18002-HSE-MG-004-00 HSE Project Management
18002-HSE-MG-004-00 HSE Project Management
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
Principal Subcontractor
MAHINDRA SUSTEN
Dibu. MK
Prepared by:
HSE Manager
A u t h o r i z e d b Muneer Nwairan
y: Project Director
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
Table of Contents
1. PURPOSE................................................................................................................................................3
2. SCOPE....................................................................................................................................................4
3. GENERAL INFORMATION.......................................................................................................................4
3.1 Glossary of Terms..............................................................................................................................4
3.2 Responsibilities..................................................................................................................................5
3.2.1 General Responsibilities.................................................................................................................5
4. Procedure..............................................................................................................................................5
4.1 HSE Committee:.................................................................................................................................5
4.2 HSE COMMUNICATION PROCEDURE.................................................................................................6
4.3 HSE REPORTING...............................................................................................................................10
4.4 Related Documents.........................................................................................................................13
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
1. PURPOSE
The purpose of this Procedure is to establish the minimum requirements for the
I. HSE Committee,
II. Communication procedure
III. HSE reporting at MSPL sites.
2. SCOPE
This procedure shall apply to all construction, assembly, pre-commissioning, commissioning and start-up
activities throughout the life-cycle/ duration of Sakaka project
All the requirements described in this procedure apply to the Construction, Pre-commissioning,
Commissioning activities performed by the CONTRACTOR and its SUBCONTRACTORS inside CONTRACTOR
fenced areas, if there is an activity that is performed in other contractor or owner areas, however shall be
applicable the other Contractor or Owner’ Procedure. If there is no such procedure, then this procedure
will be of application.
3. GENERAL INFORMATION
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
3.2 RESPONSIBILITIES
4. PROCEDURE
General:
I. Members to the Site HSE Committee are assigned by the Site Manager and the Site HSE Manager.
The Site HSE Committee shall consist of Management, HSE, and Craft personnel. The craft persons
shall be encouraged to take an active role in promoting and monitoring project HSE.
II. The Site HSE Committee will meet on a regular basis (no less than once per month or week),
preferably on the same day at the same time.
III. The Site HSE Committee reviews significant near misses, recordable injury/illnesses, and lost-time
incidents and discusses them to determine if further corrective action is necessary.
IV. The Site HSE Committee reviews and discusses findings from the Leading Indicator and
Inspections as well as any other inspections conducted since their last meeting and recommends
corrective measures to management.
V. The Site HSE Committee discusses employee HSE concerns and suggestions and offers solutions or
implements suggestions.
VI. The Site HSE Committee discusses jobs planned for the coming month, particularly HSE issues to
be addressed with craft employees.
VII. The Site HSE Committee offers topics for discussion at weekly toolbox meetings.
Committee Membership:
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
The Site HSE Manager is responsible for the coordination of internal and external
communication relevant to the Project HSE Management System.
The Site HSE Manager will maintain a Communication Log for relevant internal
communication between the various levels and functions of the project. The HSE
Manager will also maintain documentation on receiving, documenting and responding to
relevant communication from external interested parties.
The Project HSE Manager shall ensure that relevant HSE information is communicated
between the projects various levels and functions by the following means:
I. Prominent posting of the Site HSE Policy statement.
II. New employees shall be briefed on the site’s HSE Policy and its importance as
well as to HSE procedures related to their job. This may be accomplished as part
of the new employee orientation.
III. Posting of HSE information on bulletin boards, as appropriate
IV. HSE topics applicable to the site’s activities shall be included in HSE, as
appropriate.
V. Additional methods at the discretion of the site.
Site management shall encourage employees to offer suggestions, improvement ideas,
questions, or comments regarding HSE issues at the location. Facility management shall
consider and respond to each of these. This does not require every suggestion must be
implemented. It does require that all suggestions will be evaluated through the Lessons
Learned program.
External Communication
The Project will provide details of significant HSE concerns/issues upon request from
external parties. This information shall be facilitated through the Site HSE Manager.
