Professional Documents
Culture Documents
Flooring
Flooring
Cement Rs 30
Cleaning Rs 20
Cost of Wall Tiling upto size 24" x 18"(fitted upto 8' ht) 155Rs/runft
Cost of Tile Rs 65
Cement Rs 30
Cleaning Rs 20
On completion of
3
second coat.
On completion of
3
second coat.
On completion of
4
third coat.
On completion of
fourth coat + acid
washing + cleaning
and rectification
and submission of
final bill with O.K.
clearance from site
Engineer counter
signed by P.M.
5
TOTAL
Green
1 Marble/Orange
Marble
3
Rounding of Marbles
4
Kadappa 1.5" thk
Rate per sq.
Type Origin
ft.
Rs 250 to Rs
Telephone black South India
290
Rs 180 to Rs
Normal black South India
220
Rs 120 to Rs
Lower black South India
160
Rs 250 to Rs
Red base Rajasthan
290
Rs 150 to Rs
other colours Rajasthan
230
Brands –
Somany, Kajaria
Tiles, NITCO,
Johnson
10%
Totally black
ZED/SPARTEK/CERAMIC/MRUDUL/SHON
G as per Mantri
85%
7.50%
7.50%
7.50%
100%
65Rs/sqft
90Rs-200RS/sqft
600Rs-1200Rs/Box
350RS-650Rs/Box
350Rs/Box
35Rs/Sqft
40Rs/sqft
40Rs/runft
30Rs/runft
4500Rs/Brass(100sqft)
3500Rs/Brass(100Sqft)
60Rs/sqft
Area Calculation of a Single Room
Area in Total
Unit Area Length Breadth Height Sqft Area in
Sqft
Floor Size 7'8" 4'9" - 36.4167 36
Bedroom Side Wall 4'9" - 7' 33.25
Entrance Side wall 1 2'3" - 7' 15.75
Bathroo Entrance Side wall 2 2'11" - 7' 20.4167
m Exhaust side Wall 4'7.5" - 7' 32.375 156
Common wall 6'8" - 7' 46.6667
Column Offset 1 1" - 7' 0.58333
Column Offset 2 12" - 7' 7
Bedroom Floor Size 14'3" 10'6" - 149.625
Room 194
Kitchen Floor Size 8' 5'6" - 44
Window
Sill Window 20' - 3" 5 5
Ventilato
r Ventilator 7' - 3" 1.75 2
Bathroom
Bathroom
Wall Tiles of size (330mmx 457mm)-(13" x 18")-Ceramic
Door D1-3'wide-Green Marble 10"-Chamfer and edge polish 14 - - - - 75 1062.5 0.607143 182.142857143 0.048571 46.14286 0.004048
Crush sand to be River sand to be Labour rates Labour rates for Labour rates
used is 80% of Cost of used is 20% of Cost of river Cement Cost of for fixing fixing Green for fixing Green Cost of
actual qty of sand crushsand actual qty of sand sand=8000Rs/bra grout grout i.e vitrified or Cost of labour for Marble Door Cost of labour for Marble labour for
required in brass =4500RS/b required in brass for ss required 45Rs/kg Ceramic work frame for work Window Sill for work
for ceramic and rass ceramic and vitrified in kg tiles /sqft 17.50sqft 27.50sqft
vitrified tiles tiles
23,969.76 9,208.05
35,177.81
Level Unit Length
Rise 4'11.5"
Tread 4'11.5"
Landing 1 4'11.5"
GF to FF Landing 2 4'11.5"
Landing 3 3'10"
Landing 4a 4'8.5"
Landing 4b 6'7.5"
Rise 4'11.5"
Tread 4'11.5"
Landing 1 4'11.5"
FF to SF
Landing 2 3'10"
Landing 3a 4'8.5"
Landing 3b 6'7.5"
Area
Tile Type Area in sqft
Rise-Orange Marble 48
Tread-Green Marble-Polished 78
Landing 1-Ceramic tiles-(300 x
11
300mm)(1' x 1')
Landing 2-Ceramic tiles-(300 x
20
300mm)(1' x 1')
GF to FF
Landing 3-Ceramic tiles-(300 x
19
300mm)(1' x 1')
Landing 4a-Ceramic tiles-(300 x
34
300mm)(1' x 1')
Landing 4b-Ceramic tiles-(300 x
25
300mm)(1' x 1')
Rise-Orange Marble 48
Tread-Green Marble-Polished 78
Landing 1-Ceramic tiles-(300 x
20
300mm)(1' x 1')
Subtotal cos
- 6.5" 2.68576388888889 18
10.5" - 4.33854166666667 18
2'2" - 10.7430555555556 1
4'1.5" - 20.453125 1
5' - 19.1666666666667 1
7'1.5" - 33.546875 1
3'10" - 25.3958333333333 1
- 6.5" 2.68576388888889 18
10.5" - 4.33854166666667 18
4'1.5" - 20.453125 1
5' - 19.1666666666667 1
5'5.5" - 25.6996527777778 1
3'10" - 25.3958333333333 1
Number of Tiles Number of Boxes Price of per Box Price of per Tile
- - - -
- - - -
11 1 - -
20 2 - -
19 2 - -
34 3 - -
25 3 - -
- - - -
- - - -
20 2 - -
19 2 - -
26 3 - -
25 3 - -
Subtotal cost
- - -
0.14056875 0.14056875 632.559375
- - -
0.14056875 0.14056875 632.559375
0.361145833333333 1,625.16
River sand to be used is 20%
Labour rates for
of actual qty of sand Cost of river Cost of labour for
fixing vitrified or
required in brass for sand=8000Rs/brass work
Ceramic tiles /sqft
ceramic and vitrified tiles
- - - -
- - - -
- - - -
- - - -
30 2677.5 - - -
- - 30 2677.5 30
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
30 2677.5 - - -
- - 30 2677.5 30
- - - - -
- - - - -
- - - - -
- - - - -
5,355.00 5,355.00
15,536.84
50,162.80
Cost of
labour for
work
-
2677.5
-
2677.5
-
-
15,536.84
50,162.80