You are on page 1of 19

Project : PROPOSED GORDONS COMMERCIAL CENTER

Location :

BILL OF QUANTITIES
BILL NO. SUMMARY

SCOPE OF WORKS Value(Kina)


1 PRELIMINARIES 7,238,181.82
2 GROUNDWORKS 7,418,545.45
3 STRUCTURAL CONCRETE 14,349,636.36
4 FORMWORKS & SCAFFOLDINGS 8,402,181.20
5 CONCRETE REINFORCEMENT 13,781,636.36
6 MASONRY WORKS 12,452,181.82
7 WATERPROOFING/MOSITURE PROTECTION 7,660,000.00
8 STRUCTURAL STEEL WORKS 14,694,363.64
9 METALS & ALUMINUM WORKS 7,322,363.64
10 CARPENTRY AND JOINERY 9,139,090.91
11 HARDWARE 4,986,727.27
12 ROOFING AND ROOF PLUMBING 11,351,454.55
13 CEILINGS, PARTITIONS AND LININGS 10,887,272.73
14 DOORS, WINDOWS AND GLAZING 14,154,000.42
15 FINISHES 8,738,909.19
16 PAINTING 9,839,818.19
17 HYDRAULICS 9,502,727.28

18 ELECTRICAL & TELECCOMMUNICATIONS SERVICES 9,899,090.99

SUB-TOTAL (Bill No.1 to Bill No.21) = 181,818,181.82


GST (10%) = 18,181,818.18

TOTAL BUDGET ESTIMATE CONSTRUCTION COST = 200,000,000.00


BILL NO. 1
Unit Qty Rate (Kina)
GENERAL & PRELIMINAIES
I. PRELIMINARIES
a. Mobilize Contractors plant and site establishment L.S. 1.00 723,818.18

Attendance Fee (material handling and temporary works such as


b. L.S. 1.00 579,054.55
scaffoldings, power and water supply, rubbish clearance etc.)

Demobilize Contractors plant and site establishment and restore


c. L.S. 1.00 1,447,636.36
establishment area
Survey stake out and layout all permanent works prior to
commencement of work permanent structure. This should includes
d. L.S. 1.00 361,909.09
all surveyor's fees to make sure the building is constructed within the
boundary area.
Supply and construct temporary facilities and utilities including
e. LOT 1.00 868,581.82
fencing and hoarding
Provision for As-Built Drawings (Architectural, Structrural, Electrical,
g. Mechanical, Fire & Hyrdaulics). Soft (CD) & Hard (A3) copies to be L.S. 1.00 361,909.09
submitted to the Client and the Architect.
h. Provisions for Protective measures / safety / security L.S. 1.00 723,818.18
Provision for Delivery of Materials (Local & International including
i. L.S. 1.00 2,171,454.55
GST, Freight Duty & Delivery)
BILL NO. 1 - PRELIMINARIES TOTAL CARRIED TO SUMMARY
BILL NO. 2
Unit Qty Rate (Kina)
GROUNDWORKS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


Excavation of PadFooting, Wall footing, Footing Tiebeam,
f. Underground water tank and all other Item necessary for Foundation L.S. 1.00 2,225,563.64
Works
MAIN BUILDING
COMMERCIAL CENTER BUILDING L.S. 1.00 2,225,563.64

Supply, place and compact suitable compacted FILL


MATERIALS/compacted Engineered backfill to its designed level.
g. Layering and conpaction shall conform on the Structural Notes as
approved by Engr. accordance in with the design and specification.
See structural drawings for details.

COMMERCIAL BUILDING L.S. 1.00 1,483,709.09


SUB BUILDING L.S. 1.00 1,483,709.09

Supply place and compact Hardcore Fill Materials or approved


equivalent for structure, all footing shall be founded on a 200mm of
compacted hard- core fill materials. Layering and conpaction shall
h.
conform on the Structural Notes as approved by Engr. accordance
in with the design and specification. See structural drawings for
details.
BILL NO. 2 - GROUNDWORKS TOTAL CARRIED TO SUMMARY
BILL NO. 3
Unit Qty Rate (Kina)
STRUCTURAL CONCRETE WORKS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS

