Professional Documents
Culture Documents
• Clean casing
2
© COPYRIGHT 2002, All Rights Reserved
Clean casing with Bit & Scraper
CASING SCRAPER
Scraper blades
3
© COPYRIGHT 2002, All Rights Reserved
Circulating the well
This is a major step in the preparation
5
© COPYRIGHT 2002, All Rights Reserved
Application of completion fluids
A completion fluid is used:
• To help to prepare the well for production,
• To drill the pay zone,
– keep solids and cuttings in suspension
Mud
Chemical wash:
- Cleaning wellbore
Spacer: Séparation
Completion
Fluid
8
© COPYRIGHT 2002, All Rights Reserved
Drilling fluid displacement
Reverse circulation:
• A better displacement is obtained,
• The completion fluid is pumped down the
annulus and the returns are through the
drillpipe.
• Prevents solids settling in the annulus of
the well where flow velocities are lower
compared to inside drill pipe.
9
© COPYRIGHT 2002, All Rights Reserved
WELL SURFACE CONFIGURATION
for completion at a later date
2 Top Valves
tubing head housing with
hanger and kill string
1
0 © COPYRIGHT 2002, All Rights Reserved
WELL SURFACE CONFIGURATION
ready for completion
BOP's Stack
1
1 © COPYRIGHT 2002, All Rights Reserved
Network of Excellence in Training
End of Session