ABSTRACT
Influences of pile foundations and their nearby soil conditions were
neglected when performing a traditional structure analyses for most large
span steel box-girder bridges. Therefore the effects from varying soil
strengths on structure behaviors for large span steel box-girder bridges
cannot be investigated actually.
The author of this thesis applied the SAP2000 finite element program
to form an entire structure modal, including pile foundations and their nearby
soils, for a large span steel box-girder bridge across Shi-Ba-Chong Stream.
Then influences of different soil conditions on 3D dynamic behaviors of
large span steel box-girder bridge were investigated. Results from this study
support the following two conclusions:
(1) By comparing the frequency for each mode, it is clearly vivid that the
stiffness for a whole structure of a large span steel box-girder bridge
tends to be the same when values of SPT-N for soils are suitably high.
(2) When concerning a large span steel box-girder bridge, results from a 3D
dynamic analysis show that the maximum relative displacement at the top
between each two nearby piers is greater than the width of an expansion joint.
Such that collision between each two steel box-girder bridges on both sides
of an expansion joint will occur during the period for the attacking of an
earthquake
ii
e-Thesys(95 )
................................................................................................ i
................................................................................................ ii
.................................................................................................... iii
.................................................................................................... vii
.................................................................................................... ix
................................................................................
1.1 ................................................................................. 1
1.2 ................................................................................. 5
1.3 ................................................................................. 5
....................................................................
2.1 .............................................. 7
2.1.1 9
2.2 .............................................................. 13
2.3 .. 14
2.4 .......................................................... 14
2.4.1
15
2.5 ...................................................................... 19
iii
e-Thesys(95 )
2.5.1 .
22
2.6 .
26
2.6.1 ... 26
2.6.2 ... 42
2.6.3 .
44
2.7 3D 45
2.7.1
45
2.7.2 .
45
2.7.3
47
2.8 SAP2000 .
50
2.9 .. 52
2.9.1 ... 55
..
57
3.1 .
58
3.1.1
58
3.1.1.1 58
3.1.1.2 59
3.1.1.3 60
3.1.1.4 60
3.2 .. 61
iv
e-Thesys(95 )
3.3 .. 62
3.3.1 ..
62
3.3.2 .
65
3.3.3
65
3.3.3.1 66
3.3.3.2
66
3.3.3.3
66
3.3.3.4
66
3.3.3.5
66
3.3.4 . 67
3.3.4.1 ..
67
3.3.4.2 ..
67
3.3.4.3 ..
67
3.3.4.4 ..
67
3.3.4.5 ..
68
3.3.4.6 -. 68
3.4. 73
3.4.1 .. 73
3.4.2 .. 73
v
e-Thesys(95 )
76
4.1 3D .
76
4.1.1 . 76
4.1.2 82
4.1.2.1 . 82
4.1.2.2 . 88
4.2 . 94
4.3 . 107
4.3.1 11 . 108
4.3.2 12 . 109
4.3.3 13 . 110
4.3.3 22 . 111
4.3.3 23 . 112
4.4 ... 113
vi
116
e-Thesys(95 )
2.1 8
2.2 17
2.3 21
2.4 24
2.5 41
2.6 47
2.7 47
2.8 50
3.1 21 65
3.2 -. 69
3.3 -. 71
3.4 921 .. 73
4.1
. 77
4.2
. 77
4.3
. 77
4.4
. 80
4.5
.. 80
4.6
.. 80
4.7 . 94
4.8 11 .. 108
4.9 12 109
vii
e-Thesys(95 )
4.10 13 110
4.11 22 ... 111
4.12 23 ... 112
4.13 .. 115
viii
e-Thesys(95 )
1.1
21 95K~100K .
1.2
...
1.3
..
1.4
96 9 ..
1.5
2.1
..
2.2
..
10
2.3
11
2.4
11
2.5
12
2.6
49 32
2.7
63. 33
2.8
76 34
2.9
84 35
2.10 89
36
2.11
37
2.12
38
2.13
39
ix
e-Thesys(95 )
2.14
40
2.15
48
2.16
49
54
2.18 p-y
54
2.19 .
