Vision Hope International

‫رؤﯾﺎ أﻣﻞ اﻟﺪوﻟﯿﺔ‬

,Project Name: Enable gender-responsive and inclusive access to safe learning environments, and quality education services for school-aged children in four schools in Hays d district
Hudaydah governorate. Funded by the Yemen Humanitarian Fund (YHF)

‫ ﺗﻤﻮﯾﻞ ﻣﻦ ﺻﻨﺪوق اﻟﺘﻤﻮﯾﻞ اﻹﻧﺴﺎﻧﻲ ﻓﻲ اﻟﯿﻤﻦ‬- ‫ ﺗﻤﻜﯿﻦ اﻟﻮﺻﻮل اﻟﺸﺎﻣﻞ واﻻﺳﺘﺠﺎﺑﺔ اﻟﺴﺮﯾﻌﺔ ﻟﻠﻨﻮع اﻻﺟﺘﻤﺎﻋﻲ إﻟﻰ ﺑﯿﺌﺎت ﺗﻌﻠﯿﻤﯿﺔ آﻣﻨﺔ وﺧﺪﻣﺎت ﺗﻌﻠﯿﻤﯿﺔ ﻋﺎﻟﯿﺔ اﻟﺠﻮدة ﻟﻸطﻔﺎل ﻓﻲ ﺳﻦ اﻟﻤﺪرﺳﺔ ﻓﻲ أرﺑﻊ ﻣﺪارس ﻓﻲ ﻣﺪﯾﺮﯾﺔ ﺣﯿﺲ – ﻣﺤﺎﻓﻈﺔ اﻟﺤﺪﯾﺪة‬:‫اﺳﻢ اﻟﻤﺸﺮوع‬
Project Code: YEM-23-S-INGO-25967 ‫رﻗﻢ اﻟﻤﺸﺮوع‬:
‫ ﻣﺣﺎﻓظﺔ اﻟﺣدﯾدة‬- ‫ ﻣدﯾرﯾﺔ ﺣﯾس‬- ‫ﺟدوال اﻟﻛﻣﯾﺎت ﻷﻋﻣﺎل اﻹﻧﺷﺎء و إﻋﺎدة اﻟﺗﺎھﯾل ﻓﻲ ﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬
BOQs of construction and rehabilitation work at Hafsa School - Hays district - Al-Hudaydah Governorate

‫ﺳﻌراﻟوﺣدة‬
‫م‬ ‫اﻟوﺣدة‬ ‫اﻟﻛﻣﯾﺔ‬ ‫اﻻﺟﻣﺎﻟﻲ ﺑﺎﻟدوﻻر‬
‫ﺑﺎﻟدوﻻر‬
Description ‫ﺑﯾــﺎن اﻻﻋﻣـــــــــــﺎل‬
No. Unit Quantity Price Total price
Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ ﺟﻣﯾﻊ اﻟظروف‬
circumstances that surround the site, especially eventually existing slopes at the site. ‫اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ‬
2. During the excavation and in the case of being unable to reach the depth mentioned in the . ‫ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
drawings and/or finding the soil bearing capacity (structural drawing) in this depth less than ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود أرض ﺻﺧرﯾﺔ أو‬
the required, the contractor shall contact the project management. General Requirement: ‫ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل‬
The Environmental and Social Management Frame work is considered the controlling tool for ‫اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول‬
mitigating environmental and social impacts .And mitigations listed in this are mandatory to be :‫اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ‬.‫ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬
implemented along with the construction, the rehabilitation and maintenance of the schools. ‫ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت‬
The contractor is obliged to take the following measures to decrease impact of maintenance ‫اﻟﻣدرﺟﺔ ﻓﻲ ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل‬
work on the environment and beneficiaries: :‫وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن‬
1.Provide construction site with protection measures (Barriers, fence, portable scaffold ‫ ﻋﻼﻣﺎت اﻟﺗﺣذﯾر )ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص‬،(‫ اﻟﺳﻘﺎﯾل‬،‫ اﻟﺳﯾﺎج‬،‫ ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز‬.1
sheets), warning signs (authorized persons are only allowed to access work area, Provide .‫ ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ‬،( ‫اﻟﻣﺳﻣوح ﻟﮭم ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ‬
necessary light. .‫ ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر‬.2
2.Provide proper support for excavations to protect against collapse. ‫ ﺧوذة( واﻟزاﻣﮭم ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء‬،‫ أﺣذﯾﺔ اﻟﺳﻼﻣﺔ‬،‫ ﻗﻔﺎزات‬،‫ ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ‬.3
3.Provide his workers with personal protective equipment (masks, gloves, safety shoes, .‫اﻟﻌﻣل‬
helmet, overall) ‫ ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل ﻣن اﻟﻐﺑﺎر‬،‫ ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل‬.4
4.Reduce noise during working hours and do not work at night, and spray site with water ‫ اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ اﻟﻌﻣل ﻣن‬.5
during dust. ‫اﻟﺦ‬،‫اﻟزوار‬
5.Limit work in one area in series and isolate worksite from , visitors, etc... :‫ ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ ﺷﺗراطﺎت ﻋﺎﻣﺔ‬.6
6.Haul surplus material and oil and grease outside the premises and transport it in closed ( ‫ ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت‬- : ‫ﻣﻼﺣظﺔ‬
trucks to dump sites.
.(‫ﺑﻧﺎء ﻓﺻﻠﯾن دراﺳﯾﯾن )ﻓﺻول ﺷﺑﮫ داﺋﻣﺔ‬
1
Building two classrooms (semi-permanent classrooms).
1 Site Works : : ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬
General Requirement: :‫اﻟﻣﺗطﻠﺑﺎت اﻟﻌﺎﻣﺔ‬
The Environmental and Social Management Frame work is considered the ‫ﯾﻌﺗﺑر ﻋﻣل إطﺎر اﻹدارة اﻟﺑﯾﺋﯾﺔ واﻻﺟﺗﻣﺎﻋﯾﺔ أداة اﻟﺗﺣﻛم ﻟﻠﺗﺧﻔﯾف ﻣن اﻵﺛﺎر اﻟﺑﯾﺋﯾﺔ‬
controlling tool for mitigating environmental and social impacts .And mitigations ‫واﻻﺟﺗﻣﺎﻋﯾﺔ واﻟﺗﺧﻔﯾﻔﺎت اﻟﻣدرﺟﺔ ﻓﻲ ھذا اﻹطﺎر اﻟﺑﯾﺋﻲ واﻻﺟﺗﻣﺎﻋﻲ إﻟزاﻣﯾﺔ ﻟﯾﺗم ﺗﻧﻔﯾذھﺎ ﺟﻧﺑﺎ‬
listed in this are mandatory to be implemented along with the construction, the ‫إﻟﻰ ﺟﻧب ﻣﻊ إﻧﺷﺎء وإﻋﺎدة ﺗﺄھﯾل وﺻﯾﺎﻧﺔ اﻟﻣدارس وﯾﻠﺗزم اﻟﻣﻘﺎول ﺑﺎﺗﺧﺎذ اﻟﺗداﺑﯾر اﻟﺗﺎﻟﯾﺔ‬
rehabilitation and maintenance of the schools. :‫ﻟﺗﻘﻠﯾل أﺛر أﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ ﻋﻠﻰ اﻟﺑﯾﺋﺔ واﻟﻣﺳﺗﻔﯾدﯾن‬
The contractor is obliged to take the following measures to decrease impact of ‫ ﻋﻼﻣﺎت اﻟﺗﺣذﯾر‬،(‫ اﻟﺳﻘﺎﯾل‬،‫ اﻟﺳﯾﺎج‬،‫ ﺗوﻓﯾر ﺗداﺑﯾر اﻟﺣﻣﺎﯾﺔ ﻓﻲ ﻣوﻗﻊ اﻟﺑﻧﺎء )اﻟﺣواﺟز‬.1
maintenance work on the environment and beneficiaries: .‫ ﺗوﻓﯾر اﻹﺿﺎءة اﻟﻛﺎﻓﯾﺔ‬،( ‫)ﯾﺳﻣﺢ ﻟﻸﺷﺧﺎص اﻟﻣﺳﻣوح ﻟﮭم ﻓﻘط ﻟﻠوﺻول إﻟﻰ ﻣﻧطﻘﺔ اﻟﻌﻣل ﻣﻊ‬
1.Provide construction site with protection measures (Barriers, fence, portable .‫ ﻋﻣل اﻟدﻋم اﻟﻣﻧﺎﺳب ﻟﻠﺣﻔرﯾﺎت ﻟﻠﺣﻣﺎﯾﺔ ﺿد اﻻﻧﮭﯾﺎر‬.2
scaffold sheets), warning signs (authorized persons are only allowed to access ‫ ﺧوذة( واﻟزاﻣﮭم‬،‫ أﺣذﯾﺔ اﻟﺳﻼﻣﺔ‬،‫ ﻗﻔﺎزات‬،‫ ﺗوﻓﯾر ادوات اﻟﺣﻣﺎﯾﺔ اﻟﺷﺧﺻﯾﺔ ﻟﻠﻌﻣﺎل )أﻗﻧﻌﺔ‬.3
work area, Provide necessary light. .‫ﺑﺎرﺗداﺋﮭﺎ اﺛﻧﺎء اﻟﻌﻣل‬
2.Provide proper support for excavations to protect against collapse. ‫ ورش اﻟﻣوﻗﻊ ﺑﺎﻟﻣﺎء ﻟﻠﺗﻘﻠﯾل‬،‫ ﺗﻘﻠﯾل اﻟﺿوﺿﺎء أﺛﻧﺎء ﺳﺎﻋﺎت اﻟﻌﻣل وﻋدم اﻟﻌﻣل ﻓﻲ اﻟﻠﯾل‬.4
3.Provide his workers with personal protective equipment (masks, gloves, safety ‫ﻣن اﻟﻐﺑﺎر‬
shoes, helmet, overall) ‫ اﻟﻌﻣل ﻓﻲ ﻣﻧطﻘﺔ ﻣﺣددة ﻓﻘط واﻻﻧﺗﻘﺎل اﻟﻰ اﻻﺧرى ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن اﻻوﻟﻰ وﻋزل ﻣوﻗﻊ‬.5
4.Reduce noise during working hours and do not work at night, and spray site ‫اﻟﺦ‬،‫اﻟﻌﻣل ﻣن اﻟزوار‬
with water during dust. ‫ ﻧﻘل ﻓﺎﺋض اﻟﻣواد واﻟﻧﻔط واﻟﺷﺣوم ﺧﺎرج اﻟﻣﺑﺎﻧﻲ وﻧﻘﻠﮫ ﻓﻲ ﺷﺎﺣﻧﺎت ﻣﻐﻠﻘﺔ ﻟﺗﻔرﯾﻎ اﻟﻣواﻗﻊ‬.6
5.Limit work in one area in series and isolate worksite from , visitors, etc... :‫ﺷﺗراطﺎت ﻋﺎﻣﺔ‬
6.Haul surplus material and oil and grease outside the premises and transport it ( ‫ ) اﻟﻛﻣﯾﺎت ﺗم ﺣﺳﺎﺑﮭﺎ ھﻧدﺳﯾﺎ ً ﻣﻊ ﺧﺻم اﻟﻔﺗﺣﺎت‬- : ‫ﻣﻼﺣظﺔ‬
in closed trucks to dump sites.

Site planning and levelling with excavation and Backfill : :‫أﻋﻣﺎل اﻟﺗﺳوﯾﺔ ﻟﻸرﺿﯾﺔ اﻟﻣﺷروع ﻣﻊ اﻟﺣﻔر واﻟردم‬
The Whole Project site have to be leveled according to the levels on the ground, ‫ﻛﺎﻣل وﻓﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب ﻋﻠﻰ اﻟطﺑﯾﻌﺔ وذﻟك ﺑﺈزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت‬
through removing the surface obstacles, trees, soil surface layers, cutting of the ‫اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ ﺑﺎﻟﺣﻔر واﻟﻘطﻊ ﻟﻠﻣﻧﺎطﻖ اﻟﺗراﺑﯾﺔ أو اﻟﺻﺧرﯾﺔ اﻟﻣرﺗﻔﻌﺔ واﻟردم ﻟﻠﻣﻧﺎطﻖ‬
rising parts and backfilling the low parts with Gravel soil or that resulted from .‫اﻟﻣﻧﺧﻔﺿﺔ ﺑﺎﻟﺗرﺑﺔ اﻟزﻟطﯾﺔ أو اﻟﻧﺎﺗﺟﺔ ﻣن اﻟﺣﻔر ﻣﻊ ﻣراﻋﺔ اﻟﻣﯾول ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر‬
excavations. Slopes for rainwater drainage have to be considered. Trees will ‫وﻋﻧد إزاﻟﺔ اﻷﺷﺟﺎر وﻏﯾرھﺎ ﻣن‬, ‫وﯾﺟب أن ﻻ ﺗزال اﻷﺷﺟﺎر إﻻ ﺑﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
not be removed only with supervisor approval. When removing trees and roots ‫ ﻓﯾﺟب اﺟﺗﺛﺎﺛﮭﺎ ﺣﺗﻰ ﻋﻣﻖ‬، ‫ ﻣﻠﯾﻣﺗر‬80 ‫اﻷﺷﯾﺎء اﻟﻧﺎﻣﯾﺔ واﻟﺟذور اﻟﺗﻲ ﯾزﯾد ﻗطر ﺟذوﻋﮭﺎ ﻋن‬
1.1.1 with a diameter of more than 80 mm, they should be uprooted to a depth of at ‫ﻣﻠﯾﻣﺗر ﻋﻠﻰ اﻷﻗل ﺗﺣت ﺳطﺢ اﻷرض وإﻋﺎدة ردم اﻻﻧﺧﻔﺎﺿﺎت اﻟﻧﺎﺟﻣﺔ ﻋن‬500 ‫ ﯾﺻل إﻟﻲ‬Lum sum 1
least 500 mm below earth surface, Resulted excavations will be backfilled with ‫اﺳﺗﺑﻌﺎد ﻛﺗل اﻟﺣﺟﺎرة أو اﻟﻌواﺋﻖ اﻷﺧرى ﺑﺗرﺑﺔ ﻣﻧﺎﺳﺑﺔ ودﻛﮭﺎ دون ﺗﻛﺎﻟﯾف إﺿﺎﻓﯾﺔ ورﻓﻊ‬
Suitable and compacted soil without additional costs and transferring waste to ‫وﯾﺷﻣل اﻟﺳﻌر إزاﻟﺔ اﻟﻌواﺋﻖ اﻟﺳطﺣﯾﺔ‬, ‫اﻟﻣﺧﻠﻔﺎت اﻟﻰ اﻟﻣﻘﺎﻟب اﻟﻣﺧﺻﺻﺔ ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ‬
the designated landfills of local authority. The item includes the removal of ‫وإزاﻟﺔ اﻟﻧﺑﺎﺗﺎت واﻟطﺑﻘﺎت اﻟﺳطﺣﯾﺔ ﻟﻠﺗرﺑﺔ وأﻋﻣﺎل اﻟدك واﻟرش ﻋﻠﻰ طﺑﻘﺎت ﻟﺗﺣﻘﯾﻖ‬
surface barriers, plants, surface layers of soil, compacting in layers and curing ‫اﻟﻣﻧﺎﺳﯾب اﻟﻣﻼﺋﻣﺔ ﻟﻠوظﺎﺋف اﻟﻣﺣددة ﺑﻣﺧطط اﻟﻣوﻗﻊ اﻟﻌﺎم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس‬
with water to reach the appropriate levels of functions defined in the general site .‫واﻟرﺳوﻣﺎت اﻟﻣرﻓﻘﺔ ﻣﻊ ﺗﻌﻠﯾﻣﺎت ﻣﮭﻧدس اﻟﻣوﻗﻊ‬
plan according to specifications, drawings attched with the instruction of site
1.1.2 technician
Remove and reconstruction of the school Yard school wall for new :‫ھدم وإﻋﺎدة ﺑﻧﺎء ﺳور اﻟﻣدرﺳﺔ ﻟﻣوﻗﻊ اﻟﻔﺻول ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬ Lum 1
classes in Lum sum: ‫ھدم ﺳور اﻟﻣدرﺳﺔ ﻓﻲ اﻟﻣوﻗﻊ اﻟﻣﺣدد ﻟﺑﻧﺎء اﻟﻔﺻول اﻟدارﺳﯾﺔ اﻟﺟدﯾدة و اﻟﻌﻣل ﯾﺷﻣل إﻋﺎدة‬ sum
Remove the school wall at the site specified for the construction of the new ‫ﺑﻧﺎء اﻟﺳور ﻣن أطراف اﻟﻔﺻول اﻟدارﺳﯾﺔ ورﺑطﮫ ﻣﻊ اﻟﺑﻧﺎء اﻟﻣﺳﺗﺣدث ﻋﻠﻰ أن ﺗﻛون اﻟﻣواد‬
classrooms and the work includes rebuilding the fence from the edges of the ‫اﻟﻣﺳﺗﺧدﻣﺔ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﻣﺗﻧﺎﺳﻖ ﻣﻌﻣﺎرﯾﺎ ً ﻣﻊ اﻣﺗداد اﻟﺳور اﻟﻘدﯾم وﺑﻧﻔس‬
classrooms and linking it with the new construction, provided that the materials ‫طرﯾﻘﺔ اﻟﺑﻧﺎء اﻟﻣﺗﺑﻌﺔ ﻟذﻟك و ﻧﻘل اﻟﻣﺧﻠﻔﺎت و ﻛل ﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت‬
used are according to specifications and standards and architecturally .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
consistent with the extension of the old wall and in the same way as the
construction used for that and the transfer of waste and everything necessary to
finish the item according to the instructions of the supervising engineer.

1.1.3 Rehabilitation of Yard school: :‫إﻋﺎدة ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ‬


Restoring and rehabilitating the entire school wall. The work includes removing ‫إﻋﺎدة ﺗرﻣﯾم و ﺗﺄھﯾل ﺳور اﻟﻣدرﺳﺔ ﺑﺎﻟﻛﺎﻣل و اﻟﻌﻣل ﯾﺷﻣل إزاﻟﺔ اﻟﺑﻠوك اﻟﺗﺎﻟف وإﻋﺎدة ﺑﻧﺎءه‬
the damaged block and rebuilding it as before, as well as the areas of damage ‫ ﻛﺎﻟﺳﺎﺑﻖ و أﻣﺎﻛن اﻟﺿرر ﻓﻲ اﻟﺳور و اﻟﻛورﻧﯾش و طﻼء اﻟﻛورﻧﯾش و اﻻﻋﻣدة ﺑﺎﻟﻠون‬lum. Sum 1.00
in the wall and cornice according to the instructions of the supervising engineer. .‫اﻟﻣطﻠوب ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
1.1.4 Soil excavation in meter cubic: :‫ﺣﻔر اﻟﺗرﺑﺔ ﺑﺎﻟﻣﺗر اﻟﻛﻌب‬
In cubic meters: digging in any type of soil for building foundations and corridors ‫ اﻟﺣﻔر ﻓﻲ أي ﻧوع ﻣن اﻧواع اﻟﺗرﺑﺔ ﻟﻸﺳﺎﺳﺎت اﻟﻣﺑﻧﻰ واﻟﻣﻣرات ﺑﻌﻣﻖ ﻻ‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
with a depth of not less than 1 meter. Where necessary, even the level suitable ‫ وﺣﯾﺛﻣﺎ ﯾﻠزم ﺣﺗﻰ اﻟﻣﻧﺳوب اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس وﻧزع اﻟﻣﯾﺎه إن وﺟدت ﻣﻊ‬.‫ﻣﺗر‬1 ‫ﯾﻘل ﻋن‬
for establishment and dewatering, if any, while maintaining the aspects of drilling ‫ﻣﯾﺎه ( ﻣﻊ ﻧﻘل ﺟﻣﯾﻊ اﻟﻣﺧﻠﻔﺎت إﻟﻰ‬- ‫ﺗﻠﻔون‬-‫اﻟﺣﻔﺎظ ﻋﻠﻰ ﺟواﻧب اﻟﺣﻔر واﻟﺗﻣدﯾدات )ﻛﮭرﺑﺎء‬ m3
and extensions (electricity - telephone - water) with the transfer of all waste to ‫اﻟﻣواﻗﻊ اﻟﻣﻌﺗﻣدة ﻣن اﻟﺳﻠطﺔ اﻟﻣﺣﻠﯾﺔ واﻟﺣﻔرﯾﺗم طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬ 30.00
3‫م‬
the sites approved by the local authority and drilling in accordance with the ‫ وﯾﺗﺣﻣل اﻟﻣﻘﺎول أي أﺿرار ﻗد ﺗﺣدث ﺑﺎﻟﺧدﻣﺎت أو ﺑﺎﻟﻣﻧﺎزل ﺑﺳﺑب اﻟﺣﻔر‬.‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
drawings, specifications and instructions of the supervising engineer. The .‫وﺟﻣﯾﻊ ﻣﺎﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد‬
contractor shall bear any damages that may occur to the services or houses due
to excavation and all that is necessary to terminate the item.
1.1.5 Backfill around foundations, Sidewalk, water tank and areas that need to ‫اﻟردم ﺣول ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض ﻟﻠﻣﺑﻧﻰ واﻟﺧزان‬
be in meter cubic: ‫واﻟﻣﻣرات واﻟﻣﻧﺎطﻖ اﻟﺗﻲ ﺗﺣﺗﺎج ﻟذﻟك ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Backfill with valid and clean soil mixed with graded fractions stones resulted ‫ اﻟردم ﺑﺎﻟﺗرﺑﺔ اﻟﺻﺎﻟﺣﺔ واﻟﻧظﯾﻔﺔ ﻣﺧﻠوطﺔ ﺑﻛﺳر اﻷﺣﺟﺎر اﻟﻣﺗدرﺟﺔ ﺣول‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
from site excavations or brought from outside to be filled around the foundations ‫ﻛرﺳﻲ اﻟﺣﺟر واﻟﻌﻧﺎﺻر اﻹﻧﺷﺎﺋﯾﺔ أﺳﻔل ﻣﺳﺗوى ﺳطﺢ اﻷرض وداﺧل أرﺿﯾﺎت اﻟﻣﺑﻧﻰ‬
as well as inside the building on layers not more than 30 cm using mechanical ‫ ﺳم أوﻻ ً ﺑﺄول ﻣﻊ‬30 ‫ﻛﺎﻣﻠﺔ ﻣن ﻧﺎﺗﺞ اﻟﺣﻔر أو ﻣن ﺧﺎرج اﻟﻣوﻗﻊ ﻋﻠﻰ طﺑﻘﺎ ًت ﻻ ﺗزﯾد ﻋﻠﻰ‬
compactor, curing with water to achieve the appropriate strength and get a ‫اﻟدك اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟرش ﺑﺎﻟﻣﺎء ﺣﺗﻰ ﺗﺣﻘﯾﻖ اﻟﻘوة اﻟﻣﻧﺎﺳﺑﺔ و اﻟﺣﺻول ﻋﻠﻰ ﺗرﺑﺔ ﻣﺗﻣﺎﺳﻛﺔ‬
cohesive soil according to the specified levels. Carry out compacting of narrow ‫وطﺑﻘﺎ ً ﻟﻠﻣﻧﺎﺳﯾب اﻟﻣﺣددة ﻣﻊ اﺳﺗﺧدام اﻟدك ﻟﻸﻣﺎﻛن اﻟﺿﯾﻘﺔ ﺣول اﻷﺳﺎﺳﺎت واﻟﻣﺑﺎﻧﻲ‬
areas around foundations and external stone walls, causing no damage to the ‫وﻧﻘل اﻟﺗرﺑﺔ اﻟزاﺋدة ﻋن‬, ‫ ﻣﻊ ﻋدم اﻹﺿرار ﺑﺎﻟﻌﻧﺎﺻر واﻷﻋﻣﺎل اﻟﻣﻧﻔذة ﻓﻲ اﻟﻣوﻗﻊ‬,‫اﻟﺣﺟرﯾﺔ‬ m3
32.00
works implemented in the site, and transfer of excess dump soil to public dumps ‫اﻟردم إﻟﻰ ﺧﺎرج اﻟﻣوﻗﻊ ﻟﻠﻣﻘﺎﻟب اﻟﻌﺎﻣﺔ ﻣﻊ ﻋﻣل اﻟطرﻗﺎت واﻟﻣﺳﺎﻟك اﻵﻣﻧﺔ واﻟﻼزﻣﺔ ﻟﻧﻘل‬ 3‫م‬
off site. Safe roads for trolleys to transfer materials and equipment used for ‫اﻟﻣواد واﻟﻣﻌدات ﻟزوم اﻟﺗﻧﻔﯾذ ﻓﻲ ﻧطﺎق اﻟﻣوﻗﻊ وﺗﻧظﯾف اﻟﻣوﻗﻊ ﻣن اﻟﻣﺧﻠﻔﺎت اﻟﻧﺎﺗﺟﺔ ﻋن‬
implementation within the site to be prepared. Before project handover, site has ‫اﻟﺗﻧﻔﯾذ وﺗﺳﻠﯾم اﻟﻣﺷروع وﻣوﻗﻌﮫ ﺧﺎﻟﯾﺎ ً ﻣن أي ﻣؤﺛرات ﻋﻠﻰ ﺳﻼﻣﺗﮫ ﻣﺳﺗﻘﺑﻼ ً ﻣن اﻧﮭﯾﺎرات‬
to be free of waste resulting from implementation as well as other factors which ‫اﻟﺗرﺑﺔ ﺑﺄﻧواﻋﮭﺎ وﺧﻼﻓﮫ ﺑﻌد اﻻﻧﺗﮭﺎء ﻣن أﻋﻣﺎل اﻟﺗﻧﻔﯾذ ورﻋﺎة اﻟﻣﯾول اﻟﻼزم ﻟﺗﺻرﯾف ﻣﯾﺎه‬
may effect the project safety in future like landslides of various types and others, ‫اﻷﻣطﺎر واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﺑﻧد وطﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬
taking in considerations preparation of slopes needed to drain rainwater. The . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
item includes all the necessary to complete the item in accordance with the
1.1.6 drawings and specifications
Planting works:- In number:andTheinstructions
supply andofimplementation
the supervisor..of Plants with 2 -: ‫أﻋﻣﺎل اﻟﺗﺷﺟﯾر‬
meter length in pavement square that has dimention of ( 2M * 1.3 M). so every ‫ ﺳم‬70 ‫ﻣﺗر ﺑﻌﻣﻖ‬1.3 ‫ﻣﺗر وﻋرض‬2 ‫ ﺗورﯾد وﺗﻧﻔﯾذ اﺣواض أﺷﺟﺎر ﻣﻧﺎﺳﺑﺔ طول‬: ‫ﺑﺎﻟﻌدد‬
two tree in one poll. The price includes planting seedlings, agricultural soil and .‫ ﺳم ﺑﺣﯾث ﯾﺗم ﻏرس ﺷﺟرﺗﯾن ﻓﻲ ﻛل ﺣوض‬40*20*20 ‫ﺗﻧﻔﯾذ ﺑﻠوك ﺻم ﺗﻛون ﺑﻣﻘﯾﺎس‬
all that is needed according to the attached and according to drawings and ‫وﻋﻣل اﻟردﻣﯾﺎت ﻣﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ ﻻﺻﻘﺔ ﻓﯾﻣﺎ ﺑﯾﻧﮭﺎ ﺑﻣوﻧﺔ ﺧرﺳﺎﻧﯾﺔ ذو ﻧﺳﺑﺔ ﺧﻠط ﺑﻣﻘدار‬
specifications and the instructions of the supervisor engineershall be in a scale ‫ أﯾﺎم ﻣﻊ ﺗﻠﺑﯾس اﻟﺑﻠوك ﻣن‬5 ‫( ﻧﯾس إﻟﻰ اﺳﻣﻧت ﺑﺣﯾث ﯾﺗم رﺷﮭﺎ ﺑﺎﻟﻣﯾﺎه ﻛل ﯾوم ﺑﻣﻘدار‬1:3) pcs
8.00
of 25 * 10 * 50 cm. And the work of the backfill with concrete works adhesive ‫اﻟداﺧل واﻟﺧﺎرج إﺿﺎﻓﺔ اﻷﻟوان ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف ﺑﻣﺎ ﯾﺗﻧﺎﺳﻖ ﻣﻊ أﻟوان‬ ‫ﻋدد‬
between them with concrete mortar with a mixing ratio of (1:3) fine sand with ‫اﻟﻣدرﺳﺔ وﺷﻌﺎرات اﻟﻣﻧظﻣﺔ واﻟﺛﻣن ﯾﺷﻣل ﻏرس اﻟﺷﺗﻼت واﻟﺗرﺑﺔ اﻟزراﻋﯾﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم‬
cement so that it is sprinkled with water every day by 5 days with the addition of .‫ﺑﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣﺧططﺎت اﻟﻣروﻓﻘﺔ وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
colors according to the instructions of the supervising engineer in line with the
colors of the school and the logos of the organization.
1.1.7 Mitigation of environmental impact during the project implementation -: ‫ﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ ﺧﻼل ﻓﺗرة ﺗﻧﻔﯾذ اﻟﻣﺷروع‬
period: ‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد وﺗﻧﻔﯾذ اﻷﻋﻣﺎل اﻟﺿرورﯾﺔ ﺑﺎﻟﻣوﻗﻊ ﻟﺗﺧﻔﯾف اﻷﺛر اﻟﺑﯾﺋﻲ‬:‫ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬
The contractor shall supply and carry out the necessary works at the site to -:‫واﻟﻣﺗﻣﺛﻠﺔ ﺑﺎﻟﺗﺎﻟﻲ‬
mitigate environmental impact through implementation the following : . ‫ اﻟﺦ ﻟﻣﻧﻊ دﺧول ﻏﯾر اﻟﻌﺎﻣﻠﯾن إﻟﯾﮫ‬... ‫ ﺗﺳوﯾر اﻟﻣوﻗﻊ ﻛﺎﻣﻼ ً ﺑﺎﻟزﻧك أو اﻷﺧﺷﺎب أو‬-1
1. Site shall be completely fenced with zinc or wood, etc. to prevent entry of non- ‫ ﺗورﯾد ﻣﺳﺗﻠزﻣﺎت وأدوات اﻟﺳﻼﻣﺔ اﻟﺷﺧﺻﯾﺔ ﻣن إﺻﺎﺑﺎت اﻟﻌﻣل وﺗﺷﻣل )اﻟﺟزﻣﺎت‬-2
workers. (‫اﻟﺦ‬.. ‫واﻟﻘﺑﻌﺎت واﻟﻛﻔوف واﻟﻧظﺎرات اﻟواﻗﯾﺔ اﻟﻛﻣﺎﻣﺎت وﺳدادات اﻷذان وأﺣزﻣﺔ اﻷﻣﺎن‬
2 – Supply of personal safety tools against work injuries (including caps, hats, ‫ﺑﺎﻟﻌدد اﻟﻛﺎﻓﻲ ﻟﻠﻌﻣﺎل اﻟﻌﺎدﯾﯾن واﻟﻣﺎھرة ﻋﻠﻰ ﻧﻔﻘﺔ اﻟﻣﻘﺎول ﺑﺣﺳب ﺣﺟم اﻟﻌﻣﺎﻟﺔ اﻟﺗﻲ ﯾﺗطﻠﺑﮭﺎ‬
gloves, protective glasses, gaskets, earplugs, safety belts, etc.) with adequate .‫اﻟﻣﺷروع وإﻟزاﻣﮭم ﺑﺎﺳﺗﺧداﻣﮭﺎ‬
numbers for ordinary and skilled workers at the contractor's expense, depending ‫ﻣﺗر ﻣؤﻗت ﻣن اﻟزﻧك أو اﻟﺧﺷب أو‬2.5 ‫ﻣﺗر وارﺗﻔﺎع‬1×1.5 ‫ ﺗﺷﯾﯾد ﺣﻣﺎم ﺑﺄﺑﻌﺎد‬-3
on the size of the labor force required for the project. They will be oblige to use ‫اﻟﺦ وﻣرﺣﺎض ﻋرﺑﻲ وﻣﻐﺳﻠﺔ اﻷﯾدي اﻟﻣؤﻗﺗﺔ وﺗوﻓﯾر اﻟﻣﯾﺎه ﻟﮭذا اﻟﺣﻣﺎم وﻋﻣل ﺣﻔرة‬..‫اﻟﺑﻠك‬
them. ‫)ﺑﯾﺎرة ﻣﺻﻐرة أو ﺗرﻧش (ﻣﻊ اﻟﻐطﺎء وإﻟزام ﺟﻣﯾﻊ اﻟﻌﻣﺎل واﻟﻣﺷرﻓﯾن ﺑﺎﺳﺗﺧداﻣﮫ وﯾﺗم إزاﻟﺔ‬
3 - Construction of a 1.5 x 1 x2.5 meter temporary bath of zinc, wood, bricks, etc . ‫اﻟﺣﻣﺎم وردم اﻟﺑﯾﺎرة ﯾﻌد اﺳﺗﻛﻣﺎل ﺗﻧﻔﯾذ اﻟﻣﺷروع‬ Lum
1
an eastern toilet, a temporary wash basin, supply of water for bathroom and ‫ اﻟﻘﯾﺎم ﺑﺗﺷوﯾن اﻟﻣواد ﺑطرﯾﻘﺔ ﻣﻧﻔﺻﻠﺔ وﺗوﻓﯾر ﻣﺳﺎﺣﺎت ﻛﺎﻓﯾﺔ ﻟﻠﺣرﻛﺔ واﻟﻣﻧﺎورة وﻛذﻟك‬-4 sum
implement a covered cesspool . All workers and supervisors are obliged to use ‫إزاﻟﺔ اﻷﺧﺷﺎب ورﻓﻊ ﻛﺎﻓﺔ اﻟﻣﺧﻠﻔﺎت ﺧﻼل ﻓﺗرة اﻟﺗﻧﻔﯾذ إﻟﻰ ﺧﺎرج ﻣﻧطﻘﺔ اﻟﻌﻣل )اﻟﻣﻘﺎﻟب‬
it. At the completion of the project, the bathroom shall be removed and the .(‫اﻟﻣﺧﺻﺻﺔ‬
cesspool shall be backfilled. ‫اﻻﻟﺗزام ﺑوﺿﻊ اﻟﻣﻌدات اﻟﻣزﻋﺟﺔ ﺑﻌﯾدا ً ﻋن اﻷﻣﺎﻛن اﻟﻣﺄھوﻟﺔ وﺗﺷﻐﯾﻠﮭﺎ ﻓﻲ اﻷوﻗﺎت‬-5
4 - Materials to be separately stored and provide sufficient areas for movement ‫اﻟﻣﻧﺎﺳﺑﺔ وﻛذﻟك اﻻﻟﺗزام ﺑﺗﺧزﯾن اﻟﻣواد اﻟﺧطﯾرة ﺑﻌﯾدا ً ﻋن اﻟﻌﺎﻣﻠﯾن واﻟﻌﻣل ﻋﻠﻰ ﻋدم ﺗﻐﯾﯾر‬
and handling, as well as removal of wood and all waste produced during the .‫اﻟزﯾوت أو ﺗرك ﺑﻘﺎﯾﺎ اﻟﺷﺣوم ﻓﻲ ﻣﻧطﻘﺔ اﻟﻌﻣل‬
implementation period outside the work area ( public dumps). ‫ﻣﺟﺎري ( اﻟﺗﻲ ﺗﺗﻌرض ﻟﻠﻛﺳر‬-‫ﻣﯾﺎه‬- ‫ﺗﻠﻔون‬-‫اﻻﻟﺗزام ﺑﺈﺻﻼح اﻟﺧدﻣﺎت اﻟﻌﺎﻣﺔ )ﻛﮭرﺑﺎء‬-6
5 - Terrible equipments will be put away from populated places and to be . ‫إﺛﻧﺎء ﺗﻧﻔﯾذ اﻟﻣﺷروع أوﻻ ً ﺑﺄول‬
operated at the appropriate times as well as the obligation to store dangerous . ‫ ﺣﻘﯾﺑﺔ اﺳﻌﺎﻓﺎت أوﻟﯾﺔ ﻟﻠﻌﻣﺎﻟﺔ‬-7
materials away from workers and no change of oils or leaving the grease
residues in the work area.
6 - Commitment to reform public services (electricity - telephone - water -
1.1.8 "Helson's school yard mattress: :‫ﻓرﺷﺔ ھﻠﺳن ﻟﺣوش اﻟﻣدرﺳﺔ‬
Supplying and furnishing a graded helsen layer for the courtyard and the inner ‫ﺗورﯾد وﻓرش طﺑﻘﺔ ھﻠﺳن ﻣﺗدرج ﻟﻠﻔﻧﺎء واﻟﺳﺎﺣﺔ اﻟداﺧﻠﯾﺔ واﻟﻣوﺿﺣﺔ ﺑﺎﻟرﺳوﻣﺎت اﻟﻣوﺿﺣﺔ‬
courtyard, as shown in the drawings, and the work includes the following: ‫ـ‬: ‫واﻟﻌﻣل ﯾﺷﻣل اﻵﺗﻲ‬
- Leveling the site with tamping and spraying with water, and making slopes for ‫ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ ﻣﻊ اﻟدك واﻟرش ﺑﺎﻟﻣﯾﺎه وﻋﻣل ﻣﯾول ﻟﻠﺳﺎﺣﺔ ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗﺑل‬-
the yard to drain rainwater before laying the paver, according to the instructions ‫ ﺳم‬5 ‫ ﺗورﯾد وﻓرش طﺑﻘﺔ ﻛري ﺑﺳﻣك‬-. ‫ﻓرش اﻟﻛري وﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ Lum
of the supervising engineer. - Supplying and spreading a layer of paver with a .‫ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 1.00
sum
thickness of 5 cm according to the instructions of the supervising engineer.”

