.19
3. It is required that the frame of the panel be made of aluminum and be compatible with the ‫ ھذا اﻟﺻﻧدوق ﯾﺟب أن ﯾﻛون ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ وﯾﺗﺣﻣل اﻟﻌواﻣل‬،‫ﻣﺧرج اﻟﻠوح اﻟﺿوﺋﻲ‬
material of the props. .‫ وﯾﺣﺗوي ﻋﻠﻰ ﻓﯾوزات اﻟﺣﻣﺎﯾﺔ ﻣن اﻟﺷورت اﻟﻛﮭرﺑﺎﺋﻲ واﻟﺗﯾﺎر اﻟﻌﻛﺳﻲ‬،‫اﻟﺟوﯾﺔ‬
4. The panels operating system 24V. .‫م‬2020 ‫ﺳﻧﺔ ﺗﺻﻧﯾﻊ اﻟﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ واﻷﻟواح ﯾﺟب أﻻ ﺗﻛون ﻗﺑل‬.20
:‫ﻛل اﻟﻣﻌﻠوﻣﺎت اﻟﺗﺎﻟﯾﺔ ﯾﺟب أن ﺗﻛون ﻣﻧﺣوﺗﺔ ﻋﻠﻰ ﻛل ﻟوح ﺷﻣﺳﻲ ﺑطرﯾﻘﺔ ﻏﯾر ﻗﺎﺑﻠﺔ ﻟﻠﻣﺣﻲ‬.21
5. 12 V . operating system panels
.‫اﺳم اﻟﺟﮭﺔ اﻟﻣﺻﻧﻌﺔ‬.a
6.Application Class A panels (free from workmanship defects).
.‫اﻟرﻗم اﻟﺗﺳﻠﺳﻠﻲ ﻟﻠوح ورﻗم ﻣودﯾﻠﮫ‬.b
7. The fill factor must not be less than 75%. .‫ﺷﮭر وﺳﻧﺔ اﻟﺗﺻﻧﯾﻊ‬.c
8. Internal diodes designed to prevent reverse currents. .‫ﻣﻧﺣﻧﻰ اﻟﺗﯾﺎر واﻟﻔوﻟﺗﯾﺔ‬.d
9. Approved standard system IEC-61215 or IEC-61730. .(Peak Wattage) ‫اﻟواﺗﯾﺔ اﻟﻘﺻوى‬.e
10. To have passed the IEC-61730 safety test, Parts 1 and 2, successfully. .(Im, Vm and FF) ‫اﻟﺗﯾﺎر اﻷﻋظﻣﻲ واﻟﺟﮭد اﻷﻋظﻣﻲ وﻣﻌﺎﻣل اﻟﻣﻠﺊ‬.f
11. The short circuit current is 8.5 amperes. .‫ﺑﻠد اﻟﻣﻧﺷﺄ‬.g
13. The maximum power voltage is 29 volts. .‫ﺿﻣﺎن ﺟودة اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﻻ ﺗﻘل ﻋن ﺳﻧﺔ‬.22
14. The return of the collector is 15%. .‫ ﺳﺎﻋﺔ‬/‫ ﻛم‬120 ‫ﻗواﻋد ﺗﺛﺑﯾت اﻟﻠواﻗط ﻣﻐﻠﻔﻧﺔ وﺗﺗﺣﻣل ﺳرﻋﺔ رﯾﺎح‬.23
15. The degree of protection is 66 IP. .‫ ﺳﻧﺔ‬25 ‫ ﻟﻣدة‬%80 + %30 ‫ إﻟﻰ‬0 ‫ ﻣن ﺳﻣﺎﺣﯾﺔ ﻗدر ة اﻟﺧروج ﻣن‬%90 ‫ﺿﻣﺎن اﻷداء ﻻ ﯾﻘل ﻋن‬.24
16. 1X4mm2 galvanized copper wires, red for the positive and black for the negative. ‫ﻋﻧد ﺗرﻛﯾب اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﯾﺟب اﻟﺗﺄﻛد ﻣن ﺧﻣﺳﺔ ﻋواﻣل أﺳﺎﺳﯾﺔ ﺗﺿﻣن أداء اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﺑﻔﻌﺎﻟﯾﺔ وﻛﻔﺎءة‬.25
17. The performance of the panels is guaranteed for 25 years, so that the percentage of :‫ﻋﺎﻟﯾﺔ‬
performance decrease is not less than 20% after 25 years and 10 years for any technical ‫ وﺟود ظﻼل ﻟﻌواﺋﻖ وإن ﻛﺎﻧت ﺻﻐﯾرة ﻣﺛل أﻋﻣدة اﻟﺧرﺳﺎﻧﺔ اﻟﻣﻌدﻧﯾﺔ ﺗﻘﻠل ﻛﺛﯾرا ﻣن ﻗدرة‬:‫اﻟﺗظﻠﯾل اﻟﺟزﺋﻲ أو اﻟﻛﻠﻲ‬.‫أ‬
.‫اﻟﻠوح اﻹﻧﺗﺎﺟﯾﺔ‬
defect.