55
3.1
58
3.2
59
3.3
.. 60
3.4
..
60
3.5
61
3.6
.. 61
3.7
62
3.8
63
3.9
63
3.10 .
64
3.11
64
3.12 .
75
4.1
P1~P6 .. 83
4.2
P1~P6 .. 84
e-Thesys(95 )
4.3
P1~P6 .. 85
4.4
P1~P6 .. 86
4.5
P1~P6 .. 87
4.6
P1~P6 .. 89
4.7
P1~P6 .. 90
4.8
P1~P6 91
4.9
P1~P6 .. 92
4.10 P1~P6 .. 93
4.11 1 .. 97
4.12 2 .. 98
4.13 3 .. 99
4.14 4 .. 99
4.15 5 .. 101
4.16 6 .
102
4.17 7 .. 103
4.18 8 104
4.19 9 .. 105
4.20 10 . 106
4.21 11 . 108
4.22 11 . 108
4.23 12 . 109
xi
e-Thesys(95 )
4.24 12 . 109
4.25 13 . 110
4.26 13 . 110
4.27 22 111
4.28 22 111
4.29 23 112
4.30 23 112
xii
e-Thesys(95 )
1.1
( 1.1)
e-Thesys(95 )
1.1 21 95K~100K
e-Thesys(95 )
1.2
1.3
3
e-Thesys(95 )
1.4 96 9
1.5
e-Thesys(95 )
1.2
3D
1.3
21
95K~100K ()
3D
3D
(UX)
(UY)(UZ)
e-Thesys(95 )
e-Thesys(95 )
2.1 [1]
1779 Severn river
1823 George Stephenson
AASHTO
2.1
e-Thesys(95 )
2.1
1779
Coalbrookdale
1828
1874
Eads Bridge
1883
Brooklyn
1884
1889
1914
Kazinczy
1921
1944
1953
1947
1980
1994
JIS G3106 SN
1995
1999
1999 1 1
1999
921
e-Thesys(95 )
2.1.1
:
1.
()
2.1 [2]
e-Thesys(95 )
2.
(Vierrendeel)()
2.2 [2]
10
e-Thesys(95 )
3. (
)
2.3 [2]
2.4 [2]
11
e-Thesys(95 )
4.cable-stayed bridge
()
2.5 [3]
12
e-Thesys(95 )
2.2 [1]
13
e-Thesys(95 )
2.3 [1]
2.4 [4]
(CNS)
14
e-Thesys(95 )
(ASTM)
(1) ASTM A6 Standard Specification for General Requirements for Rolled
Structural Steel Bars, Plates, Shapes, and Sheet Piling;
(2) ASTM A36 Standard Specification for Carbon Structural Steel;
(3) ASTM A108 Standard Specification for Steel Bars, Carbon,
Cold-Finished, Standard Quality;
(4) ASTM A325 Standard Specification for High-Strength Bolts for
Structural Steel Joints;
(5) ASTM A435 Standard Specification for Straight-Beam Ultrasonic
Examination of Steel Plates;
(6) ASTM A572 Standard Specification for High-Strength Low-Alloy
Columbium-Vanadium Structural Steel;
(7) ASTM A709 Standard Specification for Carbon and High-Strength
Low-Alloy Structural Steel Shapes, Plates, and Bars and
Quenched-and-Tempered Alloy Structural Steel Plates for Bridges.
(AWS)
(1) AWS D1.1 Structural Welding Code-Steel.
(JIS)
(1) JIS B 0601.
(AASHTO)
(1) Standard Specifications for Highway Bridges.