Total Amount Of Excavation and Backfilling Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟردم و اﻟﺣﻔر‬
1.2 Concrete Works : ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت‬
Notes : :‫ﻣﻠﺣوظﺔ‬
The prices for reinforced concrete include the following: -:‫أﺳﻌﺎر اﻟﺧرﺳﺎﻧﺎت ﺗﺷﻣل اﻷﺗﻲ‬
1- Form works and reinforcement .‫ أﻋﻣﺎل اﻟﺷدات اﻟﺧﺷﺑﯾﺔ واﻟﺣدﯾد‬-1
2- Mixing the concrete and the watering up to a period of 2 weeks and all related works .‫ اﺳﺑوﻋﯾن وﻛل اﻷﻋﻣﺎل ﺑﺣﺳب اﻟرﺳوﻣﺎت‬2 ‫ أﻋﻣﺎل اﻟﺧﻠطﺔ اﻟﺧرﺳﺎﻧﯾﺔﻣﻊ اﻟرش ﻟﻔﺗرة‬-2
mentioned in the drawings .‫ ﻋﻣل ﻣﻛﻌﺑﺎت اﺧﺗﺑﺎر واﺧﺗﺑﺎرھﺎ‬-3
3- Producing sample and their testing. .‫ﺳم أﺳﻔل اﻟﻣﯾدات اﻟداﺧﻠﯾﺔ واﻟﺧﺎرﺟﯾﺔ‬15 ‫ طﺑﻘﺔ ﻛري ﺳﻣك‬-4
4- A layer of aggregate of 15cm thickness under the internal and the external TB's. ‫ أى طﻠﺑﺎت إﺿﺎﻓﯾﺔ ﯾطﻠﺑﮭﺎ اﻟﻣﮭﻧدس‬-5
5- Any additional requests by the Engineer .‫ ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾورد اﻟﻣواد اﻟﺗﻲ ﺗﺗطﺎﺑﻖ ﻣﻊ اﻟﻣواﺻﻔﺎت اﻟﺧﺎﺻﺔ واﻟﻌﺎﻣﺔ‬6
6- The contractor shall only use materials corresponding with the general or special ‫ ﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻣﺳﺋوﻟﯾﺔ ﻧﻘل وﺗﺧزﯾن اﻟﻣواد ﺑﺎﻟطرﯾﻘﺔ اﻟﻣﻧﺎﺳﺑﺔ اﻟﺗﻰ ﻵﺗﻌرﺿﮭﺎ ﻟﻠﺗﻠف وﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻘﯾﺎم‬-7
specifications. .‫ﺑﺳرﻋﺔ ﻧﻘل اﻟﻣواد اﻟﺗﺎﻟﻔﺔ ﻣن اﻟﻣوﻗﻊ ﻣﺑﺎﺷرة ﺑﻌﺑﺎرة أﺧرى ﻣﻣﻧوع ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﺳﺗﺧدام أي ﻣواد ﺗﺎﻟﻔﺔ‬
7- The contractor shall deliver the material to the site, store it in a proper way to prevent any ‫ ﯾﻠزم إﺳﺗﺧدام اﺳﻣﻧت ﻣﻘﺎوم ﻟﻠﻛﺑرﯾﺗﺎت ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت اﻟﻌﺎدﯾﺔ واﻟﻣﺳﻠﺣﺔ ﺑﺎﻷﺳﺎﺳﺎت‬-8
damage and remove any surplus from the site after finishing. No spoiled material has to be .‫واﻷرﺿﯾﺎت ﻓﻲ اﻟﻣﻧﺎطﻖ اﻟﺳﺎﺣﻠﯾﺔ‬
used. ‫ اﻟﻛري اﻟﻣﺳﺗﺧدم ﻟﻠﺻﺑﯾﺎت اﻟﻣﺳﻠﺣﺔ ﻛري ﻛﺳﺎرة وﯾﺳﺗﺧدم اﻟﮭزاز اﻟﻣﯾﻛﺎﻧﯾﻛﻲ أﺛﻧﺎء اﻟﺻب‬-9
8- Sulphate resistant cement shall be used for plain and reinforced concrete of the 3‫ م‬/ ‫ ﻛﺟم أﺳﻣﻧت‬350 ‫ ﻧﯾس و‬3‫م‬0.40 ‫ ﻛري و‬3‫م‬0.80 ‫ ﺧرﺳﺎﻧﺔ اﻟﺗﺳﻠﯾﺢ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-10
foundations and floors in the coastal areas. .‫ ﻛري‬/ ‫ ﻧﯾس‬/ ‫( اﺳﻣﻧت‬3:2:1) ‫ﺧرﺳﺎﻧﺔ‬
9- Aggregate used for reinforced concrete shall be broken stones. A mechanical device shall 3‫م‬1 ‫ﻛﺟم أﺳﻣﻧت ﻟﻛل‬250‫ ﻧﯾس و‬3‫م‬0.40‫ ﻛري و‬3‫م‬0.80 ‫ اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﯾﺟب أن ﺗﺗﻛون ﻣن‬-11
be used during concreting for proper compaction. .‫ ﻛري‬/ ‫ ﻧﯾس‬/‫( أﺳﻣﻧت‬6:3:1) ‫ﺧرﺳﺎﻧﺔ‬
10- Reinforced concrete shall generally, as long as no other specification is mentioned, . ‫ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ ﻣن أﻋﻠﻰ ﺣدﯾد اﻟﺗﺳﻠﯾﺢ‬-12
consist of 0,80m3 aggregate, 0,40m3 sand and 350kg cement/m3 of concrete (1:2:3)
11- Plain concrete shall generally, as long as no other specification is mentioned, consist of
0,80m3 aggregate, 0,40m3 sand and 250kg cement/m3 of concrete (1:3:6).
12- The concealled pipes for electricity connection should be installed above the concrete
Plain concrete for floors 10 cm with stone fractions, Portland Cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺳم ﻣﻊ ﺻوﻟﻧﺞ‬10 ‫ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت‬
Plain concrete with a minimum thickness of 150 kg / cm 2, to be casted above a ‫ وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬، ‫ﺳم إﺳﻣﻧت ﺑورﺗﻼﻧدي‬10 ‫ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻟﻸرﺿﯾﺎت ﺳﻣك‬-: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
ً ‫ طﺑﻘﺎ‬،‫ﺳم‬10 ‫ ﻣﻊ وﺿﻊ ﻓرﺷﺔ ﻛﺳر اﺣﺟﺎر )ﺻوﻟﻧﺞ( ﺗﺣﺗﮭﺎ ﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬،2‫ﺳم‬/‫ ﻛﺟم‬150 m2
1.2.1 stone fractions layer of not less than 10 cm thickness, according to the 65.50
.‫ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
drawings, specifications and instructions of the supervising engineer.

Reinforced concrete 250 kg / cm 2, for ground beam: : ‫ اﻟﻣﯾد إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ‬
Reinforced concrete for cemells (ground beams) using Portland Cement, with ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ اﻟﻣﯾد اﻷرﺿﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ ھز‬،‫ اﻟﺻب‬،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫ﻻ ﺗﻘل ﻋن‬ m3
1.2.2 and cutting, casting, vibrating concrete using a vibration machine and spattering ‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز واﻟرش‬ 5.54
3‫م‬
of water.( and all necessary) .All works to be done according to drawings, . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications, and engineer supervisor instructions .

Reinforced concrete for columns and lintels of 250 kg / cm 2 Resistant : ‫إﺳﻣﻧت ﺑورﺗﻼﻧدي‬2 ‫ﺳم‬/‫ﻛﺟم‬250‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب‬
Portland Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻸﻋﻣدة واﻷﻋﺗﺎب ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
Reinforced concrete for columns, lintels using Resistant Portland Cement, with ،‫ ﺗورﯾد وﻗص ووﺿﻊ اﻟﺣدﯾد‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250‫وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬
‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز واﻟرش ﻣﻊ إﺳﺗﺧدام اﻟﺗﻘﻣﯾص ﺑﺎﻟﺷواﻻت ﻟﻣدة ﻻ ﺗﻘل ﻋن‬،‫اﻟﺻب‬ m3
1.2.3 resistance of not less than 250 kg / cm 2. Item includes wood formwork, steel 4.21
supply and cutting, casting, vibrating concrete using a vibration machine, Curing .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،(‫ وﻛل ﻣﺎ ﯾﻠزم‬،‫إﺳﺑوع‬ 3‫م‬
with water in addition to cover columns with sackcloth for not less than a week.(
and all necessary) .All works to be done according to drawings, specifications,
and supervisor instructions.
Reinforced concrete for ceilings and beams, 250 kg / cm 2, Portland :‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ،‫ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور‬
Cement: ‫ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻠﺳﻘوف واﻟﺟﺳور واﻟﻣﯾد اﻟﻌﻠوﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
m2
1.2.4 Reinforced concrete for ceilings and beams using Portland Cement:with ‫ ﺗورﯾد وﻗص ووﺿﻊ‬،‫ وﺗﺷﻣل )اﻟﺗﺧﺷﯾﺑﺔ‬،2‫ﺳم‬/‫ ﻛﺟم‬250 ‫اﻟﺑورﺗﻼﻧدي وﺑﻣﻘﺎوﻣﺔ ﻻ ﺗﻘل ﻋن‬ 15.15
2‫م‬
resistance of not less than 250 kg / cm 2. Item includes (shuttering, steel supply ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،(‫ واﻟرش ﺑﺎﻟﻣﺎء وﻛل ﻣﺎ ﯾﻠزم‬،‫ ھز اﻟﺧرﺳﺎﻧﺔ ﺑﺎﻟﮭزاز‬،‫ اﻟﺻب‬،‫اﻟﺣدﯾد‬
and cutting, casting, vibrating concrete using a vibration machine and curing of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
water.( and all necessary) .All works to be done according to drawings,
Total Amount of Concrete Works. ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺔ‬

1.3 Stone and Brick Works: : ‫اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬


Building works 3‫م‬/‫ﻛﺟم‬300 ‫أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ﺗﻧﻔذ درﺟﺔ أوﻟﻰ ﻣﺗراﺑطﺔ وﺑﺎﺳﺗﺧدام اﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم وﺑﻣﺣﺗوى أﺳﻣﻧت ﻻ ﯾﻘل ﻋن‬.1
1. Construction works shall be carried out first-class, interconnected, Resistant Portland cement, to be used with a cement ‫ وﯾﺟب ﺗرﻛﯾب وإﺣﻛﺎم اﻟﻠﺣﺎﻣﺎت اﻷﻓﻘﯾﺔ واﻟراﺳﯾﺔ‬،‫ رﻣل ﺑﺎﻟﺣﺟم ( أو ﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬3 :‫ أﺳﻣﻧت‬1 ) ‫أو‬, ‫رﻣل‬
content of not less than 300 kg / m3 of sand, or (1 cement: 3 Sand),Horizontal and vertical joints are properly implemented. ‫واﻟﻌﻣل ﯾﺷﻣل اﻟﺳﻘﺎﯾل اﻟﻼزﻣﺔ واﻟﺗﻧﻌﯾم واﻟﺟﻠﻲ وﺟﻣﯾﻊ ﻣﺎ‬,‫ﺟﯾدا ً ﻣﻊ اﺳﺗواء اﻷوﺟﮫ واﺳﺗﻘﺎﻣﺔ اﻷرﻛﺎن ﺑﺎﺳﺗﺧدام اﻟﺧﯾط واﻟﻣﯾزان‬
Leveling of wall faces and straightening of corners using the thread and balance. The item price include scaffolding,
. ‫ﯾﻠزم ﻹﻧﮭﺎء اﻟﻌﻣل‬
smoothness, glossiness and all necessary to finish the work.
‫اﻟﺦ( ﻟﻠﻣواد اﻟﻣطﻠوﺑﺔ ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻓﻲ اﻟﻣﺷروع ﻻﻋﺗﻣﺎدھﺎ وأﺧذ ﻣواﻓﻘﺔ‬...‫رﻣل‬-‫ﯾﺎﺟور‬-‫ﺑﻠك‬-‫ﯾﺟب ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻘدﯾم ﻋﯾﻧﺎت)اﺣﺟﺎر‬.2
2. The contractor shall submit samples of materials to be used (stones, bricks, sand, etc.) for written approval.
3. All stones have to be laid on their natural length as to be pressed vertically where they are in the building. spraying with .‫ﺧطﯾﺔ ﻋﻠﯾﮭﺎ‬
water twice a day for a week. ‫ﺗﺑﻧﻰ ﺟﻣﯾﻊ اﻷﺣﺟﺎر ﻋﻠﻰ ﻣراﻗدھﺎ اﻟطﺑﯾﻌﯾﺔ ﻟﯾﻛون اﻟﺿﻐط ﻋﻣودﯾﺎ ً ﻋﻠﻰ ھذه اﻟﻣراﻗد ﻣﮭﻣﺎ ﻛﺎن ﻣوﻗﻌﮭﺎ ﻓﻲ اﻟﺑﻧﺎء وﺗرش اﻟﻣﺑﺎﻧﻲ‬.3
4. Stones have to be hard, solid, free of impurities, veins, sand holes, fractions and homogeneous in terms of origin and color .‫ﺟﯾدا ً ﻣرﺗﯾن ﻓﻲ اﻟﯾوم وﻟﻣدة أﺳﺑوع‬
(one quarry). ‫ ﯾﺟب أن ﺗﻛون اﻷﺣﺟﺎر ﻗوﯾﮫ وﺻﻠﺑﮫ ﺧﺎﻟﯾﺔ ﻣن اﻟﺷواﺋب واﻟﻌروق واﻟﻔﺟوات اﻟرﻣﻠﯾﺔ واﻟﻛﺳور و ﻣﺗﺟﺎﻧﺳﺔ ﻣن ﺣﯾث اﻟﻧوع‬.4
5. Construction must be regular in terms of straightening of construction lines, joints and height of courses which shall not .(‫واﻟﻠون)ﻣﺣﺟر واﺣد‬
exceed (20-25-30)cm .Spaces between fronting and lining stones (course stones) are well filled with cement mortar and stone ‫(ﺳم ﻟﺳرع‬30-25-20)‫ ﯾﺟب أن ﯾﻛون اﻟﺑﻧﺎء ﻣﻧﺗظﻣﺎ ً ﻣن ﺣﯾث اﺳﺗﻘﺎﻣﺔ ﺧطوط اﻟﺑﻧﺎء واﻟﻔواﺻل وارﺗﻔﺎﻋﺎت اﻟﺳروع ﻻ ﯾزﯾد ﻋن‬.5
fractions according to the drawings and specifications and the instructions of the supervisor .‫اﻟواﺣد ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﺑﯾن اﻟﻣداﻣﯾك ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ واﻟﺷﻠف اﻟﺻﻐﯾر طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
6. The height of fronting stone construction without lining should not exceed 60 cm. .‫ﺳم ﺑدون ﺑطﺎﻧﺔ‬60‫ ﯾﺟب أن ﻻ ﯾزﯾد ارﺗﻔﺎع اﻟﺑﻧﺎء ﻟﻠواﺟﮭﺎت ﻋن‬.6
7. Granite stone constructions should be according to the sizes shown in the drawings.
.‫ ﯾﺟب أن ﺗﻛون ﻣﺑﺎﻧﻲ اﻟﺣﺟر اﻟﺟراﻧﯾت ﺣﺳب اﻟﻣﻘﺎﺳﺎت اﻟﻣوﺿﺣﺔ ﻓﻲ اﻟرﺳوﻣﺎت‬.7
8. The Engineer shall check and review the construction work properly (ensure that the balance and the thread is used
properly, thread is tighten and check the room diameters)
‫ ﻋﻠﻰ اﻟﻣﮭﻧدس اﺳﺗﻼم أﻋﻣﺎل اﻟﺑﻧﺎء ﺑﺷﻛل ﺻﺣﯾﺢ واﻟﺗﺄﻛد ﻣن ﻣﯾزان اﻟﺧﯾط وﺷد اﻟﺧﯾط واﻟﺗرﺑﯾﻊ واﺳﺗﻼم أﻗطﺎر اﻟﻐرف واﻟﺗﺄﻛد‬.8
9. The water balance and the plumb bob to be used in all courses of the constructions (in all work stages) . .‫ﻣن ﺻﺣﺔ اﻟﺑﻧﺎء‬
10.Stones specially cut for edges will be used in all openings construction either fronting or lining stone. Edge stone height .‫ ﯾﺟب اﺳﺗﺧدام ﻣﯾزان اﻟﻣﺎء ﻓﻲ ﻛل ﻣدﻣﺎك ﯾﺑﻧﻰ وﻋﻠﻰ اﻟﺑﻧﺎء اﺳﺗﺧدام اﻟﺑﻠﺑل ﻓﻲ ﻛﺎﻓﺔ ﻣراﺣل اﻟﻌﻣل‬.9
(front height) not less than 15 cm minimum. .‫ﺳم‬15‫ وﺑﺣﯾث ﻻ ﯾﻘل ﺑﻌد اﻟﺟﺑﮭﺔ اﻟﺻﻐﯾرة ﻟﻠرﻛن ﻋن‬.‫ ﯾﺟب اﺳﺗﺧدام أﺣﺟﺎر اﻷرﻛﺎن ﻓﻲ ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺑطﺎﻧﺔ واﻟظﮭﺎرة‬.10
11. The cladding stones should be applied from top and bottom for consistency, smooth back stones will not be used for .‫ وﯾﻣﻧﻊ اﺳﺗﺧدام اﻷﺣﺟﺎر ذات اﻟظﮭر اﻷﻣﻠس‬،‫ ﯾراﻋﻰ ﺗﻧﻔﯾذ أﺣﺟﺎر اﻟﺗﻛﺳﯾﺔ ﻣن أﻋﻠﻰ وﻣن أﺳﻔل ﺑﺷﻛل ﻛﺎف ﻣن اﺟل اﻟﺗﻣﺎﺳك‬.11
cladding . .‫ رﻣل(ﻣﻊ اﻟرش ﻗﺑل اﻟﺗﻛﺳﯾﺔ ﺑﺎﻟﺣﺟر‬:‫)اﺳﻣﻧت‬1:2‫ ﯾﻠزم طرطﺷﺔ اﻟﺟﺳور واﻷﻋﻣدة ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬.12
12. Concrete beams and columns have to be spattered with cement mortar with mixing ratio of 1: 2 (cement: sand) and ‫ ﯾﺟب أن ﺗﻛون اﻟﻣﺛﺎﻧﻲ)اﻟﺑطﺎﻧﺔ( ﻣن اﻟﺣﺟر وﯾﻌﺑﺄ اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ‬-13
curing with water before stone cladding . .‫ﻛري( وﻋﻠﻰ إن ﯾﻛون اﻟﻛري ﻣﺗدرج‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫ﺧﻠط‬
13 - The lining part shall be constructed of stones. Gaps between fronting and lining stones have to be filled with plain
‫ ﯾوم ﻋﻠﻰ ﺗﺻﻧﯾﻌﮫ وﻋﻠﻰ اﻟﻣﻘﺎول ﺗورﯾد اﻟﺑﻠوك ﻟﻠﻣوﻗﻊ‬28 ‫ ﯾﻣﻧﻊ اﺳﺗﺧدام اﻟﺑﻠوك اﻻﺳﻣﻧﺗﻲ اﻟﻣﺻﻧﻊ أوﺗوﻣﺎﺗﯾﻛﯾﺎ ﻗﺑل ﻣرور‬.14
concrete of mixing (1: cement: 2.5 sand: 5 aggregate) , Aggregate shall be graded.
14.Automatic concrete blocks will not be used before 28 days of fabrication. After supply to the project site, blocks should be
.‫وﻣﻌﺎﻟﺟﺗﮫ ﺑﺎﻟﻣﺎء ﻗﺑل اﻟﺑﻧﺎء ﺑﮫ‬
cured with water before used for construction. ‫ﻛﺟم‬350‫ﺳم أو اﻛﺛر ھﻲ‬25، ‫ﺳم‬20، ‫ﺳم‬15‫ ﻧﺳﺑﺔ اﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﺑﺎﻧﻲ ﺑﺎﻟﺑﻠوﻛﺎت ااﻹﺳﻣﻧﺗﯾﺔ اﻟﻣﻔرﻏﺔ ﺳﻣك‬.15
15. Mixing ratio of the cement mortar used for constructions with hollow cement blocks of 15 cm, 20 cm, 25 cm or more is . ‫أﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب رﻣل‬
(350 kg cement per cubic meter of sand.) .‫ ﺟﻣﯾﻊ اﻟﺑﻠك اﻟﻣﺳﺗﺧدم اﺗوﻣﺎﺗﯾﻛﻲ ﺿﻐط ﻋﺎﻟﻲ‬.16
16. All the concrete block used is high pressure automatic. 2‫ ﺳم‬/ ‫ ﻛﺟم‬70 ‫ ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن‬:‫ ﺑﻠك )ﺑردﯾن( ﺻم ﻟﻠﺟدران اﻟﺣﺎﻣﻠﺔ‬-
- Solid block (Bardeen) for bearing walls: breaking resistance not less than 70 kg / cm 2 2‫ ﺳم‬/ ‫ ﻛﺟم‬35 ‫ ﻻ ﺗﻘل ﻣﻘﺎوﻣﺔ اﻟﻛﺳر ﻟﮫ ﻋن‬:‫ ﺑﻠك )ﺑردﯾن(ﺻم ﻟﻠﺟدران ﻏﯾر اﻟﺣﺎﻣﻠﺔ‬-
- Solid block (Bardeen) for non-bearing walls: breaking resistance not less than 35 kg / cm 2 .‫ ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت‬.17
17. All construction works shall be geometrically measured ,All openings and spaces to be deducted.

Black stone construction (basalt or granite): : ‫ﻣﺑﺎﻧﻲ ﺣﺟر ﻣﻧﺷﺎر أﺳود )ﺑﺎزﻟت او ﺟراﻧﯾت( ﻣﻧﺷﺎر ﺗﻛﺳﯾﺔ ﺣول اﻟﻣﯾدة‬
Squared black stone construction 15 cm thickness for the basalt stone base ‫ ﺑﻧﺎء ﺣﺟر ﻣﻧﺷﺎر ﻟﻠﻛرﺳﻲ اﻟﻣﺑﻧﻰ وﺣﯾث ﻣﺎ ﯾﻠزم اﺣﺟﺎر )ﺑﺎزﻟت او‬:‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
obtained from the project area(basalt or granite) or similar stones. Black stones ‫ ﺳم وأن ﺗﻛون‬15 ‫ﺟراﻧﯾت( ﻣﻧﺷﺎر ﻣﻘﺎوم ﻟﻠﻣﯾﺎة او اﺣﺟﺎر ﺗﻣﺎﺛﻠﺔ ﺳﻣك ﺟدار اﻟﺑﻧﺎء‬
have to be tailed, free of the veins and gaps, Rows height not more than 30 cm. ‫ﺳم وان‬30 ‫اﺣﺟﺎراﻟﺑﻧﺎء ﻣﺳﺑﻠﺔ وﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات وارﺗﻔﺎع اﻟﺻف ﻻﯾزﯾد ﻋن‬
Cement mortar solty soil resistance used to be made of 3: 1 (cement: sand) . ‫رﻣل( ﻣﻊ اﻟﺗدرﯾز‬:‫)اﺳﻣﻧت‬3:1 ‫ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي ﻣﻘﺎوم ﻟﻸﻣﻼح ﺑﻧﺳﺑﺔ‬
Starting from the ground level, Wall joints have to be smoothed, recessed ‫واﻟﺗﻛﺣﯾل ﻟﻠﻣﺑﺎﻧﻲ ﻣن ﻣﻧﺳوب اﻻرض واﻟﺗدرﯾز واﻟﺗﻠﻌﯾص اﻟﺟﯾد ﻟﻠﻣﺑﺎﻧﻲ ﻣن اﺳﻔل ﻣﻧﺳوب‬
‫اﻻرض ﻣﻊ اﻟرش واﻟﺗﻌﺑﺋﮫ اﻟﺟﯾده ﺑﯾن اﻟﻔراغ اﻟذي ﺑﯾن ﺣﺟر اﻟﺗﻛﺳﯾﺔ )اﻟظﮭﺎرة( واﻟﺑطﺎﻧﺔ‬ m3
1.3.1 pointing and then be well cured with water. Fronting and lining stones have to be 4.80
well interconnected using longitudinal stone connecting the entire thickness of .‫ﻛري( وﻋﻠﻰ ان ﯾﻛون اﻟﻛري ﻣﺗدرج‬5:‫ رﻣل‬2.5:‫اﺳﻣﻧت‬:1) ‫ﺑﺎﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬ 3‫م‬
the wall every 2 linear meter, spaces have to be well filled with concrete of(1: ‫وﯾﺟب اﻟرﺑط ﺑﯾن اﻟظﮭﺎره واﻟﺑطﺎﻧﮫ ﺑﺎﺣﺟﺎر طوﻟﯾﮫ ﻣﺗداﺧﻠﮫ ﻋﻠﻰ ﻛﺎﻣل ﺳﻣك اﻟﺣﺎﺋط ﻛل‬
cement: 2.5 sand: 5 graded aggregate), taking into account the interconnection ‫اﺛﻧﯾن ﻣﺗر طوﻟﻲ ﻓﻲ ﻛل ﺻﻔﺔ ﻣﺑﺎﻧﻲ ﻣﻊ ﻣراﻋﺎة ﺗداﺧل اﻻﺣﺟﺎر ﻋﻧد اﺗﺻﺎل ﺟدارﯾﯾن واﻟﺛﻣن‬
of stones when connecting two walls .All stone works have to be well and ‫ﯾﺷﻣل رﻓﻊ اﻟﻛرﺳﻲ ﺣﺗﻰ اﻟﻣﻧﺎﺳﯾب اﻟﺗﺻﻣﯾﻣﯾﺔ طﺑﻘﺎ ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت‬
enough spattered with water. Item Price includes building to the design levels . ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
according to the drawings and specifications and instructions of the supervisor.
The buildings of a stone chair under the Ground beam, in cubic meter:- -:‫ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
In cubic metres: stone chair buildings under the masonry, thickness of 60 cm, ‫ ﺳم وﯾﺟب ان ﺗﻛون ﻣن اﻷﺣﺟﺎر‬60 ‫ ﻣﺑﺎﻧﻲ ﻛرﺳﻲ ﺣﺟر ﺗﺣت اﻟﻣﯾدة ﺳﻣك‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣﻛﻌب‬
must be made of solid stones free of veins and gaps, and the construction must ,‫اﻟﺻﻠﺑﺔ واﻟﺧﺎﻟﯾﺔ ﻣن اﻟﻌروق واﻟﻔﺟوات و أن ﯾﻛون اﻟﺑﻧﺎء ﺑﺎﻻﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم‬
be made with resistant Portland cement, in a ratio of 3:1 (cement: sand), and it ‫ رﻣل( وﯾﻛون ﺑﺷﻛل ﻣﻧﺗظم وﻣﺗراﺑط ﻣﻊ اﻟﺗﻌﺑﺋﺔ اﻟﺟﯾدة ﻟﻠﻔراﻏﺎت ﻣﻊ‬:‫ )أﺳﻣﻧت‬1 :3 ‫ﺑﻧﺳﺑﺔ‬
must be in a regular and cohesive manner, with good filling of the voids with 7 ‫اﻟﺗدرﯾز واﻟﺗزﻏﯾن وﻣلء اﻟﻔراﻏﺎت ﺑﯾن اﻟوﺟﮫ واﻟﺑطﺎﻧﺔ ﺑﺎﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟرش ﻟﻣدة‬
seaming, cementing and filling. The spaces between the face and the lining are ‫ ﺳم‬10 ‫اﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ ﻣﻊ ﻋﻣل ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﻣﻊ أﺣﺟﺎر ﻣﺗوﺳطﺔ اﻟﺣﺟم ﺑﻣﻘدار‬
filled with cement mortar and sprayed for a period of 7 days. The work is carried ‫ﻣن أﺳﻔل اﻟﻠﺣﺟر ﺑﻌد رش اﻷرض ﺑﺎﻟﻣﺎء واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل‬
.‫ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ m3
1.3.2 out professionally, with ordinary concrete made with medium-sized stones 10 31.00
cm from the bottom of the stone, after spraying the ground with water. The price 3‫م‬
includes everything necessary to implement the item, and the work is done
according to the specifications, drawings, and directions of the supervising
engineer.
Hollow concrete Block constructions 20 cm, Automatic in meter square: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﻣﻔرغ‬
Hollow concrete Block 20 cm thickness, used for external walls and internal ‫ﻟﻠﻘواطﻊ اﻟداﺧﻠﯾﺔ و‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك )ﺑردﯾن( إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﻣﻔرغ ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
partitions and where necessary, using cement mortar: 1: 3 (cement: sieved : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫اﻟدراوي و اﻟﻣﻣر اﻻﻣﺎﻣﻲ و اﻟراﻣب وﺣﯾﺛﻣﺎ ﯾﻠزم‬
sand),and according to drawings and specifications, and instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 m2
1.3.3 22.00
supervisor 2‫م‬

Solid concrete Block constructions 20 cm, Automatic: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك ﺻم‬
Solid concrete Block 20 cm thickness, used for external walls and where ‫ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ وﺣﯾﺛﻣﺎ‬،‫ ﺳم‬20 ‫ﻣﺑﺎﻧﻲ ﺑﻠك إﺳﻣﻧﺗﻲ أﺗوﻣﺎﺗﯾﻛﻲ ﺻم ﺳﻣك‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
necessary, using cement mortar: 1: 3 (cement: sieved sand),and according to ‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬، (‫ رﻣل ﻣﻐرﺑل‬:‫)اﺳﻣﻧت‬3 : 1 ‫ وﯾ ُﺑﻧﻰ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬,‫ﯾﻠزم‬ m2
1.3.4 73.00
drawings and specifications, and instructions of the supervisor. .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬ 2‫م‬

Total Amount of Masonary and Block Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺣﺟر و اﻟﺑﻠوك‬
1.4 Plastering: : ‫اﻟﺗﻠﺑﯾس‬
Notes: -: ‫ﻣﻼﺣظﺎت‬
1-Plastering using Ordinary Resistant Portland cement to wet. Plastering shall consists of three layers: ‫ طﺑﻘﺔ‬، ‫ ﺗﻠﺑﯾس أﺳﻧﻣﺗﻲ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي اﻟﻣﻘﺎوم ﻟﻸﻣﻼح واﻟرطﺑﺔ ﻣﻛون ﻣن ﺛﻼث طﺑﻘﺎت‬-1
- Cement spattering layer 0.5 cm thick for all ceilings and walls with a mortar consisting of (1: 2: 1) A :‫( ﻛﯾس اﺳﻣﻧت‬1:2:1)‫ ﺳم ﻋﻠﻰ ﺟﻣﯾﻊ اﻷﺳﻘف واﻟﺣواﺋط ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن اﻟﺗﺎﻟﻲ‬0.5 ‫طرطﺷﺔ ﺑﺳﻣك‬
Cement bag: 2 trolley of fine aggregate : 1 trolley of sand. It includes the daily curing with water for five ‫ و طﺑﻘﺗﻲ ظﮭﺎرة‬. ‫ﻛﻣﺎ ﯾراﻋﻰ اﻟرش اﻟﻐزﯾز ﺑﺎﻟﻣﺎء ﯾوﻣﯾﺎ ً وﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬. ‫ ﻋرﺑﯾﺔ ﻧﯾس‬:‫ﻋرﺑﯾﺗﯾن ھﻠﺳن‬
days . ‫ ﻧﯾس( وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﻣﻊ‬:‫ )أﺳﻣﻧت‬3:1‫ ﺳم ﺑﻧﺳﺑﺔ‬2-1.5 ‫وﺑطﺎﻧﺔ ﺑﺳﻣك‬
- Two layers ( base coat and finish coat) with a thickness of 1.5-2cm by 3: 1 (Cement: sand) , It
.‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬، ‫اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬
includes the spatter dash, the base layer and the finish layer, and curing with water three times a day,
‫ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﯾﺎض ﺗﺧﺷﯾن إﺳﻣﻧﺗﻲ ﻟﺟﻣﯾﻊ اﻟﺟدران واﻟﺣواﺋط واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟﻣظﻼت اﻟﺧﺎرﺟﯾﺔ‬.2
according to the drawings and specifications and instructions of the supervisor. 1-All the work of
plastering Is a cement roughening for all walls, internal ceilings, external umbrellas, parapets and .‫ ﻣﻊ اﻟﺑؤج واﻷوﺗﺎر واﻟطوارف واﻟﺧدﻣﺔ ﺑﺎﻟﻣﺣﺎرة ﺑﻌد اﻟﺗﺧﺷﯾن‬3:1 ‫واﻟدراوي واﻟﺳﻼﻟم ﺑﻣوﻧﺔ ﺑﻧﺳﺑﺔ‬
staircases of 3: 1 ratio using dots, Bands , leveling spots and finishing with Plastering trowel after .‫ﯾﺟب ﺗﻧظﯾف اﻷﺳﻘف واﻟﺟدران ﻣن ﻗطﻊ اﻷﺧﺷﺎب واﻟﺷواﺋب اﻟﻌﺎﻟﻘﺔ ورﺷﮭﺎ ﺑﺎﻟﻣﺎء ﻗﺑل أﻋﻣﺎل اﻟﺗﻠﺑﯾس‬.3
roughing. ‫ رﻣل ﺧﺷن أو ھﻠﺳن ( ﻣﻊ اﻟرش‬3‫م‬/‫ﻛﺟم إﺳﻣﻧت‬450)‫ ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﻧﻔﯾذ طﺑﻘﺔ طرطﺷﺔ إﺳﻣﻧﺗﯾﺔ ﺧﺷﻧﺔ‬.4
2-Roofs and walls must be cleaned of wood , suspended impurities and be cured with water before .‫ﻟﻣدة ﺛﻼﺛﺔ أﯾﺎم ﻟﺟﻣﯾﻊ اﻟﺟدران واﻷﺳﻘف اﻟداﺧﻠﯾﺔ واﻟدراوي واﻟواﺟﮭﺎت‬
plastering. ‫ ﻣﻠم ﻋﻧد اﻟﺗﻘﺎء اﻟﺟدران اﻟﺑﻠك ﺑﺎﻟﺟدران اﻟﺣﺟر‬1‫ﺳم وﺳﻣك ﻻ ﯾﻘل ﻋن‬20 ‫ﯾﺟب ﻋﻣل ﺷﺑك ﺣدﯾد ﻋرض‬.5
3-Contractor shall implement a rough cement spattering layer (450 kg cement / m3 rough sand or fine . ‫وﺑﺎﻷﺳﻘف واﻷﻋﻣدة وﻓوق ﻣواﺳﯾر اﻟﻛﮭرﺑﺎء وﯾﺛﺑت ﺑﺎﻟﻣﺳﺎﻣﯾر ﻣن اﻟﺟﮭﺗﯾن ﻗﺑل ﺗﻧﻔﯾذ اﻟطرطﺷﺔ‬
aggregate) and curing with water for three days for all internal walls, ceilings, parapets and front walls. ‫ﯾﺟب اﺳﺗﺧدام اﻷوﺗﺎر ﻓﻲ ﻋﻣﻠﯾﺔ اﻟوزن رأﺳﯾﺎ ً وأﻓﻘﯾﺎ ً وﻋﻣل ﻣﺳﺎطر وﻧﻘﺎط ﺗﺛﺑﯾت واﺳﺗﺧدام اﻟﻘدة واﻟﻣﯾزان‬.6
4. Steel mesh, width 20 cm and thickness of not less than 1 mm should be used at the meeting of .‫وﻓﻘﺎ ً ﻟﻸﺻول اﻟﻔﻧﯾﺔ اﻟﻣﺗﺑﻌﺔ‬
block walls with stone walls, ceilings, columns and covering all electrical and water pipes. .‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم أﻋﻣﺎل اﻟﺑؤج واﻷوﺗﺎر ﻟﻠﻣﮭﻧدس اﻟﻣﺷرف ﻗﺑل اﻟﺑدء ﻓﻲ اﻋﻣﺎل اﻟﺗﺄﺳﯾس‬.7
5. Bands, rulers, the Aluminum panel and water Balance should be used in the vertically and ‫ﯾﻌﻣل اﻟﺗﺷطﯾب واﻟﻧﮭو ﻟﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻠﺑﯾس ﺑﺎﻟﺷﻛل اﻟﺻﺣﯾﺢ ﻣﻊ ﺿرورة إﻧﮭﺎء اﻟزواﯾﺎ اﻟداﺧﻠﯾﺔ‬.8
horizontally plastering leveling process and In accordance with established technical principles. ‫واﻟﺧﺎرﺟﯾﺔ اﻟﻧﺎﺗﺟﺔ ﻣن ﺗﻘﺎﺑل اﻟﺟدران ﻣﻊ ﺑﻌﺿﮭﺎ أو ﻣﻊ ﻋﻧﺎﺻر اﺧري ﺑﺷﻛل ﺟﯾد واﻻﻋﺗﻧﺎء ﺑﮭﺎ اﻋﺗﻧﺎء‬
6. Dots & Bands works shall be approved by the supervisor engineer before base works plastering is
‫ﺧﺎص ﯾﻧﮭو ﺗﻠك اﻟﺗﻘﺎﺑﻼت ﻣﻊ اﻷﺧذ ﻓﻲ اﻻﻋﺗﺑﺎر إن ﺗﻘﺎﺑل اﻷﺳﻘف ﻣﻊ اﻟﺟدران ﯾﻌﻣل ﺑﺷﻛل ﻣﺳﺗدﯾر)رﺑﻊ‬
started.
.(‫ﺳم‬1 ‫ وﻋﻧد اﻟﺣروف ﻟﻸﻋﻣدة واﻟﺟدران ﯾﺗم ﺷطﻔﮭﺎ‬,‫ﺳم‬5‫داﺋرة ﻧﺻف ﻗطرھﺎ‬
7. All plastering works have to be properly finished, like finishing the internal and external angles
resulting from meeting the walls with each other or with other elements like ceilings which shall be .(‫ﻟﺦ‬...‫ﺷﺑﺎﺑﯾك‬- ‫اﻟﻛﻣﯾﺎت اﻟﻣدرﺟﺔ ﺑﺎﻟﺟدول ﻣﺧﺻوﻣﺔ اﻟﻔﺗﺣﺎت)اﺑواب‬.9
made a round(a quarter of circle 5 cm radius), Edges of columns and walls are beveled 1 cm).
9.Openings (doors, windows, etc.) are deducted from the quantities listed in the table
Plastering of ceilings, columns and stairs Portland cement : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺳﻘوف‬
Ceilings, columns and bottom surface of stairs to be plastered with Resistant ‫ ﺗﻠﺑﯾس اﻟﺳﻘوف واﻷﻋﻣدة وﺑطن اﻟﺳﻼﻟم ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Portland cement. The item includes: Cement spattering, the base layer and the ‫ ﻣﻊ‬3 : 1 ‫وﯾﺷﻣل اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
finish layer are made of cement mortar of 1: 3 ratio .plastering wire mesh will be ،‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬،‫اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬ m2
1.4.1 used at meeting points of constructions and concrete. All works will be cured .‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 86.26
2‫م‬
with water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
Internal Wall Plastering, Portland cement: : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس اﻟﺟدران اﻟداﺧﻠﯾﺔ‬
Internal Wall plastering to be done using Portland cement, The item includes: ‫ ﺗﻠﺑﯾس اﻟﺟدران واﻟﺣواﺋط اﻟداﺧﻠﯾﺔ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي وﯾﺷﻣل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Cement Spattering, the base layer and the finish layer are made of cement ‫ وﻋﻣل اﻷوﺗﺎر‬،3 : 1 ‫اﻟطرطﺷﺔ واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬
‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس ﻓﻲ ﻣﻧﺎطﻖ‬،‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم‬،‫واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬ m2
1.4.2 mortar of 1: 3 ratio, plastering wire mesh will be used at meeting points of 145.00
constructions and concrete. .‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫اﻟﺗﻘﺎء اﻟﻣﺑﺎﻧﻲ ﺑﺎﻟﺧرﺳﺎﻧﺔ‬ 2‫م‬
Dots &bands are used for leveling of plastering. Plastering will be cured with
water three times a day. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
External plastering: External plastering to be done using Portland cement The : ‫ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬
Item includes Cement spattering using cement mortar of 300kg cement/m3 fine ‫ وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ‬،‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬،‫ ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
aggregate, base layer and the final layer are made of cement mortar of 1: 3 ،‫ ﻛﺟم إﺳﻣﻧت ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ‬300 ‫ﻣﻛوﻧﺔ ﻣن‬
m2
1.4.3 ratio. Dots &bands are used for leveling of plastering.spraying with water three ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات‬،‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬3 : 1 ‫ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬ 158.00
2‫م‬
times a day for 5 days. Plastering wire mesh will be used at meeting points of ‫ وﺗﻌﻠﯾﻣﺎت‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫ واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬، ‫ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬
constructions and concrete. Plastering works have to be done according to .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
drawings, specifications and instructions of the supervisor.
Colored cement spattering in square meter: ‫ﺗورﯾد وﺗﻧﻔﯾذ رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﻟﻠواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ‬: ‫رﺷﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻠوﻧﺔ ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
Supply and implementation of a colored cement workshop for external facades ‫ اوﺟﮫ ﺑدون ﻟون و وﺟﮭﯾن ﻣﻊ اﻟﻠون اﻟﻣطﻠوب ﺑﺣﯾث ﯾﺗم‬2 ‫ أوﺟﮫ ﺑﺣﯾث ﯾﻛون‬4 ‫واﻟﻣظﻼت‬
and umbrellas 4 sides so that it is 2 faces without color and two sides with the ‫ﺗﻌﺑﺋﺔ اﻟﻔراﻏﺎت و اﻟﺧطوط ﺑﺎﻻﺳﻣﻧت و اﻟﻔواﺻل ﺑﺎﺳﺗﺧدام اداة اﻟرش ﻣﻊ اﻟﻣﺳﺢ و اﻟﺗﻌدﯾل‬
‫ وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣﺧططﺎت اﻟﺗﻔﺻﯾﻠﯾﺔ اﻟﻣرﻓﻘﺔ وﻋﻠﻰ ان ﺗﻛون ﻣواد اﻟرﺷﺔ واﻷﻟون‬, m2
1.4.4 required color so that the spaces and lines are filled with cement and separators 158.00
using the spraying tool with wiping and modification, and where necessary . ‫ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
according to the attached detailed plans and that the spray materials and colors
are according to the instructions of the supervising engineer.