‫ ﺗﻌﺗﺑر اﻟﯾﻣن ﻣن اﻟﺑﻠدان اﻟواﻗﻌﺔ ﻓﻲ ﻧﺻف اﻟﻛرة اﻟﺷﻣﺎﻟﯾﺔ ﻟﻸرض وﯾﻌﺗﻣد ﻧوع اﻟﺗﺛﺑﯾت ﻋﻠﻰ‬:‫ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح‬.‫ب‬
A. (The decrease in the efficiency of electric power production does not exceed 10% after 10 ‫ﻣدى وإﻣﻛﺎﻧﯾﺔ ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح‬
years and 20% after 25 years and the date of commercial operation). ‫ ﻗد ﺗﺿﻣن زﯾﺎدة ﻓﻲ ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ‬:‫ أو ﻗواﻋد ﻣزودة ﺑﻣﺗﺗﺑﻊ ﻷﺷﻌﺔ اﻟﺷﻣس‬،‫ﻗواﻋد ﻣرﻧﺔ‬.‫ج‬
.‫ ﻋن ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ ﻟﻠﻘواﻋد اﻟﻣﺛﺑﺗﺔ‬%25 ‫ﺑﻧﺳﺑﺔ ﺗﺻل إﻟﻰ‬
‫ واﻟﺗوﺻﯾل ﻋﻠﻰ اﻟﺗوازي ﻟﻐرض زﯾﺎدة‬،‫ ﯾﺗم ﺗوﺻﯾل اﻷﻟواح ﻋﻠﻰ اﻟﺗواﻟﻲ ﻟﻐرض زﯾﺎدة ﻓرق اﻟﺟﮭد‬:‫ﺗوﺻﯾل اﻷﻟواح‬.‫د‬
.(PV Array) ‫ وﻋﻠﻰ اﻟﺗواﻟﻲ واﻟﺗوازي ﻟﺗﻌرف ﻣﺟﻣوﻋﺔ اﻷﻟواح ﺑﻣﺻﻔوﻓﺔ اﻷﻟواح‬،‫اﻟﺗﯾﺎر‬
7.2.4 solar panels 300 watt multi-cell 24V system: :24V ‫وات ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ ﻧﻈﺎم‬300‫اﻟﻮاح ﻃﺎﻗﺔ ﺷﻤﺴ ﺔ ﻗﺪرة‬
Number: Supplying and installing high quality solar panels and capturing solar energy ‫ ﺗﻮر ﺪ وﺗﺮﻛ ﺐ اﻟﻮاح ﺷﻤﺴ ﺔ ﻋﺎﻟ ﺔ اﻟﺠﻮدة واﻻﻟﺘﻘﺎط ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴ ﺔ‬:‫ﺎﻟﻌﺪد‬
with a capacity of 300 watts and with the following specifications: ‫ ﺠﺐ أن ﻜﻮن اﻟﻠ ح ﻣﺼﻨ ع ﻣﻦ اﻟﺴﻠ ﻜﻮن‬- :‫وات و ﺎﻟﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﻪ‬300‫ﻗﺪرة‬
The panel shall be made of polycrystalline silicon solar cells. (Poly crystalline silicon solar cells ) ‫اﻟﻤﺘ ﻠﻮر ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ‬
- The minimum power that can be obtained from a single panel under standard test ‫ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف اﻟﻔﺤﺺ اﻟﻤﻌ ﺎر ﺔ‬ ‫اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ‬-
conditions should not be less than 300 watts ‫وات‬300 ‫ﺠﺐ اﻻ ﺗﻘﻞ ﻋﻦ‬
Operating system 24V 24V ‫ﻧﻈﺎم اﻟ ﺸﻐ ﻞ‬-
- To be in conformity with international standards - IEC61215,IEC 61730 IEC61215,IEC 61730 - ‫ أن ﻜﻮن ﻣﻄﺎﺑﻖ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻌﺎﻟﻤ ﺔ‬-