2.4.1 [5]
(1)
(CNS)(ASTM)
15
e-Thesys(95 )
(JIS)
(2) ASTM A6
5%
(3)
(4) ASTM A6 50
ASTM A6
19mm ASTM A435
AWS
(Lamination)
16
e-Thesys(95 )
2.2
ASTM A36
(KSI)
(KSI)
36
ASTMA572 Gr.50
ASTMA572
Gr.50ASTMA709
Gr.50
50
50
(KSI)
(KSI)
(SMAW)
AWS A5.1 OR
A5.5
60
72
MIN.
E70xx
(SAW) AWS A5.17 60
OR A5.23
70-90
F7x-Exxx-x
(GMAW) AWS
A5.18 ER70S-X
60
72min.
(SMAW)
AWS A5.1 OR
65MIN.
A5.5 E7015,
E7016, E7018
60
72
MIN.
E7028, E7015-X
(SAW)
AWS A5.17 OR
A5.23, F7x-Exxx
60
70-90
65MIN. F7xx-Exxx
(GMAW)
60
AWS A5.18
ER70S-X
72
MIN.
58-80
58-80
17
e-Thesys(95 )
(a)
(b)(Stressrelieved)
0.05(Vanadium)
(c) 25mm Gr.36 Gr.50
(d) AWS
(e) AWS
ASTM A325
(Headed Stud)
A.
a. (Tensile Strength)4200 f/cm2
b. (Yield Strength)3500 f/cm2
c. (2)20%
d. (Reduction of Area)50%
18
e-Thesys(95 )
2.5
NC(Numerical Control)
19
e-Thesys(95 )
JISB0601 50S
50/1000 2.3
(Notch)
20
e-Thesys(95 )
2.3
50 S
100 S
(Slag)
1.5 (1/16)
0.5mm(1/48") 20
+1.0mm(1/24")
15
1:20 1:20
(Gaskets)
21
e-Thesys(95 )
2.5.1
30%
(Drift Pin)
0.8
1.0mm (1/24")
5t
22
e-Thesys(95 )
1/3
23
e-Thesys(95 )
1/2
(1)
0.4
30m
(2)
(Splice Plate)(Gusset Plate)
2.6
2.4
(Taper)
(Filler)
24
e-Thesys(95 )
(3)
TS TC
25
e-Thesys(95 )
2.6
2.6.1
921
49 11
[7]76 84 89
1.43
49 11 [7]
43 12
[8]57 6 [9]
0.1 0.15
2.6
2.63
63 11
[10]2.7 0.10.15
0.2
26
e-Thesys(95 )
3.76
76 1 19 [11]
1980 V
2.7
kh
(1) ()15
kh = ZSIC0
2.1
(2) ()15
kh =ZSIC0
2.2
kh 0.1
C0 C0 0.15
Z 1.21.00.8
0.6
S TG
TG 0.2 secS0.9
0.2 secTG 0.4 secS1.0
0.4 secTG 0.6 secS1.1
TG 0.6 secS1.2
27
e-Thesys(95 )
I
1.0()
0.8
(k v )0.1
4.84
8419[6]
AASHTO
2.8
2.3
V
W
28
e-Thesys(95 )
Z
0.33
0.23
0.28
0.18
I =1.2=1.0
y
C
F
(
CV
)m
F uv
76
0.1RdRd
5.89
88921
92184
[6]
0.33 0.23
C2.02.5
2.9
29
e-Thesys(95 )
6.90
9012[12]
921
1995
4755010%
50
2%2500
5010%2%
200
2.102.14
30
e-Thesys(95 )
10km
NA NV
2.4
SaD
W
I
y
FuR
R
31
e-Thesys(95 )
SDS
2.5 [13]
2.6 49[8][9]
32
e-Thesys(95 )
2.7 63[10]
33
e-Thesys(95 )
2.8 76 [11]
34
e-Thesys(95 )
2.9 84[6]
35
e-Thesys(95 )
0.33g
0.23g
2.10 89[6]
36
e-Thesys(95 )
120E
121E
122E
Longitude, E
2.11 [12]
37
e-Thesys(95 )
120E
121E
122E
Longitude, E
2.12 [12]
38
e-Thesys(95 )
120E
121E
122E
Longitude, E
2.13 [12]
39
e-Thesys(95 )
120E
121E
122E
Longitude, E
2.14 [12]
40
e-Thesys(95 )
2.5 [13]
1980
V
kh= ZSIC0
Z 0.6~1.2
76 V= kh W
84
76
1992
A ASHTO
Z=
475
0.33 0.23 0.28 0.18
0.1Rd
89
Z =
0.330.23
90
Zv =1/3 Z
2
Z
3
41
e-Thesys(95 )
2.6.2
(1) 90 ""
(2) 84 ""
(3) 89 4 7 ""
(4) 90 ""
(5) U.S. Standard Specifications for Highway Bridges, AASHTO, 1992.