External plastering with painting by dark color : External plastering to be : ‫ﺣول اﻟﺷﺑﺎﺑﯾك ﻣﻊ اﻟدھﺎن ﺑﻠون ﻏﺎﻣﻖ إﺳﻣﻧت ﺑورﺗﻼﻧدي‬،‫ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬
done using Portland cement with color thikness 4cm. and 12 cm width The Item ‫ﺳم‬4 ‫ ﻣﻊ اﻟﻠون ﺑﺳﻣﺎﻛﺔ‬،‫ ﺑﺎﺳﺗﺧدام اﻹﺳﻣﻧت اﻟﺑورﺗﻼﻧدي‬،‫ ﺗﻠﺑﯾس ﺧﺎرﺟﻲ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
includes Cement spattering using cement mortar of 300kg cement/m3 fine ‫ ﻛﺟم إﺳﻣﻧت‬300 ‫ وﯾﺷﻣل اﻟطرطﺷﺔ ﺑﻣوﻧﺔ ﻣﻛوﻧﺔ ﻣن‬. ‫ ﺳم‬12 ‫ﺣول اﻟﺷﺑﺎﺑﯾك وﺑﻌرض‬
aggregate, base layer and the final layer are made of cement mortar of 1: 3 : 1 ‫ ﺑﺎﻟﻣوﻧﺔ اﻹﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫ﻟﻛل ﻣﺗر ﻣﻛﻌب ﻣن اﻟﮭﻠﺳن واﻟطﺑﻘﺔ اﻷﺳﺎﺳﯾﺔ واﻟطﺑﻘﺔ اﻟﻧﮭﺎﺋﯾﺔ‬
ml
1.4.5 ratio. Dots &bands are used for leveling of plastering.spraying with water three ، ‫ ﻣﻊ اﻟرش ﺛﻼث ﻣرات ﻓﻲ اﻟﯾوم ﻟﻣدة ﺧﻣﺳﺔ أﯾﺎم‬،‫ وﻋﻣل اﻷوﺗﺎر واﻟودع ﻟوزن اﻟﺗﻠﺑﯾس‬3 77.80
‫مط‬
times a day for 5 days. Plastering wire mesh will be used at meeting points of .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﺳﺗﺧدام ﺷﺑك اﻟﺗﻠﺑﯾس‬
constructions and concrete. Plastering works have to be done according to
drawings, specifications and instructions of the supervisor.
1.5 Painting works : (‫أﻋﻣﺎل اﻟدھﺎﻧﺎت )اﻟرﻧﺞ‬
1- Surfaces must be completely dry before painting, moisture less than 15%. ,%15 ‫( ﯾﺟب أن ﺗﻛون ھذه اﻷﺳطﺢ ﺟﺎﻓﺔ ﺗﻣﺎﻣﺎ ً ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟدھﺎن و ﻧﺳﺑﺔ اﻟرطوﺑﺔ اﻗل ﻣن‬1
2- Walls, ceilings and other parts which need to be painted have to be well cleaned and free from ‫(ﯾﺗم ﺗﻧظﯾف اﻟﺣواﺋط واﻷﺳﻘف واﻷﺟزاء اﻟﻣطﻠوب دھﺎﻧﮭﺎ ﺟﯾدا ً ﻣن اﻷﺗرﺑﺔ واﻟﻐﺑﺎر واﻟﺷواﺋب وﻣﺧﻠﻔﺎت‬2
Dust, impurities and wastes using sandstone for rubbing. Ceilings are treated by mechanical rubbing ‫اﻟﺑﯾﺎض ﺑواﺳطﺔ اﻟﺣف ﺑﺣﺟر اﻟﻣﺳن وﺗﺗم ﻣﻌﺎﻟﺟﺔ ﺑﻼطﺎت اﻷﺳﻘف ﺑواﺳطﺔ اﻟﺣف اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﻣوﻧﺔ‬
and cement mortar then, sandpaper is used for smoothening. ( ‫)ﺛم ﻋﻣﻠﯾﺔ اﻟﺗﻧﻌﯾم ﺟﻣﯾﻊ اﻟﻣﺳﺎﺣﺎت ﺑورق اﻟﺻﻧﻔرة‬.‫اﻹﺳﻣﻧﺗﯾﺔ‬
3- Base layer of primer is used for to all surfaces need to be painted. .‫ ( ﯾﺗم ﻋﻣل طﺑﻘﺔ اﻷﺳﺎس ﻟﻸﺳطﺢ اﻟﻣراد دھﺎﻧﮭﺎ ﺣﺗﻰ ﺗﺗﺷﺑﻊ‬3
4- After base layer is dried, putty layer is done to the entire surfaces and left to dry, sanding and
‫( ﺑﻌد ﺟﻔﺎف طﺑﻘﺔ اﻷﺳﺎس ﯾﺗم ﻋﻠم طﺑﻘﺔ اﻟﻣﻌﺟون ﻟﻛﺎﻣل اﻟﺳطﺢ ﺣﺳب ﻧوع اﻟدھﺎن وﺗﺗرك ﻟﺗﺟف ﺛم ﺗﺗم‬4
cleaning by carton paper for the putty layer to be done. Dust on surface resulted from sanding and
‫ ﻣﻊ ﻧظﺎﻓﺔ اﻟﻐﺑﺎر ﻣن اﻟﺳطﺢ اﻟﻧﺎﺟم ﻋن‬،‫اﻟﺻﻧﻔرة اﻟﺗﻧﻌﯾم ﺑواﺳطﺔ اﻟورق اﻟﻛرﺗوﻧﻲ اﻟﻣﺧﺻص ﻟﮭذا اﻟﻐرض‬
softening to be cleaned, then another layer of putty with the same way is done.
5- Surfaces are painted with white primer paint and left to dry, followed by two faces of the desired .‫أﻋﻣﺎل اﻟﺻﻧﻔرة واﻟﺗﻧﻌﯾم وﺗﻌﺎد طﺑﻘﺔ ﺛﺎﻧﯾﺔ ﻣن اﻟﻣﻌﺟون ﺑﻧﻔس اﻟطرﯾﻘﺔ اﻷوﻟﻰ‬
color paint with sufficient time for each layer to dry. The final coat must be done after all other works ‫( ﯾﺗم دھﺎن اﻟﺳطﺢ ﺑوﺟﮫ دھﺎن ﺗﺣﺿﯾري أﺑﯾض ﺛم ﯾﺗرك ﻟﯾﺟف ﺗﻣﺎﻣﺎ ً وﯾﻠﯾﮫ وﺟﮭﯾن ﻣن اﻟدھﺎن ﺑﺎﻟﻠون‬5
on the surfaces is completed. ‫اﻟﻣطﻠوب ﻣﻊ اﻟوﻗت اﻟﻛﺎﻓﻲ ﻟﺟﻔﺎف ﻛل طﺑﻘﺔ ﻋﻠﻣﺎ ً ﺑﺄن اﻟوﺟﮫ اﻷﺧﯾر ﯾﺟب أن ﯾﺗم ﺑﻌد اﻛﺗﻣﺎل ﻛﺎﻓﺔ اﻷﻋﻣﺎل‬
6- The paint works shall be carried out according to the instructions of the paint manufacturer, All paint .‫اﻷﺧرى ﺑﺎﻷﺳطﺢ اﻟﻣراد دھﻧﮭﺎ‬
materials are from the same factory. ‫ ( ﯾﺗم ﺗﻧﻔﯾذ أﻋﻣﺎل اﻟدھﺎﻧﺎت ﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﺷرﻛﺔ اﻟﻣﺻﻧﻌﺔ ﻟﻠدھﺎﻧﺎت ﻋﻠﻰ أن ﺗﻛون ﻛﺎﻓﺔ ﻣواد اﻟدھﺎن ﻣن‬6
7- Interior paints consist of (6) stages. .‫ﻧﻔس اﻟﻣﺻﻧﻊ‬
8- External paints consists of (3) stages. .‫ ( ﻣراﺣل‬6 ) ‫( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟداﺧﻠﯾﺔ ﻣن‬7
9- The appropriate putty for oil paints should be used. .‫ ( ﻣراﺣل‬3 ) ‫( ﺗﺗﻛون اﻟطﺑﻘﺎت ﻟﻠدھﺎﻧﺎت اﻟﺧﺎرﺟﯾﺔ ﻣن‬8
10- Moisture-proof plastic paint is used for exterior facades and umbrellas . .‫ ( ﯾﺟب اﺳﺗﻌﻣﺎل اﻟﻣﻌﺟون اﻟﻣﻧﺎﺳب واﻟﺧﺎص ﺑﺎﻟدھﺎﻧﺎت اﻟزﯾﺗﯾﺔ‬9
11- All samples of required paints must be approved before supply and implementation. Contractor .‫(اﻟواﺟﮭﺎت اﻟﺧﺎرﺟﯾﺔ واﻟﻣظﻼت ﻟﻠطرﻗﺎت دھﺎن ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠرطوﺑﺔ‬10
shall be responsible of violation.
‫(ﯾﺟب ﺿرورة اﻋﺗﻣﺎد ﺟﻣﯾﻊ ﻋﯾﻧﺎت اﻟدھﺎﻧﺎت اﻟﻣطﻠوﺑﺔ اﻟﻣﺧﺗﻠﻔﺔ ﻗﺑل اﻟﺗورﯾد واﻟﺗﻧﻔﯾذ وﯾﺗﺣﻣل اﻟﻣﻘﺎول‬11
12- Materials used in paints must be of the highest quality and certified by the Specifications and
.‫ﻣﺳؤوﻟﯾﺔ اﻟﻣﺧﺎﻟﻔﺔ‬
Metrology Authority.
‫( اﻟﻣواد اﻟﻣﺳﺗﺧدﻣﺔ ﻓﻲ اﻟدھﺎﻧﺎت ﯾﺟب أن ﺗﻛون ﻣن أﺟود اﻻﻧواع وﻣﻌﺗﻣدة ﻣن ھﯾﺋﺔ اﻟﻣواﺻﻔﺎت‬12
13- The paint shall be supplied inside its sealed original packaging, indicating the name of the
manufacturer, the type of paint, the date of production, the expiry date, the usage manual and the like. .‫واﻟﻣﻘﺎﯾﯾس‬
Paints will be stored in a suitable place and in an appropriate manner. ‫(ﯾورد اﻟدھﺎن اﻟﻰ اﻟﻣوﻗﻊ داﺧل ﻋﺑواﺗﮫ اﻷﺻﻠﯾﺔ اﻟﻣﺧﺗوﻣﺔ واﻟﻣﺑﯾن ﻋﻠﯾﮭﺎ اﺳم اﻟﺷرﻛﺔ اﻟﺻﺎﻧﻌﺔ وﻧوع‬13
14- The contractor must remove the paint stains first by first before drying and cohesion on ground or ‫ وإرﺷﺎد اﻻﺳﺗﻌﻣﺎل وﻣﺎ ﺷﺎﺑﮭﮭﺎ ﻋﻠﻰ أن ﯾﺟري ﺗﺧزﯾﻧﮭﺎ ﻓﻲ‬،‫اﻟدھﺎن وﺗﺎرﯾﺦ اﻹﻧﺗﺎج وﺗﺎرﯾﺦ اﻧﺗﮭﺎء اﻟﺻﻼﺣﯾﺔ‬
glass and have to use nylon paper or any similar on floors during the process of painting according to .‫ﻣﻛﺎن ﻣﻧﺎﺳب وﺑطرﯾﻘﺔ ﻣﻧﺎﺳﺑﺔ‬
the instructions of the engineer and after the completion of the paint to clean the stains on tiles and ‫( ﻋﻠﻰ اﻟﻣﻘﺎول أن ﯾزﯾل ﺑﻘﻊ اﻟدھﺎن أوﻻ ﺑﺄول ﻗﺑل ﺟﻔﺎﻓﮭﺎ وﺗﻣﺎﺳﻛﮭﺎ ﻋﻠﻰ اﻷرض أو اﻟزﺟﺎج وﻋﻠﯾﮫ أن‬14
glass. ‫ﯾﻘوم ﺑﻔرش ﻧﺎﯾﻠون اوﺣﻼﻓﮫ ﻋﻠﻰ اﻻرﺿﯾﺎت أﺛﻧﺎء ﻋﻣﻠﯾﺔ اﻟدھﺎن ﺗﺑﻌﺎ ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس وﺑﻌد اﻧﺟﺎز اﻋﻣﺎل‬
.‫اﻟدھﺎن ﻋﻠﯾﮫ أن ﯾﻘوم ﺑﺗﻧظﯾف اﻟﺑﻘﻊ اﻟﺗﻲ ﻋﻠﻘت ﻋﻠﻰ اﻟﺑﻼط واﻟزﺟﺎج‬

Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬


Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
‫ وﺗﻌﻠﯾﻣﺎت‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬ m2
1.5.1 required color , three layers of putty and sanding to be done before painting and 89.10
according to the drawings and specifications, and the instructions of the .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
supervisor.
Oil matte paint: : ‫دھﺎن زﯾﺗﻲ ﻣطﻔﻲ‬
Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﻣطﻔﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬،‫وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت‬ m2
1.5.2 color painted above 3 coats of putty and sanding and according to the drawings 145.00
and specifications, and the instructions of the supervisor .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬ 2‫م‬
1.6 Flooring & Tiling Works: :‫اﻋﻣﺎل اﻻرﺿﯾﺎت واﻟﺗﻛﺳﯾﺎت‬
Notes : : ‫ﻣﻼﺣظﺎت‬
1.Cement mortar to be used for Installation of tiles with a mixing ratio of 3: 1. Tiles to be laid ‫ ﻣﻊ اﻟﻔرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟﻧﯾس ﺗﺣﺗﮫ‬3:1 ‫ﯾﺗم ﺗﻧﻔﯾذ اﻟﺑﻼط ﺑﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ ﺧﻠط‬.1
on a bedding of fine aggregate or sand . Joins between tiles are straight and regular
.‫وﺑﺣﯾث ﺗﻛون اﻟﻔواﺻل ﻣﺳﺗﻘﯾﻣﺔ وﻣﻧﺗظﻣﺔ‬
2. Tiles must be automatically fabricated and regularly cut.
3. Mosaic tiles with marble fractions is automatic made, size (25 x 25) cm , Half of the . ‫ﯾﺟب أن ﯾﻛون اﻟﺑﻼط أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ وﺑﻘص ﻣﻧﺗظم‬.2
thickness of this type made with white cement and is uniformed color. ‫(ﺳم وﯾﻛون ﻧﺻف‬25×25)‫ اﻟﺑﻼط اﻟﻣوزﯾﻛو ﺑﻛﺳر رﺧﺎم أوﺗوﻣﺎﺗﯾﻛﻲ اﻟﺻﻧﻊ ﻣﻘﺎس‬.3
4. An aluminum panel & water balance is used to ensure that the surface of tiles is leveled . ‫اﻟﺳﻣﺎﻛﺔ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض وﻣوﺣد اﻟﻠون‬
taking into account the slopes needed. ‫اﻟﺗﺄﻛد ﻣن اﺳﺗواء ﺳطﺢ اﻟﺑﻼط أﺛﻧﺎء اﻟﺗﻧﻔﯾذﺑﺎﺳﺗﺧدام اﻟﻘدة وﻣﯾزان اﻟﻣﺎء ﻣﻊ ﻣراﻋﺎة اﻟﻣﯾول‬.4
5. Joints should be cleaned thoroughly from cement residues and dust, grouted with white ‫ﯾﺟب ﺗﻧظﯾف اﻟﻔواﺻل ﺟﯾدا ً ﻣن ﺑﻘﺎﯾﺎ اﻷﺳﻣﻧت واﻷﺗرﺑﮫ وﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻷﺳﻣﻧت‬.5
cement, mechanically glazed and polished, curing with water must be done for at least 4 days
4 ‫اﻷﺑﯾض واﻟﺟﻠﻰ واﻟﺻﻘل اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻣﻊ ﺿرورة اﻟرش ﻟﻸﻋﻣﺎل اﻟﻣﻧﻔذة ﻣدة ﻻ ﺗﻘل ﻋن‬
(morning & evening).
6. Floor tiling work of bathrooms, kitchens and buffets, to be installed on a damp-proof layer
. ً‫أﯾﺎم ﺻﺑﺎﺣﺎ ً وﻣﺳﺎء‬
consists of a sackcloth layer between two faces of asphalt. A fine aggregate layer to be made ‫ﺑﺎﻟﻧﺳﺑﺔ ﻟﺑﻼط ارﺿﯾﺔ اﻟﺣﻣﺎﻣﺎت واﻟﻣطﺎﺑﺦ واﻟﺑوﻓﯾﺎت ﯾﻠزم ﺗورﯾدوﺗﻧﻔﯾذ طﺑﻘﺔ ﻋزل‬- .6
above the damp-proof layer. ‫ﺛم ﺗﻧﻔﯾذ ﺑﻧد اﻟﻌﻣل وﻓﻘﺎ ً ﻟﻣﺎ ذﻛر‬, ‫)وﺟﮭﯾن ﻣن اﻟزﻓﻠت ﺑﯾﻧﮭﻣﺎ طﺑﻘﺔ ﺧﯾش( ﺗﺣت طﺑﻘﺔ اﻟﮭﻠﺳن‬
7 - Interlock tiles bear high pressures and loads 250: 300 kg / cm2 and its strong resistance to .ً ‫ﻟﺣﻘﺎ‬
corrosion, less than 0.5 mm. ‫ وﻣﻘﺎوﻣﺗﮫ‬2‫ ﺳم‬/ ‫ ﻛﺟم‬300 : 250 ‫ ﺑﻼط اﻹﻧﺗرﻟوك ﯾﺗﺣﻣل اﻟﺿﻐوط واﻷﺣﻣﺎل اﻟﻌﺎﻟﯾﺔ‬-7
8- All tiling works shall be measured geometrically and all openings and spaces will be
. ‫ ﻣم‬0.5 ‫اﻟﺷدﯾدة ﻟﻠﺗﺂﻛل أﻗل ﻣن‬
deducted.
‫ ﺗﻘﺎس ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺑﻼط ھﻧدﺳﯾﺎ ً وﺗﺧﺻم ﺟﻣﯾﻊ اﻟﻔﺗﺣﺎت واﻟﻔراﻏﺎت‬-8
Mosaic tiles 25 x 25 cm, with marble fractions, automatic in sqare meter: (‫ أﺗوﻣﺎﺗﯾﻛﻲ)ﻟﻠﻔﺻول و اﻟﻣﻣر ﯾﺗﺿﻣن اﻟراﻣب‬،‫ ﺑﻛﺳر اﻟرﺧﺎم‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
Supply and installation of Mosaic tile 25 x 25 cm, 2.5 cm thickness, mixed with : ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
marble fractions. Half thickness to be made of white and uniform color. The ‫ وﯾﻛون ﻧﺻف‬،‫ ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬2.5 ‫ وﺳﻣك‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
item includes a bedding of sand or fine aggregate. Mosaic tiles are installed on (‫وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس‬, ‫ وﻣوﺣد اﻟﻠون‬،‫اﻟﺳﻣﺎﻛﺔ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬ m2
1.6.1 72.80
a concrete mortar of 1: 3. , Joints between tiles to be grouted using White ،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫ﺗﺣﺗﮫ‬ 2‫م‬
cement and tile surface is mechanically polished and smoothed according to ،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬.‫واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻓﻲ اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب‬
drawings and specifications, instructions of the supervisor engineer. .‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Skirting Tiles : :‫أﻋﻣﺎل اﻟوزرات اﻟﺳﯾراﻣﯾك‬


Supply and apply Ceramic skirts (10cm*40cm*2cm), beveled from one of the ‫(ﺳم ﻣﺷطوﻓﺔ ﻣن اﺣد‬2*40*10) ‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب وزرات ﺳﯾراﻣﯾك ﻣﻘﺎس‬
edges (industrial rinse) for the classess, and where necessary according to the ‫ وذﻟك ﻟﻠﻔﺻول وﺣﯾﺛﻣﺎ ﯾﻠزم ﺑﺣﺳب ﻣﺎ ﺗﺑﯾﻧﮫ اﻟرﺳوﻣﺎت ﻣﻊ‬،(‫اﻟﺣروف )ﺷطﻔﺔ ﺻﻧﺎﻋﯾﺔ‬
drawings shown and with the approval of the provided samples before delivery :‫إﻋﺗﻣﺎد اﻟﻌﯾﻧﺎت ﻗﺑل اﻟﺗورﯾد واﻟﺛﻣن ﯾﺷﻣل‬
and the price includes: .‫ اﻟﺗﺧﺷﯾن اﻟﻸزم ﺧﻠف اﻟﻧﻌﻼت ﻓﻲ اﻟﺟدران أو اﻟﺧرﺳﺎﻧﺔ واﻟﺗﻧظﯾف‬-
.‫وذﻟك ﻟﺗرﻛﯾب وﻟﺻﻖ اﻟﻧﻌﻼت‬، (3:1) ‫ ﻋﻣل ﻣوﻧﺔ أﺳﻣﻧﺗﯾﺔ ﺑﻧﺳب ﺧﻠط‬- ml
1.6.2 - Scrapping behind the insoles in walls or concrete and cleaning. 50.00
- Cement mortar with mixing ratios (1:3), in order to install and paste the insole. .ً ‫ اﻟﺗروﯾب ﺑﻣوﻧﺔ اﻷﺳﻣﻧت اﻷﺑﯾض وﺗﻌﺑﺋﺔ اﻟﻔواﺻل ﺟﯾدا‬- ‫ط‬.‫م‬
- Wet with white cement mortar and fill joints well. ‫ اﻟرش ﺑﺎﻟﻣﺎء ﻛﻣﺎ ﯾﺷﻣل اﻟﺛﻣن ﺟﻣﯾﻊ أﻋﻣﺎل اﻟﺗﻧظﯾف واﻟﺗﺷطﯾب وﺗﺳﻠﯾم اﻟﻌﻣل ﻋﻠﻰ اﻛﻣل‬-
- The final treatment of the final surface and heavy spraying with water and the .‫وﺟﮫ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
price includes all the work of cleaning and finishing and delivery of work to the
fullest according to specifications and drawings and the instructions of the
supervisor
Staircase andengineer.
ramp of mosaic tiles for entrances (precast). : ‫ﻣﺻﺑوب ﻟﻠﻣداﺧل‬,‫درج وﻣﻧﺣدر ﻣوزاﯾﻛواﻟﻠﻣداﺧل‬
Supply and tiling of staircase and ramp of mosaic tiles for entrance stairs, mixed ‫ﺳم)ﻗﺎﺋم‬30‫ﺳم و‬15 ‫ درج وﻣﻧﺣدر ﻣوزاﯾﻛوا ﻟﻠﻣداﺧل اﻟﻣطﻌم ﺑﻛﺳر اﻟرﺧﺎم‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
with marble fractions,15 cm for riser and 30 cm for tread, precast molded. well ‫ وﯾﺟب‬،‫ﻣﺻﺑوب ﻟﻠﻣداﺧل‬، ‫وﻧﺎﺋم ﻋﻠﻰ اﻟﺗواﻟﻲ( وﻣﻧﺣدر ﺧﺎص ﺑذوي اﻻﺣﺗﯾﺎﺟﺎت اﻟﺧﺎﺻﺔ‬
ml
1.6.3 mixing, curing, glazing and polishing. The item includes excavation, backfill, ‫ و ﯾﺷﻣل اﻟﻌﻣل اﻟﺣﻔر و اﻟردم و اﻟﺑﻧﺎء و‬،‫ واﻟﺟﻠﻲ واﻟﺗﻠﻣﯾﻊ‬،‫ واﻟرش‬،‫اﻟﻌﻧﺎﯾﺔ ﺑﻧﺳب اﻟﺧﻠط‬ 10.00
‫ط‬.‫م‬
construction, stone fractions layer, concrete casting and mosaic tiling according ‫ وﺗﻌﻠﯾﻣﺎت‬،‫وﺿﻊ اﻟﺷﻠف و ﺻب اﻟﺧرﺳﺎﻧﺔ و ﻋﻣل اﻟﻣوزاﯾﻛو طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
to the drawings. Specifications, and supervisor's instructions .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Total Amount of Finishing Works. ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻟﺗﺷطﯾﺑﺎت‬


1.7 Carpentry works (wood, aluminum, iron) : (‫ ﺣدﯾد‬،‫ أﻟﻣوﻧﯾوم‬،‫أﻋﻣﺎل اﻟﻧﺟﺎرة )ﺧﺷب‬
Notes: :‫اﻟﻤﻼﺣﻈﺎت‬
1- Item prices include sanding, kneading, smoothing and painting work for all wooden elements. .‫ ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد أﻋﻤﺎل اﻟﺼﻨﻔﺮة واﻟﻤﻌﺠﻨﺔ واﻟﺘﻨﻌ ﻢ واﻟﺪﻫﺎن ﻟ ﻞ اﻟﻌﻨﺎ اﻟﺨﺸ ﺔ‬-1
2- Item prices include the supply of all necessary hardware, including hinges, bolts, and hinges, as well
as on-site installation. Door handles must be of the “ISO” type, made in Italy, or its equivalent.
‫ ﺸﻤﻞ أﺳﻌﺎر اﻟﺒﻨﻮد ﺗﻮر ﺪ ﺟﻤﻴﻊ اﻟﺨﺮدوات اﻟﻼزﻣﺔ ﻣﻦ ﻫﻨﺪرا ﺎت وﻣﻐﺎﻟﻖ وﻣﻔﺼﻼت وﻛﺬا‬-2
3- Work on iron doors must be done according to the designs, including good sanding, a first layer of . ‫ ﻣﻬﺎزر اﻷﺑﻮاب ﺠﺐ أن ﺗﻜﻮن ﻣﻦ ﻧ ع" اﻳﺰو" ﺻﻨﻊ ا ﻄﺎ أو ﻣﺎ ﻌﺎدﻟﻪ‬.‫اﻟﻤﻮﻗﻊ‬ ‫اﻟ ﻛ ﺐ‬
rust-resistant paint, and two layers of acrylic paint in the specified color. ‫ذﻟﻚ اﻟﺼﻨﻔﺮة اﻟﺠ ﺪة وﻃ ﻘﺔ‬ ‫اﻷﺑﻮاب اﻟﺤﺪ ﺪة ﺠﺐ أن ﻳﺘﻢ ﻃ ﻘﺎ ﻟﻠﺘﺼﺎﻣ ﻢ ﻤﺎ‬ ‫اﻟﻌﻤﻞ‬
-3
4- The aluminum windows must be of the highest quality (excellent), provided that the sections are .‫دﻫﺎن ﻣﻘﺎوم ﻟﻠﺼﺪأ أو وﻃ ﻘﺘ دﻫﺎن أ ﻠ و ﺎﻟﻠﻮن اﻟﻤﺤﺪد‬
Saudi and their thickness is not less than 1mm, in a bronze or white color (20 microns) (factory
‫ أﻟﻤﻨﻴﻮم اﻟﻨﻮاﻓﺬ ﺠﺐ أن ﻜﻮن أر ﻧﻮﻋ ﺔ )ﻣﻤﺘﺎز(ﻋ أن ﺗﻜﻮن اﻟﻤﻘﺎﻃﻊ ﺳﻌﻮد ﺔ ﻻ ﺗﻘﻞ‬-4
corners), and the thickness of the glass is 6mm.
Likewise, the nails used in assembling and connecting aluminum sheets and columns and installing ، ‫ ﻣﻢ‬6 ‫ﻣ ﻜﺮو( )زوا ﺎ ﻣﺼﻨﻊ( و ﻜﻮن ﺳﻤﻚ اﻟﺰﺟﺎج‬20) ‫ ﻠﻮن ﺑﺮوﻧﺰي أو أﺑ ﺾ‬1mm ‫ﺳﻤﺎ ﺘﻬﺎ ﻋﻦ‬
the handles, shakers, and shutters are iron nails that are resistant to rust and scratching, or nails ‫ﺗﺠﻤﻴﻊ ور ﻂ ﺻﻔﺎﺋﺢ وﻗﻮاﺋﻢ اﻷﻟﻤﻨﻴﻮم وﺗ ﺒ ﺖ اﻟﻬﻨﺪرا ﺎت‬ ‫وﻛﺬا ﺗﻜﻮن اﻟﻤﺴﺎﻣ اﻟﻤﺴﺘﺨﺪﻣﺔ‬
coated with nickel-chrome. .‫واﻟﻤﻬﺎزر واﻟﻤﻐﺎﻟﻖ ﻣﺴﺎﻣ ﺣﺪ ﺪ ﺿﺪ اﻟﺼﺪأ واﻟﺨﺪش أو ﻣﺴﺎﻣ ﻣﻐﻠﻔﺔ ﻤﺎدة اﻟﻨ ﻞ ﻛﺮوم‬
All sharp edges must be smoothed to avoid injury during use or cleaning as well ‫ﺟﻤﻴﻊ اﻟﺤﻮاف اﻟﺤﺎدة ﺠﺐ أن ﻳﺘﻢ ﺗﻨﻌ ﻤﻪ ﻟﺘﻔﺎدي اﻻﺻﺎ ﺎت ﻋﻨﺪ اﻻﺳﺘﺨﺪام أو اﻟﺘﻨﻈ ﻒ أ ﻀﺎ‬
5-The window must be fixed 3 times on each side using 5 mm coated nails and at least 7 mm anchors
(dowels or similar). The joints must also be filled with putty. ‫ ﻣﻢ واﻟﺨﻮاﺑ ) وﺗﺪ‬5 ‫ ﻣﺮات ﻣﻦ ﻞ ﺟﺎﻧﺐ ﺎﺳﺘﺨﺪام اﻟﻤﺴﺎﻣ اﻟﻤﻐﻠﻔﺔ‬3 ‫ ﺠﺐ أن ﺗ ﺖ اﻟﻨﺎﻓﺬة‬-5
6 - Samples of doors, windows, and safety nets must be brought to the organization’s administration .‫ وﻛﺬﻟﻚ ﺠﺐ ﻣ ء اﻟﻔﻮاﺻﻞ ﺎﻟﻤﻌﺠﻮن‬.‫ ﻣﻢ ﻋ اﻷﻗﻞ‬7 (‫أو ﻣﺎﺷﺎ ﻪ‬
To be approved before starting implementation. ‫ ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﻣﻧظﻣﺔ‬- 6
7- Samples of each of the doors, windows, and safety nets must be brought to the company’s .‫ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ‬
management for approval before starting implementation.” ‫ ﯾﺟب إﺣﺿﺎر ﻋﯾﻧﺎت ﻟﻛل ﻣن اﻷﺑواب و اﻟﺷﺑﺎﺑﯾك وﺷﺑك اﻟﺣﻣﺎﯾﺔ إﻟﻰ إدارة اﻟﺷرﻛﺔ ﻻﻋﺗﻣﺎدھﺎ ﻗﺑل‬-7
.‫اﻟﺑدء ﻓﻲ اﻟﺗﻧﻔﯾذ‬

Wooden strips sec.(1”*4”)-Meranti wood : : ‫ ﺧﺷب ﻣﯾراﻧﺗﻲ‬،‫(ھﻧش‬4×1) ‫ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع‬


Supply and installation of wooden strips for walls, red meranti wood, width not ‫ ﻋرض ﻻﯾﻘل‬،‫ ﻣﯾراﻧﺗﻲ أﺣﻣر‬،‫ ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
less than 10 cm and a thickness of not less than 2.5 cm, finely polished and ‫ أوﺟﮭﮫ وﺗﺛﺑت‬3 ‫ ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش‬2.5 ‫ ﺳم وﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬10‫ﻋن‬
painted 3 facets and fixed with screws every 0.50 m and a depth of not less than ‫ ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب‬3 ‫م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬0.50 ‫ﺑﺎﻟﺑراﻏﻲ ﻛل‬ ml
1.7.1 3 cm on walls and be free of defects and cracks. They shall be fixed at 70cm ‫ وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول‬،‫ ﺳم ﻣن أﻷرﺿﯾﺎت‬70 ‫واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع‬ 43.50
‫ط‬.‫م‬
from floor level, the other strips are fixed at lintels level of classrooms, ‫ وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ‬
administration, store, library and laboratory and according to the drawings, . ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications and instructions of supervisor engineer.

Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬


Square meters: aluminum windows bronze excellent quality and have throat ‫ ﻧواﻓذ اﻟوﻣﻧﯾوم ﺑروﻧزي ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
aluminum strip not less than 4×8 cm and aluminum thickness not less than 1.2 ‫ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ‬1.2 ‫ ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬8×4‫ﻋن‬
mm and uses a special rubber to seal and prevent the leakage of air or water ‫وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع‬
and all haberdashery of hinges and shutters be original type and handles Laxis ‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ‬6 ‫وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض ﺑﺳﻣك‬
‫اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت( وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ‬ m2
1.7.2 and white glass thickness of 6 mm with and iced glass or wooded invisible (in 14.00
the positions specified in the drawings) and the work of netting mosquito insect ‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت‬،‫ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬ 2‫م‬
insect for openable shutters and install the throats from all sides Two fixations ،‫)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ ﻣﻊ ﺟﻣﯾﻊ اﻟﺧردوات‬،‫اﻟﺧﺎﺻﺔ‬
on The least, fixing the glass with special calves, with all the haberdashery, .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
(measurement of internal dimensions) according to the drawings, specifications,
and instructions of the supervising engineer. (A sample must be submitted for
approval.)
Windows protection steel mesh : ‫ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬
Supply and installation of protective grid steel mesh for windows 12 mm / 15 ‫ﻣم وﺑﻌرض ﻻ ﯾزﯾد ﻋن‬15/‫ﻣم‬12‫ ﺗورﯾد وﺗﻧﻔﯾذ ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
mm and no more than 12 cm width between main vertical rods and 15 cm ‫"ھﻧش‬2 ‫ ﺳم ﺑﯾن اﻟﻌوارض اﻷﻓﻘﯾﺔ وﺷﻠﻣﺎﻧﺎت داﺋرﯾﺔ‬15 ‫ﺳم ﺑﯾن اﻟﻘواﺋم اﻟرﺋﯾﺳﯾﺔ وﻋن‬12
between horizontal rods and circular planks 2 " . It will be fixed by welding from ‫ (ﺳم ﻟﺣﻣﺎﯾﺔ‬2.50×2.50) ‫ وﺷﺑك دﯾﻣن‬, ‫واﻟﺗﺛﺑﯾت ﺑواﺳطﺔ اﻟﻠﺣﺎم ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب‬
‫اﻟزﺟﺎج ﻣن اﻟﻛﺳر واﻟﻘﻣرﯾﺎت وﯾﺷﻣل اﻟرﻧﺞ وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬ m2
1.7.3 all sides. Deman mesh (2.50 x 2.50) cm is installed to protect window glass and 18.80
yemeni decoration glass ( Gamaria) . The item includes two coats of primer ‫اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬ 2‫م‬
base and three coats of the desired color with sanding, abrasion, smoothing, .‫اﻟﻣﺷرف‬
and all necessary, according to the instructions of the supervisor.

Gypsum Qamrya: :‫اﻟﻘﻣرﯾﺎت‬


supply and install Gypsum Qamrya studded with colored glass size (1*0.70m) ‫ﻣﺗر( وﺳﻣﺎﻛﺔ‬0.70*1) ‫ﺗورﯾد وﺗرﻛﯾب ﻗﻣرﯾﺎت ﻣن اﻟﺟص ﻣﻊ اﻟزﺟﺎج اﻟﻣﻠون ﻣﻘﺎس‬
thickness 5cm approved type, support by appropriate nails, the work must be ‫ﺳم ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة ﻣﻊ اﻟﺗﺛﺑﯾت اﻟﺟﯾد وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل‬5 ‫اﻟﻘﻣرﯾﺔ ﻻ ﺗﻘل ﻋن‬ pcs
1.7.4 carried out professionally and the price includes everything necessary to ‫ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬ 8.00
‫ﻋدد‬
implement the item, and the work must be done according to the specifications, .‫اﻟﻣﺷرف‬
drawings, and the directives of the supervising engineer.

Steel Doors (Provide sample to check): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟﻣراﺑﯾﻊ‬
form . Steel angle beam 2” to be welded along the perimeter of the entire door . 2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫دﺋري‬
Door frame (rectangular section panels )width is not less than 20 cm and ‫ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬
thickness 2 mm with three hinges. The item price Includes the anti-rust paint ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬ m2
1.7.5 4.40
after sanding and well abrasion, two coats of oil paint for door and locks. ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬ 2‫م‬
Frames are installed before plastering, they have to be fixed to walls by three 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
planted in wall and welded In accordance with the instructions of the supervisor
engineer.

Classroom blackboards: :‫ﺳﺑورات ﺳوداء ﻟﻠﻔﺻول اﻟدراﺳﯾﺔ‬


Supply and implement cement blackboards by paste and paint size (2.4*1.2m) ‫ﻣﺗر( ﻟون اﺳود‬1.2*2.4) ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺳﺑورات اﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﻣﻌﺟون واﻟطﻼء ﻣﻘﺎس‬
chalky black color, with a wooden frame and chalk shelf, the work must be ‫طﺑﺎﺷﯾرﯾﺔ ﻣﻊ اﻟﺑرواز اﻟﺧﺷﺑﻲ وﺟﻠﺳﺎت اﻟطﺑﺎﺷﯾر وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬ pcs
1.7.6 carried out professionally and the price includes everything necessary to .‫ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2.00
‫ﻋدد‬
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.

Rainwater drainage pipes: : ‫ﻣواﺳﯾر ﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر‬


By linear metre, supply and installation of medium pressure plastic pipes to ‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ ﺗورﯾد وﺗرﻛﯾب ﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﺿﻐط ﻣﺗوﺳط ﻟﺗﺻرﯾف ﻣﯾﺎه اﻷﻣطﺎر ﻗطر‬ pcs
1.7.7 drain rainwater, 3 inches in diameter, and securely fixed, with the length of the . .‫ ﻣﺗر‬1 ‫ ھﻧش واﻟﺗﺛﺑﯾت ﺑﺈﺣﻛﺎن ﻋﻠﻰ أن ﯾﻛون طول اﻟﻣﯾزاب‬3 3.00
‫ﻋدد‬
gutter being 1 meter. "

Total Amount of Doors and Windows Works ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻷﺑواب و اﻟﻧواﻓذ‬
1.8 Electrical Works : (‫ )ﯾﻠزم إﻋﺗﻣﺎد اﻟﻌﯾﻧﺎت ﻗﺑل اﻟﺗورﯾد‬: ‫اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
Notes : ‫ـ‬:‫ﻣﻼﺣظﺎت‬
- All materials and accessories must be of the highest quality and conform to international standards. .‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ اﻟﻌﺎﻟﻣﯾﺔ‬-
- All electrical work items will include supply of materials, installation, testing and commission. Internal wiring for all
‫ ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون اﻟﺗﻣدﯾدات داﺧﻠﯾﺔ‬-
networks shall be concealed inside plastic conduits of PVC type, conforming to British specifications BS-4607 and
shall have electrical insulation resistance of more than 100 Mega ohm.
‫ وأن‬BS-4607 ‫ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬PVC ‫ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺷﺑﻛﺎت داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع‬
Independent conduits for each electric circuit shall be used with a diameter not less than 20 cm. Flexible metal ‫ ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ‬. ‫ ﻣﯾﺟﺎ أوم‬100 ‫ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر ﻣن‬
conduits shall be used to protect wires and movable cables, such as connections of devices and motors and at ‫ﺳم وﺗﺳﺗﻌﻣل اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ‬20 ‫ﺑﻘطر ﻻ ﯾﻘل ﻋن‬
the expansion joints of the building, if any. No visible wiring is accepted , The contractor will bear responsibly of ‫ وﻻ ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات‬,.‫ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد ﻓواﺻل اﻟﺗﻣدد ﻟﻠﻣﺑﻧﻰ إن وﺟدت‬
any mistakes in the installation and shall re-install them properly . The wiring for each network must be ‫ ﻛﻣﺎ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات ﻟﻛل‬. ‫اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل ﺑﺎﻟﺷﻛل اﻟﺳﻠﯾم‬
independent of each other (Electrical lighting network, electrical sockets network, telephone network, computer ‫ ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر‬- ‫ ﺷﺑﻛﺔ اﻟﺗﻠﻔون‬- ‫ ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ‬- ‫ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
network, fire, television, etc.). They are not allowed to be mixed in conduits , partitions or boxes. A minimum
‫ ﻛﻣﺎ ﯾﺟب‬, ‫ﺗﻠﻔزﯾون وﻏﯾرھﺎ ( وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت واﻟﻌﻠب‬، ‫ ﺣرﯾﻖ‬،‫ﻛﻣﺑﯾوﺗر‬، _
distance of 40 cm should be considered between the power network and the computer and telephone networks. -
The circular and squared assembly boxes used for the switches shall be made of good plastic, Fire resistant and
. ‫ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون‬40 ‫ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ ﺗﻘل ﻋن‬
comply with the British specifications BS4662, VDE-3676 and shall have special covers to prevent penetration of ‫ ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد واﻟﻣﻘﺎوم ﻟﻠﺣرﯾﻖ‬-
moisture and insects. Those boxes will be made by the same factory which manufactured the electrical pipes, All ‫ ﻋﻠﻰ أن ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ ﺗﻣﻧﻊ ﺗﺳرب‬BS-4662 ، VDE-3676 ‫وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
sockets shall comply with (IEC 60889, 60309) specifications. ‫اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و ﯾﺟب أن ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ‬
- The contractor must submit the drawings which illustrate all electrical installations , path of pipes , places of the (IEC 60889, 60309) ‫ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
circuit breakers and electrical boards before starting any work for approval by the Engineer ‫ﻋﻠﻰ اﻟﻣﻘﺎول ﺗﺳﻠﯾم رﺳوﻣﺎت ﺗوﺿﯾﺣﯾﺔ ﺗﺑﯾن ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت اﻟﻛﮭرﺑﺎﺋﯾﺔ وﻣﺳﺎر اﻟﻣواﺳﯾر وأﻣﺎﻛن اﻟﻘﺳﺎﻣﺎت‬-
Submitting the As built drawings and bear the cost to the item prices.
‫وﻟوﺣﺎت اﻟﻛﮭرﺑﺎء ﻗﺑل اﻟﺑدء ﺑﺄي أﻋﻣﺎل ﻟﻼﻋﺗﻣﺎد ﻣن ﻗﺑل اﻟﻣﮭﻧدس‬
- The electrical circuits of 13A socket are the same of lighting, but that number of sockets does not exceed 6
sockets in the circuit and its wiring is (2.50) mm square. - Each socket of 20A or heater shall have an independent
‫( وﺗﺣﻣﯾل ﺗﻛﻠﻔﺗﮭﺎ ﻋﻠﻰ‬As Builte Drawing) ‫وﻋﻣل رﺳوﻣﺎت ﻟﻣﺎ ھو ﻣﻧﻔذ ﺑﺣﺳب ﻣراﺣل ﺗﻧﻔﯾذ اﻷﻋﻣﺎل‬
circuit, wire (4 mm square), pipe, and circuit breakers. - When connecting wires to each other regular connections . ‫أﺳﻌﺎر اﻟﺑﻧود‬
are used like connecters. 2.50 ) ‫ ﺑﻧﻔس طرﯾﻘﺔ اﻹﻧﺎرة ﺑﺣﯾث ﻻ ﺗزﯾد ﻋدد اﻟﻣﺂﺧذ ﻋن ﺳﺗﺔ ﻣﺂﺧذ ﻓﻲ اﻟداﺋرة وأﺳﻼﻛﮭﺎ‬13A ‫دواﺋر اﻟﻣﺂﺧذ‬-
- The executive plan of each area shall be attached to the boards of this area in a way that does not corrode or .‫( ﻣﻠم ﻣرﺑﻊ‬
affected by water. ‫ﻣﺎﺳورة وﻗﺎطﻊ‬،(‫ ﻣﻠم ﻣرﺑﻊ‬4 )‫ أو ﺳﺧﺎن داﺋرة ﻣﺳﺗﻘﻠﺔ ﺳﻠك‬20A ‫ﻛل ﻣﺄﺧذ‬-
- Samples must be submitted for all materials prior to installation. The Contractor shall bear all responsibility and connecters ‫ﻋﻧد اﻻﺣﺗﯾﺎج إﻟﻰ ﺗوﺻﯾل اﻷﺳﻼك ﻣﻊ ﺑﻌﺿﮭﺎ ﺗﺳﺗﺧدم ﺗوﺻﯾﻼت ﻧظﺎﻣﯾﺔ ﻛﻧﻛﺗرات‬-
cost of supply before the sample is approved by the Consultant. The
.‫ﯾﺗم إﻟﺻﺎق اﻟﻣﺧطط اﻟﺗﻧﻔﯾذي ﻟﻛل ﻣﻧطﻘﺔ داﺧل اﻟﻠوﺣﺎت اﻟﺧﺎﺻﺔ ﺑﮭذه اﻟﻣﻧطﻘﺔ ﺑطرﯾﻘﺔ ﻻ ﺗﺗﺂﻛل وﻻ ﺗﺗﺄﺛر ﺑﺎﻟﻣﺎء‬-
Consultant shall be entitled to reject any quantities installed or supplied before approval.
- All wires in the distribution boards shall be numbered according to the circuits numbers with plastic numbers ‫ ﯾﺟب ﺗﻘدﯾم ﻋﯾﻧﺎت ﻟﺟﻣﯾﻊ اﻟﻣواد ﻗﺑل اﻟﺗﻧﻔﯾذ واﻟﺗرﻛﯾب وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳؤوﻟﯾﺔ وﺗﻛﻠﻔﺔ اﻟﺗورﯾد ﻗﺑل‬-
designated for this purpose. These numbers will be pasted inside the switches and sockets. .‫اﻋﺗﻣﺎد اﻟﻌﯾﻧﺔ ﻣن ﻗﺑل اﻹﺳت ﺷﺎري وﯾﺣﻖ ﻟﻼﺳﺗﺷﺎري رﻓض أي ﻛﻣﯾﺎت ﯾﺗم ﺗﻧﻔﯾذھﺎ أو ﺗورﯾدھﺎ ﻗﺑل اﻋﺗﻣﺎدھﺎ‬
-All wires and cables to be made of copper with a conductivity of at least ‫ﯾﺗم ﺗرﻗﯾم ﺟﻣﯾﻊ اﻷﺳﻼك ﻓﻲ ﻟوﺣﺎت اﻟﺗوزﯾﻊ اﻟﻔرﻋﯾﺔ وﻓﻘﺎ ﻷرﻗﺎم اﻟدواﺋر ﺑﺄرﻗﺎم ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﺧﺻﺻﺔ ﻟﮭذا‬-
99%and manufactured according to the specifications of the International .‫اﻟﻐرض وﯾﺗم ﻋﻣل ھذه اﻷرﻗﺎم داﺧل اﻟﻣﻔﺎﺗﯾﺢ و اﻟﻣﺂﺧذ‬
Electricity Authority (IEC-28). Connectors and cables of motor and the like shall be flexible type to resist vibrations. ‫ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ ﻣوﺻﻼت اﻷﺳﻼك واﻟﻛواﺑل ﻣﺻﻧوﻋﺔ ﻣن اﻟﻧﺣﺎس اﻟذي ﻻ ﺗﻘل ﻣوﺻﻠﯾﺗﮫ‬-
These cables and wires must be 1000/600 volts, with suitable sections and capacity. The standard colors of wires ‫( وﺗﻛون ﻣوﺻﻼت‬IEC-28) ‫ وﻣﺻﻧﻊ طﺑﻘﺎ ﻟﻣواﺻﻔﺎت ھﯾﺋﺔ اﻟﻛﮭرﺑﺎء اﻟدوﻟﯾﺔ‬%99 ‫ ( ﻋن‬Conductivity)
and cables must be adhered. (red, yellow, blue) for power, black for neutral ,(green, green and yellow) for ground,
‫ و ﯾﺟب أن ﺗﻛون ھذه اﻟﻛﺎﺑﻼت‬. ‫وﻛﺎﺑﻼت اﻟﻣﺣرﻛﺎت وﻣﺎ ﺷﺎﺑﮫ ﻣن اﻟﻧوع اﻟﻣﺷﻌر اﻟﻣرن ﻟﺗﺣﻣل اﻻھﺗزازات‬
so that, there is no confusion between multiple wires. -Testing: Operation of all electric equipment, fittings,
insulated circuits, insulated cables, all main and subsidiary circuit breakers, earthing. ‫ ﻓوﻟت وﺑﻣﻘﺎطﻊ واﺳﺗطﺎﻋﺎت ﺗﯾﺎرﯾﮫ ﻣﻧﺎﺳﺑﺔ‬1000/600 ‫واﻷﺳﻼك ﻣن ﻓﺋﺔ‬
- Wiring through wall should be made vertically. It is strictly forbidden to break walls horizontally. ،‫ أزرق (ﻟﻠﻔﺎزات أﺳود ﻟﻠﺣﯾﺎدي )أﺧﺿر‬،‫ أﺻﻔر‬،‫وﯾﺟب اﻻﻟﺗزام ﺑﺎﻷﻟوان اﻟﻘﯾﺎﺳﯾﺔ ﻟﻸﺳﻼك واﻟﻛﺎﺑﻼت )أﺣﻣر‬
-Testing: All electric equipment , fittings, insulated circuits, insulated cables, all main and sub circuit breakers, and ‫أﺧﺿر وأﺻﻔر(ﻟﻸرﺿﻲ ﺑﺣﯾث ﻻ ﯾﻧﺷﺄ اﻟﺗﺑﺎس ﺑﯾن اﻷﺳﻼك اﻟﻣﺗﻌددة‬
earthing have to be operationalized - Work includes the installation of plastic pipes (PVC) of orange color for , ‫ﺟﻣﯾﻊ اﻟﻘواطﻊ اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ‬, ‫ﻋﺎزﻟﯾﮫ اﻟﻛﺎﺑﻼت‬, ‫ﻋﺎزﻟﯾﮫ اﻟدواﺋر‬, ‫ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻷﺟﮭزة واﻟﺗرﻛﯾﺑﺎت‬: ‫اﺧﺗﺑﺎر‬-
ceilings and black for walls with diameters ¾” & 1”, which to be placed before wiring. Wiring to be manufactured ‫اﻟﺗﺄرﯾض‬
of copper 2.5 mm high quality, insulated by plastic material with the boxes size (7 cm × 7 cm) and junction points. .‫ وﯾﻣﻧﻊ ﻣﻧﻌﺎ ﺑﺎﺗﺎ اﻟﺗﻛﺳﯾر ﻓﻲ اﻟﺟدران ﺑﺷﻛل أﻓﻘﻲ‬.. ‫ ﯾراﻋﻰ أن ﺗﻛون ھذه اﻟﺗﻣدﯾدات رأﺳﯾﮫ‬--
- Work includes all installations from the distribution board to the distribution boxes with wires 2.5 mm and 4 mm
‫ ﯾﺟب ﺗﺷﻐﯾل ﺟﻣﯾﻊ اﻟﻣﻌدات اﻟﻛﮭرﺑﺎﺋﯾﺔ واﻟﺗﺟﮭﯾزات واﻟدواﺋر اﻟﻣﻌزوﻟﺔ واﻟﻛﺎﺑﻼت اﻟﻣﻌزوﻟﺔ وﺟﻣﯾﻊ‬:‫ اﻻﺧﺗﺑﺎر‬-
- At the intersection of a water line or a sewage line with the path of an electrical cable, the power cable should be
above and not below the installation ‫( ﺑﺎﻟﻠون اﻟﺑرﺗﻘﺎﻟﻲ‬PVC) ‫ ﯾﺷﻣل اﻟﻌﻣل ﺗرﻛﯾب اﻷﻧﺎﺑﯾب اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬- ‫ﻗواطﻊ اﻟداﺋرة اﻟرﺋﯾﺳﯾﺔ واﻟﻔرﻋﯾﺔ واﻟﺗﺄرﯾض‬
- The item includes everything necessary ‫ ﯾﺻﻧﻊ اﻻﺳﻼك ﻣن‬.‫ واﻟﺗﻲ ﯾﺟب وﺿﻌﮭﺎ ﻗﺑل ﺗوﺻﯾل اﻷﺳﻼك‬، "1 &" ¾ ‫ﻟﻸﺳﻘف واﻷﺳود ﻟﻠﺟدران ﺑﺄﻗطﺎر‬
to carry out the work to the fullest according to the attached technical specifications and engineering drawings and .‫ ﺳم( وﻧﻘﺎط اﻟوﺻل‬7 × ‫ ﺳم‬7) ‫ ﻣم ﺑﺟودة ﻋﺎﻟﯾﺔ وﻣﻌزوﻟﺔ ﺑﻣﺎدة ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺣﺟم اﻟﺻﻧﺎدﯾﻖ‬2.5 ‫ﻧﺣﺎس‬
the instructions of the supervisor ‫ ﻣم‬4 ‫ ﻣم و‬2.5 ‫ ﯾﺷﻣل اﻟﻌﻣل ﺟﻣﯾﻊ اﻟﺗرﻛﯾﺑﺎت ﻣن ﻟوﺣﺔ اﻟﺗوزﯾﻊ إﻟﻰ ﺻﻧﺎدﯾﻖ اﻟﺗوزﯾﻊ ﺑﺄﺳﻼك‬-
‫ ﯾﺟب أن ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط اﻟﻣﯾﺎه أو ﺧط اﻟﺻرف اﻟﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬-
‫وﻟﯾس أﺳﻔل اﻟﺗرﻛﯾب‬
‫ ﯾﺗﺿﻣن اﻟﻌﻧﺻر ﻛل ﻣﺎ ھو ﺿروري ﻟﺗﻧﻔﯾذ اﻟﻌﻣل ﻋﻠﻰ أﻛﻣل وﺟﮫ ﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻔﻧﯾﺔ اﻟﻣرﻓﻘﺔ واﻟرﺳوﻣﺎت‬-
‫ ﯾﺟب أن‬، ‫ ﻋﻧد ﺗﻘﺎطﻊ ﺧط ﻣﯾﺎه أو ﺧط ﺻرف ﺻﺣﻲ ﻣﻊ ﻣﺳﺎر ﻛﺎﺑل ﻛﮭرﺑﺎﺋﻲ‬- ‫اﻟﮭﻧدﺳﯾﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف‬
.‫ﯾﻛون ﻛﺎﺑل اﻟطﺎﻗﺔ أﻋﻠﻰ و ﻟﯾس ﺗﺣت اﻟﺗﺛﺑﯾت‬

Socket 13 A: : A 13 ‫ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬


Supply and installation of a socket 13A with a switch, It shall be concealed ‫ ﯾرﻛب داﺧل اﻟﺣﺎﺋط‬،(‫ ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗش‬A 13 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬:‫ﺑﺎﻟﻌدد‬
inside the wall with all requirements of black PVC conduits which will be bent in _‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ‬PVC) ‫ﻣﻊ ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء‬ pcs
1.8.1 the bending points using spiral spring, wires and boxes. Screws are used for ‫ واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ‬،‫ وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ‬،‫ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬ 4.00
‫ﻋدد‬
fixation. Item includes all connection to the distribution board according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗوزﯾﻊ‬
drawings and specifications , And the supervisor's instructions.
Ceiling fans: : ‫ﻣراوح ﺳﻘف‬
In number: Supply and installation of fans fixed to the ceilings, excellent type, ‫ ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺗﺛﺑت ﺑﺎﻟﺳﻘوف ﻧوع ﻣﻣﺗﺎز اﺗوﻣﺎﺗﯾﻛﻲ ﻧظﺎﻣﯾن طﺎﻗﺔ ﺷﻣﺳﯾﺔ‬: ‫ﺑﺎﻟﻌدد‬
automatic, two systems solar energy and electricity systems, with the switch and ‫وﻛﮭرﺑﺎء ﻣﻊ اﻟﻣﻔﺗﺎح وﺟﻣٌﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻٌﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر‬
all supplies, and connection to the electrical outlet, including plastic pipes, which ‫واﻟﺑﻼﺳﺗﯾﻛﯾﺔ واﻟﺗﻲ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطٌﯾﺗﮭﺎ وﺗﺛﺑٌﯾﺗﮭﺎ واﻟﻣﺳﺎﻣﯾر اﻟﻘﺎﻟووظ‬
are placed before pouring, cans and their covers, and fixed with screws and ‫واﻟﺗﺳﻠﯾك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ وﯾﺗم اﻋﺗﻣﺎد اﻟﻌﯾﻧﮫ ﻣن ﻗﺑل ادارة اﻟﻣﺷروع واﻟﺛﻣن‬ pcs
1.8.2 wires from the point to the distribution panel. The sample is approved by the .‫◌ٌ ﯾﺷﻣل ﻛل ﻣﺎ ٌﯾﻠزم ﻻﻧﮭﺎء اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾٌﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 4.00
‫ﻋدد‬
project management, and the price includes everything. What is necessary to
complete the work according to the specifications and instructions of the
supervising engineer..

Supply and installation of standard lighting : Supply and installation of a : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬
standard lighting unit, include the switch and PVC pipes which can be bent ( at ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ وﺗﺷﻣل اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬:‫ﺑﺎﻟﻌدد‬
bending points) using spiral spring, pipes are placed before casting .The item ‫ واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب‬،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC)
ً ‫ طﺑﻘﺎ‬،‫وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ pcs
1.8.3 shall include boxes and their covers which they shall be fixed with screws as 8.00
well as wires from the point to the distribution board according to drawings and .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬ ‫ﻋدد‬
specifications.

Supply and installation of a regular lighting unit with a hemispherical : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﻛروي وﺗﺷﻣل اﻟﻣﻔﺗﺎح‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular lighting unit with a hemispherical ،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬
cover, including the switch and black plastic pipes (PVC). It is bent - in the ‫واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك ﻣن اﻟﻧﻘطﺔ‬
.‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ pcs
1.8.4 bending areas - using spring, which is placed before casting, the cans and their 2.00
covers, and fixed with screws and wires from the point to the distribution panel, ‫ﻋدد‬
according to the drawings and specifications, and the instructions of the
supervising engineer.

Total Amount of Electricity Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ‬

Total summation .(‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﺑﻧﺎء اﻟﻔﺻول )ﺷﺑﮫ اﻟداﺋﻣﺔ‬


‫ﺗرﻣﯾم و إﻋﺎدة ﺗﺄھﯾل ﻟﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬
2
Rehabilitation of Hafsa Girls School.
Oil matte paint: : ‫دھﺎن زﯾﺗﻲ‬
Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
2.1 color painted above 3 coats of putty and sanding and according to the drawings ‫وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت و اﻟﻌﻣل ﯾﺷﻣل ﻣﻌﺎﻟﺟﺔ‬ 720.00
2‫م‬
and specifications, and the instructions of the supervisor ،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗﻠﺑﯾس ﻓﻲ ﺣواف اﻟﻧواﻓد و ﻏﯾرھﺎ ﻣن اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺟدران‬
.‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬
Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
2.2 required color , three layers of putty and sanding to be done before painting and ،‫اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت ﺑﻌد اﻟﺗﻧﺿﯾف واﻟﻘﺷط وﺗرﻣﯾم اﻟﺗﻠﯾﯾس اﻟﺳﺎﺑﻖ‬ 350.00
2‫م‬
according to the drawings and specifications, and the instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬
supervisor.
Water- Resistant Plastic Paint: : ‫دھﺎن ﻣﺎﺋﻲ ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠﻣﺎء‬
Water emulsion paint for exterior walls consists of base layer and three coats of ‫دھﺎن ﻣﺳﺗﺣﻠب ﻣﺎﺋﻲ ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ ﯾﺗﻛون ﻣن طﺑﻘﺔ أﺳﺎﺳﯾﺔ وﺛﻼث طﺑﻘﺎت ﻣن اﻟﻠون‬
m2
2.3 the required color , the price includes all the work necessary to prepare the ‫ اﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻷﻋﻣﺎل اﻟﻼزﻣﺔ ﻟﺗﺟﮭﯾز اﻷﺳطﺢ ﻣن اﻟﺻﻧﻔرة واﻟﻣﻌﺟﻧﺔ و‬،‫اﻟﻣطﻠوب‬ 208.00
2‫م‬
surfaces of sanding and kneading and all that is necessary. according to the ‫ ﺣﺳب‬.‫ﻣﻌﺎﻟﺟﺔ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺗﻠﯾﯾس ﺑﺎﻻﺳﻣﻧت ﻗﺑل اﻟدھﺎن و اﻟﻣﻌﺟﻧﺔ وﻛل ﻣﺎ ﯾﻠزم‬
drawings and specifications, and the instructions of the supervisor. . ‫اﻟﻣﺧططﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف‬
Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬
Bronze aluminum windows , excellent quality are installed. Frame section be at ‫ ﺗورﯾد و ﺗرﻛﯾب ﻧواﻓذ اﻟوﻣﻧﯾوم و درﻓﺎت ﻟﻠﻧواﻓذ اﻟﻣﻔﻘودة ﺑروﻧزي ﻧوﻋﯾﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
least 4 x 8 cm , thickness shall not be less than 1.2 mm. Special rubber shall be ‫ ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬8×4‫ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل ﻋن‬
used for sealing and preventing leakage of air or water. All fittings like hinges ‫ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ‬1.2
and locks be original types. Knobs are laxis, glass 6mm white or opaque ‫اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض‬ m2
2.5 38.00
(according to locations specified in drawings) openable-shutters are provided (‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت‬6 ‫ﺑﺳﻣك‬ 2‫م‬
with insect-resistant nets. All sides of frames are fixed with at least two rivets, ‫وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ‬
with all fittings, according Specifications, and instructions of the supervisor ‫ ﻣﻊ ﺟﻣﯾﻊ‬،‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت اﻟﺧﺎﺻﺔ‬،‫اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬
engineer (Samples needed to be provided). ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺧردوات‬
.(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫اﻟﻣﺷرف‬
Sanding and re-painting of the protective grille. :‫ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﺷﺑك ﺣﻣﺎﯾﺔ‬
Per square meter: - Sanding and repainting the protective nets using abrasives ‫ ﺻﻧﻔرة و إﻋﺎدة دھﺎن ﻟﺷﺑﺎك اﻟﺣﻣﺎﯾﺔ ﺑﺎﻟﺟﻠﺦ و اﻟﺑرﺷﺎت و اﻟﻌﻣل ﯾﺷﻣل طﻼء‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
m2
2.6 and sprays. The work includes painting two sides with a base primer and three ‫وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل‬ 31.00
2‫م‬
sides in the required color, sanding, grinding the excess, smoothing, and .‫ﻣﺎ ﯾﻠزم وﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
everything necessary, according to the directives of the supervising engineer.
Windows protection steel mesh : ‫ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬
Supply and installation of protective grid steel mesh for windows 12 mm / 15 ‫ﻣم وﺑﻌرض ﻻ ﯾزﯾد ﻋن‬15/‫ﻣم‬12‫ ﺗورﯾد وﺗﻧﻔﯾذ ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
mm and no more than 12 cm width between main vertical rods and 15 cm ‫"ھﻧش‬2 ‫ ﺳم ﺑﯾن اﻟﻌوارض اﻷﻓﻘﯾﺔ وﺷﻠﻣﺎﻧﺎت داﺋرﯾﺔ‬15 ‫ﺳم ﺑﯾن اﻟﻘواﺋم اﻟرﺋﯾﺳﯾﺔ وﻋن‬12
between horizontal rods and circular planks 2 " . It will be fixed by welding from ‫ (ﺳم ﻟﺣﻣﺎﯾﺔ‬2.50×2.50) ‫ وﺷﺑك دﯾﻣن‬, ‫واﻟﺗﺛﺑﯾت ﺑواﺳطﺔ اﻟﻠﺣﺎم ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب‬ m2
2.7 all sides. Deman mesh (2.50 x 2.50) cm is installed to protect window glass and ‫اﻟزﺟﺎج ﻣن اﻟﻛﺳر واﻟﻘﻣرﯾﺎت وﯾﺷﻣل اﻟرﻧﺞ وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬ 15.00
2‫م‬
yemeni decoration glass ( Gamaria) . The item includes two coats of primer ‫اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬
base and three coats of the desired color with sanding, abrasion, smoothing, .‫اﻟﻣﺷرف‬
and all necessary, according to the instructions of the supervisor.
Steel Doors (Sample need to check): .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × × ‫ھﻧش‬1) ‫ ﺗورﯾدو ﺗرﻛﯾب أﺑواب ﺣدﯾد ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد اﻟﻣراﺑﯾﻊ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ‫"ﻋﻠﻰ ﻣﺣﯾط‬2 ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن دﺋري‬1.3 ‫ھﻧش ( ﺳﻣك‬2
form . Steel angle beam 2” to be welded along the perimeter of the entire door . ‫ ﻣم ﻣﻊ ﻋﻣل ﺛﻼت‬2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬
m2
2.8 Door frame (rectangular section panels )width is not less than 20 cm and ‫ﻣﻔﺻﻼت وﯾﺷﻣل‬ 4.40
2‫م‬
thickness 2 mm with three hinges. The item price Includes the anti-rust paint ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬
after sanding and well abrasion, two coats of oil paint for door and locks. ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬
Frames are installed before plastering, they have to be fixed to walls by three 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
planted in wallof
Maintenance and welded
iron doorsIn accordance with the instructions of the supervisor ‫ﺻﯾﺎﻧﺔ اﻻﺑواب اﻟﺣدﯾدﯾﺔ‬
In square meters: Maintaining and inspecting the school’s iron doors according ‫ ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﺣﻣﺎﻣﺎت ﺑﺎﻷﺑﻌﺎد ﺑﺣﺳب اﻟﻛﻣﯾﺎت م وذﻟك‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
to the dimensions according to the quantities, by doing the following: - -: ‫ﺑﻌﻣل اﻵﺗﻲ‬
- Cutting the damaged iron, replacing the removed parts of the gates and others ‫ ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة‬-
in the door body, and plumbing the other parts by repairing or replacing them. ‫اﻷﺟزاء اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ و طﻼء اﻻﺑواب ﺑﻣﺎدة اﺳﺎس و ووﺟﮭﯾن زﯾﺗﻲ ﺑﻌد‬
- Replacing damaged bolts and hinges with others, making three hinges on . . ‫اﻟﺟﻠﺦ و اﻟﺳﻧﻔرة‬ m2
2.9 each side and what is needed for them, and supplying an excellent quality lock. ‫ اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ‬- 22.00
2‫م‬
- Adjusting the weight and other necessary maintenance work to ensure that the .‫ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد ﻗﻔل ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة‬
gate is restarted as required. The contractor must visit the site before submitting ‫ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل‬-
the price offer. ‫ وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر‬، ‫اﻟﻣطﻠوب‬
The item includes everything necessary according to generally accepted work .‫ﯾﺷﻣل اﻟﺑﻧد ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
principles and the instructions of the supervising engineer
Mosaic tiles 25 x 25 cm, with marble fractions, automatic: : ‫ أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺑﻛﺳر اﻟرﺧﺎم‬،‫ ﺳم‬25×25 ‫ﺑﻼط ﻣوزاﯾﻛو‬
Supply and installation of Mosaic tile 25 x 25 cm, 2.5 cm thickness, mixed with ،‫ ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬2.5 ‫ وﺳﻣك‬،‫ ﺳم‬25×25 ‫ ﺑﻼط ﻣوزاﯾﻛو‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
marble fractions. Half thickness to be made of white and uniform color. The ‫وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل‬, ‫ وﻣوﺣد اﻟﻠون‬،‫وﯾﻛون ﻧﺻف اﻟﺳﻣﺎﻛﺔ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬
m2
2.10 item includes a bedding of sand or fine aggregate. Mosaic tiles are installed on ‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت‬3 : 1 ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫)اﻟﻧﯾس( ﺗﺣﺗﮫ‬ 4.00
2‫م‬
a concrete mortar of 1: 3. , Joints between tiles to be grouted using White ‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬.‫ واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ ﻓﻲ اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب‬،‫اﻷﺑﯾض‬
cement and tile surface is mechanically polished and smoothed according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫واﻟﻣواﺻﻔﺎت‬
drawings and specifications, instructions of the supervisor engineer.
Mosaico tiles, 30 x 1.2 m, with broken marble, automatic (for stairs) in : ‫ أﺗوﻣﺎﺗﯾﻛﻲ)ﻟدرج اﻟﺳﻠم( ﺑﺎﻟﻌدد‬،‫ ﺑﻛﺳر اﻟرﺧﺎم‬،‫ م‬1.2×.30 ‫ﺑﻼط ﻣوزاﯾﻛو‬
numbers: ،‫ ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬،‫ ﺑﻛﺳر اﻟرﺧﺎم أﺗوﻣﺎﺗﯾﻛﻲ‬،‫ ﺳم‬3 ‫ وﺳﻣك‬،‫ م‬1×.30 ‫ﺑﻼط ﻣوزاﯾﻛو‬
Mosaico tiles, 30 x 1, 3m and 3 thick, with automatic marble breakage, with ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ‬،‫وﯾﺷﻣل ﻓرﺷﺔ ﻣن اﻟﮭﻠﺳن أو اﻟرﻣل )اﻟﻧﯾس( ﺗﺣﺗﮫ‬, ‫وﻣوﺣد اﻟﻠون‬
white cement, uniform colour, including a bed of holsun or sand (gneiss) ‫ واﻟﺟﻠﻲ واﻟﺗﻧﻌﯾم واﻟﺗﻠﻣﯾﻊ اﻟﻣﯾﻛﺎﻧﯾﻛﻲ‬،‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬3 : 1 ‫ﺑﻧﺳﺑﺔ‬ pcs
2.11 underneath, and placed on cement mortar in a ratio of 1:3 with the joints 12.00
‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬.‫ﻓﻲ اﻟﻣوﻗﻊ ﺑﻌد اﻟﺗرﻛﯾب‬ ‫ﻋدد‬
impregnated with white cement, and scouring, smoothing and mechanical
polishing on site. After installation. According to the drawings, specifications,
and instructions of the supervising engineer
Ceramic skirts: : ‫وزرات ﺳﯾراﻣﯾك‬
Ceramic skirts similar to the Spanish tile quality with the required color, Height 7 ‫ وزرات ﻣن اﻟﺳﯾراﻣﯾك ﻣﺎﯾﻣﺎﺛل ﺟودة اﻟﺑﻼط اﻷﺳﺑﺎﻧﻲ ﺑﺎرﺗﻔﺎع ﻻ ﯾﻘل ﻋن‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
not less than 7 cm. It shall be installed on cement mortar 1: 3. Joints are ‫ ﻣﻊ ﺗﺷرﯾب اﻟﻔواﺻل‬3 : 1 ‫ وﯾوﺿﻊ ﻋﻠﻰ ﻣوﻧﺔ إﺳﻣﻧﺗﯾﺔ ﺑﻧﺳﺑﺔ‬،‫ﺳم وﺑﺎﻟﻠون اﻟﻣطﻠوب‬ ml
2.12 35.00
grouted with white cement, The visible upper edges to be flattened according to ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫ ﻣﻊ ﺷطف اﻟﺣﺎﻓﺔ اﻟﻌﻠوﯾﺔ اﻟظﺎھرة طﺑﻘﺎ ً ﻟﻠﻣواﺻﻔﺎت‬،‫ﺑﺎﻹﺳﻣﻧت اﻷﺑﯾض‬ ‫ط‬.‫م‬
specifications, and the instructions of the supervisor. .‫اﻟﻣﺷرف‬

