PERMIT TO WORK
CONTENT
SIMOPS process is one of the risk management tools aiming at prevention of conflicting
operations/activities by involving of all parties into HAZID/RA process, working out
Conflicting Activities Risk Mitigation plan and maintaining cooperation and communication
at all stages of simultaneous works till their end.
PTW PROCEDURE
CONTRACTOR/ •
•
Verifies compliance with and effectiveness of PTW procedure
Ensues PTW(s) are carried out per requirements as approved
SUBCONTRACTOR • Ensures staff is trained
• Ensures all employees, Vendors and all Lower tier Subcontractors follow the procedure
Site Manager (SM) • Provides personnel, facilities, and other resources necessary to effectively implement and
enforce PTW procedure
•
CONTRACTOR/ •
Ensures training for concerned staff
Develops, approves, maintains, audits and continuously monitors implementation of PTW
SUBCONTRACTOR Procedure
• Provides feedback on performance and assists site supervision to plan and coordinate
HSE Manager work for effective implementation of PTW procedure
CONTRACTOR Issuing Authority • Direct subordinate of the CONTRACTOR Site Manager, certified in PTW and Approval
Assessment process
• Ensures all controls stated in JSA associated with work are in place before PTW issue
• Verifies by supervision that stated conditions in a work place and PTW are maintained
•
CONTRACTOR Work Permit Verifies permits are correctly completed by the Issuing Authority and Performing
Authority
Coordinator (WPC) • Proves PTW package verification by signature
• Ensures conformity of every PTW package with PTW Procedure requirements
• Ensures permits are distributed, opened and closed as to procedural requirements
• Maintains PTW Register
• Archives PTW packages after PTW cancellation upon work completion
ROLES AND RESPONSIBILITIES
•
SUBCONTRACTOR Work •
SUBCONTRACTOR’s employee authorized in writing by SUBCONTRACTOR’s Site Manager
Shall complete CONTRACTOR’s PTW Training Course and approval assessment process.
Performer`s • Shall be competent, certified and skilful in his/her discipline and line management (process organization).
• Individually responsible for implementation and enforcement of PTW procedure.
Supervisor (Permit Requestor) • Responsible for quality and safety of work.
• Appoints Work Performer responsible for work execution
•
SUBCONTRACTOR Work •
Prepares PTW package together with CONTRACTOR Issuing Authority the permit for work activities.
Complies with PTW conditions.
Performer • Lists correctly all tools and equipment required for job execution.
• Provides PPE specified on the Permit.
(Work Performing Authority) • Keeps PTW original copy always available in place of work.
• Applies all safety measures specified Work Permit and maintains their effectiveness.
• Hold a pre-job talk (STARRT) in order to share the risk assessment with the performing group/crew.
• Leave work site in tidy and safe condition before declaring the work completion.
•
Employees Must know, understand and comply with the health, safety and environmental requirements of PTW
procedure as applicable to their work scope.
• Must attend STARRT Meeting and do RA prior to work Must report any unsafe condition, tool and equipment
that may affect safety of operation to their direct Supervisor
• Must advise their direct Supervisor whenever unsure or unclear instructions received for a task, or where
concerned about the safety status of any task.
• Must keep the workplace in safe condition and clean it up after work completion.
•
Authorized Gas Tester •
Nominated by the CONTRACTOR HSE Manager and/or Commissioning Manager.
Specifically trained and experienced in use of Gas Testing Equipment
• Familiar with atmospheric hazards and hazardous gas characteristics
• Performs gas tests according to periodicity required by PTW
• Maintains the gas test records
PTW PACKAGE – MAIN PERMITS
•• Work
Work
Required does
whenever
that notthethe
requires create
task
enough heat
involves
use of athe toatolift
use of
crane flame ignite
or
flammable
other potentialgas-air
sourcemixtures
of
material
of flammable
ignition
and equipment
in an areamaterials
that has a in
for
highHeavy
operating orfor
potential Critical
units
fire or or
combustible
lifting materials
(this does
explosion. not in the
area
• include being
EXAMPLES: chainworked.
falls or
o
• Work that does not require
Welding
other
o Flame manually
cutting powered
specialized permits
hoisting
o Grinding devices):
• EXAMPLES:
/ Cutting
oo Grit blasting
20/50 tons or more
ooPneumatic / Hydraulic testing
Use of powered
o Spading
o Exceeding 75% steel
of max wirerated
and de-spading of systems
brushes
capacity
under pressure or which contain
osubstances
Use of electrical/electronic
o Two or more whichcranes
are flammable,
equipment
toxic which has not been
or corrosive
o Crane
o Chemical load
certifiedcleaningline deviates
as suitable for use in
from
o Handling vertical
flammable of hazardous
atmospheressubstances
ooe.g.,
Poor radioactive
access, sources,
Non-destructive clearances
test bytoxic /or
corrosive/flammable chemicals.