(6) Guide Specifications for Design and Construction of Segmental Concrete
Bridges, AASHTO, 1989.
(7) Guide Specifications for Horizontally Curved Highway Bridges
AASHTO 1993.
(8) ACI
(9) AISC
(10)
(11)
(1)
.2,400kg/m3
.2,300kg/m3
AC ...2,300kg/m3
.........................7,850kg/m3
1,900kg/m3
42
e-Thesys(95 )
.......... 100kg/m
(2) "" HS20-44 30%
(3)
A.201.110-5/
B.251.1710-5/
(4)
A. CEB-FIP ACI-209R
B.
C.
(5)
84 89
1
V=MAX[ZICW/(1.2y Fu)ZICW/(3.0y)]
Z()
=0.33()
2
VV =
Z V I CV
( )mW
1.2 y Fuv
43
e-Thesys(95 )
2
Z V ( 3 Z )
=0.22
(6)
2.6.3 [14]
RC 10M
44
e-Thesys(95 )
2.7 3D
[15] 61
2.8 [16] SAP2000
2.7.1
P1 P2 20m
P3 P4
2.7.2
3D
2.7
45
e-Thesys(95 )
2.7 P1 P2
1
P3 P4
1
P1 P2 P2 P3
46
e-Thesys(95 )
2.7.3
2.6
(cycle/sec)
(cycle/sec)
1
0.67
0.50
0.97
0.54
1.01
0.61
1.34
0.63
2.7
P 1P2
(cm)
P2P3
(cm)
P3P4
(cm)
0.53
0.31
0.20
0.43
0.28
0.18
0.31
0.44
0.19
82.4
54.0
0.22
100.8
30.5
0.51
1.39
1.30
0.28
47
e-Thesys(95 )
0.6
P1-P2
P2-P3
0.4
(cm)
P3-P4
0.2
-0.2
-0.4
-0.6
0
10
20
30
40
50
60
70
sec
(a)
0.5
P1-P2
0.4
P2-P3
P3-P4
cm
0.3
0.2
0.1
0
-0.1
-0.2
-0.3
-0.4
-0.5
0
10
20
30
40
50
60
70
50
60
70
sec
(b)
0.5
P1-P2
0.4
P2-P3
P3-P4
cm
0.3
0.2
0.1
0
-0.1
-0.2
-0.3
-0.4
-0.5
0
10
20
30
40
sec
(c)
2.15
48
e-Thesys(95 )
100
P1-P2
80
P2-P3
60
P3-P4
(cm)
40
20
0
-20
-40
-60
-80
-100
0
10
20
30
40
50
60
70
(sec)
(a)
150
P1-P2
P2-P3
(cm)
100
P3-P4
50
-50
-100
-150
0
10
20
30
40
50
60
50
60
70
(sec)
(b)
2
P1-P2
P2-P3
1.5
P3-P4
(cm)
0.5
-0.5
-1
-1.5
0
10
20
30
40
70
(sec)
(c)
2.16
49
e-Thesys(95 )
2.8
H Z
0.96
1.29
1.40
1.42
2.07
2.13
2.25
2.48
2.57
2.61
50
e-Thesys(95 )
(Pushover Analysis)
(Performance Based Design)
SAP2000 Computers and StructuresInc
SAP2000
ATC-40
(Performance Point)
1.