Wooden strips sec.(1”*4”)-Meranti wood : : ‫ ﺧﺷب ﻣﯾراﻧﺗﻲ‬،‫(ھﻧش‬4×1) ‫ﺷراﺋر ﺧﺷﺑﯾﺔ ﻗطﺎع‬


Supply and installation of wooden strips for walls, red meranti wood, width not ‫ ﻋرض ﻻﯾﻘل‬،‫ ﻣﯾراﻧﺗﻲ أﺣﻣر‬،‫ ﺗورﯾد وﺗرﻛﯾب ﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
less than 10 cm and a thickness of not less than 2.5 cm, finely polished and ‫ أوﺟﮭﮫ وﺗﺛﺑت‬3 ‫ ﺳم ﻣﻧﻌﻣﺔ وﻣﺻﻧﻔرة وﻣدھﻧﺔ ﺑﺎﻟورﻧﯾش‬2.5 ‫ ﺳم وﺑﺳﻣك ﻻ ﯾﻘل ﻋن‬10‫ﻋن‬
ml
2.13 painted 3 facets and fixed with screws every 0.50 m and a depth of not less than ‫ ﺳم ﻓﻲ اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب‬3 ‫م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬0.50 ‫ﺑﺎﻟﺑراﻏﻲ ﻛل‬ 45.00
‫ط‬.‫م‬
3 cm on walls and be free of defects and cracks. They shall be fixed at 70cm ‫ وﻋﻧدﻣﺳﺗوى اﻷﻋﺗﺎب ﻟﺟﻣﯾﻊ اﻟﻔﺻول‬،‫ ﺳم ﻣن أﻷرﺿﯾﺎت‬70 ‫واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع‬
from floor level, the other strips are fixed at lintels level of classrooms, ‫ وﺷراﺋر ﻋﻠوﯾﺔ ﻟﻠﻣﻌﻣل ﺣﺳب اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬,‫واﻻدارة واﻟﻣﺧزن واﻟﻣﻛﺗﺑﺔ‬
administration, store, library and laboratory and according to the drawings, . ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications and instructions of supervisor engineer.
Restoration and painting of balustrades ‫إﻋﺎدة ﺗرﻣﯾم ودھﺎن اﻟدرﺑزﯾﻧﺎت‬
Per square meter: Sanding, maintaining and repainting the balustrades in the ‫ ﺑﻌد ﺗﻘﺷﯾر‬،‫ ﻋﻣل ﺻﻧﻔرة وﺻﯾﺎﻧﺔ وإﻋﺎدة دھﺎن اﻟدرﺑزﯾﻧﺎت ﺑﺎﻟﻠون اﻟﻣطﻠوب‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
،‫ ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة وﺗرﻣﯾم اﻟدرﺑزﯾن اﻟﺧﺷب واﻟﺣدﯾد ﺛم ﻋﻣل وﺟﮭﯾن‬،‫اﻟدھﺎن اﻟﻘدﯾم‬ ml
2.14 desired color, after peeling the old paint, with kneading, sanding and restoring 10.00
the wood and iron balustrades, then making two sides, according to the ..‫طﺑﻘﺎ ً ﻟﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫مط‬
instructions of the supervising engineer.

Maintenance and repainting of wooden shutters: :‫ﺻﯾﺎﻧﺔ و إﻋﺎدة دھﺎن اﻟﺷراﯾر اﻟﺧﺷﺑﯾﺔ‬
Per linear meter: Maintenance and repainting of wooden wall panels, so that ‫ ﺑﺣﯾث ﯾﺗم ﺗﻧﻌﯾﻣﮭﺎ وﺻﻧﻔرﺗﮭﺎ‬،‫ ﺻﯾﺎﻧﺔ و اﻋﺎدة دھﺎن ﻟﺷراﺋر ﺧﺷﺑﯾﺔ ﻟﻠﺟدران‬:‫ﺑﺎﻟﻣﺗر اﻟطوﻟﻲ‬
they are smoothed, sanded, and painted with 3-sided varnish. The item includes ‫ أوﺟﮭﮫ و اﻟﺑﻧد ﯾﺷﻣل ﺻﯾﺎﻧﺔ اﻟﻣﻧﺎطﻖ اﻟﻣﮭﺗرﺋﺔ و ﺗﻐﯾﯾرھﺎ ﺑﺷراﺋر‬3 ‫و دھﺎﻧﮭﺎ ﺑﺎﻟورﻧﯾش‬
maintenance of worn out areas and replacing them with similar or red Meranti ‫ ﺳم ﻓﻲ‬3 ‫م وﺑﻌﻣﻖ ﻻ ﯾﻘل ﻋن‬0.50 ‫ﻣﺷﺎﺑﮭﺔ او ﻧوﻋﯾﺔ ﻣﯾراﻧﺗﻲ أﺣﻣروﺗﺛﺑت ﺑﺎﻟﺑراﻏﻲ ﻛل‬ ml
2.15 type panels, which are fixed with screws every 0.50 m and at a depth of not less ‫اﻟﺟدران وﺗﻛون ﺧﺎﻟﯾﺔ ﻣن اﻟﻌﯾوب واﻟﺷروخ و ﺗﺛﺑت ﺑﺎرﺗﻔﺎع ﻣﻧﺎﺳب ﻣن أﻷرﺿﯾﺔ ﺣﺳب‬ 250.00
‫مط‬
than 3 cm in the walls and are free of defects. The cracks are fixed at an . ‫اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
appropriate height from the floor according to the drawings, specifications, and
instructions of the supervising engineer.
Rebuilding the roof of the staircase: :‫إﻋﺎدة ﺑﻧﺎء ﺳﻘف ﺑﯾت اﻟدرج‬
Remove and remove the roof of the stairs house, rebuild a new wooden ceiling ‫إزاﻟﺔ وﺧﻠﻊ ﺳﻘف ﺑﯾت اﻟدرج وإﻋﺎدة ﺑﻧﺎء ﺳﻘف ﺧﺷﺑﻲ ﺟدﯾد ﻣن إﻋﺎدة ﺗرﻛﯾب اﻟﺧﺷب‬
from the re -installation of the previous wood after its joining, removing the ‫اﻟﺳﺎﺑﻖ ﺑﻌد ﺗﻧﺿﯾﻔﮫ وإزاﻟﺔ اﻟﻠوح اﻟﺧﺷﺑﻲ واﺳﺗﺑداﻟﮫ ﺑﺎﺧر ﺟدﯾد وﺻب اﻟﺳﻘف وﺑﻧﺎء اﻟدروه‬
wooden plate, replacing it with a new one, pouring the ceiling and building the ‫ ﺳم وﺳﻣﺎﻛﺔ‬30 ‫ ﻗدم ﺑﻣﺳﺎﻓﺎت‬14×6×3 ‫ ﻣﻘﺎس‬. ‫ﻣﻊ ﺗرﻛﯾب ﻣﺎﺳورة ﺗﺻرﯾف ﻣﯾﺎه اﻻﻣطﺎر‬ m2
2.16 18.00
course with the installation of a rainwater drainage pipe. 3 x 6 x 14 feet at 30 cm ‫ ﻣﻠم ﺑﺎﻹﺿﺎﻓﺔ إﻟﻰ اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ ﻟﻸﺳﻘف وﻧﻘل وازاﻟﺔ اﻟﻣﺧﻠﻔﺎت‬9 2‫م‬
and 9 mm thick ‫(" وﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬.1:1.5:3) ‫ﻧﺳﺑﺔ اﻟﺧﻠط‬
Mixing ratio (1: 1.5: 3.) “According to the instructions of the supervising engineer

Rehabilitation of a staircase for the entrances from mosaic tiles 5 cm thick, the ‫ﺳم‬30 ‫ﺳم وﺑﻌرض اﻟﻧﺎﺋﻣﺔ‬5 ‫ﺗﺄھﯾل درج ﻟﻠﻣداﺧل ودرج اﻟﺳﻠم ﻣن اﻟﺑﻼط اﻟﻣوزاﯾﻛو ﺑﺳﻣك‬
sleeper width is 30 cm, and the post is 15 cm high. The work includes the -:‫ﺳم و اﻟﻌﻣل ﯾﺷﻣل اﻷﺗﻲ‬15 ‫وإرﺗﻔﺎع اﻟﻘﺎﺋﻣﺔ‬
following: ‫ ﺣﻔر ﻟﻸﺳﺎﺳﺎت اﻟﺟﻌم‬-
- Digging for foundations .‫ﺳم‬20 ‫ طﺑﻘﺔ ﻛﺳر ﺣﺟر ﺑﺳﻣك‬-
- A layer of broken stone, 20 cm thick. .‫ أﺳﺎﺳﺎت ﻣن اﻟﺟﻌم و اﻟﺧرﺳﺎﻧﮫ اﻟﻌﺎدﯾﺔ و اﻟﻣﺑﺎﻧﻲ اﻟﺣﺟر اﻟﻣرﺑوع‬- ml
2.17 - Foundations of aggregate, regular concrete, and square stone buildings. ‫ ﺗرﻛﯾب درج ﻣوزاﯾﻛو )ﻣطﻌم ﺑﻛﺳر اﻟرﺧﺎم( ﻟﻠﻘواﺋم و اﻟﻧواﺋم ﻋﻠﻰ ﻣوﻧﺔ اﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﺟﻠﻲ‬- 7.20
‫مط‬
- Installing a mosaic staircase (inlaid with broken marble) for the posts and ‫اﻟﻣﯾﻛﺎﻧﯾﻛﻲ واﻟﺗﻧﻌﯾم اﻟﺗﺎم و ﻛل ﻣﺎﯾﻠزم ﻷﻧﮭﺎء اﻟﺑﻧد طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وأﺻول‬
sleepers on a cement mortar with mechanical polishing, complete smoothing, .‫اﻟﻌﻣل وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
and everything necessary to finish the item in accordance with the drawings,
specifications, work principles, and instructions of the supervising engineer.
Supply and installation of a single fluorescent lighting unit, 120 cm, 40 : ‫ وات‬40 ‫ﺳم‬120 ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد‬
watts: 40 ‫ﺳم‬120 ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة اﻧﺎرة ﻓﻠورﺳﻧت ﻣﻔرد‬: ‫ﺑﺎﻟﻌدد‬
In number: Supply and installation of a single fluorescent lighting unit, 120 cm 40 ‫ ( واﻟﺗﻲ ﺗوﺿﻊ‬PVC) ‫وات ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬ pcs
2.18 It comes with the key and includes plastic pipes (PVC) which are placed ‫ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطﯾﺗﮭﺎ وﻣﺳﺎﻣﯾر اﻟﻘﻠووظ واﻟﺗﻣدﯾدات اﻟﻛﮭرﺑﺎﺋﯾﺔ‬ 40.00
‫ﻋدد‬
Before molding, cans and their lids are secured with screws and wires .‫ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
From the point to the distribution board according to the specification and
standards and with the instructions of the site engineer.
Supply and installation of a regular outdoor lighting unit with a semi-oval : ‫"ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular external lighting unit with a semi- ‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام‬PVC) ‫اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬
pcs
2.19 oval cover, including the switch and black plastic pipes (PVC). It is bent - in the ‫ واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك‬،‫اﻻﺳﺑرﻧﺞ‬ 15.00
‫ﻋدد‬
bending areas - using spring, which is placed before pouring. The cans and their .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬
covers are fixed with screws and wires from the point to the distribution panel,
according to the drawings, specifications, and the engineer’s instructions. Admin.
Ceiling fans: : ‫ﻣراوح ﺳﻘف‬
In number: Supply and installation of fans fixed to the ceilings, excellent type, ‫ ﺗورﯾد وﺗرﻛﯾب ﻣراوح ﺗﺛﺑت ﺑﺎﻟﺳﻘوف ﻧوع ﻣﻣﺗﺎز اﺗوﻣﺎﺗﯾﻛﻲ ﻧظﺎﻣﯾن طﺎﻗﺔ ﺷﻣﺳﯾﺔ‬: ‫ﺑﺎﻟﻌدد‬
automatic, two systems solar energy and electricity systems, with the switch and ‫وﻛﮭرﺑﺎء ﻣﻊ اﻟﻣﻔﺗﺎح وﺟﻣٌﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﺗوﺻٌﯾل ﺣﺗﻰ ﻣﺄﺧذ اﻟﻛﮭرﺑﺎء وﺗﺷﻣل اﻟﻣواﺳﯾر‬
all supplies, and connection to the electrical outlet, including plastic pipes, which ‫واﻟﺑﻼﺳﺗﯾﻛﯾﺔ واﻟﺗﻲ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب واﻏطٌﯾﺗﮭﺎ وﺗﺛﺑٌﯾﺗﮭﺎ واﻟﻣﺳﺎﻣﯾر اﻟﻘﺎﻟووظ‬
‫واﻟﺗﺳﻠﯾك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ وﯾﺗم اﻋﺗﻣﺎد اﻟﻌﯾﻧﮫ ﻣن ﻗﺑل ادارة اﻟﻣﺷروع واﻟﺛﻣن‬ pcs
2.20 are placed before pouring, cans and their covers, and fixed with screws and 13.00
wires from the point to the distribution panel. The sample is approved by the .‫◌ٌ ﯾﺷﻣل ﻛل ﻣﺎ ٌﯾﻠزم ﻻﻧﮭﺎء اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾٌﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
project management, and the price includes everything. What is necessary to
complete the work according to the specifications and instructions of the
supervising engineer..
Socket 13 A: : A 13 ‫ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬
Supply and installation of a socket 13A with a switch, It shall be concealed ‫ ﯾرﻛب داﺧل اﻟﺣﺎﺋط‬،(‫ ﻣﻊ اﻟﻣﻔﺗﺎح )ﺳوﯾﺗش‬A 13 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﺄﺧذ ﻛﮭرﺑﺎء ﻗوة‬:‫ﺑﺎﻟﻌدد‬
inside the wall with all requirements of black PVC conduits which will be bent in _‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ‬PVC) ‫ﻣﻊ ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت ﻣن ﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾك اﻟﺳوداء‬ pcs
2.21 the bending points using spiral spring, wires and boxes. Screws are used for ‫ واﻟﺗوﺻﯾل ﺣﺗﻰ ﻟوﺣﺔ‬،‫ وأﺳﻼك وﻋﻠب ﻣﻊ اﻟﺗﺛﺑﯾت ﺑﺎﻟﻣﺳﺎﻣﺑر اﻟﻘﻼووظ‬،‫ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬ 14.00
‫ﻋدد‬
fixation. Item includes all connection to the distribution board according to .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗوزﯾﻊ‬
drawings and specifications , And the supervisor's instructions.
Main gate: :‫ﺑواﺑﺔ اﻟﺣدﯾد اﻟرﺋﯾﺳﯾﺔ‬
Per square meter: an iron gate for the main entrance to the school (iron pressed ‫ﺑواﺑﺔ ﺣدﯾدﯾﺔ ﻟﻠﻣدﺧل اﻟرﺋﯾﺳﻲ ﻟﻠﻣدرﺳﺔ ) ﺣدﯾد ﻛﺑس ﺻﺎج ﻣﺣﺑب وﻣﺑطن‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
from granulated and lined sheet, 3.5 meters wide and 3 meters high, with a 1 x 2 ‫ ﻣﺗر ﻣﺗﺣرك وﻣﺎ ﯾﻠزﻣﮭﺎ ﻣن‬2×1 ‫م ﻣﻊ ﻋﻣل ﻓﺗﺣﺔ ﺑﺎب‬3 ‫ وارﺗﻔﺎع‬3.5 ‫ﺑﻌرض‬
meter movable door opening and the necessary bases and columns. It includes ‫ﻗواﻋد واﻋﻣدة وﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻣن ﺗﺛﺑﯾت وﺗرﻛﯾب وأﻗﻔﺎل واﻟدھﺎن ﺑرﯾﻣر ﺛﻼﺛﮫ اوﺟﮫ‬ m2
2.22 all the necessary fixing, installation, locks, three-sided primer paint, and anti-rust ً ‫ طﺑﻘﺎ‬،‫واﻟدھﺎن ﺿد اﻟﺻدأ وﺑﺎﻟﻠون اﻟﻣطﻠوب طﻠﯾﺗﯾن ﻧﮭﺎﺋﺗﯾن ﻣﻊ ﺟﻣﯾﻊ ﻣﺷﺗﻣﻼﺗﮭﺎ‬ 10.00
2‫م‬
paint in the required color, two coats. Two finishes with all their components, in ‫ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
accordance with the drawings, specifications, and instructions of the supervising
engineer
12 line electrical distribution board: :‫ ﺧط‬12 ‫ﻟوﺣﺔ ﺗوزﯾﻊ ﻛﮭرﺑﺎﺋﯾﺔ‬
In number: Sub-distribution panel (single phase) Crabtree or its equivalent with ‫ ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ ﺗوزﯾﻊ ﻓرﻋﯾﺔ )طور اﺣﺎدي( ﻛراﺑﺗري أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ ﺑدوﻻب‬:‫ﺑﺎﻟﻌدد‬ pcs
2.23 a cupboard installed inside the wall with 12 lines, according to the drawings, ‫ طﺑﻘﺎ ً ﻣﻊ ﻋﻣل اﻟﺗﻣدﯾدات اﻟﻼزﻣﺔ وﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب‬،‫ ﺧط‬12 ‫ﺗرﻛب داﺧل اﻟﺣﺎﺋط‬ 1.00
‫ﻋدد‬
specifications, and instructions of the supervising engineer. .‫اﻟرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Total summation ‫اﻹﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة اﻟﺗﺄھﯾل ﻓﻲ ﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬
3 Restoration and rehabilitation of Bathrooms Hafsa Girls School. ‫ﺗرﻣﯾم و إﻋﺎدة ﺗﺄھﯾل ﻟﺣﻣﺎﻣﺎت ﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬

Oil matte paint: : ‫دھﺎن زﯾﺗﻲ‬


Oil matte paint for walls consists of a primer coat and three coats of the required ‫ دھﺎن زﯾﺗﻲ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻟﻠﺣواﺋط واﻟﺟدران ﻣﻛون ﻣن وﺟﮫ أﺳﺎس‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
‫وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت و اﻟﻌﻣل ﯾﺷﻣل ﻣﻌﺎﻟﺟﺔ‬ m2
3.1 color painted above 3 coats of putty and sanding and according to the drawings 10.00
and specifications, and the instructions of the supervisor ،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺗﻠﺑﯾس ﻓﻲ ﺣواف اﻟﻧواﻓد و ﻏﯾرھﺎ ﻣن اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺟدران‬ 2‫م‬
.‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
Emulsion painting for ceilings: : ‫دھﺎن أﻣﻠﺷن ﻟﻠﺳﻘوف‬
Water emulsion paint for ceilings consists of base layer and three coats of the ‫ دھﺎن أﻣﻠﺷن )ﻣﺎﺋﻲ( ﻟﻠﺳﻘوف ﻣﻛون ﻣن وﺟﮫ أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
،‫اﻟﻣطﻠوب ﻣﻊ اﻟﻣﻌﺟﻧﺔ واﻟﺻﻧﻔرة ﺛﻼث طﺑﻘﺎت ﺑﻌد اﻟﺗﻧﺿﯾف واﻟﻘﺷط وﺗرﻣﯾم اﻟﺗﻠﯾﯾس اﻟﺳﺎﺑﻖ‬ m2
3.2 required color , three layers of putty and sanding to be done before painting and 10.00
according to the drawings and specifications, and the instructions of the .‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬ 2‫م‬
supervisor.
Water- Resistant Plastic Paint: : ‫دھﺎن ﻣﺎﺋﻲ ﺑﻼﺳﺗﯾك ﻣﻘﺎوم ﻟﻠﻣﺎء‬
Water emulsion paint for exterior walls consists of base layer and three coats of ‫دھﺎن ﻣﺳﺗﺣﻠب ﻣﺎﺋﻲ ﻟﻠﺟدران اﻟﺧﺎرﺟﯾﺔ ﯾﺗﻛون ﻣن طﺑﻘﺔ أﺳﺎﺳﯾﺔ وﺛﻼث طﺑﻘﺎت ﻣن اﻟﻠون‬
the required color , the price includes all the work necessary to prepare the ‫ اﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻷﻋﻣﺎل اﻟﻼزﻣﺔ ﻟﺗﺟﮭﯾز اﻷﺳطﺢ ﻣن اﻟﺻﻧﻔرة واﻟﻣﻌﺟﻧﺔ و‬،‫اﻟﻣطﻠوب‬ m2
3.3 surfaces of sanding and kneading and all that is necessary. according to the ‫ ﺣﺳب‬.‫ﻣﻌﺎﻟﺟﺔ اﻟﻔﺗﺣﺎت ﻓﻲ اﻟﺗﻠﯾﯾس ﺑﺎﻻﺳﻣﻧت ﻗﺑل اﻟدھﺎن و اﻟﻣﻌﺟﻧﺔ وﻛل ﻣﺎ ﯾﻠزم‬ 10.00
2‫م‬
drawings and specifications, and the instructions of the supervisor. . ‫اﻟﻣﺧططﺎت واﻟﻣواﺻﻔﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﺷرف‬

Aluminum windows: : ‫ﻧواﻓذ اﻟوﻣﻧﯾوم‬


Bronze aluminum windows , excellent quality are installed. Frame section be at ‫ ﺗورﯾد و ﺗرﻛﯾب ﻧواﻓذ اﻟوﻣﻧﯾوم و درﻓﺎت ﻟﻠﻧواﻓذ اﻟﻣﻔﻘودة ﺑروﻧزي ﻧوﻋﯾﺔ‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
least 4 x 8 cm , thickness shall not be less than 1.2 mm. Special rubber shall be ‫ ﺳم وﺳﻣك اﻷﻟﻣﻧﯾوم ﻻ ﯾﻘل ﻋن‬8×4‫ﻣﻣﺗﺎزة وﯾﻛون اﻟﺣﻠﻖ ﻗطﺎع اﻟﻣوﻧﯾوم ﻻ ﯾﻘل ﻋن‬
used for sealing and preventing leakage of air or water. All fittings like hinges ‫ﻣم وﯾﺳﺗﺧدم ﻣطﺎط ﺧﺎص ﻹﺣﻛﺎم اﻟﻐﻠﻖ وﻣﻧﻊ ﺗﺳرب اﻟﮭواء او اﻟﻣﺎء وﺟﻣﯾﻊ‬1.2
and locks be original types. Knobs are laxis, glass 6mm white or opaque ‫اﻟﺧردوات ﻣن ﻣﻔﺻﻼت وﻣﻐﺎﻟﻖ ﺗﻛون اﺻﻠﯾﺔ اﻟﻧوع وﻣﻘﺎﺑض ﻻﻛﺳﯾس وزﺟﺎج أﺑﯾض‬ m2
3.5 2.00
(according to locations specified in drawings) openable-shutters are provided (‫ ﻣم ﻣﻊ وزﺟﺎج ﻣﺛﻠﺞ او ﻣﺷﺟر ﻣﺎﻧﻊ ﻟﻠرؤﯾﺔ )ﻓﻲ اﻟﻣواﺿﻊ اﻟﻣﺣددة ﻓﻲ اﻟرﺳوﻣﺎت‬6 ‫ﺑﺳﻣك‬ 2‫م‬
with insect-resistant nets. All sides of frames are fixed with at least two rivets, ‫وﻋﻣل ﺷﺑك اﻟﻧﺎﻣس اﻟﻣﺎﻧﻊ ﻟﻠﺣﺷرات ﻟﻠدرﻓﺎت اﻟﻘﺎﺑﻠﺔ ﻟﻠﻔﺗﺢ وﺗﺛﺑﯾت اﻟﺣﻠوق ﻣن ﺟﻣﯾﻊ‬
with all fittings, according Specifications, and instructions of the supervisor ‫ ﻣﻊ ﺟﻣﯾﻊ‬،‫ وﺗﺛﺑﯾت اﻟزﺟﺎج ﺑﺎﻟرﺑﻼت اﻟﺧﺎﺻﺔ‬،‫اﻟﺟواﻧب اﺛﻧﯾن ﺗﺛﺑﯾﺗﺎت ﻋﻠﻰ اﻷﻗل‬
engineer (Samples needed to be provided). ‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس‬،‫)اﻟﻘﯾﺎس ﻣن اﻷﺑﻌﺎد اﻟداﺧﻠﯾﺔ( طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫اﻟﺧردوات‬
.(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬.‫اﻟﻣﺷرف‬
Maintenance of aluminum windows: Maintenance of aluminum windows. The ‫ ﺻﯾﺎﻧﺔ ﺷﺑﺎﺑﯾك اﻟﻣﻧﯾوم و اﻟﻌﻣل ﯾﺷﻣل ﺗﺛﺑﯾت اﻟﻧواﻓذ وﻋﻣل رﺑﻼت‬: ‫ﺻﯾﺎﻧﺔ ﺷﺑﺎﺑﯾك اﻟﻣﻧﯾوم‬
work includes installing the windows, making shutters, ensuring that the ‫و‬. ‫و ﺿﻣﺎن ﻏﻠﻖ و ﻓﺗﺢ اﻟﻧواﻓذ ﺑﺳﮭوﻟﺔ و ﺗورﯾد و ﺗرﻛﯾب ﺷﺑك اﻟﻧﺎﻣس وﺗﻧظﯾف اﻟﻧواﻓذ‬
windows close and open easily, supplying and installing awnings, and cleaning ‫ ﯾﺗﺿﻣن‬.‫ﻛل ﻣﺎ ﯾﻠزم ﻻﻧﮭﺎء اﻟﺑﻧد ﺑﺣﺳب ﺗوﺟﯾﮭﺎت ﻣﮭﻧدس اﻟﻣﺷرف‬ m2
3.6 the windows. And everything necessary to complete the item according to the 2.20
2‫م‬
directives of the supervising engineer.
Windows protection steel mesh : ‫ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬
Supply and installation of protective grid steel mesh for windows 12 mm / 15 ‫ﻣم وﺑﻌرض ﻻ ﯾزﯾد ﻋن‬15/‫ﻣم‬12‫ ﺗورﯾد وﺗﻧﻔﯾذ ﺷﺑك ﺣﻣﺎﯾﺔ ﻟﻠﻧواﻓذ ﻣﺻﺑﻌﺎت‬-:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
mm and no more than 12 cm width between main vertical rods and 15 cm ‫"ھﻧش‬2 ‫ ﺳم ﺑﯾن اﻟﻌوارض اﻷﻓﻘﯾﺔ وﺷﻠﻣﺎﻧﺎت داﺋرﯾﺔ‬15 ‫ﺳم ﺑﯾن اﻟﻘواﺋم اﻟرﺋﯾﺳﯾﺔ وﻋن‬12
‫ (ﺳم ﻟﺣﻣﺎﯾﺔ‬2.50×2.50) ‫ وﺷﺑك دﯾﻣن‬, ‫واﻟﺗﺛﺑﯾت ﺑواﺳطﺔ اﻟﻠﺣﺎم ﻣن ﺟﻣﯾﻊ اﻟﺟواﻧب‬ m2
3.7 between horizontal rods and circular planks 2 " . It will be fixed by welding from 3.00
all sides. Deman mesh (2.50 x 2.50) cm is installed to protect window glass and ‫اﻟزﺟﺎج ﻣن اﻟﻛﺳر واﻟﻘﻣرﯾﺎت وﯾﺷﻣل اﻟرﻧﺞ وﺟﮭﯾن ﺑراﯾﻣر أﺳﺎس وﺛﻼﺛﺔ أوﺟﮫ ﺑﺎﻟﻠون‬ 2‫م‬
yemeni decoration glass ( Gamaria) . The item includes two coats of primer ‫اﻟﻣطﻠوب ﻣﻊ اﻟﺻﻧﻔرة وﺟﻠﺦ اﻟزواﺋد واﻟﺗﻧﻌﯾم وﻛل ﻣﺎ ﯾﻠزم وﺑﺣﺳب ﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬
base and three coats of the desired color with sanding, abrasion, smoothing, .‫اﻟﻣﺷرف‬
and all necessary, according to the instructions of the supervisor.
Steel Doors: .(.‫ ) وﯾﻠزم ﺗﻘدﯾم ﻋﯾﻧﮫ ﻹﻋﺗﻣﺎدھﺎ‬: ‫أﺑواب ﺣدﯾد رص‬
Galvanized iron doors, shutter is made of steel tubes - rectangular section (1” × ‫ ﺗورﯾد و ﺗرﻛﯾب أﺑواب ﺣدﯾد رص ﻣﺟﻠﻔن ﻣﻊ ﻋﻣل اﻟدرﻓﮫ ﻣن اﻟﺣدﯾد‬:‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
2”) , Thickness 1.3 mm, Steel panels are placed together in excellent technical ‫ﻣﻠم ﯾرص ﺑﺻورة ﻓﻧﯾﺔ ﻣﻣﺗﺎزة ﻣﻊ ﻋﻣل ﺷﻠﻣﺎن‬1.3 ‫ھﻧش ( ﺳﻣك‬2 × ‫ھﻧش‬1) ‫اﻟﻣراﺑﯾﻊ‬
form . Steel angle beam 2” to be welded along the perimeter of the entire door . 2 ‫ﺳم وﺳﻣك‬20 ‫واﻟﺣﻠﻖ ﻋرﯾض رص ﻻﯾﻘل ﻋن‬, ‫"ﻋﻠﻰ ﻣﺣﯾط ﻓردة اﻟﺑﺎب ﺑﺎﻟﻛﺎﻣل‬2 ‫دﺋري‬
Door frame (rectangular section panels )width is not less than 20 cm and ‫ﻣم ﻣﻊ ﻋﻣل ﺛﻼت ﻣﻔﺻﻼت وﯾﺷﻣل‬ m2
3.8 thickness 2 mm with three hinges. The item price Includes the anti-rust paint ‫ا ﻟدھﺎن اﻟﻣﺎﻧﻊ ﻟﻠﺻداء ﺑﻌد اﻟﺻﻧﻔرة واﻟﺟﻠﺦ اﻟﺟﯾد ﻻﺛﺎر اﻟﻠﺣﺎم ﻣﻊ ﻋﻣل وﺟﮭﯾن اﺧرﯾن ﻣن‬ 4.40
2‫م‬
after sanding and well abrasion, two coats of oil paint for door and locks. ‫اﻟدھﺎن اﻟزﯾﺗﻲ ﻟﻠﺑﺎب واﻟﻣﻐﺎﻟﻖ وﻋﻠﻰ ان ﯾﺗم ﺗﻧﻔﯾذ اﻟﺣﻠوق ﻗﺑل اﻋﻣﺎل اﻟﺗﻼﺑﯾس وﺗﺛﺑﯾث‬
Frames are installed before plastering, they have to be fixed to walls by three 16 ‫اﻟﺣﻠوق ﺑﺎﻟﺟدران ﺑﻌدد ﺛﻼث ﻧﻘﺎط ﻣن ﻛل ﺟﺎﻧب ﻋﻠﻰ اﻻﻗل ﺑﺧواﺑﯾر ﻣن اﻟﺣدﯾد ﻗطر‬
points of each side at least using steel dowels 16 mm diameter and 20 cm long, .‫ﺳم ﺗوﺿﻊ داﺧل اﻟﺣﺟر وﺗﻠﺣم وﻓﻖ ﺗوﺟﯾﮭﺎت وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬20 ‫ﻣﻠم وطول‬
planted in wall and welded In accordance with the instructions of the supervisor
engineer.
Maintenance of iron doors ‫ﺻﯾﺎﻧﺔ اﻻﺑواب اﻟﺣدﯾدﯾﺔ‬
In square meters: Maintaining and inspecting the school’s iron doors according ‫ ﺻﯾﺎﻧﺔ وﻣﻔﺎﻗدة اﻻﺑواب اﻟﺣدﯾدﯾﺔ ﻟﻠﻣدرﺳﺔ ﺑﺎﻷﺑﻌﺎد ﺑﺣﺳب اﻟﻛﻣﯾﺎت م وذﻟك‬: ‫ﺑﺎﻟﻣﺗر اﻟﻣرﺑﻊ‬
to the dimensions according to the quantities, by doing the following: - -: ‫ﺑﻌﻣل اﻵﺗﻲ‬
- Cutting the damaged iron, replacing the removed parts of the gates and others ‫ ﻗطﻊ اﻟﺣدﯾد اﻟﺗﺎﻟف واﺳﺗﺑدال اﻟﻘطﻊ اﻟﻣﺧﻠوﻋﺔ ﻣن ﻣراﺑﯾﻊ وﻏﯾرھﺎ ﻓﻲ ﺟﺳم اﻟﺑﺎب وﺳﻣﻛرة‬-
in the door body, and plumbing the other parts by repairing or replacing them. . ‫اﻷﺟزاء اﻻﺧرى ﺑﺈﺻﻼﺣﮭﺎ أو إﺳﺗﺑداﻟﮭﺎ‬
- Replacing damaged bolts and hinges with others, making three hinges on ‫ اﺳﺗﺑدال اﻟﻣﻐﺎﻟﻖ واﻟﻣﻔﺻﻼت اﻟﺗﺎﻟﻔﮫ ﺑﺄﺧري وﻋﻣل ﺛﻼث ﻣﻔﺻﻼت ﻓﻲ ﻛل ﺟﺎﻧب وﻣﺎ‬- m2
3.9 each side and what is needed for them, and supplying an excellent quality lock. .‫ﯾﻠزﻣﮭﻣﺎ وﺗورﯾد ﻗﻔل ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة‬ 6.00
2‫م‬
- Adjusting the weight and other necessary maintenance work to ensure that the ‫ﺿﺑط اﻟوزﻧﯾﺔ وﻏﯾر ذﻟك ﻣن اﻋﻣﺎل اﻟﺻﯾﺎﻧﺔ اﻟﻼزﻣﮫ ﻟﺿﻣﺎن اﻋﺎدة ﺗﺷﻐﯾل اﻟﺑواﺑﺔ ﺑﺎﻟﺷﻛل‬-
gate is restarted as required. The contractor must visit the site before submitting ‫ وﻋﻠﻲ اﻟﻣﻘﺎول زﯾﺎرة اﻟﻣوﻗﻊ ﻗﺑل ﺗﻘدﯾم ﻋرض اﻟﺳﻌر‬، ‫اﻟﻣطﻠوب‬
the price offer. ‫ﯾﺷﻣل اﻟﺑﻧد ﺻﻧﻔرة و اإﻋﺎدة دھﺎن ﻛل ﻣﺎﯾﻠزم ﺑﺣﺳب اﺻول اﻟﻌﻣل اﻟﻣﺗﻌﺎرف ﻋﻠﯾﮭﺎ وﺗﻌﻠﯾﻣﺎت‬
The item includes everything necessary according to generally accepted work .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
principles and the instructions of the supervising engineer
Maintenance &treatment roof of the bathroom ‫ﻣﻌﺎﻟﺟﺔ ﺳﻘف اﻟﺣﻣﺎم‬
maintenance &treatment roof of the bathroom , and the work includes the lower ‫ﻣﻌﺎﻟﺟﺔ ﺳﻘف اﻟﺣﻣﺎم و اﻟﻌﻣل ﯾﺷﻣل اﻟطﺑﻘﺔ اﻟﺳﻔﻠﯾﺔ و اﻟﻌﻠوﯾﺔ )اﻟﻛﻔر اﻟﺳﻔﻠﻲ و اﻟﻌﻠوي‬
and upper layer (the lower and upper layer of the surface concrete), scraping ‫ﻟﺧرﺳﺎﻧﺔ اﻟﺳطﺢ(ﻗﺷط اﻟطﺑﻘﺔ اﻟﺗﺎﻟﻔﺔ و اﻟﺿﻌﯾﻔﺔ و ﺟﻠﺦ اﻟﺣدﯾد و إﺿﺎﻓﺔ ﺣدﯾد ﺑﻧﺎء ﻋﻠﻰ ﻛﻣﯾﺔ‬
the worn out and weak layer, grinding the iron, adding construction iron if ‫اﻟﺿرر اذا ﻟزم اﻻﻣر و طﻼء اﻟﺣدﯾد ﺑﻣﺎدة اﻟﺑرﯾﻣر ﺿد اﻟﺻداء و اﻟﺻب و ﻛل ﻣﺎ ﯾﻠزم‬
lum.
3.10 necessary, coating the iron with a material, spattering, pouring, applying an .‫ﻻﻧﮭﺎء اﻟﺑﻧد ﺑﺣﺳب ﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 1.00
Sum
insulating material to the surface of the tank, and everything else. It is necessary
to complete the item according to the instructions of the supervising engineer.