Have successfully passed the IEC61730 Part One and Part Two safety examination or its ‫اﻟﺠﺰﺋﻴ اﻷول واﻟﺜﺎ أو ﻣﺎ ﻌﺎدﻟﻬﻤﺎ‬ IEC61730 ‫ أن ﻜﻮن ﻗﺪ اﺟﺘﺎزت ﻓﺤﺺ اﻷﻣﺎن‬-
equivalent ‫ﺑﻨﺠﺎح‬
Application Class A board type, free from workmanship defects ‫ ﺧﺎﻟ ﻪ ﻣﻦ اﻟﻌﻴﻮب اﻟﻤﺼﻨﻌ ﺔ‬،Application Class A ‫ ﻧﻮﻋ ﻪ اﻟﻠ ح ﻣﻦ اﻟﻨ ع‬-
pcs
- Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell temp. 25°C Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell - 4
‫ﻋدد‬
Open circuit voltage not less than 38.5V temp. 25°C
Short circuit current? 10A 38.5V ‫ ﺗﻮﺗﺮ اﻟﺪارة اﻟﻤﻔﺘﻮﺣﺔ ﻻ ﻘﻞ ﻋﻦ‬-
Maximum power current: 8.5 amps 10A ? ‫ ﺗ ﺎر اﻟﺪارة اﻟﻘﺼ ة‬-
Maximum power potential: ? 29 volts ‫ أﻣﺒ‬8.5 ? : ‫ ﺗ ﺎر اﻟﻄﺎﻗﺔ اﻷﻋﻈ‬-
Receiver yield? 15th % ‫ ﻓﻮﻟﺖ‬29 ? : ‫ ﺟﻬﺪ اﻟﻄﺎﻗﺔ اﻷﻋﻈ‬-
Built-in diodes designed to prevent reverse currents % 15 ? ‫ ﻣﺮدود اﻟﻼﻗﻂ‬-
IP degree of protection? 66 ‫ دﻳﻮدات داﺧﻠ ﺔ ﻣﻦ ﺗﺼﻤ ﻢ اﻟﻠ ح ﻟﻤﻨﻊ اﻟﺘ ﺎرات اﻟﻌﻜﺴ ﺔ‬-
- Approved Standard IEC-61215 or IEC-61730 IP ? 66 ‫ درﺟﺔ اﻟﺤﻤﺎ ﺔ‬-
- The degree of inclination of the board is 45? or the nature of the area. IEC -61730 ‫ أو‬IEC-61215 ‫ اﻟﻨﻈﺎم اﻟﻘ ﺎ اﻟﻤﻌﺘﻤﺪ‬-
- 1x4mm2 galvanized copper jumper wires, red for the positive and black for the .‫ ?أو ﻃﺒ ﻌﺔ اﻟﻤﻨﻄﻘﺔ‬45 ‫ درﺟﺔ ﻣ ﻼن اﻟﻠ ح‬-
negative ‫ ﻟﻮن أﺣﻤﺮ ﻟﻠﻤﻮﺟﺐ وﻟﻮن أﺳﻮد ﻟﻠﺴﺎﻟﺐ‬1x4mm2 ‫ أﺳﻼك اﻟﺘﻮﺻﻞ ﻣﻦ اﻟﻨﺤﺎس اﻟﻤﺠﻠﻔﻦ‬-
7.2.5 10-year warranty on all materials and against improper workmanship. .‫ ﺳﻨﻮات ﻟﺠﻤﻴﻊ اﻟﻤﻮاد وﺿﺪ ﺳﻮء اﻟﺘﺼ ﻴﻊ‬10 ‫ ﺿﻤﺎن ﻟﻤﺪة‬-

- The applicant must attach the data that guarantees the performance of the panels for ‫ﺳﻨﺔ ﺤ ﺚ ﻻ ﺗﻘﻞ ﺴ ﺔ‬10‫ﻋ اﻟﻤﺘﻘﺪم ارﻓﺎق اﻟﺒ ﺎﻧﺎت اﻟ ﺗﻀﻤﻦ أداء اﻷﻟﻮاح ل‬-
10 years, so that the rate of decline in performance is not less than 80% after 25 years, . ‫ وﻋ ﺳﻨﻮات ﻷي ﺧـﻠﻞ ﻓ‬، ‫ﺳﻨﺔ‬25 ‫ ﻌﺪ‬%80 ‫اﻧﺨﻔﺎض اﻷداء ﻋﻦ‬
and ten years for any technical defect. %16 ‫ اﻟ ﻔﺎءة اﻟﺪﻧ ﺎ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺠﺐ أﻻ ﺗﻘﻞ ﻋﻦ‬-
The minimum efficiency of solar panels should not be less than 16%. %75 ‫( ﺠﺐ أﻻ ﻘﻞ ﻋﻦ‬Fill Factor) ‫ ﻣﻌﺎﻣﻞ اﻟﻤﻸ‬-
Fill factor must not be less than 75%. ‫ﺠﺐ أن ﺠﻬﺰ ﺼﻨﺪوق ﻗﺎ ﻞ ﻟﻠﻔﺘﺢ ﻟﻮﺻﻞ واﺳ ﺪال اﻟ ﻴ ﻼت ﻋﻨﺪ‬ ‫ ﻞ إﻃﺎر ﻟ ح ﺿﻮ‬-