2.
3. (Pushover)
4.
5. P-delta
6. ()
51
e-Thesys(95 )
7.
8.
9. power-spectral-density
10. -
11.
12.
13.
14.
15.
16.
17.
18. -
19.
20.
2.9
-
52
e-Thesys(95 )
Winkler
2.8
Reese Matlock
-(p-y
curve) 2.9 [18]
2.10
53
e-Thesys(95 )
54
e-Thesys(95 )
2.19 [18]
2.9.1 [19]
1
2.19 K H
KH
B
= kH0 H
30
kH0 =
BH
3
4
2.5
1
E 0
30
E I
= 1.3614 P P
E0
2.6
4
29 12
D 29
2.7
K = KH L D
55
e-Thesys(95 )
K H
k H 0 30
(kgf
cm
2.0
B H (cm)
2.0
E
25 N 1 N1
K V
KV
B
= kV 0 V
30
kV 0 =
3
4
2.8
1
E0
30
2.9
2.8 2.9
k V 0 30
(kgf
cm
E 0 25 N1 N1
BV (cm)
BV = Av
2.10
Av (cm )
56
e-Thesys(95 )
3.1
21 95K+000~100K+000 (
)
57
e-Thesys(95 )
3.1.1
[17]
3.1.1.1
3.1
2 2
3.1 [22]
58
e-Thesys(95 )
3.1.1.2
ij
3D 3.2
i j
3.2 [22]
59
e-Thesys(95 )
3.1.1.3
3.3
3.3 [22]
3.1.1.4
N
3.4
60
e-Thesys(95 )
3.2
3.5
3.6
3.5
3.6
61
e-Thesys(95 )
3.3
21
95K+000~100K+000 ()
3.3.1
(A) 3.7 3.9
3.7
62
e-Thesys(95 )
3.8
3.9
63
e-Thesys(95 )
(B) 3.10 :
3.10
(C) 3.11
3.11
64
e-Thesys(95 )
3.3.2
21
3.1 21
1.
2*70m()&3*92m()
2.
10m
3.
2.4 ~3.7 m
()
25 ~ 33
mm
()
16 ~ 22
mm
()
22 ~ 28
mm
4.
11.4*6.0m
5.
6.
10m 45
m)
3.3.3
65
e-Thesys(95 )
3.3.3.1
414 10.0
30
3.3.3.2
1
414 23 3.7
2.4 6.0 6.2
3.3.3.3
RC 8 3 13.5
3.3.3.4
14.25 10 3
3.3.3.5
1243 150 35
66
e-Thesys(95 )
3.3.4
-
3.3.4.1
2
fc350kgf/cm 2.34510-6kgf
2
/cm3 0.2 280624kgf/cm 16
2
SD280
fy2800kgf/cm219 SD420W
fy4200kgf/cm
3.3.4.2
ASTM A709 GRADE
50 GRADE 36
3.3.4.3
2
fy4200kgf/cm
3.3.4.4
2
fc280kgf/cm 2.34510-6
2
16
kgf /cm3 0.2 250998kgf/cm
67
e-Thesys(95 )
2
SD280
fy2800kgf/cm219 SD420W
fy4200kgf/cm
3.3.4.5
2
fc280kgf/cm
2
16
2.34510-6 kgf/cm3 0.2 250998kgf/cm
SD280 fy2800kgf/cm2 19 SD420W
2
fy4200kgf/cm
3.3.4.6 -
-
3.2.22~ 3.2.23
68
e-Thesys(95 )
0.3
3.2
3.8
11
13
15
17
19
KV
KH
(kgf
Cm
(kgf
Cm
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
69
e-Thesys(95 )
3.2
21
22
24
27
29
30
32
34
KV
KH
(kgf
Cm
(kgf
Cm
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
60
1140544
528499
70
e-Thesys(95 )
3.3 -
KV
KH
1.5
SM
106545.779
61658.26771
SM
73500.707
44041.61979
