This document discusses high-rise tower surveying. It describes how high-rise towers can be surveyed either externally or internally using plumbing methods. The purpose of high-rise tower surveying is to define the location, level, and height of building elements according to drawings, prepare as-built drawings, and set permissible errors. Surveying equipment used includes auto levels, total stations, optical plummets, and measuring tapes. High-rise tower monitoring and control involves measuring settlement, deflection, sway, and concrete shortening.
Original Description:
How highrise tower survey is important. Hiw to do actually is explained in presentation.
This document discusses high-rise tower surveying. It describes how high-rise towers can be surveyed either externally or internally using plumbing methods. The purpose of high-rise tower surveying is to define the location, level, and height of building elements according to drawings, prepare as-built drawings, and set permissible errors. Surveying equipment used includes auto levels, total stations, optical plummets, and measuring tapes. High-rise tower monitoring and control involves measuring settlement, deflection, sway, and concrete shortening.
This document discusses high-rise tower surveying. It describes how high-rise towers can be surveyed either externally or internally using plumbing methods. The purpose of high-rise tower surveying is to define the location, level, and height of building elements according to drawings, prepare as-built drawings, and set permissible errors. Surveying equipment used includes auto levels, total stations, optical plummets, and measuring tapes. High-rise tower monitoring and control involves measuring settlement, deflection, sway, and concrete shortening.
Presented by- Laxman Shete(GET 2019) Content 1) Introduction 2) Purpose 3) Equipment 4) Building monitoring & control
8/23/2019 High-Rise Tower Survey 2
Introduction What makes high-rise building Meaning of High-rise tower surveying High-rise tower survey can be done- 1. Plumb externally 2. Plumb internally Horizontal datum transfer
8/23/2019 High-Rise Tower Survey 3
Purpose Survey oriented- To define Location, level & Height of the element as per drawing. Repeat operation to minimize error. Prepare As-Built drawing. Set permissible error for different elements with consultation of concern team. Project oriented- Minimize execution time Reduce rework Cost saving 8/23/2019 High-Rise Tower Survey 4 Equipment used Equipment Use Auto/Laser Level Transfer & Check in Vertical Plane Total Station To set-out 2D/3D points & record as- Built Optical/Laser Transfer 2D points vertically upwards. Plummet Measuring tape To measure distance
Accessories Diagonal Eye Piece, Stencil, Marker,
Paint, etc.
8/23/2019 High-Rise Tower Survey 5
Fig1 : Laser plummet Fig3 : Total station
Fig2 : Optical plummet
8/23/2019 High-Rise Tower Survey 6 Building monitoring & control 1. Shore pile movement monitoring 2. Raft settlement monitoring 3. Slab Deflection Monitoring 4. Vertical monitoring Fig4 : Slab cut-out
5. Building sway monitoring
6. Concrete shortening monitoring
Fig5 : Spirit plate
8/23/2019 High-Rise Tower Survey 7 Fig6 : MS bracket stand Fig7 : Reference mark