Completed Arabic toilet: :‫ﻣرﺣﺎض ﻋرﺑﻲ ﻣﺗﻛﺎﻣل‬


Supply, install, and operate completed Arabic toilet include elbow, Arabic ‫ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل ﻣرﺣﺎض ﻋرﺑﻲ ﻣﺗﻛﺎﻣل ﻣﻊ اﻟﻛوع وﺳﯾﻔون ﻋرﺑﻲ وﻣﺷن ارﺿﻲ‬
siphon, floor drains, include sewage connection by plastic pipes dim=6" (0.5 of ‫ ھﻧش )ﻧﺻف ﺿﻐط(ﻣﻊ‬6 ‫ﻣﻊ ﺗﻣدﯾدات اﻟﺻرف اﻟﺻﺣﻲ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
total pressure) with ventlation pipe/bathroom , and the work include water feeds ‫اﻧﺑوب ﺗﮭوﯾﺔ ﻟﻛل ﺣﻣﺎم وﻛذﻟك اﻟﻌﻣل ﯾﺷﻣل ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟداﺧﻠﯾﺔ ﺑﻣواﺳﯾر ﺑﻼﺳﺗﯾك ﻗطر‬
by plastic pipes diameter 0.5" with heavy steel faucet, valves, ... etc. and all ‫ھﻧش وﻣﻊ ﺗرﻛﯾب ﺣﻧﻔﻲ اﻟﻧﯾﻛل ﻛروم ﺛﻘﯾل وﻣﺣﺎﺑس ﻣﻊ ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﻣن ﻗطﻊ‬0.5 pcs
3.11 fittings, all items must be excellent quality and approved, the work must be ‫ووﺻﻼت وﻣﺣﺎﺑس وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل‬ 4.00
‫ﻋدد‬
carried out professionally and the price includes everything necessary to .‫ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
implement the item, and the work must be done according to the specifications,
drawings, and the directives of the supervising engineer.
Wash Basin: -: ‫ﻣﻐﺳﻠﺔ وﺟﮫ‬
In number: Supply and installation of a countertop sink with dimensions of 40 * ‫ ﺳم ﺑﺎﻟون اﻟﻣطﻠوب ﻣﻊ اﻟﻌﻣود ﻣﻊ‬60 * 40 ‫ ﺗورﯾد وﺗرﻛﯾب ﻣﻐﺳﻠﺔ وﺟﮫ ذو أﺑﻌﺎد‬: ‫ﺑﺎﻟﻌدد‬
60 cm, with the required balloon, column and faucets measuring 0.5 inches, ‫ ھﻧش ﯾرﻛب وﯾﺛﺑت ﻋﻠﻰ ﻣواﺳﯾر ﻣﻊ ﺟﻣﯾﻊ ﺗوﺻﯾﻼت اﻟﻣﺎء ﻣن‬0.5 ‫اﻟﺣﻧﻔﯾﺎت ذو ﻣﻘﺎس‬
‫ واﻟﺗﺻرﯾف ﺣﺗﻰ اﻟﻣﺷن اﻷرﺿﻲ ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟﻣﻘﺎﯾﯾس‬، ‫اﻟﺟدار اﻟﺧﺎرﺟﻲ‬ pcs
3.12 installed and fixed on pipes with all water connections from the external wall, 2.00
and draining to the ground basin according to the specifications, standards and ‫وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
instructions of the supervising engineer.

Water plastic tank with exterior feeding extensions: :‫ﺧزاﻧﺎت ﻣﯾﺎه ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣﻊ ﺗﻣدﯾدات اﻟﺗﻐذﯾﺔ اﻟﺧﺎرﺟﯾﺔ‬
Supply and install water plastic tank 3 layers (approved type) on roof capacity ‫ ﻟﺗر ﻣﻊ‬2000 ‫ﺗورﯾد وﺗرﻛﯾب ﺧزان ﺑﻼﺳﺗﯾك ﺛﻼث طﺑﻘﺎت )ﻋﯾﻧﺔ ﻣﻌﺗﻣدة( ﻓﻲ اﻟﺳطﺢ ﺳﻌﺔ‬
2000 Liters, include cement foundation under the tank thickness 15cm and ‫ﺳم( و ﻓﺗﺣﺎت ﻓﻲ اﻟذروة ﻟﻣرور اﻟﺗﻣدﯾدات‬15) ‫ﻋﻣل ﻗﺎﻋدة اﺳﻣﻧﺗﯾﺔ ﺗﺣت اﻟﺧزان ﺑﺳﻣﺎﻛﺔ‬
vents in the walls of peak for water extensions, work include float ball, valves, ‫ھﻧش ﻣن‬0.5 ‫واﻟﻌﻣل ﯾﺷﻣل ﺗورﯾد ﺗرﻛﯾب ﻋواﻣﺔ وﻣﺣﺑس وﻣواﺳﯾر ﺗﻐذﯾﺔ ﺑﻼﺳﺗﯾك ﻗطر‬
plastic pipes dim=0.5" from the tank to bathrooms and hand washing basins ‫اﻟﺧزان اﻟﻰ اﻟﺣﻣﺎﻣﺎت واﻟﻣﻐﺎﺳل ﻣﻊ ﺗﺛﺑﯾﺗﮭﺎ ﺑﻛﻠﯾﺑﺎت اﺻﻠﯾﺔ ﻓﻲ اﻟﺟدران وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد‬
‫اﺻﻠﯾﺔ ﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ pcs
3.13 with support in walls by steel clips, all items must be excellent quality and 1.00
approved, the work must be carried out professionally and the price includes .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
everything necessary to implement the item, and the work must be done
according to the specifications, drawings, and the directives of the supervising
engineer.

sewage inspection rooms: : ‫ﻏﺮف ﺗﻔﺘ ﺶ ﻟﻠ ف اﻟﺼ‬


supply and implement sewage inspection rooms size net 0.6*0.6*0.6m by automatic ‫ﻣ وذﻟﻚ ﺑﻮاﺳﻄﺔ‬0.6*0.6*0.6 ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻏﺮف ﺗﻔﺘ ﺶ ﻟﻠ ف اﻟﺼ ﻣﻘﺎس ﺻﺎ‬
solid bricks size 40*20*20cm, work include excavation and implement crushed stones ‫ﺳﻢ واﻟﻌﻤﻞ ﺸﻤﻞ اﻟﺤﻔﺮ وﻋﻤﻞ ﻃ ﻘﻪ ﻛ ﺣﺠﺮ ﻣﻊ‬20*20*40 ‫ﻠﻚ ﺻﻢ ﺗﻤﺎﺗ ﻚ ﻣﻘﺎس‬
with concrete under the inspection room and exterior and interior plaster by cement ‫ﺧﺮﺳﺎﻧﺔ ﻋﺎد ﺔ ﺗﺤﺖ ﻏﺮﻓﺔ اﻟﺘﻔﺘ ﺶ ﺛﻢ ﻳﺘﻢ ﺑﻨﺎء اﻟﺠﺪران وﺗﻠﺒ ﺲ اﻟﻐﺮﻓﺔ ﻣﻦ اﻟﺪاﺧﻞ‬
mortar with Sika include supply and implement concrete lid thickness 10cm by cement ‫ واﻟﻌﻤﻞ ﺸﻤﻞ ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻏﻄﺎء ﺧﺮﺳﺎ‬،‫واﻟﺨﺎرج ﺎﻟﻤﻮﻧﺔ اﻻﺳﻤﻨ ﺔ ﻣﻊ ﻣﺎدة اﻟﺴ ﺎ‬
mortar mixture of Portland cement and Sana'a crushed sand or equivalent sand from ‫ﺳﻢ و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ ﻌﺪ ان ﻳﺘﻢ ﺿ ﻂ ﻣﻴﻮل ﻣﻮاﺳ اﻟ ف اﻟﺼ وذﻟﻚ‬10 ‫ﺳﻤﺎ ﺔ‬ pcs
3.14 4.00
nearest area mixing (1:3) and spraying by water for 7days, the work must be carried out ‫ﻋدد ﺎﺳﺘﺨﺪام أﺳﻤﻨﺖ ﺑﻮرﺗﻼﻧﺪي ورﻣﻞ ﻛﺴﺎرە ﺻﻨﻌﺎ او ﻣﺎ ﺎﻓﺌﻪ ﻣﻦ اﻗﺮب ﻣﻨﻄﻘﺔ و ﺴﺘﺨﺪم‬
professionally and the price includes everything necessary to implement the item, and ‫( ﻣﻊ اﻟﺮش و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ اﻟﺒﻨﺪ‬3:1) ‫ﺑ ﺴ ﺔ ﺧﻠﻂ‬
the work must be done according to the specifications, drawings, and the directives of .‫و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
the supervising engineer.

Rehabilitation of exchange pipes for the external and internal streams of ‫إﻋﺎدة ﺗﺎھﯾل ﻣواﺳﯾر ﺻرف اﻟﻣﺟﺎري اﻟﺧﺎرﺟﯾﺔ واﻟداﺧﻠﯾﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﻣﺿﻐوط واﻟﻣﻘوى‬
compressed plastic and strengthening daimeter 6 "and 4" and 2 "and all sizes ‫" وﻛل اﻻﺣﺟﺎم ﺑﺣﺳب اﻟرﺳوﻣﺎت ﺗﺣت وﻓوق اﻷرض واﻟﺛﻣن ﯾﺷﻣل اﻟﺣﻔر‬2‫" و‬4‫"ًو‬6‫ﻗطر‬
according to the drawings under the ground and the price include drilling, ‫ﺳم ﺣول اﻟﻣﺎﺳوره واﻟﻣﯾول‬40×40 ‫واﻟردم واﻟﻔرش ﺑﺎﻟﮭﻠﺳن وﺣزام ﻣن اﻟﺧرﺳﺎﻧﺔ اﻟﻌﺎدﯾﺔ‬
Lum
3.15 backfilling and brushes in the tongue and a belt of regular concrete 40 x 40 cm .‫واﻟﻘطﻊ اﻟﻸزﻣﮫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت‬ 1.00
Sum
around the pipe, tendencies, and the crisis pieces according to the graphics
Rehabilitation of the cesspool: Rehabilitation of the cesspool, which includes ‫ إﻋﺎدة ﺗﺄھﯾل اﻟﺑﯾﺎرة و اﻟﺗﻲ ﺗﺗﺿﻣن ﺗﻧﺿﯾف اﻟﻣﺧﻠﻔﺎت و اﻻﺗرﺑﺔ‬: ‫إﻋﺎدة ﺗﺄھﯾل اﻟﺑﯾﺎرة‬
cleaning out the waste and dust above and inside the cesspool, making two ‫ ﻋﻣل ﺻﻔﺗﯾن ﻣن اﻟﺑﻠوك و اﻟﺗﻠﺑﯾس ﺣول اﻟﺑﯾﺎرة ﻟﻠﺣﻣﺎﯾﺔ و ﻋﻣل ﻛل ﻣﺎ‬,‫ﻓوق و داﺧل اﻟﺑﯾﺎرة‬
layers of blocks and plastering around the cesspool for protection, and doing ‫ﯾﻠزم ﻟﺿﻣﺎن ﻋدم دﺧول ﻣﯾﺎة اﻻﻣطﺎر اﻟﻰ اﻟﺑﯾﺎرة و اﻟﻌﻣل ﯾﺷﻣل ﺗﻐطﯾﺔ ﻓﺗﺣﺎت اﻟﺑﯾﺎرة ﻣن‬
everything necessary to ensure that rainwater does not enter the cesspool. The . ‫اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ و ﻋﻣل اﻏطﯾﺔ ﺧرﺳﺎﻧﯾﺔ و ﻋﻣل ھواﯾﺔ ﻟﻠﺑﯾﺎرة‬ Lum
3.16 work includes covering the cesspool openings with reinforced concrete and 1.00
Sum
Making concrete covers and making a hobby for the yard.

Supply and installation of standard lighting unit: : ‫ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬
Supply and installation of a normal lighting units, with switches including black ‫ ﻣﻊ اﻟﻣﻔﺗﺎح وﺗﺷﻣل اﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ‬،‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﻋﺎدﯾﺔ‬:‫ﺑﺎﻟﻌدد‬
plastic conduits (PVC) which can be bent ( at bending points) using spiral ‫ واﻟﺗﻲ ﺗوﺿﻊ ﻗﺑل اﻟﺻب؛‬،‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام اﻻﺳﺑرﻧﺞ‬PVC) ‫اﻟﺳوداء‬
spring ,these pipes have to be installed before casting. The item includes boxes ،‫ واﻷﺳﻼك ﻣن اﻟﻧﻘطﺔ إﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬،‫واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ‬
.‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬ pcs
3.17 and their covers, screws, and wires from the point to the distribution board, 6.00
according to the drawings and specifications, and the instructions of the ‫ﻋدد‬
supervisor.

Supply and installation of a regular outdoor lighting unit with a semi-oval : ‫"ﺗورﯾد وﺗرﻛﯾب وﺣدة إﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي‬
cover: ‫ ﺗورﯾد وﺗرﻛﯾب وﺣدة إ ﺿﺎءة ﺧﺎرﺟﯾﺔ ﻋﺎدﯾﺔ ﻣﻊ ﻏطﺎء ﻧﺻف ﺑﯾﺿﺎوي وﺗﺷﻣل‬:‫ﺑﺎﻟﻌدد‬
In numbers: Supply and installation of a regular external lighting unit with a semi- ‫( وﺗﺛﻧﻰ _ﻓﻲ ﻣﻧﺎطﻖ اﻟﺛﻧﻲ_ ﺑﺎﺳﺗﺧدام‬PVC) ‫اﻟﻣﻔﺗﺎح واﻟﻣواﺳﯾر اﻟﺑﻼﺳﺗﯾﻛﯾﺔ اﻟﺳوداء‬
oval cover, including the switch and black plastic pipes (PVC). It is bent - in the ‫ واﻟﺗﻰ ﺗوﺿﻊ ﻗﺑل اﻟﺻب واﻟﻌﻠب وأﻏطﯾﺗﮭﺎ وﺗﺛﺑﯾﺗﮭﺎ ﺑﺎﻟﻣﺳﺎﻣﯾر اﻟﻘﻼووظ واﻻﺳﻼك‬،‫اﻻﺳﺑرﻧﺞ‬
.‫ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬،‫ طﺑﻘﺎ ً ﻟﻠرﺳوﻣﺎت واﻟﻣواﺻﻔﺎت‬،‫ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزﯾﻊ‬ pcs
3.18 bending areas - using spring, which is placed before pouring. The cans and their 2.00
covers are fixed with screws and wires from the point to the distribution panel, ‫ﻋدد‬
according to the drawings, specifications, and the engineer’s instructions. Admin.

Wall Sockets 13 amps: : ‫ أﻣﺑ ٌر‬13 ‫ﻣﺄﺧذ ﻛﮭرﺑﺎء‬


Supply and installation of electrical power 13 amp socket mounted inside the ‫ أﻣﺑٌر رﻛب داﺧل اﻟﺣﺎﺋط ﻣﻊ ﺟﻣٌﻊ اﻟﻣﺳﺗﻠزﻣﺎت ﻣن اﻧﺎﺑٌب‬13 ‫ ﻣوﺟب ﻛﮭرﺑﺎء ﻗوة‬: ‫ﺑﺎﻟﻌدد‬
wall with all the requirements of PVC pipe , wire and cans with screw nails The ‫ ) وﯾﺗم وﺿﻌﮭﺎ ﻗﺑل اﻟﺻب واﻟﻌﻠب وﻏطٌﺗﮭﺎ‬PVC(‫ وﺗﺷﻣل اﻟﻣواﺳٌر اﻟﺑﺎﻟﺳﺗ ٌﻛٌﺔ‬, PVC pcs
3.19 price includes do all the necessary to finish this works according to the ‫زﺛﺑٌﺗﮭﺎ ﺑﺎﻟﺳﺎﻣٌر اﻟﻘﺎﻟووظ واﻟﺳﺎﻟك ﻣن اﻟﻧﻘطﺔ اﻟﻰ ﻟوﺣﺔ اﻟﺗوزٌ ﻋواﻟﺛﻣن ٌ ﺗﺷﻣل ﻛل ﻣﺎ ٌﻟزم اﻟﻧﮭﺎء‬ 2.00
‫ﻋدد‬
engineering specifications and engineer instructions .. ..‫اﻟﻌﻣل ﺣﺳب اﻟﻣواﺻﻔﺎت وﺗﻌﻠ ٌﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Total summation ‫اﻹﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل إﻋﺎدة ﺗﺄھﯾل و إﻋﺎدة ﺗرﻣﯾم اﻟﺣﻣﺎﻣﺎت ﻓﻲ ﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬
‫أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه ارﺿﻲ ﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬
4
Construction work on a Underground water tank at Hafsa Girls School
Site Works : : ‫اﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬
Notes : -:‫ﻣﻼﺣظﺎت‬
1. The contractor shall visit the site before elaboration of the tender and study all ‫ﻋﻠﻰ اﻟﻣﻘﺎول اﻟﻣﺗﻘدم ﻓﻲ اﻟﻌطﺎء زﯾﺎرة ﻣوﻗﻊ اﻟﻣﻧﺷﺄة ﻗﺑل اﻟﺑدء ﻓﻲ دراﺳﺔ اﻟﻌطﺎء ودراﺳﺔ‬
circumstances that surround the site, especially eventually existing slopes at the ‫ﺟﻣﯾﻊ اﻟظروف اﻟﻣﺣﯾطﺔ ﺑﺎﻟﻣﻧﺷﺄة واﻟﻣؤﺛرة ﻋﻠﻰ اﻷﻋﻣﺎل ﻣﺛل طرﯾﻖ إﯾﺻﺎل اﻟﻣواد اﻟﻼزﻣﺔ‬
site. . ‫ﻟﻺﻧﺷﺎء و دراﺳﺔ طرﯾﻘﺔ ووﺳﯾﻠﺔ ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ اﻟﻌﺎم وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ‬
2. During the excavation and in the case of being unable to reach the depth ‫ﻋﻧد اﻟﺣﻔر ﻓﻲ ﺣﺎﻟﺔ ﻋدم اﻟﻘدرة ﻟﻠوﺻول اﻟﻰ اﻟﻌﻣﻖ اﻟﺗﺻﻣﯾﻣﻲ ﺑﺎﻟرﺳوﻣﺎت ﻧﺗﯾﺟﺔ ﻟوﺟود‬
mentioned in the drawings and/or finding the soil bearing capacity (structural ‫أرض ﺻﺧرﯾﺔ أو ﻛﺎﻧت ﻣﻘﺎوﻣﺔ اﻟﺗرﺑﺔ أﻗل ﻣن اﻟﻣﻘﺎوﻣﺔ اﻟﺗﺻﻣﯾﻣﯾﺔ ﻓﻌﻠﻰ اﻟﻣﻘﺎول اﻷﺗﺻﺎل‬
drawing) in this depth less than the required, the contractor shall contact the ‫ﺑﺎدارة اﻟﻣﺷروع ﻗﺑل اﻟﺑدء ﻓﻲ أﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت ﻟﺗﺷﻛﯾل ﻟﺟﻧﺔ ﻟﻠدراﺳﺔ وﺗﺣدﯾد اﻟﺣﻠول‬
project management. .‫اﻟﻣﻧﺎﺳﺑﺔ وإﻋﺗﻣﺎدھﺎ ﻣن ادارة اﻟﻣﺷروع وﯾﺗﺣﻣل اﻟﻣﻘﺎول ﻛﺎﻣل اﻟﻣﺳﺋوﻟﯾﺔ ﻓﻲ ﺣﺎﻟﺔ اﻟﻣﺧﺎﻟﻔﮫ‬

4.1.1 Site leveling: :‫ﺗﺳوﯾﺔ اﻟﻣوﻗﻊ‬


implement leveling for site dim=(3*3*depth 2.8m) in site this include remove for ‫ ﻣﺗر( ﻓﻲ اﻟﻣوﻗﻊ ﻣﻊ‬2.8 ‫*ﻋﻣﻖ‬3*3) ‫ﺗﻧﻔﯾذ ﺗﺳوﯾﺔ ﺳطﺣﯾﺔ ﻟﻣوﻗﻊ اﻟﺧزان ﺑﺎﻻﺑﻌﺎد اﻟﺻﺎﻓﻲ‬
trees, soil, stones, ..etc. from the site giving well level, the price includes ‫ واﻟﺳﻌر‬،‫اﻟﺦ ﻣن اﻟﻣوﻗﻊ ﺑﺣﯾث ﯾﺻﺑﺢ اﻟﻣوﻗﻊ ﻣﺳﺗوي‬...‫ازاﻟﺔ اﻟﺣﺷﺎﺋش واﻟﺗرﺑﺔ واﻻﺣﺟﺎر و‬
everything necessary to implement the item with the disposal of the resulting ‫ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر‬
materials to a suitable place with no harm or affect agricultural lands, water ‫ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر‬ m2
20.00
streams and private property, the work must be carried out professionally and ‫ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬ 2‫م‬
the price includes everything necessary to implement the item, and the work .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
must be done according to the specifications, drawings, and the directives of the
supervising engineer.
4.1.2 Soil excavations: :‫اﻟﺣﻔر اﻟﺗراﺑﻲ‬
Implement soil excavation dim=(4*4*depth 3.2 m) in ground this include stones ‫ﻣﺗر( ﻓﻲ اﻻرض وﯾﺷﻣل اي اﺣﺟﺎر‬3.2 ‫*ﻋﻣﻖ‬4*4) ‫ﺗﻧﻔﯾذ ﺣﻔر ﺗراﺑﻲ ﻟﻠﺧزان ﺑﺎﻻﺑﻌﺎد‬
mixed with soil reaching valid rock for foundation (rock layer near ground ‫ﻣﺧﺗﻠطﺔ ﺿﻣن اﻟﺗرﺑﺔ ﺣﺗﻰ اﻟوﺻول اﻟﻰ اﻟﺻﺧر اﻟﺻﺎﻟﺢ ﻟﻠﺗﺄﺳﯾس )اﻟﺻﺧر ﻗرﯾب ﻣن ﺳطﺢ‬
surface) using appropriate tools and appropriate support for excavation sides so ‫اﻻرض( وﯾﺗم اﻟﻌﻣل ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﻣﻊ اﻟﺣﻔﺎظ ﻋﻠﻰ اﺳﻧﺎد ﺟواﻧب اﻟﺣﻔر ﺑﺣﯾث ﻻ‬
as to not cause harm the nearly buildings, the price includes everything ‫ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد‬
necessary to implement the item with the disposal of the resulting materials to a ‫اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك‬ m3
10.00
suitable place with no harm or affect agricultural lands, water streams and ‫اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ 3‫م‬
private property, the work must be carried out professionally and the price .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
includes everything necessary to implement the item, and the work must be
done according to the specifications, drawings, and the directives of the
supervising engineer.

4.1.3 Rock excavations: :‫اﻟﺣﻔر اﻟﺻﺧري‬


Implement excavations in the rock dim=(4*4*depth 3.2 m) reaching foundation ‫ﻣﺗر( ﺣﺗﻰ اﻟوﺻول اﻟﻰ ﻣﻧﺳوب اﻟﺗﺄﺳﯾس‬3.2 ‫*ﻋﻣﻖ‬4*4) ‫ﺗﻧﻔﯾذ ﺣﻔر ﻓﻲ اﻟﺻﺧر ﺑﺎﻻﺑﻌﺎد‬
level using appropriate tools which will not harm the nearly buildings, the price ‫وﯾﺗم اﻟﻌﻣل ﺑواﺳطﺔ أدوات ﻣﻧﺎﺳﺑﺔ ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ اﻟﻣﺑﺎﻧﻲ اﻟﻣﺟﺎورة واﻟﺳﻌر ﯾﺷﻣل ﻛل‬
includes everything necessary to implement the item with the disposal of the ‫ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد ﻣﻊ اﻟﺗﺧﻠص ﻣن اﻟﻣواد اﻟﻧﺎﺗﺟﺔ اﻟﻰ ﻣﻛﺎن ﻣﻧﺎﺳب ﺑﺣﯾث ﻻ ﺗوﺛر ﻋﻠﻰ‬
resulting materials to a suitable place with no harm or affect agricultural lands, ‫اﻷراﺿﻲ اﻟزراﻋﯾﺔ وﻣﺟﺎري اﻟﺳﯾول واﻻﻣﻼك اﻟﺧﺎﺻﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل‬ m3
10.00
water streams and private property, the work must be carried out professionally ‫ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس‬ 3‫م‬
and the price includes everything necessary to implement the item, and the work .‫اﻟﻣﺷرف‬
must be done according to the specifications, drawings, and the directives of the
supervising engineer.

Total Amount of site work ‫إﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣوﻗﻊ اﻟﻌﺎم‬


4.2 Concrete Works : ‫اﻋﻣﺎل اﻟﺧرﺳﺎﻧﺎت‬

4.2.1 Normal concrete (sub-base concrete) under the body of tank: :‫ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ )ﺧرﺳﺎﻧﺔ ﻧظﺎﻓﺔ( ﺗﺣت ﺟﺳم اﻟﺧزان‬
supply and implement Normal concrete thickness 10cm under the body of tank ‫ ﺳم ﺗﺣت ﺟﺳم اﻟﺧزان ﺑﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ذات‬10 ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺧرﺳﺎﻧﺔ ﻋﺎدﯾﺔ ﺑﺳﻣﺎﻛﺔ‬
with concrete of 300kg/m3 cement quantity, by Portland cement and sand and ‫ﻣﺗر ﻣﻛﻌب وذﻟك ﺑﺎﺳﺗﺧدام أﺳﻣﻧت ﺑورﺗﻼﻧدي ورﻣل وﻛري ﻣن‬/‫ﻛﺟم‬300 ‫ﻣﺣﺗوى اﺳﻣﻧﺗﻲ‬
m2
gravel from nearest area, the work must be carried out professionally and the ‫اﻗرب ﻣﻧطﻘﺔ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ 16.00
2‫م‬
price includes everything necessary to implement the item, and the work must .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
be done according to the specifications, drawings, and the directives of the
supervising engineer.
4.2.2 Reinforced concrete for bottom slab, beams, top slab: :‫اﻟﺧرﺳﺎﻧﺔ اﻟﻣﺳﻠﺣﺔ ﻟﻼرﺿﯾﺔ واﻟﺟﺳور واﻟﺳﻘف‬
supply and implement reinforced concrete forbottom slab, beams, top slab with ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺧرﺳﺎﻧﺔ ﻣﺳﻠﺣﺔ ﻟﻼرﺿﯾﺔ واﻟﺟﺳور واﻟﺳﻘف وذﻟك ﺑﺧرﺳﺎﻧﺔ ذات ﻣﺣﺗوى‬
concrete of 350kg/m3 cement quantity, using mechanical mixer for concrete, ‫ﻣﺗر ﻣﻛﻌب وﯾﺗم اﻟﺻب ﺑﺎﺳﺗﺧدام ﺧﻼطﺔ ﻣﯾﻛﺎﻧﯾﻛﯾﺔ ﻟﺧﻠط اﻟﺧرﺳﺎﻧﺔ‬/‫ﻛﺟم‬350 ‫اﺳﻣﻧﺗﻲ‬
vibrator, polishing the surface after casting, and adhere to spray and immerse ‫وﯾﺳﺗﺧدم اﻟﮭزاز ﻣﻊ ﻣراﻋﺎة اﻟﺗﺧﺷﯾن ﺑﻌد اﻟﺻب واﻻﻟﺗزام ﺑﺎﻟرش واﻟﻐﻣر ﺑﺎﻟﻣﺎء ﻟﻣدة ﻻ ﺗﻘل‬
the concrete by water for not less than 21day, implement approved materials as ‫ ﺣدﯾد ﺗﺳﻠﯾﺢ ﺟودة‬-1 :‫ وﯾﺗم اﻟﺗﻧﻔﯾذ ﺑﺎﺳﺗﺧدام ﻣواد ﻣﻌﺗﻣدة ﻋﻠﻰ اﻟﻧﺣو اﻟﺗﺎﻟﻲ‬،‫ ﯾوم‬21 ‫ﻋن‬
following: 1- reinforcing steel high quality Grade 40 approved by project ‫ وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع )ﺣدﯾد ﺗرﻛﻲ ﺟودة ﻋﺎﻟﯾﺔ ﻣن وﻛﯾل ﻣﻌﺗﻣد‬Grade40 ‫ﻋﺎﻟﯾﺔ‬
engineer (Turkish steel high quality from authorized agent in Yemen) have to be ‫ﻓﻲ اﻟﺟﻣﮭورﯾﺔ اﻟﯾﻣﻧﯾﺔ( ﺑﺣﯾث ﯾﻛون ﺟدﯾد وﺧﺎﻟﻲ ﻣن اﻟﺻدأ وان ﻻ ﯾﻛون ﻗد ﺗﻌرض ﻟﻠرطوﺑﺔ‬
new and rust free and have not been exposed to moisture in warehouse of ‫ﻋﻧد اﻟوﻛﯾل وﯾﺗم ﻧﻘﻠﮫ ﻟﻠﻣوﻗﻊ ﺑﺻوره ﺳﻠﯾﻣﺔ وﯾﺣﻔظ ﻓﻲ اﻟﻣوﻗﻊ ﺑطرﯾﻘﺔ ﺳﻠﯾﻣﺔ ﻓﻲ ﻣﺧزن‬
agent, transport it to site in proper way and store it in site properly in closed ‫ اﺳﻣﻧت ﺑورﺗﻼﻧدي ﻧوﻋﯾﺔ ﻣﻣﺗﺎز وﻣﻌﺗﻣد‬-2 .‫ﻣﻐﻠﻖ ﺑﺣﯾث ﻻ ﯾﺗﻌرض ﻟﻠﻣطر او رطوﺑﺔ اﻟﺟو‬
store away of rain and moisture. 2-Portland cement excellent quality approved ‫ﻣن ﻣﮭﻧدس اﻟﻣﺷروع )اﺳﻣﻧت ﻋﻣران او اﻟوطﻧﯾﺔ( وان ﯾﻛون اﻻﺳﻣﻧت طري ﻟم ﯾﻣر ﻋﻠﻰ‬ m3
by project engineer (Amran or Alwatanya cement) fresh cement manufactured ‫ﻟﻠﻛﯾس وان ﻻ ﯾﻛون‬/‫ﻛﺟم‬50 ‫إﻧﺗﺎﺟﮫ اﻛﺛر ﻣن ﺷﮭرﯾن وان ﯾﻛون ﻣﺷون ﺑﺄﻛﯾﺎس ﺳﻠﯾﻣﺔ ﺳﻌﺔ‬ 6.10
3‫م‬
date less than 2months, in proper bags capacity 50kg/bag, not stiffened, and ‫ﻣﺗﺣﺟر ﻗد ﺗﻌرض ﻟﻠرطوﺑﺔ وﯾﺗم ﻧﻘﻠﮫ ﻟﻠﻣوﻗﻊ ﺑﺻوره ﺳﻠﯾﻣﺔ وﯾﺣﻔظ ﻓﻲ اﻟﻣوﻗﻊ ﺑطرﯾﻘﺔ ﺳﻠﯾﻣﺔ‬
have not been exposed to moisture, transport it to site in proper way and store it ‫ رﻣل ﻧوﻋﯾﺔ ﻣﺗدرج ﻣن‬-3 .‫ﻓﻲ ﻣﺧزن ﻣﻐﻠﻖ ﺑﺣﯾث ﻻ ﯾﺗﻌرض ﻟﻠﻣطر او رطوﺑﺔ اﻟﺟو‬
in site properly in closed store away of rain and moisture. 3- Gradient Sand from ‫اﻟﻛﺳﺎرة وﯾﻛون ﺧﺎﻟﻲ ﻣن اﻻﺗرﺑﺔ واﻟﺷواﺋب ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع‬
crusher, soil and impurities free, excellent quality approved by project engineer ‫ ﻛري ﻧوﻋﯾﺔ ﺑﺎزﻟﺗﻲ ﻣﺗدرج‬-4 .(‫)رﻣل ﻛﺳﺎره ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ‬
(Sana'a crushed sand or equivalent sand from nearest area). 4- Basalt gradient ‫ﻣن اﻟﻛﺳﺎرة وﯾﻛون ﺧﺎﻟﻲ ﻣن اﻻﺗرﺑﺔ واﻟﺷواﺋب ﻧوﻋﯾﺔ ﻣﻣﺗﺎزة وﻣﻌﺗﻣد ﻣن ﻣﮭﻧدس اﻟﻣﺷروع‬
gravel from crusher, soil and impurities free, excellent quality approved by ‫ ﻣﯾﺎه ﻧظﯾﻔﺔ ﻧﻔس ﻧوﻋﯾﺔ اﻟﻣﯾﺎه‬-5 .(‫)ﻛري ﻛﺳﺎره ﺻﻧﻌﺎﻧﻲ او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ‬
project engineer (High quality of crushed gravel or equivalent sand from nearest ‫ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل‬،.‫اﻟﺻﺎﻟﺣﺔ ﻟﻠﺷرب‬
area). 5- Clean water same type of drinking water, the work must be carried out .‫ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
professionally and the price includes everything necessary to implement the ‫ ﯾراﻋﻲ ﻗﺑل اﻟﺻب ﺗرﻛﯾب ﻣﺎﺳورة ﻣﻔﯾض ﻟﻠﺧزان وﻋﻣل ﻓﺗﺣﺎت ﻓﻲ اﻟﺳﻘف‬:‫ﻣﻼﺣظﺔ‬
item,
Total and the work
amount must be done
of Concrete Worksaccording to the specifications, drawings, and .‫اﻟﺧرﺳﺎﻧﺔﻟﺗﺟﻣﯾﻊ اﻟﻣﺎء اﻟﻰ اﻟﺧزان وﻓﺗﺣﺔ ﻻﻧﺑوب اﻟﺗﮭوﯾﺔ‬
‫وﻓﺗﺣﺔ اﺧرى‬
‫اﻟﺷﻔطﻻﻋﻣﺎل‬
‫ﻟﻣﺎﺳورة اﻟﻌﺎم‬
‫اﺟﻣﺎﻟﻲ‬