4.5
SM
57458.771
35233.29583
6.2
SM
57458.771
35233.29583
7.5
SM
140595.534
79274.91562
SM
106545.779
61658.26771
10.5
SM
11
175443.481
96891.56354
12
SM
22
376971.281
193783.1271
13.5
SM
41
749269.128
361141.2823
15
SM
36
649102.952
317099.6625
16.5
SM
39
709041.688
343524.6344
71
(kgf
Cm
(kgf
Cm
e-Thesys(95 )
3.3
KV
KH
18.1
SM
33
589679.271
290674.6906
19.5
SM
36
649102.952
317099.6625
21
SM
36
649102.952
317099.6625
22.5
SM
35
629235.902
308291.3385
24
SM
38
689007.198
334716.3104
25
SM
35
629235.902
308291.3385
72
(kgf
Cm
(kgf
Cm
e-Thesys(95 )
3.4
3.4.1
HS-20-44
3.4.2
921
TCU078 3.3 3.12
3.4 921
TCU078
km
(gal)
(gal)
(gal)
9.6
171
318
462
73
PGA
g
0.462
e-Thesys(95 )
(a)
(b)
74
e-Thesys(95 )
(c)
3.12
75
e-Thesys(95 )
(UX)(UY)(UZ)
4.1 3D .
4.1.1
4.1 4.3
76
e-Thesys(95 )
4.1
UX
UY
UZ
cm
cm
cm
P1
1.55E-05
3.8827
0.06524
P2
4.863
3.9178
0.0375
P3
4.837
7.1412
0.02391
P4
4.8345
7.234
0.02363
P5
4.8558
5.1027
0.02616
P6
3.036E-06
3.9144
0.032
4.2
UX
UY
UZ
cm
cm
cm
P1~P2
4.8764
0.0304
0.194
P2~P3
0.02602
7.752
0.08964
P3~P4
0.00247
2.4283
0.00282
P4~P5
0.02036
5.6695
0.02818
P5~P6
4.8764
0.0304
0.194
4.3
UX
UY
UZ
cm
cm
cm
P1~P2
0.01037
0.00756
0.0913
P2~P3
7E-05
0.02547
0.0422
P3~P4
1E-05
0.00832
0.0133
P4~P5
9E-04
0.0188
0.0126
P5~P6
0.01255
0.01107
0.0288
77
e-Thesys(95 )
4.1
P1
3.8827 40.25
P2 4.863
38.05 P3 7.1412
40.75 P4
7.234 40.8 P5
5.1027 45.2 P6
3.9144 40.25
4.2
P1 P2
4.8764
38.05 P2 P3
7.752 40.8 P3 P4
2.4283 41.7
P4 P5 5.6695
40.85 P5 P6
4.8683 38.05
4.3
P1
P2 0.010307
38 P2 P3
0.0422 40.25 P3 P4
0.00832
78
e-Thesys(95 )
40.75 P4 P5
0.0188 40.85 P5 P6
0.0288 40.25
4.4 4.6
79
e-Thesys(95 )
4.4
UX
UY
UZ
cm
cm
cm
P1
0.0124
5.5057
0.0134
P2
5.632
8.4904
0.03013
P3
5.587
9.4617
0.02509
P4
5.609
10.1122
0.0253
P5
5.602
9.7463
0.0306
P6
6.35E-06
5.5495
0.0137
4.5
UX
UY
UZ
cm
cm
cm
P1~P2
6.1435
5.9595
0.1202
P2~P3
0.00856
6.1342
0.1122
P3~P4
0.02469
1.304
0.00745
P4~P5
0.06589
4.7944
0.1356
P5~P6
6.127
6.695
0.1323
4.6
UX
UY
UZ
cm
cm
cm
P1~P2
0.5039
0.5557