- Each light panel frame must be equipped with an openable box to connect and replace ‫ ﻫﺬا اﻟﺼﻨﺪوق ﺠﺐ أن ﻜﻮن ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت‬. ‫اﻟﻠﺰوم وﻣﻨﻪ ﻳﺆﺧﺬ ﻣﺨ ج اﻟﻠ ح اﻟﻀﻮ‬
cables when necessary, from which the light panel output is taken. This box must be ‫ و ﺤﺘﻮي اﻟﺼﻨﺪوق ﻋ ﻓﻴﻮازات اﻟﺤﻤﺎ ﺔ‬،‫اﻟ ﻄﺎﻧ ﺔ أو ﻣﺎ ﻌﺎدﻟﻬﺎ و ﺘﺤﻤﻞ اﻟﻌﻮاﻣﻞ اﻟﺠ ﺔ‬
according to British specifications or its equivalent and bear weather factors, and the . ‫ﻣﻦ اﻟﺸﻮرت اﻟ ﻬ ﺎ و اﻟﺘ ﺎر اﻟﻌﻜ‬
box contains protection fuses from electrical shorts and reverse current. 2018 ‫ ﺳﻨﺔ ﺗﺼ ﻴﻊ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ واﻷﻟﻮاح ﺠﺐ أﻻ ﺗﻜﻮن ﻗ ﻞ‬-
- The year of manufacture of solar cells and panels should not be earlier than 2018 .‫ﺳﺎﻋﺔ‬/‫ ﻢ‬120 ‫ ﻗﻮاﻋﺪ ﺗ ﺒ ﺖ اﻟﻠﻮاﻗﻂ ﻣﺠﻠﻔﻨﺔ وﺗﺘﺤﻤﻞ ﻋﺔ ر ﺎح‬-
- The bases for fixing the coils are galvanized and withstand a wind speed of 120 km/h. ‫ﻄ ﻘﺔ ﻏ ﻗﺎ ﻠﺔ‬ ‫ ﻞ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘﺎﻟ ﺔ ﺠﺐ أن ﺗﻜﻮن ﻣﻨﺤﻮﺗﺔ ﻋ ﻞ ﻟ ح ﺷﻤ‬-
- All of the following information must be engraved on each solar panel in an indelible :‫ﻟﻠﻤﺤـﻲ‬
way: . ‫ اﺳﻢ اﻟﺠﻬﺔ اﻟﻤﺼﻨﻌﺔ‬-
- The name of the manufacturer. ‫ اﻟﺮﻗﻢ اﻟ ﺴﻠﺴ ﻟﻠ ح ورﻗﻢ ﻣﻮد ﻠﻪ‬-
- Serial number and model number of the board ‫ ﺷﻬﺮ وﺳﻨﺔ اﻟﺼﻨﻊ‬-
Month and year of manufacture ‫ ﻣﻨﺤ اﻟﺘ ﺎر واﻟﻔﻮﻟﺘ ﺔ‬-
- current and voltage curve (Peak Wattage) ‫ اﻟﻮاﺗ ﺔ اﻟﻘﺼﻮى‬-
Peak Wattage (Im, Vm and FF) ‫ اﻟﺘ ﺎر اﻷﻋﻈ واﻟﺠﻬﺪ اﻷﻋﻈ وﻣﻌﺎﻣﻞ اﻟﻤ‬-
7.2.6 Note ‫ﻣﻼﺣﻈﺔ‬
Supply and installation of a Gel battery type C10 - Deep cycle (high quality storage, an ‫ ) ﺗﺨ ﻦ ذات ﺟﻮدة ﻋﺎﻟ ﺔ ﻣﺎرﻛﺔ‬C10 - Deep cycle ‫ ﻧ ع‬Gel ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻄﺎر ﺔ‬
original brand), where the cell is the main component of the battery. Such as the ‫وﺗ ﺘﺞ اﻟﺨﻠ ﺔ ﻏﺎﻟ ﺎ ﺟﻬﺪا‬, ‫ﺗﺠﺎر ﺔ أﺻﻠ ﺔ ( ﺣ ﺚ ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﻤﻜﻮن اﻟﺮﺋ ﺴ ﺔ ﻟﻠ ﻄﺎر ﺔ‬
internal resistance and drain current of the cell. The battery can consist of one cell or ‫ و ﻌﺘﻤﺪ ﻣﻘﺪار‬،‫ ﻓﻮﻟﺖ ﺑ ﻨﻤﺎ اﻷﻣﺒ اﻟﻤﺴﺘﻮﻋﺐ ﻓﻴﻬﺎ ﻳﺘﻐ ﺑﺘﻐ ﻣﺴﺎﺣﺘﻬﺎ‬2 ‫ﻛﻬ ﺎﺋ ﺎ ﻣﻘﺪارە‬
