END PROTECTION WALL DETAILset
ormancf excess
DISPLAY AREA REA
aoe
sane,
Sa
=
Fae oa
cet | Pesce) gop ate | nme
TYPICAL FRANE FRONT ELEVATION FRONT ELEVATION Puan] sare | Datel | ot | fae) comptes
ELEVATION (OPTION 1) (OPTION 2) [aren comer ane
ome rin sit pl oma gn fi ca hn ith
My PET ll ceo
122.3. Forintastuctur pecs, pain sgrboard mtb sub ames
{or cior day te proj anand shal opted a ton a
THIS IS WHERE YOUR TAXES GO ‘ho aah ees. The dn ad mat beau, as Som
[NAME OF PROJECT: index, sot have te olningspecicaos
LOCATION:
“aaa. wo, 8 xR
NAME OF CONTRACTOR: Resin: 7
DATE STARTED: fechas
‘CONTRACT COMPLETION DATE: Fe le Mal fron
‘Subinmaton
‘CONTRACT Cosr: peek
IMPLEMENTING OFFICE:
‘SOURCES OF FUNDS:
onesie
= 5BDIW-PRS e2
ZONE 3 NARA
SCALE 390m (CONTOUR INTERVAL = METER
{0D OF TERIZED TOPO:
SURVEY, USING GHGS RIK HYPER Hf GNSS RTH CRS
RErERENCE COOROMATE SYSTEM = PRSEZ-PTIN
{VERTICAL OATUM = taun Soa evel OSL)
REFERENCE:
as-si28
Ne teeoeo0s7
E4803
2286-3128 S LOCATED INSIDE THE STA. FEBRGY. PLAZA TIS
@
S-Tw: PRS o2
ZONES
SCALE #10001
RIVER BED ELEVATIONDTM: PRS 82
ZONES
SCALE 1:100M
FLo0@ LEVEL
ING RIVER BEDE
aren27+892.51