0.1035
P2~P3
0.03625
0.5832
0.0098
P3~P4
0.00217
0.1265
0.0061
P4~P5
0.07365
0.4621
0.1173
P5~P6
0.6156
0.8181
0.1155
80
e-Thesys(95 )
4.4
P1
5.5057 40.35
P2 8.4904
40.35 P3
9.4617 40.85 P4
10.1112 40.85 P5
9.7463 40.4
P6 5.5495
40.35
4.5
P1 P2
6.1435
40.85 P2 P3
6.1342 41.3 P3 P4
1.304
43.75 P4 P5
4.7944 39.75 P5 P6
6.695 41.35
4.6
P1
P2 0.5557
38.45 P2 P3
0.5832 41.3 P3 P4
0.1265
81
e-Thesys(95 )
43.75 P4 P5
0.4621 39.75 P5 P6
0.8181
40.85
4.1.2
4.1.2.1
4.1 4.5
4-1 11
267.643kg/cm2-104.884kg/cm2
4-2 12
107.093kg/cm2-39.236kg/cm2
4-3 13
54.430kg/cm2-47.184kg/cm2
4-4 22
337.529kg/cm2-316.179kg/cm2
4-5 23
46.301kg/cm2-32.180kg/cm2
82
e-Thesys(95 )
(a) P1~P3 11
(b) P4~P6 11
4-1 P1~P6
83
e-Thesys(95 )
(a) P1~P3 12
(b) P4~P6 12
4-2 P1~P6
84
e-Thesys(95 )
(a) P1~P3 13
(b) P4~P6 13
4-3 P1~P6
85
e-Thesys(95 )
(a) P1~P3 22
(b) P4~P6 22
4-4 P1~P6
86
e-Thesys(95 )
(a) P1~P3 23
(b) P4~P6 23
4-5 P1~P6
87
e-Thesys(95 )
4.1.2.2
4.6 4.10
4-6 11
291.572kg/cm2-107.812kg/cm2
4-7 12
88.686kg/cm2-38.982kg/cm2
4-8 13
56.513kg/cm2-47.204kg/cm2
4-9 22
328.327kg/cm2-316.571kg/cm2
4-5 23
38.681kg/cm2-28.954kg/cm2
88
e-Thesys(95 )
(a) P1~P3 11
(b) P4~P6 11
4-6 P1~P6
89
e-Thesys(95 )
(a) P1~P3 12
(b) P4~P6 12
4-7 P1~P6
90
e-Thesys(95 )
(a) P1~P3 13
(b) P4~P6 13
4-8 P1~P6
91
e-Thesys(95 )
(a) P1~P3 22
(b) P4~P6 22
4-9 P1~P6
92
e-Thesys(95 )
(a) P1~P3 23
(b) P4~P6 23
4-10 P1~P6
93
e-Thesys(95 )
4.2
4.11 4.20
4.7
0.863Hz
0.862Hz
1.095Hz
1.073Hz
1.312Hz
1.090Hz
1.338Hz
1.134Hz
1.410Hz
1.167Hz
1.425Hz
1.221Hz
1.486Hz
1.396Hz
1.748Hz
1.479Hz
1.816Hz
1.495Hz
10
1.888Hz
1.782Hz
4.7
Z
0.86304Hz
0.86155Hz
4.8
Y P3P4
1.09530 Hz 1.07347
Hz
4.9
(P3~P4)(P4~P5)
P3P4P5 Z
94
e-Thesys(95 )
Z
1.31184 Hz
1.09001 Hz 20%
4.10
P3P4P5 P4
P1~P3
P4~P6 P3~P4
1.33794 Hz
1.13383 Hz 18%
4.11
1.40966 Hz 1.16730 Hz
20.76%
4.12
P2~P3
P2P3P4
1.42548 Hz 1.22122 Hz
16.72%
4.13
1.48606 Hz
95
e-Thesys(95 )
1.39577 Hz 6.46%
4.14
P1~P2 P5~P6
P5~P6
1.74770 Hz
1.47883Hz 18.18%
4.15
P1~P2
P5~P6
P1~P2
1.81574 Hz
1.49484Hz 21.46%