several cells, and the common type is six cells (6 cells x 2 volts = 12 volts) - it is of a deep- .‫ﺷﺤﻦ اﻷﻣﺒ ﻋ ﺧﺼﺎﺋﺺ أﺧﺮى ﻣﺜﻞ اﻟﻤﻘﺎوﻣﺔ اﻟﺪاﺧﻠ ﺔ وﺗ ﺎر اﻻﺳﺘ اف ﻟﻠﺨﻠ ﺔ‬/‫ﺗﻔ ــﻎ‬
cycle type and provided with gel as a medium to transfer the reactions between the ‫ ﺧﻼ ﺎ‬6) ‫ واﻟﻨ ع اﻟﺸﺎﺋﻊ ﺳﺘﺔ ﺧﻼ ﺎ‬،‫واﻟ ﻄﺎر ﺔ ﻤﻜﻦ أن ﺗﺘﻜﻮن ﻣﻦ ﺧﻠ ﺔ واﺣﺪة أو ﻋﺪة ﺧﻼ ﺎ‬
lead plates. ‫أن ﺗﻜﻮن ﻣﻦ ﻧ ع ﻋﻤ ﻘﺔ اﻟﺪورة وﻣﺰودة ﻤﺎدة اﻟﺠﻞ ﻛﻮﺳ ﻂ ﻟﻨﻘﻞ‬- (‫ ﻓﻮﻟﺖ‬12 = ‫ ﻓﻮﻟﺖ‬x 2
- That the battery production period should not be more than a year. The efficiency of .‫اﻟﺘﻔﺎﻋﻼت ﺑ أﻟﻮاح اﻟﺮﺻﺎص‬
charging and discharging is not less than 90% of the charge in the battery. - The number ‫ﻛﻔﺎءة اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﻻ ﺗﻘﻞ‬. ‫ ان ﻻ ﻜﻮن ﻗﺪ ﻣﺮ ﻋ ﻓ ة اﻧﺘﺎج اﻟ ﻄﺎر ﺔ أ ﻣﻦ ﻋﺎم‬-
of charging and discharging cycles should not be less than 3000 cycles at 50% of the load ‫ ﻋﺪد دورات اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﺠﺐ ان ﻻ ﺗﻘﻞ‬-.‫ ﻣﻦ اﻟﺸﺤﻨﺔ اﻟﻤﻮﺟﻮدة ﺎﻟ ﻄﺎر ﺔ‬%90 ‫ﻋﻦ‬
According to the following specifications:- -:‫ ﻣﻦ اﻟﺤﻤﻞ وﻓﻘﺄ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﺔ‬% 50 ‫ دورة ﻋﻨﺪ‬3000 ‫ﻋﻦ‬
Moisture-proof iron solar battery base:In number: Supplying a moisture-resistant iron ‫ ﺗﻮر ﺪ ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ‬:‫ ﺎﻟﻌﺪد‬:‫ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ‬
solar battery base (original brand - at least one full year guarantee) and the price ‫ ﺿﻤﺎن ﺳﻨﺔ ﺎﻣﻠﺔ ﻋ اﻻﻗﻞ( واﻟﺴﻌﺮ ﺸﻤﻞ‬- ‫ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ )ﻣﺎرﻛﺔ ﺗﺠﺎر ﺔ أﺻﻠ ﺔ‬ pcs
includes all that is needed to complete the item according to the specifications and .‫ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﺠﺎز اﻟﺒﻨﺪ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬ 2
‫ﻋدد‬
instructions of the supervising engineer.
Battery Gel Deep cycle 150Ah : :Deep cycle ‫ أﻣﺑﯾر‬150 ‫ﺑطﺎرﯾﺔ ﺟل‬
Number: Supply and installation of a 150 amp deep cycle gel battery (original brand -Gel ‫ )ﻣﺎرﻛﺔ ﺗﺟﺎرﯾﺔ أﺻﻠﯾﺔ‬Deep cycle ‫ أﻣﺑﯾر‬150 ‫ ﺗورﯾد وﺗرﻛﯾب ﺑطﺎرﯾﺔ ﺟل‬:‫ﺑﺎﻟﻌدد‬ pcs