ground
ionizing bearing
o Painting
/ radiation
operations
pressure
o
o Working
Metal concern
Poses cutting, chipping
o at Height on safety
o Work
o Requires special
on isolated handling
electrical equipment
PTW PACKAGE – COMPLEMENTARY PERMITS
EXCAVATION WORK
FIRST ENERGIZING
CONFINED SPACE
RADIOGRAPHY PERMIT
ENTRY
WORK PERMIT
PERMIT
Is• Required
For issued
Ituse oftoindustrial
cover
any
is mandatory timeall excavation
foran personworks
electrical
any
radioactive item to a
to enter
isotopes,
ensure
e.g.requiresthat
confined
in the precautions
energization,
space.
x-ray are
of welds.even taken to avoid
if temporary,
Usually such
• or
damage
works aretoPTW
A becomes
main underground
a shall
live system
performed services
always
at the(i.e.
be
time e.g. jointly
panels,
issued
of
pipelines,
boards, electrical
cabinets,
with a Confined
minimum personnel or
Spacetelecommunication
transformer
Entry
staying or (for
on permit.
site
cables etc.at nights).
equipment
example, is energized for the first
time).
PTW PACKAGE – WORK METHOD STATEMENT AND JOB
SAFETY ANALYSIS
N
INSTALLED / MAINTAINED
attached with the PTW if the job INSTRUCTIONS NECESSARY TO PERFORM THE TASK SAFELY?
BACK BELTS
CORRECT TYPE GLOVES
Y
WELDING LENS / OXY GOGGLESY
Y
Y
N
N
N
N
PERMIT TO WORK PROCEDURE IT
work team understand the DO I/WE HAVE THE CORRECT TOOLS TO DO THE TASK SAFELY?
Y
N
N
6
7
8
9
identified in JSA and that any STARRT REVIEWED FOR ADDITIONAL ACTION
Y
Y
N
N
10
11
12
13
fully briefed
WORKS REQUIRING NO PERMIT
• It is allowed to issue one PTW for several work places that are in the area
of work performer`s clear visibility, except for highly hazardous works.
Controls that
will be
present/ put in
Cross-reference
Controls that should be givenplace during
to No.
should be in work
of PTWs under which
place/ execution. Pay
simultaneous
If some hazards
prepared
were identified operationsattention
are to
before work
that are not performed inthetheEntry
commences.
listed in Hazards work area“Others”.
Pay attention Also carefully
Reminder on
Section, they consider the
to the Entry the PTW
should be development
“Others”. original/copies
written in the of working
additional line distribution
situation.
MAIN PTW FORMS
Additional
instructions or
notes from GC,
if any. If not,
the Section is
Commissioning
Manager`s √ left blank
signature will be
By signing
required at
here, the SUB
Pre-/Commissioni
WPAngtakes
stage of the
responsibility
Project
By signing here, the SUB
for every word
WPA takes responsibility
underlined
for every word
above.
underlined above.
MAIN PTW FORMS
• Gas Test is performed by Authorised Gas Tester and registered in this Section.
• If this section is insufficient due to the number of periodic tests during one 12-
hour shift, Gas Test continuation sheet is available and can be included in the
permit pack.
MAIN PTW FORMS
The lower
However,part person
of the Section concerns
responsible
hazards
shouldn`tapplicable mainlyhazards
forget about to lifting
associatedoperation:
with the work place
1. the
Crane/Boom
lifting conditions
operation will and
be
The list of personnel
capacityengaged in the
Liftingperformed
Operation
2. Ground
and
is thoseinfrom
shown
conditions the right-
handadjacent
section,
3. Load
areas
as that might
compared
characteristics to the
endangerof
“Number safety of the operation.
personnel” Sections in
4. Lifting gear conditions
CWP
5. andsetup
Crane HWP.
All the rest sections are filled in the
same way as previously described for
CWP and HWP
COMPLEMENTARY PTW FORMS
CONFINED SPACE ENTRY PERMIT REQUIREMENTS
Pay attention to the necessity of
• Compulsory training providing detailed description of
• WMS and JSA conditions check each
safe means time to/egress
of access
from a CS.
before entry It is very important for a person
• Drawing with identified exits, outside
responsible anchor
to check access/egress
conditions and provide for
points for lifelines adequate ones if unsafe.
• Attendant
• Entry log book
• Entry board
The main compulsory
• Rescue and communication
• In case where some work is to be performed in a CS, gas test/s plan
should
precautionary beare listed
measures
• Gas test below to ensure:
registered in CSE Permit (not the•correspondent Section of •CWP
Ventilation (if necessary) or HWP).
Safe access
• In case there is insufficient space in the Section, a continuation•
Safe atmosphere
sheet (which
• Communication between
is a
part of Confined Space Entrance Sheet) can be included into the
entrants
• Etc.
PTW pack.
and attendant
COMPLEMENTARY PTW FORMS
EXCAVATION PERMIT REQUIREMENTS
• Drawing of underground commutations and utilities
• Identification of the utilities belonging to SNEMA, if any
(underground electrical utilities operating company)
• Plot plan with identified lines and utilities
• Verification and approval by SNEMA`s stamp both on the
CWP and the drawing.
COMPLEMENTARY PTW FORMS