4.16
P1~P2 P5~P6
1.88825Hz
1.78177Hz 5.97%
96
e-Thesys(95 )
b
4.11 1
97
e-Thesys(95 )
b
4.12 2
98
e-Thesys(95 )
b
4.13 3
99
e-Thesys(95 )
b
4.14 4
100
e-Thesys(95 )
b
4.15 5
101
e-Thesys(95 )
b
4.16 6
102
e-Thesys(95 )
b
4.17 7
103
e-Thesys(95 )
b
4.18 8
104
e-Thesys(95 )
b
4.19 9
105
e-Thesys(95 )
b
4.20 10
106
e-Thesys(95 )
4.3
11 12 13 22 23
4.8 4.12
107
e-Thesys(95 )
4.3.1 11
aP1~P3
bP4~P6
4.21 11
aP1~P3
bP4~P6
4.22 11
4.8 11
11
11
267.643(kg/cm2)
-104.882(kg/cm2)
291.572(kg/cm2)
-107.812(kg/cm2)
108
e-Thesys(95 )
4.3.2 12
aP1~P3
bP4~P6
4.23 12
aP1~P3
bP4~P6
4.24 12
4.9 12
12
12
107.093(kg/cm2)
-39.236(kg/cm2)
88.686(kg/cm2)
-38.982(kg/cm2)
109
e-Thesys(95 )
4.3.3 13
aP1~P3
bP4~P6
4.25 13
aP1~P3
bP4~P6
4.26 13
4.10 13
13
13
54.430(kg/cm2)
-47.184(kg/cm2)
56.513(kg/cm2)
-47.204(kg/cm2)
110
e-Thesys(95 )
4.3.4 22
aP1~P3
bP4~P6
4.27 22
aP1~P3
bP4~P6
4.28 22
4.11 22
22
22
337.529(kg/cm2)
-316.170(kg/cm2)
328.327(kg/cm2)
-316.571(kg/cm2)
111
e-Thesys(95 )
4.3.5 23
aP1~P3
bP4~P6
4.29 23
aP1~P3
bP4~P6
4.30 23
4.12 23
23
23
46.301(kg/cm2)
-32.180(kg/cm2)
38.681(kg/cm2)
-28.954(kg/cm2)
112
e-Thesys(95 )
4.4
(UX)(UY)
(UZ) 4.8
4.13
0.034cm
4.13
0.058cm
4.13
0.026cm
4.13
0.769cm
4.13
1.268cm
4.13
0.603cm
4.13
2.878cm
4.13
1.057cm
4.13
0.793cm
113
e-Thesys(95 )
114
e-Thesys(95 )
4.13
(cm)
0.06524
0.0306
0.194
0.1356
0.0913
0.1173
(cm)
4.863
5.632
4.8764
6.1435
0.01255
0.6156
(cm)
7.234
10.1122
7.752
6.695
0.02547
0.8181
115
e-Thesys(95 )
1.
0.863Hz 1.888 Hz
0.862Hz 1.782 Hz
2.
1.
P4 Y (
) 10.1122cm
2.
P2~P3 Y (
) 7.752cm
3.
4.
11291.6kg/cm2
22337.5kg/cm2
12107.1kg/cm2
1356.5kg/cm2
116
e-Thesys(95 )
2346.3kg/cm2
1.
2.
117
e-Thesys(95 )
[1]
[2] 2003
2003 2 26
[3] http://contest.ks.edu.tw/~river/travel/cbbridge/cbbridgemain.htm
Lee Tung-Li
[4] (CNS)
[5]
[6] 19952000
[7] 1960
[8] 1954 2
[9] 1968
[10] 1974 4
[11] 1987
[12] 2001
[13] 2003
[14] 2006
21
95K~100K ()
[15] 2004
[16] 2005
118
e-Thesys(95 )
p-y
[19] 1998
[20]
2005
[21]
(1996)
[22] 2004
pp.850~857
119
e-Thesys(95 )