‫ﺿﻣﺎن ﺳﻧﺗﯾن ﻛﺎﻣﻠﺔ ﻋﻠﻰ اﻻﻗل( واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت‬ 2
Gel - full two years warranty at least) and the price includes all necessary according to ‫ﻋدد‬
.‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the attached specifications and instructions of the supervising engineer.
note :- Inverters Supply, installation, commissioning and testing of a String inverter. The word ‫ﻛﻠﻣﺔ‬, (String inverter )‫ ﻟﻌواﻛس ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل وإﺧﺗﺑﺎر ﻣﺣول اﻟﻌﻛس‬: ‫ﻣﻼﺣظﺔ‬
“Inverter” means reversing the current from DC to alternating current (AC). The direct current comes ‫اﻟﺗﯾﺎر اﻟﻣﺳﺗﻣر‬,(AC) ‫( إﻟﻰ ﻣﺗردد‬DC) ‫( ﺗﻌﻧﻲ ﻋﻛس اﻟﺗﯾﺎر ﻣن ﻣﺳﺗﻣر‬Inverter) ‫اﻟﻌﺎﻛس‬
from either batteries or solar panels or both according to the following specifications:-
-:‫ﻣﺻدره إﻣﺎ ﻣن اﻟﺑطﺎرﯾﺎت أو اﻷﻟواح اﻟﺷﻣﺳﯾﺔ أو ﻛﻠﯾﮭﻣﺎ وﻓﻘﺄ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
Inverter works in two systems (24V-240V (Hybrid solar inverter) with a capacity of 2500VA: :2500VA ‫ ( وﺑﻘدرة‬24V-240V(Hybrid solar inverter) ‫اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن‬
Quantity: Supply, installation, commissioning and testing of an inverter operating in two systems 24V-240V(Hybrid solar ‫ ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل واﺧﺗﺑﺎر اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن‬:‫ﺑﺎﻟﻌدد‬
24V-240V (Hybrid solar inverter) with a capacity of 2500VA so that it can withstand at least twice ‫ﺑﺣﯾث ﯾﺗﺣﻣل ﻣﺎ ﻻ ﯾﻘل ﻋن ﺿﻌف ﻗدرﺗﮫ ﻟﺑﺿﻊ ﺛواﻧﻲ وذو ﺣﻣﺎﯾﺔ‬2500VA ‫ ( وﺑﻘدرة‬inverter
its capacity for a few seconds and has an automatic protection that disconnects in the event of an pcs
‫ واﻟﻌﻣل ﯾﺷﻣل‬%95 ‫ وﻛﻔﺎءه ﻻ ﺗﻘل ﻋن‬.‫اﺗوﻣﺎﺗﯾﻛﯾﺔ ﯾﻔﺻل ﻓﻲ ﺣﺎل زﯾﺎدة اﻟﺣﻣل او ارﺗﻔﺎع اﻟﺣرارة‬ 1
increase in the load or an increase in temperature. And an efficiency of not less than 95%, and the ‫ﻋدد‬
work includes everything needed to complete the work, according to the attached specifications