Structural Concrete: including 25Mpa @ 28 days in accordance


with the design and specification of the approved plan

a. COMMERCIAL / SUB BUILDING


Underground Watertank Concrete in situ slabs including Visqueen
High Performance DPM 500UM with Jointing System or Approved L.S. 1.00 717,481.82
Equivalent
PAD FOOTINGS including Visqueen High Footing Tie Beam
L.S. 1.00 1,004,474.55
incuding Visqueen High
Performance DPM 500UM with Jointing System or Approved
L.S. 1.00 1,865,452.73
Equivalent
Concrete Pier L.S. 1.00 1,721,956.36
Column Concrete Filled L.S. 1.00 1,721,956.36
Concrete Girder (CGB) L.S. 1.00 1,721,956.36
Floor Slab L.S.
Ground Floor Slab & WALKWAY- 150mm thick RC slab L.S. 1.00 3,013,423.64
Concrete Wall Guard along Waiting Area L.S. 1.00 1,147,970.91
Non-Shrink Leveling Grout as approved by an Engineer lot 1.00 1,434,963.64
BILL NO. 3- STRUCTURAL CONCRETE WORKS TOTAL CARRIED TO SUMMARY
BILL NO.4
Unit Qty Rate (Kina)
FORMWORKS & SCAFFOLDINGS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS

FORMWORKS & SCAFFOLDINGS (Supply and Install


Formworks & Scaffoldings necessary to support all Structural
Concrete Works in Accordance with the plans, and other related
works that needs scaffoldings, etc.)

Face of Pad Footings L.S. 1.00 840,218.12


Pedestal Upstand L.S. 1.00 924,239.93
Face of the Strip Footing L.S. 1.00 1,008,261.74
Face of the wall Footing L.S. 1.00 1,008,261.74
Face of Footing Tie beam L.S. 1.00 1,260,327.18
Formworks for all concrete stairs L.S. 1.00 1,680,436.24
Formworks for Suspended Slabs L.S. 1.00 1,260,327.18
Supply & Install Scaffoldings lot 1.00 420,109.06
BILL NO. 4 - FORMWORKS & SCAFFOLDINGS TOTAL CARRIED TO SUMMARY
BILL NO. 5
Unit Qty Rate (Kina)
CONCRETE - REINFORCEMENT
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


Supply, fabricate and install REINFORCEMENT for concrete
Structure - deformed steel bar & Reomesh in accordance with the
plan and drawing.
Steel Grade 410Mpa, shall be PNGS 1003
MAINBUILDING
Underground Watertank Concrete in situ slabs. kgs 38,762.55 35.55
Pad Footing/ Pedestal Footing kgs 58,143.82 35.55
Footing Tie Beam kgs 58,143.82 35.55
Wall Footing/Strip Footing kgs 77,525.10 35.55
Floor Slab
Floor Slab to Mech. Floor .- 125mm thick RC slab kgs 155,050.19 35.55
BILL NO. 5 - CONCRETE-REINFORCEMENT CARRIED TO SUMMARY
BILL NO.6
Unit Qty Rate (Kina)
MASONRY WORKS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
Fifth Edition January 1990, authorised by agreement between
a.
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association
Australia, Inc.

IV. GENERAL ITEMS

200mm Thick Masonry Wall (400x200mm Nominal Hollow


Concrete Blocks in accordance with AS 2733 built in stretcher bond
in mortar to AS 1475, Loadbearing walls, Concrete filling 20MPA
Vibrated reinforced concrete filling-see structural with complete
Reinforcements, Shear Studs & Angle Bracket to Steel Columns &
Beams Connections). See structural drawings and notes for details.

WL-1 200mm Blockwalls L.S. 1.00 12,452,181.82


BILL NO. 6 - MASONRY WORKS TOTAL CARRIED TO SUMMARY
BILL NO.7
Unit Qty Rate (Kina)
WATERPROOFING/MOISTURE PROTECTION
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS

"ARDEX " (Torch Applied Membranes-applied in accordance w/ the


manufacturer's instuction contained in the technical sheet(S) for wall
and floor waterproof membrane) or Approved Equivalent
Flooring lot 1.00 1,532,000.00
Brick Wall lot 1.00 1,532,000.00
Waiting Area, Breakout area lot 1.00 766,000.00
Cleaners room lot 1.00 766,000.00
female toilet lot 1.00 459,600.00
male toilet lot 1.00 459,600.00
Balcony lot 1.00 995,800.00
Office Area lot 1.00 1,149,000.00
BILL NO.7 - WATERPROOFING/MOISTURE PROTECTION TOTAL CARRIED TO SUMMARY
BILL NO. 8
Unit Qty Rate (Kina)
STRUCTURAL STEEL WOEKS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