Communication with Regulatory Bodies:
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
When a notice is received from a regulatory authority, the receiver should notify
the Site HSE Manager. A copy of the notice will be made and kept by the HSE
Department; a copy of the notice will be forwarded to the Global HSE Manager
with a covering note explaining the circumstances. Response to notice from
Regulatory Authorities shall be made in accordance with the time frame specified
on the notice.
Communication matrix:
MODE OF
CONTENT OF
GIVER RECEIVER COMMUNIC FREQUENCY RECORDS
COMMUNICATION
ATION
Health & Safety CEO of All employees and stake Policy Board, As & when
Policy MSP holders Web Site required
CEO of All employees and stake Policy Board, As & when
Environmental Policy
MSP holders Web Site required
Substance abuse CEO of All employees and stake Policy Board, As & when
policy MSP holders Web Site required
Before
Top sheet of
Hard copy, commencement
HSE Management Project Client, All employee of Plan, Training
Mail, Training of project and as
Plan Director project, Sub contractors, Records
Program & when required
afterwards
Client (if asked for Before
submission), Employees, Hard Copy, commencement Training
Security Project
Sub Contractor’s Mail, Training of project and as records
Management Plan Director
workmen, Supplier, Program & when required
Visitor afterwards
Before
Emergency Hard Copy, commencement
Clients, Employees, Sub Training
Management Plan & Project Induction of project and
Contractor’s workmen, Records
Fire Prevention & Director Training, as & when
Supplier, Visitor
Control Plan Mock Drill required
afterwards
Hard Copy,
Clients, Planning In –
Mail,
Waste Management Project Charge, Store Keeper, As and when Training
Induction
Plan Director Sub Contractor’s required Records
training
workmen, Supplier
program
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
Mail, Hard
Clients, Employees, Sub Copy,
Traffic Management Project As and when Training
Contractor’s workmen, Induction
Plan Director required Records
Supplier, Visitor Training
Program
Mail,
Project Director, Project MOM,
Subcontractors Discussion in
HSE HSE Committee Subcontracto
Performance Project HSE Monthly
Manager Members, Sub r Assessment
Assessment Report Committee
Contractors Report
Meeting
HSE Induction
All internal interested
training, Job
parties and external
specific HIRA (18002-
Hazard Identification Project interested parties like As and when
Training, Tool HSE-MG-014)
& Risk Assessment manager Customers, suppliers, required
Box Talk,
Sub Contractors,
Awareness
Workmen, visitors etc.
posters,
E Mail,
Issues related to Head - HSE
HSE Manager, Discussion As and when MOM of HSE
procurement of PPE Internation
Procurement Manager points in HSE required Meeting
& Safety devices al
Meeting.
Head –
Changes in the HSE All internal interested Document
HSE As and when it Document
Management system parties at relevant Change note
(Internatio takes place Change Note
elements functions and levels through mail
nal)
All internal interested
Project parties and external
Manager / interested parties like Document Prior starting of
SOP SOP
Departme Customers, suppliers, release the Project
ntal Head Sub Contractors,
Workmen, visitors etc
HSE Site Engineer /
All HSE inspection & Manager / Construction Manager / Relevant
Mail Daily
Observation report HSE Project Manager / BU forms
Engineer Head / BU HSE Head
Head – HSE Managers, Project
Audit
Internal HSE audit HSE Director, PM and other
Mail Yearly Schedule
schedule (Internatio relevant interested
nal) parties
18002-HSE-
Internal Audit
RP-006
observation report &
At least once in 18002-HSE-
summary and status Internal
Auditee Mail life of every CL-006a
including Non- Auditor
project 18002-HSE-
conformity and its
FO-006b
corrective action
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
nal)
Project EHS Committee
MOM of the HSE HSE Members, Project 18002-HSE-
Mail Monthly
Meeting Manager Director, Head – HSE FO-004a
(International)
Site Engineer /
Construction Manager /
Disciplinary Action Project Project Manager / HSE As & when Relevant
Mail
Report Director Manager/ HR Manager / acquired. form
Departmental Head /
Sub Contractor / Violator
Mail.