‫ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﻌﻣل وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
and the instructions of the supervisin

Solar system installation accessories: ‫ ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل‬:‫ ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬:‫ﻣﻠﺣﻘﺎت ﺗرﻛﯾب ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ‬
In the cut: the supply, installation and processing of applications for the supply ‫وإﺧﺗﺑﺎر ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻹﺗﻣﺎم ﺗرﻛﯾب وﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ‬
and processing of energy - :‫وﻓﻘﺎ ً ﻟﻠﻧظم واﻟﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ ﻛﻣﺎ ﯾﻠﻲ‬
1. Two 63 amp circuit breakers. .‫ أﻣﺑﯾر‬63 ‫ ﻗواطﻊ‬2 ‫ ﻋدد‬.1
2. 1 MCCB breaker, 150 amps. .‫ اﻣﺑﯾر‬150 ‫ ﻗوة‬MCCB ‫ﻗﺎطﻊ‬1‫ ﻋدد‬.2
3. 3-line assembly box. .‫ ﺧط‬3 ‫ ﺻﻧدوق ﺗﺟﻣﯾﻊ‬.3
4. 2-line arrester. .‫ﺧط‬2 ‫ ﻗﺎطﻊ ﺻواﻋﻖ‬.4 Ls
1
5. amps and amps amps amps. .‫ أﻣﺑﯾر‬6‫ أﻣﺑﯾر و‬20‫ أﻣﺑﯾر و‬63 ‫ ﺑول‬2 ‫ ﻗواطﻊ ﺣﻣﺎﯾﺔ‬.5 ‫ﻣﻘطوﻋﯾﺔ‬
6. A voltage monitor 100 amps 275 volts. .‫ ﻓوﻟت‬275 ‫ أﻣﺑﯾر‬100 ‫ ﻣراﻗب ﻓوﻟﺗﯾﺔ‬.6
7... DC and AC insulated copper wires with sizes suitable for the amounts of ‫ ﻣن اﻟﻧﺣﺎس ﺑﻣﻘﺎﺳﺎت ﻣﻧﺎﺳﺑﺔ ﻟﻛﻣﯾﺎت اﻟﺗﯾﺎر اﻟﻛﮭرﺑﺎﺋﻲ اﻟﻣﺎر‬AC‫ و‬DC ‫ اﺳﻼك ﻣﻌزوﻟﺔ‬. .7
electric current passing through them. .‫ﻓﯾﮭﺎ‬
And the price includes all the services and accessories required to supply the ‫واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻟﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬
solar energy as required. ‫ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب وﻓﻘﺎ ﻟﻠﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ وان ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت ذات ﺟودة ﻋﺎﻟﯾﺔ وﺧﺎﺿﻌﺔ‬
‫ﻟﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Total Amount of solar energy system work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬

Total summation ‫ اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ‬+ ‫إﻻﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬

‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم‬