You are on page 1of 3

3.35 3.35 1.

80

Wrap back
-1.50% -1.50% 2.0m

0.3
1 H=5m, ACEGrid GG80-I@0.5m
ITEM 311(1)f2 - PCCP PAVEMENT
(UNREINFORCED), 0.30m THK., 14 DAYS

ITEM 200(1) - AGGREGATE SUBBASE COURSE,


200mm THK. 4.0m
ACESandbag EC-III
0.3
ACEDrain SV100 @2m 1 H=5m, ACEGrid GG80-I@0.5m
Vegetation

Ditch

6.0m

0.3
1 H=5m, ACEGrid GG150-I@0.5m

Horizontal drainage
8.0m
(Drainage pipe @2m with aggregate)
8.0m

0.3
1 H=5m, ACEGrid GG150-I@0.5m

0.5m

1.0m
0.5m
1.0m
210kg/cm2 Concrete

D13@20cm
6.0m

Length=6m, diameter=30cm micro-piles @3m


Boring hole and insert 50kg/m rail piles,
grouting the gaps with 210kg/cm² concrete. 3.0m
The inner and outer rows of micro-piles are laid alternately.

TYPICAL ROADWAY SECTION


SCALE 1:50

REPUBLIC OF THE PHILIPPINES


PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD
REGIONAL OFFICE NO. VII SYSTEM - ASSET PRESERVATION PROGRAM - LEMUEL N. ASENTISTA
REHABILITATION / RECONSTRUCTION OF ROADS WITH ENGINEER II (GEODETIC ENGINEER) 06
CEBU CITY DISTRICT ENGINEERING SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TYPICAL ROADWAY SECTION DRAFTED/PREPARED:
OFFICE SECONDARY ROADS - CEBU-BALAMBAN CHRISTIAN B. FELICES MARILYN A. OJEDA MANOLO B. MADRONIO, JR. RAMON P. DEVANADERA 08
TRANSCENTRAL HIGHWAY - K0011 + 274 - K0011 + 405, ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
V. SOTTO ST., CEBU CITY JULIUS CAEZAR G. DELORIA DATE: DATE: DATE: DATE:
CEBU CITY ENGINEER II
® ®
Installation Procedure of ACEGrid Guideline for ACEGrid wrapping
Wrap-around Reinforced Structure Reserved for wrapping
TM
at the corner and the end of structure
ACESandbag filled with aggregates
®
Crushed aggregate ACETex NW CM259

Reserve a part of ACEGrid for wrapping

TM
ACEPin T5 Drainage Pipe Length for
1 4
®
wrapping 2m
ACEGrid

2m 2m 2 5 Height of single layer


®
Step 6. Lay a layer of ACETex NW CM250 as separator from previous layer at
®
Step 1. Excavate and level the foundation; then place ACEGrid the bottom of drainage. Put the drainage pipe and covers with aggregates. Lay
TM ®
reinforcement. ACEPin T5 should be installed another layer of ACETex NW as a separator at the top of drainage.
®
minimum of every 2 meters at ACEGrid overlapping. Maintain the slope facing based on designed angle
3 6
Compaction level Length for embedding
TM
ACESandbag filled aggregates
Backfill and compaction level

30cm
TM
Step 2. Stack ACESandbag , backfill, and compact (min. 90%)
®
Wrapped ACEGrid
Wrap back
Compaction level Step 7. Backfill and compaction (min. 90%) to finish the layer.

30cm 1 4
®
Step 3. Stack another soil bag, wrap ACEGrid and anchor it 2 5

2m
Compaction level
50cm

6 3

Step 8. Repeat the procedures until the structure is


Step 4. Backfill and compact (min. 90%) to the required level completed according to design drawing. for
g t h
Artifical seeding might be needed if natural Len g 2m
in
vegetation is not dense enough. w rapp Backfill soil
Compaction level
Machine Direction

Overlap 30 cm TM

ACEPin T5
TM ACEPin T5 @2m
50cm

Ove
Step 5. Repeat step 1 to 4 to construct another layer of rlap
30 c ACESandbag TM

reinforcement m
®
Overlapping of geogrid 3D model of ACEGrid Structure
N.T.S N.T.S
REPUBLIC OF THE PHILIPPINES
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD
REGIONAL OFFICE NO. VII SYSTEM - ASSET PRESERVATION PROGRAM - LEMUEL N. ASENTISTA
REHABILITATION / RECONSTRUCTION OF ROADS WITH ENGINEER II (GEODETIC ENGINEER) 07
CEBU CITY DISTRICT ENGINEERING SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - INSTALLATION PROCESS OF
DRAFTED/PREPARED:
OFFICE SECONDARY ROADS - CEBU-BALAMBAN ACEGRID WRAPPED REINFORCED WALL CHRISTIAN B. FELICES MARILYN A. OJEDA MANOLO B. MADRONIO, JR. RAMON P. DEVANADERA 08
TRANSCENTRAL HIGHWAY - K0011 + 274 - K0011 + 405, ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
V. SOTTO ST., CEBU CITY JULIUS CAEZAR G. DELORIA DATE: DATE: DATE: DATE:
CEBU CITY ENGINEER II
Material Specification 3. ACETex NW CM250
(1). Material: Poylester (PET) continuous filament and needle punched
® GG80-I
1. ACEGrid (2). Specification description
(1). Material: Polyester (PET). Propertries Unit ACETex NW CM250 Test Method
(2). Surface appearance: coating with polyvinyl chloride (PVC) to anti UV,
.
biological degradation, hydrolysis and chemical degradation Material Poylester (PET) continuous filament and needle punched
Tensile Strength, Tult (MD) kN/m ≥12.2 ASTM D4595
(3). Specification description
Elongation (MD) % ≤70 ASTM D4595
Value Puncture Strength (MD) N ≥2500 ASTM D6241
Properties Test Standard Unit Apparent Opening Size95 (O ) mm 0.30 ASTM D4751
GG80-I GG150-I
Nominal Mass g/m2
216 ASTM D5261
Material High Tenacity PET Yarn Coated With PVC
Tensile Strength,ultT - MD ASTM D6637 kN/m ≥80 ≥150
Drainage Pipe =4"@2m
T - CD
Tensile Strength,ult ASTM D6637 kN/m ≥30 ≥30
Layout nonwoven geotextile above and below the granular
Elongation - MD ASTM D6637 % ≤10 ≤10