4.3 Stone and Brick Works: : ‫اﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬

4.3.1 Basalt stone walls thickness 50cm (trimmed square basalt stone approved ‫اﺳﻮد ﻣ ع وﻗ ﺺ ﻧﻮﻋ ﺔ‬ ‫ﺣﺠﺮ ﺎزﻟ‬
) ‫ﺳﻢ‬50 ‫ﺳﻤﺎ ﺔ‬ ‫اﻟﺠﺪاران اﻟﺤﺠﺮ اﻟ ﺎزﻟ‬
type): :(‫ﻣﻌﺘﻤﺪة‬
supply and implement stone walls thickness 50cm by trimmed square basalt ‫ﺳﻢ ﻣﻦ اﻟﺤﺠﺮ ﺎزﻟ اﺳﻮد ﻣ ع وﻗ ﺺ ﻧﻮﻋ ﺔ‬50 ‫ﺗﻮر ﺪ وﺗﻨﻔ ﺬ ﻣ ﺎ ﺟﺪران ﺳﻤﺎ ﺔ‬
stone approved type with normal concrete of of 300kg/m3 cement quantity by ‫ﻣ ﻣﻜﻌﺐ وذﻟﻚ ﺎﺳﺘﺨﺪام‬/‫ﻛﺠﻢ‬300 ‫ﻣﻌﺘﻤﺪة ﻣﻊ ﺧﺮﺳﺎﻧﺔ ﻋﺎد ﺔ ذات ﻣﺤﺘﻮى اﺳﻤﻨ‬ m3
Portland cement and sand and gravel from nearest area with good stuffing and 16.00
‫أﺳﻤﻨﺖ ﺑﻮرﺗﻼﻧﺪي ورﻣﻞ وﻛﺮي ﻣﻦ اﻗﺮب ﻣﻨﻄﻘﺔ ﻣﻊ اﻟﺘﺪر ﺰ واﻟ ﻏ وﻣﻞء اﻟﻔﺮاﻏﺎت ﺑ‬ 3‫م‬
filling the blanks between face and lining of walls with cement mortar and ‫ ا ﺎم و ﻨﻔﺬ اﻟﻌﻤﻞ ﻤﻬﻨ ﺔ واﻟﺴﻌﺮ ﺸﻤﻞ ﻞ ﻣﺎ ﻠﺰم ﻟﺘﻨﻔ ﺬ‬7 ‫اﻟﻮﺟﻪ واﻟ ﻄﺎﻧﺔ ﻣﻊ اﻟﺮش ﻟﻤﺪة‬
spraying by water for 7days, the work must be carried out professionally and the .‫اﻟﺒﻨﺪ و ﺘﻢ اﻟﻌﻤﻞ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت واﻟﺮﺳﻮﻣﺎت وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
price includes everything necessary to implement the item, and the work must
be done according to the specifications, drawings, and the directives of the
Total amount of Stone and Brick Works : ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﺑﺎﻧﻲ‬
4.4 Plastering and Painting Works: : ‫اﻟﺗﻠﺑﯾس واﻟدھﺎن‬

4.4.1 Interior plaster for walls with Sicka: :‫اﻟﺗﻠﺑﯾس اﻟداﺧﻠﻲ ﻟﻠﺟدران ﻣﻊ اﻟﺳﯾﻛﺎ‬
supply and implement interior plaster thickness (1-2cm) for walls before the ‫ﺳم( ﻟﻠﺟدران ﻣن اﻟداﺧل ﻗﺑل ﺻﺑﺔ اﻟﺳﻘف ﻣﻊ اﻟطرطﺷﺔ‬2-1) ‫ﺗورﯾد وﺗﻧﻔﯾذ ﺗﻼﺑﯾس ﺑﺳﻣﺎﻛﺔ‬
ceiling work with splashing layer by cement mortar with Sicka using Portland ‫ﻛﯾس ﺳﻣﻧت( وذﻟك ﺑﺎﺳﺗﺧدام أﺳﻣﻧت‬/‫ﻛﺟم‬1) ‫وذﻟك ﺑواﺳطﺔ اﻟﻣوﻧﺔ اﻻﺳﻣﻧﺗﯾﺔ ﻣﻊ اﻟﺳﯾﻛﺎ‬
cement and Sana'a crushed sand or equivalent sand from nearest area mixing (3:1) ‫ﺑورﺗﻼﻧدي ورﻣل ﻛﺳﺎره ﺻﻧﻌﺎﻧﻲ او ﻣﺎ ﯾﻛﺎﻓﺋﮫ ﻣن اﻗرب ﻣﻧطﻘﺔ وﯾﺳﺗﺧدم ﺑﻧﺳﺑﺔ ﺧﻠط‬ m2
(1:3) and spraying by water for 7days, the work must be carried out by strings ‫ أﯾﺎم وﯾﻧﻔذ اﻟﻌﻣل ﺑواﺳطﺔ اﻟﺧﯾوط واﻟﻣﺳطرة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ‬7 ‫ﻣﻊ اﻟرش ﻟﻣدة ﻻ ﺗﻘل ﻋن‬ 43.00
2‫م‬
and ruler, the work must be carried out professionally and the price includes ‫واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬
everything necessary to implement the item, and the work must be done .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
according to the specifications, drawings, and the directives of the supervising
4.4.2 engineer.
Intrior paint of walls and floor of tank: :‫دھﺎن ﺟدران وارﺿﯾﺔ اﻟﺧزان ﻣن اﻟداﺧل‬
supply and implement paint by (Master seal 180) or epoxy for intrior walls and ،‫( او اﯾﺑوﻛﺳﻲ ﻷرﺿﯾﺔ وﺟدران اﻟﺧزان ﻣن اﻟداﺧل‬180 ‫ﺗورﯾد وﺗﻧﻔﯾذ دھﺎن )ﻣﺎﺳﺗر ﺳﯾل‬
floor of tank, the work must be carried out professionally and the price includes ‫وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬ m2
43.00
everything necessary to implement the item, and the work must be done .‫واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2‫م‬
according to the specifications, drawings, and the directives of the supervising
engineer.
Total amount of Plastering & Painting Works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﺗﻠﺑﯾس‬

4.5 Metal & Wood Works: : ‫اﻷﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﻧﺟﺎرة‬

4.5.1 Aluminum ladder inside the tank: :‫ﺳﻠم اﻟﻣﻧﯾوم داﺧل اﻟﺧزان‬
Supply and install Aluminum ladder inside the tank, approved type, length fits ‫ ﺑطول ﯾﺗﻧﺎﺳب ﻣﻊ ارﺗﻔﺎع اﻟﺧزان ﻣﻊ‬،‫ﺗورﯾد وﺗرﻛﯾب ﺳﻠم ﻣن اﻷﻟﻣﻧﯾوم ﻧوﻋﯾﺔ ﻣﻌﺗﻣدة‬
with hight of tank include well fixing, the work must be carried out professionally ‫اﻟﺗﺛﺑﯾت وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب‬ pcs
1.00
and the price includes everything necessary to implement the item, and the work .‫اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
must be done according to the specifications, drawings, and the directives of the
supervising engineer.
4.5.2 Tank led: :‫ﻏطﺎء ﻟﻠﺧزان‬
Supply and install Steel led of heavy sheet size (0.6*0.6m),with heavy steel ‫ﺳم( ﻣﻊ‬60×60)‫ﺗورﯾد وﺗرﻛﯾب ﻏطﺎء ﻣن اﻟﺣدﯾد اﻟﺻﺎج اﻟﻣﺣﺑب اﻟﻘوي ) دﺑل ( ﻣﻘﺎس‬
frames and bars, support the frame before concrete casting, install all ‫ﺑرواز ﺟﺎﻓﻲ و ﻣدﻋم ﺗﺣت اﻟﺻﺎج ﺑﺣدﯾد ﺟﺎﻓﻲ وﯾرﻛﯾب اﻟﺑرواز ﺣول ﻓﺗﺣﺔ اﻟﺧزان أﺛﻧﺎء‬
belongings excellent quality (hands, joints, lock) include anti-moisture paint, the ‫اﻟﺻب وﯾﺷﻣل اﻟﺗﺛﺑﯾت واﻟﻣﻔﺻﻼت واﻟدھﺎن اﻟﻣﻘﺎوم ﻟﻠرطوﺑﺔ ﻣﻊ اﻟﻘﻔل وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ‬ pcs
1.00
work must be carried out professionally and the price includes everything ‫واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬ ‫ﻋدد‬
necessary to implement the item, and the work must be done according to the .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
specifications, drawings, and the directives of the supervising engineer.

Total amount of Metal & Wood Works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻟﻣﻌدﻧﯾﺔ واﻟﺧﺷﺑﯾﺔ‬

4.6.1 Rainwater harvesting pipes from ceilings to tank: :‫اﻧﺎﺑﯾﺑب ﺣﺻﺎد ﻣﯾﺎه اﻻﻣطﺎر ﻣن اﺳطﺢ اﻟﻣدرﺳﺔ اﻟﻰ اﻟﺧزان‬
Supply and install rainwater harvisting pipe network by plastic pipes UPVC ‫( ﻟﺗﺻرﯾف‬UPVC) ‫ﺗورﯾد وﺗرﻛﯾب ﺷﺑﻛﺔ ﺣﺻﺎد ﻣﯾﺎه اﻟﻰ اﻟﺧزان ﺑواﺳطﺔ اﻧﺎﺑﯾب ﺑﻼﺳﺗﯾك‬
dim=4" (0.5 of full pressure) from the roofs to the ground tank with glow in ‫" )ﻧﺻف ﺿﻐط( ﻣﻊ اﺳﺗﺧدام‬4 ‫ﻣﯾﺎه اﻷﻣطﺎر ﻣن اﻻﺳطﺢ ﺣﺗﻰ اﻟﺧزان اﻟﺗﺟﻣﯾﻌﻰ ﻗطر‬
plumbing and fixing on walls by steel clips, the work must be carried out ‫ وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ‬،‫اﻟﺷﻠك اﻟذاﺋب ﻓﻲ اﻟﺳﺑﺎﻛﺔ ﻣﻊ اﻟﺗﺛﺑﯾت ﻓﻲ اﻟﺟدران ﺑواﺳطﺔ ﻛﻠﯾﺑﺎت ﺣدﯾد‬ ml
professionally and the price includes everything necessary to implement the ‫واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت‬ 30.00
‫ط‬.‫م‬
item, and the work must be done according to the specifications, drawings, and .‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬
the directives of the supervising engineer.
4.7 Sanitary Works : : ‫اﻻﻋﻣﺎل اﻟﺻﺣﯾﺔ‬

4.7.1 water pump to lift the water from subground tank to upper tanks in roof: :‫دﯾﻧﺎﻣو ﻟرﻓﻊ اﻟﻣﯾﺎه ﻣن اﻟﺧزان اﻻرﺿﻲ اﻟﻰ اﻟﺧزاﻧﺎت ﻓوق اﻟﺳطﺢ‬
Supply and install water pump original quality with lifting capacity not less than ‫ ﻣﺗر ﻟرﻓﻊ اﻟﻣﯾﺎه ﻣن‬30 ‫ﺗورﯾد وﺗرﻛﯾب دﯾﻧﺎﻣو )ﻣﺿﺧﺔ( ﻧوﻋﯾﺔ اﺻﻠﯾﺔ ﺑﻘدرة رﻓﻊ ﻻ ﺗﻘل ﻋن‬
30 meters to raise water from the subground tank to upper tanks in roof, with its ‫ ﻣﻊ اﻟﺷﻔﺎط ﻣﻊ ﺗرﻛﯾﺑﮭﺎ ﻓﻲ اﻟﺻﻧدوق ﺣدﯾدي ﻟﺣﻣﺎﯾﺔ‬،‫اﻟﺧزان اﻟﺳﻔﻠﻲ إﻟﻰ اﻟﺧزاﻧﺎت اﻟﻌﻠوﯾﺔ‬
suction and install it in steel box to protect the pump, with lock and electrical ‫اﻟﻣﺿﺧﺔ ﻣﻊ اﻟﻘﻔل وﻣﻊ ﻣﻔﺗﺎح ﻛﮭرﺑﺎء ﯾﺛﺑت ﻋﻠﻰ اﻟﺟدار وﻣﺣﻣﻲ ﻣن اﻻﻣطﺎر وﻣن ﻋﺑث‬
switch fixed to the wall and protected from rain and children, all materials must ‫اﻻطﻔﺎل وﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد ﺟودة ﻣﻣﺗﺎزة وﻣﻌﺗﻣدة وﯾﻧﻔذ اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ‬
be excellent and approved, the work must be carried out professionally and the .‫ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ pcs
1.00
price includes everything necessary to implement the item, and the work must ‫ﻋدد‬
be done according to the specifications, drawings, and the directives of the
supervising engineer.

Total amount of sanitary works ‫اﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻟﻼﻋﻣﺎل اﻟﺻﺣﯾﺔ‬

Total of water tank work ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم أﻋﻣﺎل ﺑﻧﺎء ﺧزان ﻣﯾﺎه‬

‫أﻋﻣﺎل ﻣﺗﻔرﻗﺔ داﺧل ﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬


5
Various works inside Hafsa Girls School

Metal signboard: :‫ﻟوﺣﺔ ﻣﻌدﻧﯾﺔ‬


Supply and install of a metal signboard for the project, a 4-digit model with ‫ ﺧﺎﻧﺎت ﺗﺣﻣل ﺷﻌﺎر اﻟﻣﻧظﻣﺔ واﻟﻣﻣول‬4 ‫ﺗورﯾد وﺗرﻛﯾب ﻟوﺣﺔ اﺳﻣﯾﺔ ﻣﻌدﻧﯾﺔ ﻟﻠﻣﺷروع ﻧﻣوذج‬
clarification for the name of the project, name and logo of the organization and ‫ وذﻟك ﺧﻼل ﻣدة اﻗﺻﺎھﺎ‬،‫ ﺣﺳب اﻟﻧﻣوذج اﻟﺧﺎص ﺑﺎﻟﻣﻧظﻣﺔ‬،‫واﺳم اﻟﻣﺷروع واﻟﻣوﻗﻊ‬
doner, and the year of implementation, install it within a maximum period of two ‫ وﯾﻧﻔذ‬،‫ ﺷﺎﻣل اﻻﻋﻣدة اﻟﻣﻌدﻧﯾﺔ واﻟﺣﻔر واﻟﻘواﻋد واﻟﺗرﻛﯾب‬،‫اﺳﺑوﻋﯾن ﻣن ﺗﺎرﯾﺦ ﺗﺳﻠﯾم اﻟﻣوﻗﻊ‬
weeks from the date of site handover , the price include metal columns, ‫اﻟﻌﻣل ﺑﻣﮭﻧﯾﺔ واﻟﺳﻌر ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻟﺗﻧﻔﯾذ اﻟﺑﻧد وﯾﺗم اﻟﻌﻣل ﺑﺣﺳب اﻟﻣواﺻﻔﺎت‬ pcs
5.1 excavation, bases and installation .‫واﻟرﺳوﻣﺎت وﺗوﺟﯾﮭﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ ‫ﻋدد‬
1.00
the work must be carried out professionally and the price includes everything
necessary to implement the item, and the work must be done according to the
specifications, drawings, and the directives of the supervising engineer.

Total Amount of Seperate Works ‫إﺟﻣﺎﻟﻲ اﻻﻋﻣﺎل اﻟﻣﺗﻔرﻗﺔ‬

Total summation ‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم أﻋﻣﺎل ﻣﺗﻔرﻗﺔ داﺧل اﻟﻣدرﺳﺔ‬


‫اﻹﺟﻣﺎ ﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل اﻹﻧﺷﺎء و إﻋﺎدة اﻟﺗﺎھﯾل ﻓﻲ ﻣدرﺳﺔ ﺣﻔﺻﺔ ﻟﻠﺑﻧﺎت‬
6 ‫ اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ ﻣدرﺳﺔ اﻟﺻﺎﻟﺢ‬+ ‫أﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬
6.1 School sound loudspeaker system: ‫ ﻛل ﻣﻧظوﻣﺔ‬،‫ ﻣﻧظوﻣﺔ ﺗﻛﺑﯾر ﺻوﺗﻲ ﻟﻺذاﻋﺔ اﻟﻣدرﺳﯾﺔ ﻧوﻋﯾﺔ ﻣﻣﺗﺎزه‬1 ‫ﺗورﯾد وﺗرﻛﯾب ﻋدد‬
:‫ﺗﺗﻛون ﻣن اﻟﺗﺎﻟﻲ‬
6.1.1 Wireless Handheld Microphones for at least 150-250 m with rechargeable batteries ‫ ﻣ ﻋ اﻷﻗﻞ ﻣﻊ‬150-250 ‫ ﺟ ﺪ ﺣ‬،‫ﻋﺪد ﺟﻬﺎز ﻣ ﻜﺮوﻓﻮن ﻻﺳﻠ ﻣﺤﻤﻮل ﺎﻟ ﺪ‬ pcs 1.00
‫ﻄﺎر ﺎت ﻗﺎ ﻠﻪ ﻟﻠﺸﺤﻦ‬ ‫ﻋدد‬
6.1.2 Speakers (trumpet / conical shape) weather resistant 16 inch diameter ‫ ﻫ ﺶ‬16 ‫( ﻣﻘﺎوم ﻟﻠﻄﻘﺲ ﻗﻄﺮ‬ ‫ﺷ ﻞ ﻣﺨﺮو‬/ ‫ﻋﺪد ﺳﻤﺎﻋﺔ ﻣﻜ اﻟﺼﻮت )ﺑﻮق‬ pcs 2.00
‫ﻋدد‬
6.1.3 Audio amplifier (mixer) able to operate the components of system at same time, able to ‫ ﻤﻜﻦ‬،‫ﻧﻔﺲ اﻟﻮﻗﺖ‬ ‫ ﻋﺪد ﻣﻀﺨﻢ ﺻﻮ )ﺧﻼط(ﻗﺎدر ﻋ ﺸﻐ ﻞ ﻣﻜﻮﻧﺎت اﻟﻤﻨﻈﻮﻣﺔ‬pcs 1.00
work from battery 12V. ‫ ﻓﻮﻟﺖ‬12 ‫ﺸﻐ ﻠﺔ ﻣﻦ ﻄﺎر ﺔ‬ ‫ﻋدد‬
(It is preferable that the device be able to operate from the solar system, either by 12- ‫ ﻓﻮﻟﺖ‬12 ‫) ﻔﻀﻞ ان ﻜﻮن اﻟﺠﻬﺎز ﻗﺎدر ﻋ اﻟﻌﻤﻞ ﻣﻦ اﻟﻤﻨﻈﻮﻣﺔ اﻟﺸﻤﺴ ﺔ اﻣﺎ ﺑﻨﻈﺎم‬
volt system or by 220-volt system together) (‫ﻓﻮﻟﺖ ﻣﻌﺎ‬220 ‫او ﻨﻈﺎم‬
6.1.4 With cable rolls wire (The length of the roll is 70 metres) and necessary accessories ‫ ﻣ (ﻣﻊ اﻟﺘﻮاﺑﻊ اﻟﻼزﻣﺔ ﻟ ﺸﻐ ﻞ اﻟﻤﻨﻀﻮﻣﺔ‬70 ‫ ﺗﻮر ﺪ ﻋﺪد ﻟﻔﻪ ﺎ ﻼت )ﻃﻮل اﻟﻠﻔﺔ‬Roll 1.00
needs to operate the system in schools ‫اﻟﻤﺪارس‬ ‫ﻟﻔﺔ‬

Total Amount of Loudspeaker system ‫إﺟﻣﺎﻟﻲ أﻋﻣﺎل اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ‬