Supply materials , fabricate and install STRUCTURAL STEEL to
include all the necessary bracing etc.. in accordance with the
appproved plans and specifications
Steel Column with surface preparation and primer coat as
specified
a.) C- 460 UB 82.1 kgs 39,373.96 93.30
b.) C- 410 UB 59.2 kgs 23,624.38 93.30
Steel Beam with surface preparation and primer coat as
specified
Floor Framing
Main 460 UB 82.1 kgs 62,998.34 93.30
Sub UB 59.2 kgs 31,499.17 93.30
BILL NO. 8 - STRUCTURAL STEEL WORKS TOTAL CARRIED TO SUMMARY
BILL NO. 9
Unit Qty Rate (Kina)
METAL & ALUMINUM WORKS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS

Provide materials and construct to manufacturer's details the stairs


Hand Railings
STAIR RAILINGS - ø50mm x 1.6mm thk 304 Stainless Steel Pipe
Handrail in Mirror Finish, ø50mm x 2.0mm thk 304 Stainless Steel
Pipe vertical in accordance with the approved plan and drawings
(Verify Manufacturer's Standard).

Stair Case Railings Stainless L.S. 1.00 2,196,709.09


Ramp Railings L.S. 1.00 1,098,354.55
Balcony Railings L.S. 1.00 4,027,300.00
Provide materials and construct to manufacturer's details for the
Balcony Glass railings
BILL NO. 9 - METAL & ALUMINUM WORKS TOTAL CARRIED TO SUMMARY
BILL NO. 10
Unit Qty Rate (Kina)
CARPENTRY AND JOINERY
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS

Supply materials and install all necessary hardware including but not
limited to Doors, windows, cabinet, accessories, etc in accordance L.S. 1.00 9,139,090.91
with the approved plans & specifications, U.N.O

BILL NO. 10 - CARPENTRY AND JOINERY TOTAL CARRIED TO SUMMARY


BILL NO. 11
Unit Qty Rate (Kina)
HARDWARE
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS

Supply materials and install all necessary hardware including but not
limited to Doors, windows, cabinet, accessories, etc in accordance L.S. 1.00 4,986,727.27
with the approved plans & specifications, U.N.O

BILL NO. 11 - HARDWARE TOTAL CARRIED TO SUMMARY


BILL NO. 12
Unit Qty Rate (Kina)
ROOFING & ROOF PLUMBING
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


The Roof, Canopy and Gutter materials and installation to include all
necessary structural and non-structural support.
ROOFING WORKS
0.60mm BMT Lysaght Steel Grade G550, Coating AZ150 or
Approved equivalent to architects Approval with 450 Sisaltion
Draped Over Roof Purlins on Wire Netting Support (Chicken Wire
assembly 1.00 6,810,872.73
Aperture 1 1/2" or 40mm, Gauge 22). Roof Pitch min. of 10 deg.
Includes Flashings, Ridge Caps, Valley Gutter, Downpipes & other
accessories.
ROOF OVER - 4mm Aluminum Composite Panel on Manufacturer's
Standard Aluminum Frame System w/ Nano Surface Finish (Panels
should be Non-Combustible) with CHS Steel Pipe Bracing Support assembly 1.00 4,540,581.82
including accessories. See Structural Connection as to Engineer
Details.

BILL NO. 12 - ROOF & ROOF PLUMBING TOTAL CARRIED TO SUMMARY


BILL NO. 13
Unit Qty Rate (Kina)
CEILING, PARTITIONS AND LININGS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


CEILING PANEL

Supply and Install Ceiling Panel with standard Gyprock Ceiling


framing System in accordance with the plans & specifications

COMMERCIAL BUILDING
Exposed Slab Soffit sq.m. 4536.36 360.00
13mm Gyprock Firecheck Plastered Board sq.m. 9988.32 436.00
13mm tck Gyprock Aquacheck Wet Areas sq.m. 3745.62 436.00
600x600mm Acoustic Ceiling Board sq.m. 9072.73 360.00
BILL NO. 13 - CEILINGS + PARTITIONS TOTAL CARRIED TO SUMMARY
BILL NO. 14
Unit Qty Rate (Kina)
WINDOWS AND GLAZING
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


All Doors, Windows and Glazing should be in accordance with the
approved plans & specifications

All Doors & Windows should include all necessary accessories


such as Door locks, door closer, door stopper, door hinges (4 pcs
per door) etc. "Lockwood" brand or approved equivalent.