HSE Stats -
Discussion in
HSE Project Director, HSE 18002-HSE-
HSE Statistics Project HSE Monthly
Manager Head (International) FO-004b
Committee
Meeting
Incident /
Accident
Incident / Accident Site Project Director, HSE As & when Preliminary
Mail
Preliminary Report Engineer Manager acquired Report
18002-HSE-
RP-005a
Office
Project Director, Inspection
Office Inspection HSE
Administration manager, Mail Monthly Report
reports Manager
HR Manager 18002-HSE-
FO-009
Permitting
Authority
(Site
Engineer /
Sub Contractor’s As & When Relevant
Work Permits Constructi Mail
Supervisor required Work Permits
on
Manager /
HSE
Manager/
Mail,
Induction
training, Job Training
HSE All end users of the As & When
MSDS specific Records,
Manager material required
Training, Display Board
Display of
information
Mail,
MOM of the
Project Director, Discussion in
HSE Project
KPI Report Construction Manager, Project Monthly
Manager Committee
Committee Members Committee
Meeting
Meeting
Roles & HSE Clients, Sub Contractors, Organisation As & when HSE Plan,
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
General:
MSPL sites shall make every attempt to prevent the possibility of incidents and accidents
to employees when performing work activities.
The Following data will be collected and maintained
I. Incidents
II. Work Hours
III. HSE Inspections
IV. PTW Logs
V. HSE Training Data
VI. HSE Action Tracking Register
HSE will generate and distribute on the 03rd of each month the following reports:
o Monthly HSE Summary Report
o HSE Statistics Report
These reports will be distributed, minimally, to the following key personnel:
o Project Director
o Client Management
o MSPL HSE HO
o Construction managers
o Global HSE Head
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
- The total number of hours worked by all employees working in the premises, it includes
managerial,
- supervisory, professional, technical, clerical and other workers (including contractor workers,
security personnel & others)
- Man-hours worked shall be calculated from site record including overtime. When this is not
applicable, the same shall be estimated by multiplying the total Man days worked for the period
covered by the number of hours worked per day. The total number of Man days for a period is
the product of the number of persons engaged multiplied by the Man days worked.
Calendar days (including the scheduled days off such as weekends, company holidays, vacation days or
others off days, etc.) on which an employee is unable to work or is restricted in his work because of
occupational injury or illness. This does not include the day of the injury / illness and is based on his
ability to work rather than his work schedule.
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
The Lost Time Injury Rate uses the number of cases that contained lost work days. The calculation is made
by multiplying the number of incidents that were lost time cases by 200,000 and then dividing that by the
employee labour hours at the company.
Accident
- An unintended / unplanned occurrence which will result in personal injury, property loss
Reportable Lost Time Injury
- An Injury causing death (or) disablement (permanent/partial) of the injured person for 24 hours
or more excluding the day of the shift on which the accident occurred.
Dangerous Occurrence
- An unplanned event, whether it is attended by personal injury or disablement, which result in –
- Bursting of plant used for containing or supplying steam under pressure greater than
atmosphere pressure.
- Collapse or failure of crane, winch, chain pulley, hydra or other appliance or other appliance
used in raising or lowering goods or any part thereof, or the overturning of crane, hydra etc.,
- Explosion or fire or bursting out, leakage or escape of any hot substance causing injury to any
person or any room or place in which persons are employed
- Collapse or subsidence of any material, equipment, structure, scaffold
Hazard
Hazard is any existing or potential physical conditions in the workplace that itself or by interacting with
other variables can result in death, injuries, property damage or any other losses
Risk
Risk is likelihood that the hazard will result in an accident. Risk also considers how serious the resultant
injury would be
The OSHA Recordable Incident Rate (or Incident Rate) is calculated by multiplying the number of
recordable cases by 200,000, and then dividing that number by the number of hours at the company.
Severity Rate:
Number of man days lost due to reportable lost time injuries per million Man hours worked Man days
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00
HSE PROJECT MANAGEMENT
DOCUMENT: 18002-HSE-MG-004
405 MW dc SOLAR PV PLANT,SAKAKA- KSA
The latest version of this document is available in electronic format for consultation and document management.
Document: 18002-HSE-MG-004-00