6.2 Supply and install 1 excellent quality school solar system, each system ‫ ﻛل ﻣﻧظوﻣﺔ ﺗﺗﻛون‬،‫ ﻣﻧظوﻣﺔ طﺎﻗﺔ ﺷﻣﺳﯾﺔ ﻣدرﺳﯾﺔ ﻧوﻋﯾﺔ ﻣﻣﺗﺎزه‬1 ‫ﺗورﯾد وﺗرﻛﯾب ﻋدد‬
contains the following: :‫ﻣن اﻟﺗﺎﻟﻲ‬
Notes : ‫ـ‬:‫ﻣﻼﺣظﺎت‬
- All materials and accessories must be of the highest quality and conform to international ‫ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣواد واﻷدوات ﻣن أﺟود اﻷﻧواع وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﻘﯾﺎﺳﯾﺔ‬-
standards.
.‫اﻟﻌﺎﻟﻣﯾﺔ‬
- All electrical work items will include supply of materials, installation, testing and commission.
Internal wiring for all networks shall be concealed inside plastic conduits of PVC type, ‫ ﺟﻣﯾﻊ ﺑﻧود اﻷﻋﻣﺎل اﻟﻛﮭرﺑﺎﺋﯾﺔ ﺷﺎﻣﻠﺔ ﺗورﯾد اﻟﻣواد واﻟﺗرﻛﯾب واﻟﺗﺟرﺑﺔ واﻟﺗﺷﻐﯾل وان ﺗﻛون‬-
conforming to British specifications BS-4607 and shall have electrical insulation resistance of ‫ وﻣطﺎﺑﻘﺔ‬PVC ‫اﻟﺗﻣدﯾدات داﺧﻠﯾﺔ ﻣﺧﻔﯾﺔ ﻟﺟﻣﯾﻊ اﻟﺷﺑﻛﺎت داﺧل ﻣواﺳﯾر ﺑﻼﺳﺗﯾﻛﯾﺔ ﻣن ﻧوع‬
more than 100 Mega ohm. 100 ‫ وأن ﺗﻛون ﻣﻘﺎوﻣﺔ اﻟﻌزل اﻟﻛﮭرﺑﻲ ﺑﮭﺎ أﻛﺛر ﻣن‬BS-4607 ‫ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
Independent conduits for each electric circuit shall be used with a diameter not less than 20 ‫ﺳم‬20 ‫ ﯾﺟب اﺳﺗﻌﻣﺎل ﻣواﺳﯾر ﻣﺳﺗﻘﻠﺔ ﻟﻛل داﺋرة ﻛﮭرﺑﺎﺋﯾﺔ ﺑﻘطر ﻻ ﯾﻘل ﻋن‬. ‫ﻣﯾﺟﺎ أوم‬
cm. Flexible metal conduits shall be used to protect wires and movable cables, such as ‫وﺗﺳﺗﻌﻣل اﻟﻣواﺳﯾر اﻟﻣﻌدﻧﯾﺔ اﻟﻣرﻧﺔ ﻟﺣﻣﺎﯾﺔ اﻷﺳﻼك واﻟﻛواﺑل اﻟﻣﺗﺣرﻛﺔ او اﻟﻣﻌرﺿﺔ‬
connections of devices and motors and at the expansion joints of the building, if any. No
‫ وﻻ‬,.‫ﻟﻠﺗﺣرﯾك ﻣﺛل ﺗوﺻﯾﻼت اﻷﺟﮭزة واﻟﻣوﺗورات وﻋﻧد ﻓواﺻل اﻟﺗﻣدد ﻟﻠﻣﺑﻧﻰ إن وﺟدت‬
visible wiring is accepted , The contractor will bear responsibly of any mistakes in the
installation and shall re-install them properly . The wiring for each network must be
‫ﯾﺳﻣﺢ ﺑﺎﻟﺗﻣدﯾدات اﻟظﺎھرة وأي ﺧطﺎء ﻓﻲ اﻟﺗﻣدﯾدات ﯾﺗﺣﻣل اﻟﻣﻘﺎول إﻋﺎدة اﻟﻌﻣل ﺑﺎﻟﺷﻛل‬
independent of each other (Electrical lighting network, electrical sockets network, telephone ‫ ﻛﻣﺎ ﯾﺟب أن ﺗﻛون اﻟﺗﻣدﯾدات ﻟﻛل ﺷﺑﻛﺔ ﻣﺳﺗﻘﻠﺔ ﻋن اﻷﺧرى ) ﺷﺑﻛﺔ اﻹﻧﺎرة‬. ‫اﻟﺳﻠﯾم‬
network, computer network, fire, television, etc.). They are not allowed to be mixed in ‫ ﺣرﯾﻖ‬،‫ﻛﻣﺑﯾوﺗر‬، _ ‫ ﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر‬- ‫ ﺷﺑﻛﺔ اﻟﺗﻠﻔون‬- ‫ ﺷﺑﻛﺔ اﻟﻣﺄﺧذ اﻟﻛﮭرﺑﺎﺋﯾﺔ‬- ‫اﻟﻛﮭرﺑﺎﺋﯾﺔ‬
conduits , partitions or boxes. A minimum distance of 40 cm should be considered between ‫ ﻛﻣﺎ ﯾﺟب‬, ‫ﺗﻠﻔزﯾون وﻏﯾرھﺎ ( وﻻ ﯾﺳﻣﺢ اﻟﺧﻠط ﺑﯾﻧﮭﺎ ﻓﻲ اﻟﻣواﺳﯾر أو اﻟﻘﺳﺎﻣﺎت واﻟﻌﻠب‬،
the power network and the computer and telephone networks. - The circular and squared . ‫ﺳم ﺑﯾن ﺷﺑﻛﺔ اﻟﻛﮭرﺑﺎء وﺷﺑﻛﺔ اﻟﻛﻣﺑﯾوﺗر واﻟﺗﻠﻔون‬40 ‫ﻣراﻋﺎة وﺟود ﻣﺳﺎﻓﺔ ﻻ ﺗﻘل ﻋن‬
assembly boxes used for the switches shall be made of good plastic, Fire resistant and ‫ ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ اﻟداﺋرﯾﺔ واﻟﻣرﺑﻌﺔ واﻟﻣﺳﺗﺧدﻣﺔ ﻟﻠﻣﻔﺎﺗﯾﺢ ﻣﺻﻧوﻋﺔ ﻣن اﻟﺑﻼﺳﺗﯾك اﻟﺟﯾد‬-
comply with the British specifications BS4662, VDE-3676 and shall have special covers to
prevent penetration of moisture and insects. Those boxes will be made by the same factory
‫ ﻋﻠﻰ أن‬BS-4662 ، VDE-3676 ‫واﻟﻣﻘﺎوم ﻟﻠﺣرﯾﻖ وﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ‬
which manufactured the electrical pipes, All sockets shall comply with (IEC 60889, 60309) ‫ﯾﻛون ﻟﮭﺎ أﻏطﯾﺔ ﺧﺎﺻﺔ ﺗﻣﻧﻊ ﺗﺳرب اﻟرطوﺑﺔ واﻟﺣﺷرات ﻟﮭﺎ و ﯾﺟب أن ﺗﻛون ﻋﻠب اﻟﺗﺟﻣﯾﻊ‬
specifications. ‫ﻣﺻﻧﻌﺔ ﻣن ﻧﻔس اﻟﻣﺻﻧﻊ اﻟﻣﺻﻧﻊ ﻟﻣواﺳﯾر اﻟﻛﮭرﺑﺎء ﻛﻣﺎ ﯾﺟب أن ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﺂﺧذ‬
- The contractor must submit the drawings which illustrate all electrical installations , path of (IEC 60889, 60309) ‫ﻣطﺎﺑﻘﺔ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
pipes , places of the circuit breakers and electrical boards before starting any work for
approval by the Engineer
6.2.1 Integrated grounding unit for lightning rods: L.S: Supply, implementation and testing of ‫ ﺗﻮر ﺪ وﺗﻨﻔ ﺬ واﺧﺘ ﺎر وﺣﺪة ﺗﺄر ﺾ‬:‫ ﺎﻟﻌﺪد‬:‫وﺣﺪة ﺗﺄر ﺾ ﻣﺘ ﺎﻣﻠﺔ ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ‬
an integrated grounding unit for lightning rods, which includes excavation and ‫م‬2 ‫م و ﻌﻤﻖ‬1.5×1.5 ‫ﻣﺘ ﺎﻣﻠﺔ ﻟﻤﺎﻧﻌﺎت اﻟﺼﻮاﻋﻖ و ﺸﻤﻞ أﻋﻤﺎل اﻟﺤﻔﺮ واﻟﺮدم ﻤﺴﺎﺣﺔ‬
backfilling with an area of 1.5 x 1.5 m and a depth of 2 m, installing two 120 cm long ‫ﺳﻢ ﻋ ﺻﻔﺎﺋﺢ ﻧﺤﺎﺳ ﺔ واﻟﺪﻓﻦ ﺣﻮﻟﻬﺎ ﻣﻊ‬120 ‫وﺗﺮﻛ ﺐ اﺛﻨ أﺳ ﺎخ ﻣﻦ اﻟﻨﺤﺎس ﻄﻮل‬
copper skewers on copper plates, burying around them with coal and salt, connecting ‫ ﺎﻟ ﻠﻴ ﺎت اﻟﺨﺎﺻﺔ وﺗﻮﺻ ﻠﻬﺎ‬2‫ﻣﻢ‬35 ‫اﻟﻔﺤﻢ واﻟﻤﻠﺢ واﻟﺘﻮﺻ ﻞ ﺑ اﻷﺳ ﺎخ ﺴﻠﻚ ﻣﻜﺸﻮف‬
the skewers with open wire 35 mm 2 with special clips and connecting them to an ‫ﺳﻢ وﻣﻦ ﺛﻢ اﻟﺘﻮﺻ ﻞ إ ﺑ ﺎر ﻧﺤﺎس ﻣﻊ اﻟﻠﺤﺎم واﻟﻌﺰل‬30×30 ‫إ ﻏﺮﻓﺔ ﺗﻔﺘ ﺶ‬
inspection room 30 x 30 cm, and then connect to a copper pipe with welding and ‫ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﻣﻦ ﺛﻢ ﺗﻮر ﺪ وﺗﻤﺪ ﺪ ﻂ ﺗﺤﺬﻳﺮ ﻣﻦ اﻟ ﻼﺳ ﻚ اﻷﺻﻔﺮ ﻋﺮض‬ pcs
1
insulation according to the plans, and then supplying and extending a yellow plastic ‫ ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﻬﺎء اﻟﺒﻨﺪ ﻣﻦ ﺗﻜﺴ‬. ‫ﺳﻢ ﻣﻜﺘﻮب ﻋﻠ ﺔ ﻋ ﺎرات ﺗﺤﺬﻳ ﺔ ﻗ ﻞ اﻟﺮدم‬15 ‫ﻋدد‬
warning tape, 15 cm wide, with warning phrases written on it before backfilling. With ‫و ﻋﺎدة ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف ﻣﻊ ﻋﺮض ﻋﻴﻨﺔ ﻣﻦ ﺟﻤﻴﻊ‬
all that is necessary to finish the item of crushing and recycling according to the plans ‫ ﻣﻊ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﻬﺎء اﻟﻌﻤﻞ وﻓﻖ‬. ‫اﻟﻤﻮاد ﻗ ﻞ اﻟ ﻛ ﺐ ﻋ اﻟﻤﻬﻨﺪس ﻟﻠﻤﻮاﻓﻘﺔ ﻋﻠﻴﻬﺎ‬
and instructions of the supervising engineer, with the presentation of a sample of all ‫ﻣﻊ ﻋﻤﻞ ﻣﺄﺧﺬ ﻓﺤﺺ اﻟﻨﻮازل ﻋ ارﺗﻔﺎع ﻣ ﻦ ﻣﻦ ﺳﻄﺢ‬.IEC 60364 . ‫اﻟ ﻮد اﻟﻘ ﺎ‬
materials before installation to the engineer for approval. With everything needed to .‫اﻷرض‬
finish the work according to the standard code. IEC 60364. With the upstream socket
working
6.2.2 Metal at a height
structure of two for
of Holder meters
solarfrom the :ground.
panels :‫ﻫ ﻞ ﻣﻌﺪ ﺣﺎﻣﻞ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
lump sum: the supply and installation of a fixed metal structure that must meet the ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻫ ﻞ ﻣﻌﺪ ﺛﺎ ﺖ ﺠﺐ أن ﺗﺘﻮﻓﺮ ﻓﻴﻬﺎ اﻻﺷ اﻃﺎت اﻟﺘﺎﻟ ﺔ‬:‫ﺎﻟﻤﻘﻄﻮﻋ ﺔ‬
following requirements :- ‫ ﺗﺮﺗ ﻂ وﺗﻠﺤﻢ ﻣﻊ‬،‫ﻣﻢ‬2 ‫ﻫ ﺶ وﺳﻤﺎ ﺔ‬2 ‫ اﻟﻬ ﻞ ﻳﺘﻜﻮن ﻣﻦ اﻋﻤﺪە ﺣﺪ ﺪ ﻪ ﺷﻠﻤﺎن ﺄ ﻌﺎد‬-
- The structure consists of Schulman iron columns with dimensions of 2 inches and ‫ﻣﻠﻢ وان ﺗﻜﻮن ﻘﻮە ﺗﺤﻤﻞ‬1.80 ‫ﻫ ﺶ وﺳﻤﺎ ﺔ‬1.50 ‫ﺣﺎﻣﻞ اﻷﻟﻮاح ﺣﺪ ﺪ ﺷﻠﻤﺎن ﺄ ﻌﺎد‬
thickness of 2 mm. They are connected and welded to the Schlman iron plate holder ‫ﻫ ﺶ‬2 ‫ﺎﻓ ﺔ ﻟﺤﻤﻞ اﻷﻟﻮاح وﺗﺤﻤﻞ ﺷﺪة اﻟ ﺎح اﻟﻌﺎﺗ ﺔ ﻣﻊ ﻋﻤﻞ ﻗﻮاﻋﺪ ﻣﻌﺪﻧ ﻪ ﺷﻠﻤﺎن‬
with dimensions of 1.50 inches and thickness of 1.80 mm and to be of sufficient bearing .‫اﻻﺳﻔﻞ‬ ‫ﻣﻢ ﺗ ﺖ ﻧﻬﺎ ﺔ اﻷﻋﻤﺪة‬ 2 ‫ﺴﻤﺎ ﺔ‬
strength to carry the panels and withstand the intensity of high winds with the work of ‫درﺟﺔ واﻟﻬ ﺎ ﻞ ﻜﻮن ﻣﺼﻨ ع ﻣﻦ اﻟﺤﺪ ﺪ اﻟﻤﻄﺎوع اﻟﻤﻄ‬20‫ ﻳﺘﻢ ﺗ ﺒ ﺖ اﻻﻟﻮاح ﻋ زوا ﺔ‬-
Schulman metal bases 2 inches with a thickness of 2 mm that fix the end of the columns ‫ ﺛﻢ اﻟﻄﻼء ﺎﻟﻠﻮن اﻟﻤﻄﻠﻮب‬.(‫ﻤﺎدة ﻣﻘﺎوﻣﺔ ﻟﻠﺼﺪاء )ﺑ ﻤﺮ‬ Lum
at the bottom. ‫ﺠﺐ أن ﺗﺼﻤﻢ اﻟﻬ ﻞ اﻟﻤﻌﺪ اﻟﺤﺎﻣﻞ ﺤ ﺚ ﺴﻤﺢ ﺎﺳ ﺪال اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺴﻬﻮﻟﻪ‬- Sum 1
- The panels are installed at an angle of 20 degrees and the structures are made of .‫وﻛﺬ ا ﻟ ﺴﻬ ﻞ ﻋﻤﻠ ﻪ اﻟﺘﻨﻈ ﻒ وﻏﺴﻞ اﻻﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
wrought iron coated with a rust-resistant material (primer). Then paint in the desired ‫ﻟﺘﺄﻣ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ ﻳ ﺖ ﻗﻔﻞ ﻳ ﻂ ﺑ اﻟﻔﺘﺤﺔ اﻟﺨﻠﻔ ﺔ ﻟﻠ ح اﻟﺸﻤ واﻟﻘﺎﻋﺪة‬-
color ‫واﻟﺜﻤﻦ ﺸﻤﻞ ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﺤﺴﺐ اﻟﻤﺨﻄﻄﺎت واﻟﺮﺳﻮﻣﺎت اﻟﺘﻔﺼ ﻠ ﺔ اﻟﻤﺮﻓﻘﺔ‬
- The carrier steel structure must be designed to allow easy replacement of the solar ‫وﺗﻮﺟﻴﻬﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬
panels, as well as to facilitate the process of cleaning and washing the solar panels.
- Secure the solar panels, a lock is installed between the back opening of the solar panel
and the base,The price includes all that is needed according to the attached detailed
6.2.3 plans
"Noteand drawings and the directions of the supervising engineer ‫ﻣﻼﺣﻈﺔ‬
: 1. Solar panels ‫ اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ‬.1
1.1.The concept of solar panel A solar cell made of semiconductor materials such as ‫ﻣﻔﻬﻮم اﻟﻠ ح اﻟﺸﻤ‬.1.1
silicon is the main component of a solar panel. Many solar cells are connected to ‫اﻟﻠ ح‬ ‫ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻌﺔ ﻣﻦ ﻣﻮاد ﺷ ﺔ ﻣﻮﺻﻠﺔ ﺎﻟﺴﻠ ﻜﻮن اﻟﻤﻜﻮن اﻷﺳﺎ‬
metallic busbars to form an array of cells known as the solar panel. ‫ ﺣ ﺚ ﻳﺘﻢ ﺗﻮﺻ ﻞ اﻟﻌﺪ ﺪ ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ ﺨﻄﻮط ﺗﻮﺻ ﻞ ﻣﻌﺪﻧ ﺔ‬. ‫اﻟﺸﻤ‬
1.2.Types of solar panels made of crystalline silicon . ‫)اﻟ ﺎﺳ ﺎر( ﻟ ﺸ ﻞ ﻣﺼﻔﻮﻓﺔ ﻣﻦ اﻟﺨﻼ ﺎ ﺗﻌﺮف ﺎﻟﻠ ح اﻟﺸﻤ‬
Solar panels made of crystalline silicon cells are divided into two main types: ‫أﻧﻮاع اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﻣﺎدة اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر ﺗﻨﻘﺴﻢ اﻷﻟﻮاح‬.1.2
1. Mono-crystalline: It consists of monocrystalline cells (containing crystals of the same :‫اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن اﻟﻤﺘ ﻠﻮر إ ﻧﻮﻋ رﺋ ﺴ ﻫﻤﺎ‬
shape and dimensions and having the same optical and physical properties). ‫ ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ أﺣﺎد ﺔ اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ‬:(Mono-crystalline) ‫أﺣﺎد ﺔ اﻟﺘ ﻠﻮر‬.1
2. Poly-crystalline: It consists of polycrystalline cells (containing crystals of different .(‫ﺔ واﻟﻔ ﺎﺋ ﺔ‬ ‫اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﻤﺘﻠﻚ ﻧﻔﺲ اﻟﺨﺼﺎﺋﺺ اﻟ‬ ‫ﻠﻮرات ﻣﺘﻤﺎﺛﻠﺔ‬
shapes and dimensions, and differing in optical and physical properties). ‫ ﺗﺘﻜﻮن ﻣﻦ ﺧﻼ ﺎ ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر )ﺗﺤﺘﻮي ﻋ‬:(Poly-crystalline) ‫ﻣﺘﻌﺪدة اﻟﺘ ﻠﻮر‬.2
1.3.Components of solar panels made of silicon cells. .(‫ﺔ واﻟﻔ ﺎﺋ ﺔ‬ ‫اﻟﺨﺼﺎﺋﺺ اﻟ‬ ‫اﻟﺸ ﻞ واﻹ ﻌﺎد وﺗﺘﻔﺎوت‬ ‫ﻠﻮرات ﻣﺨﺘﻠﻔﺔ‬
Solar panels: It is a number of solar cells connected in series to obtain the total voltage .‫ﻣﻜﻮﻧﺎت اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ اﻟﻤﺼﻨﻮﻋﺔ ﻣﻦ ﺧﻼ ﺎ اﻟﺴﻠ ﻜﻮن‬.1.3
required for the panel, and is equal to the sum of the voltages for each solar cell, but ‫ ﻋ ﺎرة ﻋﻦ ﻋﺪد ﻣﻦ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ اﻟﻤﻮﺻﻠﺔ ﻋ اﻟﺘﻮا ﻟﻠﺤﺼﻮل‬: ‫اﻷﻟﻮاح اﻟﺸﻤﺴ ﺔ‬
the total current of the panel is equal to the current of the solar cell since the cells ‫ وﻟ ﻦ اﻟﺘ ﺎر‬،‫ و ﺴﺎوي ﻣﺠﻤ ع اﻟﺠﻬﻮد ﻟ ﻞ ﺧﻠ ﺔ ﺷﻤﺴ ﺔ‬،‫ﻋ اﻟﺠﻬﺪ اﻟ اﻟﻤﻄﻠﻮب ﻟﻠ ح‬
straight connected ‫اﻟ ﻟﻠ ح ﺴﺎوي ﻧﻔﺲ ﺗ ﺎر اﻟﺨﻠ ﺔ اﻟﺸﻤﺴ ﺔ ﻤﺎ أن اﻟﺨﻼ ﺎ ﻣﻮﺻﻠﺔ ﻋ اﻟﺘﻮا‬
1. It is required that the minimum power that can be obtained from a single panel ‫ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف‬ ‫ﺸ ط أن ﺗﻜﻮن اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ‬.1
under the standard test conditions is not less than the capacity of the panel. .‫اﻟﻔﺤﺺ اﻟﻤﻌ ﺎري ﺤ ﺚ ﻻ ﺗﻘﻞ ﻋﻦ ﻗﺪرة اﻟﻠ ح‬
2. The minimum efficiency of solar panels should not be less than 16% under standard .‫ﯾﺷﺗرط أن ﯾﻛون اﻟوﺟﮫ اﻷﻣﺎﻣﻲ ﻟﻠﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ ﻣﻘﺎوﻣﺎ ً ﻷﺛر اﻟﺻدﻣﺎت‬.18
measurement conditions. ‫ﻛل إطﺎر ﻟوح ﺿوﺋﻲ ﯾﺟب أن ﯾﺟﮭز ﺑﺻﻧدوق ﻗﺎﺑل ﻟﻠﻔﺗﺢ ﻟوﺻل أو اﺳﺗﺑدال اﻟﻛﯾﺑﻼت ﻋﻧد اﻟﻠزوم وﻣﻧﮫ ﯾؤﺧذ‬.19
3. It is required that the frame of the panel be made of aluminum and be compatible with the ‫ ھذا اﻟﺻﻧدوق ﯾﺟب أن ﯾﻛون ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﺑرﯾطﺎﻧﯾﺔ أو ﻣﺎ ﯾﻌﺎدﻟﮭﺎ وﯾﺗﺣﻣل اﻟﻌواﻣل‬،‫ﻣﺧرج اﻟﻠوح اﻟﺿوﺋﻲ‬
material of the props. .‫ وﯾﺣﺗوي ﻋﻠﻰ ﻓﯾوزات اﻟﺣﻣﺎﯾﺔ ﻣن اﻟﺷورت اﻟﻛﮭرﺑﺎﺋﻲ واﻟﺗﯾﺎر اﻟﻌﻛﺳﻲ‬،‫اﻟﺟوﯾﺔ‬
4. The panels operating system 24V. .‫م‬2020 ‫ﺳﻧﺔ ﺗﺻﻧﯾﻊ اﻟﺧﻼﯾﺎ اﻟﺷﻣﺳﯾﺔ واﻷﻟواح ﯾﺟب أﻻ ﺗﻛون ﻗﺑل‬.20
:‫ﻛل اﻟﻣﻌﻠوﻣﺎت اﻟﺗﺎﻟﯾﺔ ﯾﺟب أن ﺗﻛون ﻣﻧﺣوﺗﺔ ﻋﻠﻰ ﻛل ﻟوح ﺷﻣﺳﻲ ﺑطرﯾﻘﺔ ﻏﯾر ﻗﺎﺑﻠﺔ ﻟﻠﻣﺣﻲ‬.21
5. 12 V . operating system panels
.‫اﺳم اﻟﺟﮭﺔ اﻟﻣﺻﻧﻌﺔ‬.a
6.Application Class A panels (free from workmanship defects).
.‫اﻟرﻗم اﻟﺗﺳﻠﺳﻠﻲ ﻟﻠوح ورﻗم ﻣودﯾﻠﮫ‬.b
7. The fill factor must not be less than 75%. .‫ﺷﮭر وﺳﻧﺔ اﻟﺗﺻﻧﯾﻊ‬.c
8. Internal diodes designed to prevent reverse currents. .‫ﻣﻧﺣﻧﻰ اﻟﺗﯾﺎر واﻟﻔوﻟﺗﯾﺔ‬.d
9. Approved standard system IEC-61215 or IEC-61730. .(Peak Wattage) ‫اﻟواﺗﯾﺔ اﻟﻘﺻوى‬.e
10. To have passed the IEC-61730 safety test, Parts 1 and 2, successfully. .(Im, Vm and FF) ‫اﻟﺗﯾﺎر اﻷﻋظﻣﻲ واﻟﺟﮭد اﻷﻋظﻣﻲ وﻣﻌﺎﻣل اﻟﻣﻠﺊ‬.f
11. The short circuit current is 8.5 amperes. .‫ﺑﻠد اﻟﻣﻧﺷﺄ‬.g
13. The maximum power voltage is 29 volts. .‫ﺿﻣﺎن ﺟودة اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﻻ ﺗﻘل ﻋن ﺳﻧﺔ‬.22
14. The return of the collector is 15%. .‫ ﺳﺎﻋﺔ‬/‫ ﻛم‬120 ‫ﻗواﻋد ﺗﺛﺑﯾت اﻟﻠواﻗط ﻣﻐﻠﻔﻧﺔ وﺗﺗﺣﻣل ﺳرﻋﺔ رﯾﺎح‬.23
15. The degree of protection is 66 IP. .‫ ﺳﻧﺔ‬25 ‫ ﻟﻣدة‬%80 + %30 ‫ إﻟﻰ‬0 ‫ ﻣن ﺳﻣﺎﺣﯾﺔ ﻗدر ة اﻟﺧروج ﻣن‬%90 ‫ﺿﻣﺎن اﻷداء ﻻ ﯾﻘل ﻋن‬.24
16. 1X4mm2 galvanized copper wires, red for the positive and black for the negative. ‫ﻋﻧد ﺗرﻛﯾب اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﯾﺟب اﻟﺗﺄﻛد ﻣن ﺧﻣﺳﺔ ﻋواﻣل أﺳﺎﺳﯾﺔ ﺗﺿﻣن أداء اﻷﻟواح اﻟﺷﻣﺳﯾﺔ ﺑﻔﻌﺎﻟﯾﺔ وﻛﻔﺎءة‬.25
17. The performance of the panels is guaranteed for 25 years, so that the percentage of :‫ﻋﺎﻟﯾﺔ‬
‫ وﺟود ظﻼل ﻟﻌواﺋﻖ وإن ﻛﺎﻧت ﺻﻐﯾرة ﻣﺛل أﻋﻣدة اﻟﺧرﺳﺎﻧﺔ اﻟﻣﻌدﻧﯾﺔ ﺗﻘﻠل ﻛﺛﯾرا ﻣن ﻗدرة‬:‫اﻟﺗظﻠﯾل اﻟﺟزﺋﻲ أو اﻟﻛﻠﻲ‬.‫أ‬
performance decrease is not less than 20% after 25 years and 10 years for any technical
.‫اﻟﻠوح اﻹﻧﺗﺎﺟﯾﺔ‬
defect.
‫ ﺗﻌﺗﺑر اﻟﯾﻣن ﻣن اﻟﺑﻠدان اﻟواﻗﻌﺔ ﻓﻲ ﻧﺻف اﻟﻛرة اﻟﺷﻣﺎﻟﯾﺔ ﻟﻸرض وﯾﻌﺗﻣد ﻧوع اﻟﺗﺛﺑﯾت ﻋﻠﻰ‬:‫ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح‬.‫ب‬
A. (The decrease in the efficiency of electric power production does not exceed 10% after 10
‫ﻣدى وإﻣﻛﺎﻧﯾﺔ ﺗوﺟﯾﮫ وﻣﯾﻼن اﻷﻟواح‬
years and 20% after 25 years and the date of commercial operation). ‫ ﻗد ﺗﺿﻣن زﯾﺎدة ﻓﻲ ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ‬:‫ أو ﻗواﻋد ﻣزودة ﺑﻣﺗﺗﺑﻊ ﻷﺷﻌﺔ اﻟﺷﻣس‬،‫ﻗواﻋد ﻣرﻧﺔ‬.‫ج‬
.‫ ﻋن ﻣﺗوﺳط ﻋدد ﺳﺎﻋﺎت اﻹﺷﻌﺎع اﻟﺷﻣﺳﻲ ﻟﻠﻘواﻋد اﻟﻣﺛﺑﺗﺔ‬%25 ‫ﺑﻧﺳﺑﺔ ﺗﺻل إﻟﻰ‬
‫ واﻟﺗوﺻﯾل ﻋﻠﻰ اﻟﺗوازي ﻟﻐرض زﯾﺎدة‬،‫ ﯾﺗم ﺗوﺻﯾل اﻷﻟواح ﻋﻠﻰ اﻟﺗواﻟﻲ ﻟﻐرض زﯾﺎدة ﻓرق اﻟﺟﮭد‬:‫ﺗوﺻﯾل اﻷﻟواح‬.‫د‬
6.2.4 solar panels 300 watt multi-cell 24V system: .(PV Array) ‫ وﻋﻠﻰ اﻟﺗواﻟﻲ واﻟﺗوازي ﻟﺗﻌرف ﻣﺟﻣوﻋﺔ اﻷﻟواح ﺑﻣﺻﻔوﻓﺔ اﻷﻟواح‬،‫اﻟﺗﯾﺎر‬
:24V ‫وات ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ ﻧﻈﺎم‬300‫اﻟﻮاح ﻃﺎﻗﺔ ﺷﻤﺴ ﺔ ﻗﺪرة‬
Number: Supplying and installing high quality solar panels and capturing solar energy ‫ ﺗﻮر ﺪ وﺗﺮﻛ ﺐ اﻟﻮاح ﺷﻤﺴ ﺔ ﻋﺎﻟ ﺔ اﻟﺠﻮدة واﻻﻟﺘﻘﺎط ﻟﻠﻄﺎﻗﺔ اﻟﺸﻤﺴ ﺔ‬:‫ﺎﻟﻌﺪد‬
with a capacity of 300 watts and with the following specifications: ‫ ﺠﺐ أن ﻜﻮن اﻟﻠ ح ﻣﺼﻨ ع ﻣﻦ اﻟﺴﻠ ﻜﻮن‬- :‫وات و ﺎﻟﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﻪ‬300‫ﻗﺪرة‬
The panel shall be made of polycrystalline silicon solar cells. (Poly crystalline silicon solar cells ) ‫اﻟﻤﺘ ﻠﻮر ﻣﺘﻌﺪد اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ‬
- The minimum power that can be obtained from a single panel under standard test ‫ﻤﻜﻦ اﻟﺤﺼﻮل ﻋﻠﻴﻬﺎ ﻣﻦ اﻟﻠ ح اﻟﻮاﺣﺪ ﺗﺤﺖ ﻇﺮوف اﻟﻔﺤﺺ اﻟﻤﻌ ﺎر ﺔ‬ ‫اﻟﻄﺎﻗﺔ اﻟﺪﻧ ﺎ اﻟ‬-
conditions should not be less than 300 watts ‫وات‬300 ‫ﺠﺐ اﻻ ﺗﻘﻞ ﻋﻦ‬
Operating system 24V 24V ‫ﻧﻈﺎم اﻟ ﺸﻐ ﻞ‬-
- To be in conformity with international standards - IEC61215,IEC 61730 IEC61215,IEC 61730 - ‫ أن ﻜﻮن ﻣﻄﺎﺑﻖ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﻌﺎﻟﻤ ﺔ‬-
Have successfully passed the IEC61730 Part One and Part Two safety examination or its ‫اﻟﺠﺰﺋﻴ اﻷول واﻟﺜﺎ أو ﻣﺎ ﻌﺎدﻟﻬﻤﺎ‬ IEC61730 ‫ أن ﻜﻮن ﻗﺪ اﺟﺘﺎزت ﻓﺤﺺ اﻷﻣﺎن‬-
equivalent ‫ﺑﻨﺠﺎح‬
Application Class A board type, free from workmanship defects ‫ ﺧﺎﻟ ﻪ ﻣﻦ اﻟﻌﻴﻮب اﻟﻤﺼﻨﻌ ﺔ‬،Application Class A ‫ ﻧﻮﻋ ﻪ اﻟﻠ ح ﻣﻦ اﻟﻨ ع‬-
pcs
- Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell temp. 25°C Standard Test Conditions: Air mass 1.5; Irradiance = 1000W/m2; cell - 4
‫ﻋدد‬
Open circuit voltage not less than 38.5V temp. 25°C
Short circuit current? 10A 38.5V ‫ ﺗﻮﺗﺮ اﻟﺪارة اﻟﻤﻔﺘﻮﺣﺔ ﻻ ﻘﻞ ﻋﻦ‬-
Maximum power current: 8.5 amps 10A ? ‫ ﺗ ﺎر اﻟﺪارة اﻟﻘﺼ ة‬-
Maximum power potential: ? 29 volts ‫ أﻣﺒ‬8.5 ? : ‫ ﺗ ﺎر اﻟﻄﺎﻗﺔ اﻷﻋﻈ‬-
Receiver yield? 15th % ‫ ﻓﻮﻟﺖ‬29 ? : ‫ ﺟﻬﺪ اﻟﻄﺎﻗﺔ اﻷﻋﻈ‬-
Built-in diodes designed to prevent reverse currents % 15 ? ‫ ﻣﺮدود اﻟﻼﻗﻂ‬-
IP degree of protection? 66 ‫ دﻳﻮدات داﺧﻠ ﺔ ﻣﻦ ﺗﺼﻤ ﻢ اﻟﻠ ح ﻟﻤﻨﻊ اﻟﺘ ﺎرات اﻟﻌﻜﺴ ﺔ‬-
- Approved Standard IEC-61215 or IEC-61730 IP ? 66 ‫ درﺟﺔ اﻟﺤﻤﺎ ﺔ‬-
- The degree of inclination of the board is 45? or the nature of the area. IEC -61730 ‫ أو‬IEC-61215 ‫ اﻟﻨﻈﺎم اﻟﻘ ﺎ اﻟﻤﻌﺘﻤﺪ‬-
- 1x4mm2 galvanized copper jumper wires, red for the positive and black for the .‫ ?أو ﻃﺒ ﻌﺔ اﻟﻤﻨﻄﻘﺔ‬45 ‫ درﺟﺔ ﻣ ﻼن اﻟﻠ ح‬-
negative ‫ ﻟﻮن أﺣﻤﺮ ﻟﻠﻤﻮﺟﺐ وﻟﻮن أﺳﻮد ﻟﻠﺴﺎﻟﺐ‬1x4mm2 ‫ أﺳﻼك اﻟﺘﻮﺻﻞ ﻣﻦ اﻟﻨﺤﺎس اﻟﻤﺠﻠﻔﻦ‬-
negative ‫ ﻟﻮن أﺣﻤﺮ ﻟﻠﻤﻮﺟﺐ وﻟﻮن أﺳﻮد ﻟﻠﺴﺎﻟﺐ‬1x4mm2 ‫ أﺳﻼك اﻟﺘﻮﺻﻞ ﻣﻦ اﻟﻨﺤﺎس اﻟﻤﺠﻠﻔﻦ‬-
6.2.5 10-year warranty on all materials and against improper workmanship. .‫ ﺳﻨﻮات ﻟﺠﻤﻴﻊ اﻟﻤﻮاد وﺿﺪ ﺳﻮء اﻟﺘﺼ ﻴﻊ‬10 ‫ ﺿﻤﺎن ﻟﻤﺪة‬-

- The applicant must attach the data that guarantees the performance of the panels for ‫ﺳﻨﺔ ﺤ ﺚ ﻻ ﺗﻘﻞ ﺴ ﺔ‬10‫ﻋ اﻟﻤﺘﻘﺪم ارﻓﺎق اﻟﺒ ﺎﻧﺎت اﻟ ﺗﻀﻤﻦ أداء اﻷﻟﻮاح ل‬-
10 years, so that the rate of decline in performance is not less than 80% after 25 years, . ‫ وﻋ ﺳﻨﻮات ﻷي ﺧـﻠﻞ ﻓ‬، ‫ﺳﻨﺔ‬25 ‫ ﻌﺪ‬%80 ‫اﻧﺨﻔﺎض اﻷداء ﻋﻦ‬
and ten years for any technical defect. %16 ‫ اﻟ ﻔﺎءة اﻟﺪﻧ ﺎ ﻟﻸﻟﻮاح اﻟﺸﻤﺴ ﺔ ﺠﺐ أﻻ ﺗﻘﻞ ﻋﻦ‬-
The minimum efficiency of solar panels should not be less than 16%. %75 ‫( ﺠﺐ أﻻ ﻘﻞ ﻋﻦ‬Fill Factor) ‫ ﻣﻌﺎﻣﻞ اﻟﻤﻸ‬-
Fill factor must not be less than 75%. ‫ﺠﺐ أن ﺠﻬﺰ ﺼﻨﺪوق ﻗﺎ ﻞ ﻟﻠﻔﺘﺢ ﻟﻮﺻﻞ واﺳ ﺪال اﻟ ﻴ ﻼت ﻋﻨﺪ‬ ‫ ﻞ إﻃﺎر ﻟ ح ﺿﻮ‬-
- Each light panel frame must be equipped with an openable box to connect and replace ‫ ﻫﺬا اﻟﺼﻨﺪوق ﺠﺐ أن ﻜﻮن ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت‬. ‫اﻟﻠﺰوم وﻣﻨﻪ ﻳﺆﺧﺬ ﻣﺨ ج اﻟﻠ ح اﻟﻀﻮ‬
cables when necessary, from which the light panel output is taken. This box must be ‫ و ﺤﺘﻮي اﻟﺼﻨﺪوق ﻋ ﻓﻴﻮازات اﻟﺤﻤﺎ ﺔ‬،‫اﻟ ﻄﺎﻧ ﺔ أو ﻣﺎ ﻌﺎدﻟﻬﺎ و ﺘﺤﻤﻞ اﻟﻌﻮاﻣﻞ اﻟﺠ ﺔ‬
according to British specifications or its equivalent and bear weather factors, and the . ‫ﻣﻦ اﻟﺸﻮرت اﻟ ﻬ ﺎ و اﻟﺘ ﺎر اﻟﻌﻜ‬
box contains protection fuses from electrical shorts and reverse current. 2018 ‫ ﺳﻨﺔ ﺗﺼ ﻴﻊ اﻟﺨﻼ ﺎ اﻟﺸﻤﺴ ﺔ واﻷﻟﻮاح ﺠﺐ أﻻ ﺗﻜﻮن ﻗ ﻞ‬-
- The year of manufacture of solar cells and panels should not be earlier than 2018 .‫ﺳﺎﻋﺔ‬/‫ ﻢ‬120 ‫ ﻗﻮاﻋﺪ ﺗ ﺒ ﺖ اﻟﻠﻮاﻗﻂ ﻣﺠﻠﻔﻨﺔ وﺗﺘﺤﻤﻞ ﻋﺔ ر ﺎح‬-
- The bases for fixing the coils are galvanized and withstand a wind speed of 120 km/h. ‫ﻄ ﻘﺔ ﻏ ﻗﺎ ﻠﺔ‬ ‫ ﻞ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘﺎﻟ ﺔ ﺠﺐ أن ﺗﻜﻮن ﻣﻨﺤﻮﺗﺔ ﻋ ﻞ ﻟ ح ﺷﻤ‬-
- All of the following information must be engraved on each solar panel in an indelible :‫ﻟﻠﻤﺤـﻲ‬
way: . ‫ اﺳﻢ اﻟﺠﻬﺔ اﻟﻤﺼﻨﻌﺔ‬-
- The name of the manufacturer. ‫ اﻟﺮﻗﻢ اﻟ ﺴﻠﺴ ﻟﻠ ح ورﻗﻢ ﻣﻮد ﻠﻪ‬-
- Serial number and model number of the board ‫ ﺷﻬﺮ وﺳﻨﺔ اﻟﺼﻨﻊ‬-
Month and year of manufacture ‫ ﻣﻨﺤ اﻟﺘ ﺎر واﻟﻔﻮﻟﺘ ﺔ‬-
- current and voltage curve (Peak Wattage) ‫ اﻟﻮاﺗ ﺔ اﻟﻘﺼﻮى‬-
Peak Wattage (Im, Vm and FF) ‫ اﻟﺘ ﺎر اﻷﻋﻈ واﻟﺠﻬﺪ اﻷﻋﻈ وﻣﻌﺎﻣﻞ اﻟﻤ‬-
- Maximum current, maximum voltage and fill factor (Im, Vm and FF) ‫ ﻠﺪ اﻟﻤ ﺸﺄ‬-
- country of origin

6.2.6 Note ‫ﻣﻼﺣﻈﺔ‬


Supply and installation of a Gel battery type C10 - Deep cycle (high quality storage, an ‫ ) ﺗﺨ ﻦ ذات ﺟﻮدة ﻋﺎﻟ ﺔ ﻣﺎرﻛﺔ‬C10 - Deep cycle ‫ ﻧ ع‬Gel ‫ﺗﻮر ﺪ وﺗﺮﻛ ﺐ ﻄﺎر ﺔ‬
original brand), where the cell is the main component of the battery. Such as the ‫وﺗ ﺘﺞ اﻟﺨﻠ ﺔ ﻏﺎﻟ ﺎ ﺟﻬﺪا‬, ‫ﺗﺠﺎر ﺔ أﺻﻠ ﺔ ( ﺣ ﺚ ﺗﻌﺘ اﻟﺨﻠ ﺔ اﻟﻤﻜﻮن اﻟﺮﺋ ﺴ ﺔ ﻟﻠ ﻄﺎر ﺔ‬
internal resistance and drain current of the cell. The battery can consist of one cell or ‫ و ﻌﺘﻤﺪ ﻣﻘﺪار‬،‫ ﻓﻮﻟﺖ ﺑ ﻨﻤﺎ اﻷﻣﺒ اﻟﻤﺴﺘﻮﻋﺐ ﻓﻴﻬﺎ ﻳﺘﻐ ﺑﺘﻐ ﻣﺴﺎﺣﺘﻬﺎ‬2 ‫ﻛﻬ ﺎﺋ ﺎ ﻣﻘﺪارە‬
several cells, and the common type is six cells (6 cells x 2 volts = 12 volts) - it is of a deep- .‫ﺷﺤﻦ اﻷﻣﺒ ﻋ ﺧﺼﺎﺋﺺ أﺧﺮى ﻣﺜﻞ اﻟﻤﻘﺎوﻣﺔ اﻟﺪاﺧﻠ ﺔ وﺗ ﺎر اﻻﺳﺘ اف ﻟﻠﺨﻠ ﺔ‬/‫ﺗﻔ ــﻎ‬
cycle type and provided with gel as a medium to transfer the reactions between the ‫ ﺧﻼ ﺎ‬6) ‫ واﻟﻨ ع اﻟﺸﺎﺋﻊ ﺳﺘﺔ ﺧﻼ ﺎ‬،‫واﻟ ﻄﺎر ﺔ ﻤﻜﻦ أن ﺗﺘﻜﻮن ﻣﻦ ﺧﻠ ﺔ واﺣﺪة أو ﻋﺪة ﺧﻼ ﺎ‬
lead plates. ‫أن ﺗﻜﻮن ﻣﻦ ﻧ ع ﻋﻤ ﻘﺔ اﻟﺪورة وﻣﺰودة ﻤﺎدة اﻟﺠﻞ ﻛﻮﺳ ﻂ ﻟﻨﻘﻞ‬- (‫ ﻓﻮﻟﺖ‬12 = ‫ ﻓﻮﻟﺖ‬x 2
- That the battery production period should not be more than a year. The efficiency of .‫اﻟﺘﻔﺎﻋﻼت ﺑ أﻟﻮاح اﻟﺮﺻﺎص‬
charging and discharging is not less than 90% of the charge in the battery. - The number ‫ﻛﻔﺎءة اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﻻ ﺗﻘﻞ‬. ‫ ان ﻻ ﻜﻮن ﻗﺪ ﻣﺮ ﻋ ﻓ ة اﻧﺘﺎج اﻟ ﻄﺎر ﺔ أ ﻣﻦ ﻋﺎم‬-
of charging and discharging cycles should not be less than 3000 cycles at 50% of the load ‫ ﻋﺪد دورات اﻟﺸﺤﻦ واﻟﺘﻔ ــﻎ ﺠﺐ ان ﻻ ﺗﻘﻞ‬-.‫ ﻣﻦ اﻟﺸﺤﻨﺔ اﻟﻤﻮﺟﻮدة ﺎﻟ ﻄﺎر ﺔ‬%90 ‫ﻋﻦ‬
According to the following specifications:- -:‫ ﻣﻦ اﻟﺤﻤﻞ وﻓﻘﺄ ﻟﻠﻤﻮاﺻﻔﺎت اﻟﺘﺎﻟ ﺔ‬% 50 ‫ دورة ﻋﻨﺪ‬3000 ‫ﻋﻦ‬

6.2.7 Moisture-proof iron solar battery base:In number: Supplying a moisture-resistant iron ‫ ﺗﻮر ﺪ ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ‬:‫ ﺎﻟﻌﺪد‬:‫ﻗﺎﻋﺪة ﻄﺎر ﺎت ﺷﻤﺴ ﺔ ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ‬
solar battery base (original brand - at least one full year guarantee) and the price ‫ ﺿﻤﺎن ﺳﻨﺔ ﺎﻣﻠﺔ ﻋ اﻻﻗﻞ( واﻟﺴﻌﺮ ﺸﻤﻞ‬- ‫ﺣﺪ ﺪ ﻣﻘﺎوم ﻟﻠﺮﻃ ﺔ )ﻣﺎرﻛﺔ ﺗﺠﺎر ﺔ أﺻﻠ ﺔ‬
pcs
includes all that is needed to complete the item according to the specifications and .‫ﺟﻤﻴﻊ ﻣﺎ ﻠﺰم ﻹﻧﺠﺎز اﻟﺒﻨﺪ ﺤﺴﺐ اﻟﻤﻮاﺻﻔﺎت وﺗﻌﻠ ﻤﺎت اﻟﻤﻬﻨﺪس اﻟﻤ ف‬ 2
‫ﻋدد‬
instructions of the supervising engineer.

6.2.8 Battery Gel Deep cycle 150Ah : :Deep cycle ‫ أﻣﺑﯾر‬150 ‫ﺑطﺎرﯾﺔ ﺟل‬
Number: Supply and installation of a 150 amp deep cycle gel battery (original brand -Gel ‫ )ﻣﺎرﻛﺔ ﺗﺟﺎرﯾﺔ أﺻﻠﯾﺔ‬Deep cycle ‫ أﻣﺑﯾر‬150 ‫ ﺗورﯾد وﺗرﻛﯾب ﺑطﺎرﯾﺔ ﺟل‬:‫ﺑﺎﻟﻌدد‬
Gel - full two years warranty at least) and the price includes all necessary according to ‫ﺿﻣﺎن ﺳﻧﺗﯾن ﻛﺎﻣﻠﺔ ﻋﻠﻰ اﻻﻗل( واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ ﻣﺎ ﯾﻠزم ﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت‬ pcs
.‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 2
the attached specifications and instructions of the supervising engineer. ‫ﻋدد‬

6.2.9 note :- Inverters Supply, installation, commissioning and testing of a String (String inverter )‫ ﻟﻌواﻛس ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل وإﺧﺗﺑﺎر ﻣﺣول اﻟﻌﻛس‬: ‫ﻣﻼﺣظﺔ‬
inverter. The word “Inverter” means reversing the current from DC to alternating ‫اﻟﺗﯾﺎر‬,(AC) ‫( إﻟﻰ ﻣﺗردد‬DC) ‫( ﺗﻌﻧﻲ ﻋﻛس اﻟﺗﯾﺎر ﻣن ﻣﺳﺗﻣر‬Inverter) ‫ﻛﻠﻣﺔ اﻟﻌﺎﻛس‬,
current (AC). The direct current comes from either batteries or solar panels or -:‫اﻟﻣﺳﺗﻣر ﻣﺻدره إﻣﺎ ﻣن اﻟﺑطﺎرﯾﺎت أو اﻷﻟواح اﻟﺷﻣﺳﯾﺔ أو ﻛﻠﯾﮭﻣﺎ وﻓﻘﺄ ﻟﻠﻣواﺻﻔﺎت اﻟﺗﺎﻟﯾﺔ‬
both according to the following specifications:-
6.2.10 Inverter works in two systems (24V-240V (Hybrid solar inverter) with a capacity ‫ ( وﺑﻘدرة‬24V-240V(Hybrid solar inverter) ‫اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن‬
of 2500VA: :2500VA
Quantity: Supply, installation, commissioning and testing of an inverter 24V-240V(Hybrid ‫ ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل واﺧﺗﺑﺎر اﻧﻔرﺗر ﯾﻌﻣل ﺑﻧظﺎﻣﯾن‬:‫ﺑﺎﻟﻌدد‬
operating in two systems 24V-240V (Hybrid solar inverter) with a capacity of ‫ﺑﺣﯾث ﯾﺗﺣﻣل ﻣﺎ ﻻ ﯾﻘل ﻋن ﺿﻌف ﻗدرﺗﮫ ﻟﺑﺿﻊ‬2500VA ‫ ( وﺑﻘدرة‬solar inverter
2500VA so that it can withstand at least twice its capacity for a few seconds and ‫ وﻛﻔﺎءه ﻻ ﺗﻘل‬.‫ﺛواﻧﻲ وذو ﺣﻣﺎﯾﺔ اﺗوﻣﺎﺗﯾﻛﯾﺔ ﯾﻔﺻل ﻓﻲ ﺣﺎل زﯾﺎدة اﻟﺣﻣل او ارﺗﻔﺎع اﻟﺣرارة‬
has an automatic protection that disconnects in the event of an increase in the ‫ واﻟﻌﻣل ﯾﺷﻣل ﻛل ﻣﺎ ﯾﻠزم ﻹﻧﺟﺎز اﻟﻌﻣل وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت‬%95 ‫ﻋن‬ pcs
load or an increase in temperature. And an efficiency of not less than 95%, and ‫اﻟﻣﮭﻧدس اﻟﻣﺷرف‬ 1
‫ﻋدد‬
the work includes everything needed to complete the work, according to the
attached specifications and the instructions of the supervisin

6.2.11 Solar system installation accessories: ‫ ﺗورﯾد وﺗرﻛﯾب وﺗﺷﻐﯾل‬:‫ ﺑﺎﻟﻣﻘطوﻋﯾﺔ‬:‫ﻣﻠﺣﻘﺎت ﺗرﻛﯾب ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ‬
In the cut: the supply, installation and processing of applications for the supply ‫وإﺧﺗﺑﺎر ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻹﺗﻣﺎم ﺗرﻛﯾب وﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ وﺗﺷﻐﯾﻠﮭﺎ‬
and processing of energy - :‫وﻓﻘﺎ ً ﻟﻠﻧظم واﻟﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ ﻛﻣﺎ ﯾﻠﻲ‬
1. Two 63 amp circuit breakers. .‫ أﻣﺑﯾر‬63 ‫ ﻗواطﻊ‬2 ‫ ﻋدد‬.1
2. 1 MCCB breaker, 150 amps. .‫ اﻣﺑﯾر‬150 ‫ ﻗوة‬MCCB ‫ﻗﺎطﻊ‬1‫ ﻋدد‬.2
3. 3-line assembly box. .‫ ﺧط‬3 ‫ ﺻﻧدوق ﺗﺟﻣﯾﻊ‬.3
4. 2-line arrester. .‫ﺧط‬2 ‫ ﻗﺎطﻊ ﺻواﻋﻖ‬.4
5. amps and amps amps amps. .‫ أﻣﺑﯾر‬6‫ أﻣﺑﯾر و‬20‫ أﻣﺑﯾر و‬63 ‫ ﺑول‬2 ‫ ﻗواطﻊ ﺣﻣﺎﯾﺔ‬.5 Ls
6. A voltage monitor 100 amps 275 volts. .‫ ﻓوﻟت‬275 ‫ أﻣﺑﯾر‬100 ‫ ﻣراﻗب ﻓوﻟﺗﯾﺔ‬.6 ‫ﻣﻘطوﻋﯾﺔ‬ 1
7... DC and AC insulated copper wires with sizes suitable for the amounts of ‫ ﻣن اﻟﻧﺣﺎس ﺑﻣﻘﺎﺳﺎت ﻣﻧﺎﺳﺑﺔ ﻟﻛﻣﯾﺎت اﻟﺗﯾﺎر اﻟﻛﮭرﺑﺎﺋﻲ اﻟﻣﺎر‬AC‫ و‬DC ‫ اﺳﻼك ﻣﻌزوﻟﺔ‬. .7
electric current passing through them. .‫ﻓﯾﮭﺎ‬
And the price includes all the services and accessories required to supply the ‫واﻟﺳﻌر ﯾﺷﻣل ﺟﻣﯾﻊ اﻟﻣﺳﺗﻠزﻣﺎت واﻟﻣﻠﺣﻘﺎت اﻟﻣطﻠوﺑﺔ ﻟﺗﺟﮭﯾز ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬
solar energy as required. ‫ﺑﺎﻟﺷﻛل اﻟﻣطﻠوب وﻓﻘﺎ ﻟﻠﻣﻌﺎﯾﯾر اﻟﻌﺎﻟﻣﯾﺔ وان ﺗﻛون ﺟﻣﯾﻊ اﻟﻣﻠﺣﻘﺎت ذات ﺟودة ﻋﺎﻟﯾﺔ وﺧﺎﺿﻌﺔ‬
‫ﻟﻣواﻓﻘﺔ اﻟﻣﮭﻧدس اﻟﻣﺷرف وﺑﺣﺳب اﻟﻣواﺻﻔﺎت اﻟﻣرﻓﻘﺔ وﺗﻌﻠﯾﻣﺎت اﻟﻣﮭﻧدس اﻟﻣﺷرف‬

Total Amount of solar energy system work ‫إﺟﻣﺎﻟﻲ اﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬

Total summation ‫ اﻹذاﻋﺔ اﻟﻣدرﺳﯾﺔ‬+ ‫إﻻﺟﻣﺎﻟﻲ اﻟﻌﺎم ﻻﻋﻣﺎل ﻣﻧظوﻣﺔ اﻟطﺎﻗﺔ اﻟﺷﻣﺳﯾﺔ‬