Double-leaf 8mm THK Tempered tinted glass on powder coated


L.S. 1 3,538,500.11
aluminum frames.
Single-leaf 8mm THK Tempered tinted glass on powder coated
L.S. 1 2,547,720.08
aluminum frames.
Marine Plywood flush hollow core door in Ducco finish, L.S. 1 990,780.03
Fire rated steel door in epoxy paint finish, L.S. 1 707,700.02
Aluminum Sliding window (closable & lockable) aluminum frame on
L.S. 1 2,123,100.06
powder coated finish to manuf's details.

Fixed laminted tempered tinted glass (Exterior 6mm tinted tempered


glass+interior 6mm tinted tempered glass) on powder coated
L.S. 1 4,246,200.13
aluminum frames, including all structural and non-structural
connection accessories. To manufacturer's detail.
BILL NO. 14- WINDOWS AND GLAZING TOTAL CARRIED TO SUMMARY
BILL NO. 15
Unit Qty Rate (Kina)
FINISHES
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


WALL FINISH

Render-25mm thick cement Plastering, lime and sand (1:0:6) render


in two coats with a wood float finish to an approved finish externally
on Masonry Walls, Cement render 25mm thick suitably finished to
receive paint as specified.

Exterior rendered in smooth cement finish with Ardex Water Proffing


L.S. 1.00 1,310,836.38
(Shelterguard)
Interior in Lifestyle Intonaco Stucco Plaster Finish L.S. 1.00 1,310,836.38
WTL - 300x300mm Glazed Ceramic Tiles (Toilets) L.S. 1.00 436,945.46
FLOOR FINISH
Supply labour and material to intall Ceramic Floor tiles w/
elastomeric tile adhesive over waterproofing including grout and
necessary accessories as specified on the approved plan and
drawing to Architect details.
600X600MM Glazed Ceramic Tiles L.S. 1.00 2,621,672.76
600x600MM non-slipped Ceramic Tiles (indoor) L.S. 1.00 1,747,781.84
600x600MM non-slipped Ceramic Tiles (outdoor) L.S. 1.00 873,890.92
Taxtiles Rubber Tiles L.S. 1.00 436,945.46
BILL NO. 15 - FINISHES TOTAL CARRIED TO SUMMARY
BILL NO. 16
Unit Qty Rate (Kina)
PAINTING
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


WALL PAINTING
Supply labour, materials and necessary tools to execute the painting
works for WALLS in accordance with approved plan and
specification
Exterior rendered Wall L.S. 1.00 2,951,945.46
Interior rendered Wall L.S. 1.00 1,967,963.64
Columns - Painted with Fire Retardant Paint-Intumescent (FR:
L.S. 1.00 491,990.91
120/120/120)
Columns - Top Coat Painted with 3coats final Paint - Dulux Metal
L.S. 1.00 491,990.91
Shield Epoxy Paint
CEILING PAINTING
Supply labour, materials and necessary tools to execute the painting
works for ceilings in accordance with approved plan and
specification- Painted with 1 undercoat and 3 coats of final paint -
Latex Paint - Semi Gloss
Exposed Slab Soffit L.S. 1.00 1,574,370.91
Gyprock Firecheck Plastered Board L.S. 1.00 1,672,769.09
Gyprock Aquacheck Wet Areas L.S. 1.00 688,787.27
BILL NO. 16 - PAINTING TOTAL CARRIED TO SUMMARY
BILL NO. 17
Unit Qty Rate (Kina)
HYDRAULICS
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


