You are on page 1of 18

Institute of Technology of Cambodia

Department of Industrial and Mechanical Engineering

Topic : Spraying Machine

Coordinator: Dr. LIV Yi

Presenter : Mr. CHROEUN Sokay & Mr. SOUN Vey


Contents
I. Project members

II. Introduction
III. Objective
IV. Methodology

V. Result
VI. Conclusion
I. Project members

 CHROEUN Sokay (GIM)


 SOUN VEY (GIM)
 SORT Sengly (GIM)
 SAMBATH Chhany (GIM)
 RETH Rithy (GIM)
II.Introduction

1.Definition:
 An agricultural machine used to replace farmers’ works.
II.Introduction

2.Aims of the project:


 Make impacts in agricultural sector: Agricultural activities.
II.Introduction

2.Aims of the project:


 Push manufacturing in our country: Start from a conventional machine but
many
III.Objective

1.Function:
 Spraying: Pesticide, Chemicals & Liquid fertilizer
III.Objective

1.Function:
 Spraying: Pesticide, Chemicals & Liquid fertilizer
 Fertilizing and sowing seed: Scattering seed (rice,…) & Solid fertilizer ( Urea,
15-15-15,…)
III.Objective

2.Advantages:
 Security: Protect farmers from pesticide harm, to prevent poisoning and to
provide a roof and comfortable operating place.

Cool air-conditioned cabin High from the chemical fog


III.Objective

2.Advantages:
 High efficiency: Has ability to spray and sow higher than the traditional

method. (2 to 3 hectares per hour)


III.Objective

2.Advantages:
 Water, Chemicals & Fertilizer saving: A large water tank can spray more area
of crop than the small tank can. Not getting lost in the field any more.
III.Objective

3.Concept of Design:
 Engine: Diesel engine
 Power and controlling system: Hydraulic pump & Gearbox(3 shifts)
 Driving system: 4 wheels drive
 Spraying system: 14m spraying boom, High pressure pump, 300L water tank.
 Weight: 1500kg
IV.Methodology

 Making prototype: Using 3D printer, Arduino sensors and actuators and other
materials.
IV.Methodology

 Seeking existing materials: getting the specifications and price of some components
(secondhand & new).
IV.Methodology

 Seeking existing materials: getting the specifications and price of some components
(secondhand & new).
V. Result

 Since this project has been started, it takes about 1 month and half
long but we just reach about 50% of prototype. The only one factors
which really causes us step very slowly is Time Organizing. Most of
the time, we have to spend on our school works that’s quite difficult to
find an available time to have a meeting together.
VI.Conclusion

 This machine looks like a very simple machine but it provides many
benefits to the farmers to increase annual yield and it should be an
idea to change our country from an agricultural country to an
agroindustry country as well.
X-SPRAYER

THANKS YOU

You might also like