20cm
Tensile strength at 5% Strain-MD ASTM D6637 kN/m ≥40 ≥75
Carboxyl End Group (CEG) ASTM D7409 mmol/kg ≤30 ≤30
Molecular Weight ASTM D4603 Mn ≥25000 ≥25000
Reduction Factor of Creep ASTM D5262/ASTM D6992 ≥1.43 ≥1.43 Installation of Horizontal Drainage
Creep Strength at 120 years ASTM D5262/ASTM D6992 ≥56 ≥105 N.T.S
kN/m Sealing cable tie
Reduction Factor of Installation Damage ASTM D5818 ≥1.00 ≥1.00 4. ACESandbag EC-III
(1). Material : Polyethylene (PE) / Polypropylene(PP)

45cm
54cm
Reduction Factor of Durability EN 12447 ≥1.06 ≥1.06
(2). Dimension : 45cm×50cm (inner)
Long Term Design Strength at 120 years kN/m ≥52 ≥98 (3). Color: Green/Black
Chemical Resistance (With pH12.3 at 30°C for 24 Months) ISO TR20432/ISO 13434 % ≥90 ≥90 (4). Specification description
SVHC Were Less Than 0.1% (w/w) ISO TR20432/ISO 13434 % ≥90 ≥90 Properties Test Standard Unit Value
50cm
Material Polyethylene (PE) 62cm
: LTDS
(4). Description of Long Term Design Strength (LTDS) in machine direction (MD)
Nominal Tensile Strength ASTM D4595 kN/m ≥14 ≥14
must conform to the above listed data. The calaulation of LTDS is: ACESandbag EC III
Mesh Size Measured by rule mm ≤1.3x1.6 N.T.S
LTDS=Tult/RF,
RF=RFID*RFCR*RFD Light Penetration ASTM D6567 % ≥35 Longitudinal axle should be
(5). Erosion control bags should be integrally formed by interweaved flat yarn and perpendicular to the wall
Where, monofilament, in response to the strength and the bearing pressure requirement.

10~20cm
RF : the product of all applicable reduction factors to geogrid tensile strength; In addition, the friction between erosion control bags is increased, resulting in the
RFID : according to ASTM D5818,which need to attach test report, adopt 1.4 if test report is higher stacked stability. Slope side
not submitted.
RFCR: according to ASTM D6992 or ASTM D5262, which need to attach 10,000 hours test 40~50cm
report or accelerating creep test report, adopt 3.0 if test report is not submitted.
according to EN 12447, adopt
RFD : durability for 120 years, 2.0 if test report is not submitted. ACEsandbag ECIII after Filling
N.T.S
(5). In order to make sure the quality of geogrid, manufacture should be suited ISO9000 and CE
Marking certification. Manufacture have to append material certification and test report. The 6. Ditch:
contractor should submit samples and test report to the owner and supervisor for approval.
5.ACEAnchor T5
(1). Material : PA+Glass fiber
(6). So as to confirm that product quality is strictly controlled according to world regulationsnd or standard. (2). Dimension : 8.8cm x 23cm 10cm 10cm
50cm
The geogrid manufacture must established their owned and maintained QC laboratory which ought to
certificated by GAI (Geosynthetics Accreditation Insitotute) and the accreditation body which be a 8.8cm 8.8cm

20cm
member of ILAC (The International Laboratory Accreditation Cooperation).

10ψ @20cm
TM 2000psi PC
2.ACEDrain SV-100
23cm
(1). Material :High-impact Polystyrene (HIPS) and Polyester Overlying non-woven filter Detail of Ditch
Nonwoven Geotextile
: 10mm(T)*200mm(W)
(2). Material Specification
200mm
TM
ACEAnchor T5
10mm
Detail drawing of drainage board N.T.S
N.T.S
REPUBLIC OF THE PHILIPPINES
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD
REGIONAL OFFICE NO. VII SYSTEM - ASSET PRESERVATION PROGRAM - LEMUEL N. ASENTISTA
REHABILITATION / RECONSTRUCTION OF ROADS WITH ENGINEER II (GEODETIC ENGINEER) 08
CEBU CITY DISTRICT ENGINEERING SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - MATERIAL SPECIFICATION DRAFTED/PREPARED:
OFFICE SECONDARY ROADS - CEBU-BALAMBAN CHRISTIAN B. FELICES MARILYN A. OJEDA MANOLO B. MADRONIO, JR. RAMON P. DEVANADERA 08
TRANSCENTRAL HIGHWAY - K0011 + 274 - K0011 + 405, ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
V. SOTTO ST., CEBU CITY JULIUS CAEZAR G. DELORIA DATE: DATE: DATE: DATE:
CEBU CITY ENGINEER II