WATER SUPPLY
PLUMBING FIXTURES & ACCESSORIES in accordance with the
plans & specifications.
SSK lot 1.00 190,054.55
Sink (SK) and Accessories lot 1.00 190,054.55
Water Closet (WC) and Accessories lot 1.00 190,054.55
Disable Water Closet (WC) and Accessories lot 1.00 380,109.09
Disable Basin and Accessories lot 1.00 380,109.09
Basin (B) and Accessories lot 1.00 190,054.55
Floor Drain (FD) and Accessories lot 1.00 190,054.55
LINEAR Floor Drain and Accessories lot 1.00 190,054.55
Urinal (U) and Accessories lot 1.00 190,054.55
DRAINAGE SYSTEM & SEWERLINES in accordance with the
approved plans
Provision for PNGWaterboard to connect sewerlines to the public
L.S. 1.00 475,136.36
sewer system
Area Drain Catch Basin sets 1.00 1,425,409.09
Contractor to provide sump pumps of rating 1.5kW sump pit
lot 1.00 950,272.73
(1500mm x 1500mm x 1500mm).
FIRE SERVICES SYSTEM 0
Provide materials and install Fire Services Lines with complete
accessories & fittings in accordance with the approved plan and assy 1.00 570,163.64
specification
Supply and install complete fire hydrant pump sets of 10 L/s @
assy 1.00 475,136.36
1100kPA, Rating1.5kW
Supply and install complete Jockey pumps of 1.26L/s @ 1100kPA,
assy 1.00 475,136.36
Rating1.5kW
Supply and install complete transfer pump sets of 2.45 L/s @
assy 1.00 475,136.36
400kPA, Rating 1.0kW
Supply and install complete booster pump sets of 3.22 L/s @
assy 1.00 475,136.36
300kPA, Rating 1.0kW
Supply & Install Fire Brigade Booster Valve Assembly with 65mm
assy 1.00 475,136.36
RPZD allow for all required fixtures & fittings.

Supply & Install Fire Hoose Reels (FHR) with complete accessories
set 1.00 380,109.09
& fittings in accordance with the plan & specification

Supply & Install Fire Hydrants (FH) with complete accessories &
set 1.00 380,109.09
fittings in accordance with the plan & specification

Supply & Install WATER TANK BAFFLES) with complete


set 1.00 475,136.36
accessories & fittings in accordance with the plan & specification

PRE-TEST & COMMISIONING LOT 1.00 380,109.09


BILL NO. 17 - HYDRAULICS TOTAL CARRIED TO SUMMARY
BILL NO. 18
Unit Qty Rate (Kina)
ELECTRICAL & TELECOMMUNICATIONS SERVICES
I. MEASUREMENT AND DEFINITIONS
The Contractor is referred to Bill No. 1 - Preliminaries for full details
a.
of 'Measurement and Definitions'.
II. SPECIFICATION
The Contractor is referred to the Specifications for full descriptions of
a. materials, workmanship, etc. and shall allow here or in his prices for
all costs incurred therewith.
III. METHOD OF MEASUREMENT

This Bill of Quantities has been measured in accordance with the


Australian Standard Method of Measurement of Building Works -
a. Fifth Edition January 1990, authorised by agreement between
Australian Institute of Quantity Surveyors and The Master
Contractors' - Construction and Housing Association Australia, Inc.

IV. GENERAL ITEMS


ELECTRICAL SITE WORKS
Mains temporary power board connected to distribution board at site
offices. Two circuits run within site to provide all weather temp power L.S. 1.00 197,981.82
distribution.

Connect security lighting to poles. Poles and lights excluded. L.S. 1.00 197,981.82

SWITCHBOARDS -
Supply & Install Complete ATS in accordance with the plans &
set/ 1.00 692,936.37
Specifications
Supply & Install Complete MDB in accordance with the plans &
set/ 1.00 692,936.37
Specifications

Supply & Install Complete Sub Distribution Board to all area Needed set/ 1.00 593,945.46

LIGHTINGS, SWITCHES & GPO's


Supply & Install complete Luminaires & Switches in Accordance with
the plans & specifications. Switches and accessories or approved
equivalent.
MAIN BUILDING
Ceiling Recessed LED Modular Luminaire, 600x600mm, IP20 with
3000K LED, Svelte EL-SVT-1001-0 or approved equivalent, 24 L.S. 1.00 692,936.37
Watts
compact IP6G LED Luminare. Complete with 4000K LED. Forceled
L.S. 1.00 692,936.37
4000 HF L840 OR Approved Equal. 34W
Same as above except emergency version forceled 4000 HF E3
L.S. 1.00 593,945.46
L840 approved equal. 34W
Recessed LED Downlight in a 200mmØ cut- out. 4000K LED
supplied with pre-wired flex and plug. Chal 200 LED2000-840 HF L.S. 1.00 593,945.46
RSB FP. 18W
10A single way switch. Clipsal standard series or approved
L.S. 1.00 593,945.46
equivalent.
PIR Occupancy type motion sensor with integral timer position
sensor to activate local circuit when area/ space is occupied. Clipsal
L.S. 1.00 593,945.46
751R3 wire infrasccan or hager EEB10 series presence sensor or
approved equivalent.

