Professional Documents
Culture Documents
647 Gad-Sh-2
647 Gad-Sh-2
C
A 150 C
L OF ABUTMENT/PILE CAP 150
L OF EXP. GAP A1
CL OF BEARING / ABUTMENT / CROSS GIRDER 750 CL OF CARRIAGE WAY
40 STRIP SEAL EXP. JOINT
8450
400THK. DIRT WALL
3500 475 7500 475
APPROACH SLAB CARRIAGE WAY
RCC RAILING
1100 WEARING COAT CONSTRUCTION JOINT
400 75mm THK. CEMENT
20 FILLER 800 F.R.L
CONCRETE(M30)
JOINT 275
300
3500
20 GAP
1060
3600 800 1875 800
300 SEISMIC
ARRESTER
BLOCK
(RB1) 2500 2500 1050
150 mm THK 650 650 TOP OF
PCC (M15) 1875 ABUTMENT CAP
12300
JACKING PORTION
800
ABUTMENT CAP
8450
WEEP HOLES 100 8450
L OF CARRIAGE WAY
DIA WITH AC PIPE 390 PTFE 3600 1200
IN 1:20 SLOPE BEARING
@1000 C/C
C
E ABUTMENT
3600 25
GAP
H1 3500
1925 1925
600 THK.
B FILTER MEDIA B 800
400
RETURN 1800
WALL
4000 1200
770
40 THK.STRIP SEAL EXP.JOINT
750 875
A 300
400 300
750 3600 750 RETURN WALL RETURN WALL
5100
DEPTH OFGIRDER
450
SECTIONAL ELEVATION OF ABUTMENT 700 505
CL OF EXPANSION JOINT
CL OF BEARING/CROSS GIRDER/
SCALE 1:75
1875
300 CL OF CARRIAGEWAY/BRIDGE
2192 410
CL OF GIRDER CL OF GIRDER C
L OF GIRDER
337
300
300(BRACKET)
DIRT 700 700 400 DIRT 700
DETAILS OF LEVELS & HEIGHT OF WALL WALL
850
ABUTMENT PORTION : 337 (RB2) 337 20 337
525
PTFE B3 (TYP.)
1. 100.11 M 250 390 BEARING (TYP.)
1790
HFL (RB1)
1390
870 570 870
2. FINISHED ROAD LEVEL 103.1 M PEDESTAL (RB1) B1 B1
305
SEISMIC
3. TOP OF ABUTMENT CAP 100.76 M NOTES : ARRESTER 1790 800 570
BLOCK ABUTMENT CAP 870 570
1. ALL DIMENSIONS ARE IN MM AND LEVELS B2
(RB2) (TYP.) PTFE BEARING [PTFE] PEDESTAL [PTFE] ABUTMENT CAP
4. TOP OF PILE CAP 98M ARE IN M. UNLESS OTHERWISE NOTED. 1725 2500 2500 1725
5. 8450
SCOUR LEVEL 95.595 M 590 1200
6.
SECTIONAL PLAN OF ABUTMENT CAP SHOWING
(FOND. LEV.) 76.2 M ABUTMENT
ARRANGEMENT OF PEDESTAL & BEARING
7. H1 3.15 M SCALE 1:75
8. 5.025 M
DETAIL - E
R1
SCALE 1:50
DIST.: WEST CHAMPARAN TITLE: GENERAL ARRANGEMENT DRAWING OF ABUTMENT DRAWN BY: Munna DATE : SEPT., 2023 SUPERSTAR DESIGNER PVT. LTD.
DEVELOPMENT OF RURAL EXECUTIVE ENGINEER,
BRIDGE :CONSTRUCTION OF RCC BRIDGE AT PMGSY ROAD KARIYA AS SHOWN
ROADS/BRIDGES IN THE STATE OF RURAL WORKS DEPARTMENT, DESIGNEDDIST.
BASAULI TO KARIYA BASAULI IN CHAINAGE 1.08 KM IN WEST CHAMPARAN BY: S.R. CONSULTANT & ENGINEERS
BIHAR UNDER NABARD SCHEME WORKS DIVISION PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT CHECKED BY: H.K. PATNA