10A, 240V single switched power outlet (CLIPSAL C2000 SERIES) L.S. 1.00 692,936.37

10A 240V double switched socket outlet (Clipsal C2000 Series) L.S. 1.00 692,936.37

Permanent Power Connection via isolator.1Ø 20A L.S. 1.00 692,936.37

Three phase switched socket outlet equal to clipsal 56C532.Provide


L.S. 1.00 692,936.37
plug equal to clipsal 56P532. Rating is indicated. 32A

STAIR / STEP LIGHTS


Recessed LMS Mini LED step lights (LMS-3K-L-WH) L.S. 1.00 494,954.55
BALCONY UP LIGHTS -
Recessed LMS Mini LED step lights (LMS-3K-L-WH) L.S. 1.00 494,954.55
BILL NO.18 - ELECTRICAL & TELECOMMUNICATIONS SERVICES TOTAL CARRIED TO SUMMARY
Amount (Kina)

723,818.18

579,054.55

1,447,636.36

361,909.09

868,581.82

361,909.09

723,818.18

2,171,454.55
7,238,181.82

Amount (Kina)

2,225,563.64

2,225,563.64

1,483,709.09
1,483,709.09

7,418,545.45

Amount (Kina)
717,481.82

1,004,474.55

1,865,452.73

1,721,956.36
1,721,956.36
1,721,956.36

3,013,423.64
1,147,970.91
1,434,963.64
14,349,636.36

Amount (Kina)

840,218.12
924,239.93
1,008,261.74
1,008,261.74
1,260,327.18
1,680,436.24
1,260,327.18
420,109.06
8,402,181.20

Amount (Kina)
1,378,163.64
2,067,245.45
2,067,245.45
2,756,327.27

5,512,654.54
13,781,636.36

Amount (Kina)

12,452,181.82
12,452,181.82

Amount (Kina)
1,532,000.00
1,532,000.00
766,000.00
766,000.00
459,600.00
459,600.00
995,800.00
1,149,000.00
7,660,000.00

Amount (Kina)

3,673,590.91
2,204,154.55

5,877,745.46
2,938,872.73
14,694,363.64

Amount (Kina)

2,196,709.09
1,098,354.55
4,027,300.00

7,322,363.64
Amount (Kina)

9,139,090.91

9,139,090.91

Amount (Kina)

4,986,727.27

4,986,727.27

Amount (Kina)

6,810,872.73
4,540,581.82

11,351,454.55

Amount (Kina)

1,633,090.91
4,354,909.09
1,633,090.91
3,266,181.82
10,887,272.73

Amount (Kina)

3,538,500.11

2,547,720.08

990,780.03
707,700.02

2,123,100.06

4,246,200.13
14,154,000.42

Amount (Kina)

1,310,836.38

1,310,836.38
436,945.46

2,621,672.76
1,747,781.84
873,890.92
436,945.46
8,738,909.19

Amount (Kina)

2,951,945.46
1,967,963.64

491,990.91

491,990.91
1,574,370.91
1,672,769.09
688,787.27
9,839,818.19

Amount (Kina)

190,054.55
190,054.55
190,054.55
380,109.09
380,109.09
190,054.55
190,054.55
190,054.55
190,054.55

475,136.36

1,425,409.09

950,272.73

570,163.64

475,136.36

475,136.36

475,136.36

475,136.36

475,136.36

380,109.09

380,109.09

475,136.36

380,109.09
9,502,727.28

Amount (Kina)
197,981.82

197,981.82

692,936.37

692,936.37

593,945.46

692,936.37

692,936.37

593,945.46

593,945.46

593,945.46

593,945.46

692,936.37

692,936.37

692,936.37

692,936.37

494,954.55

494,954.55
9,899,090.99

You might also like