Traffic Management Plan

MG7300 N2 Gas Back-up Facility Project


Pipeline - from TNSPI Site
to Samsung

Pipeline Layout
DURATION: 3WEEKS

MS PLATE MS PLATE MS PLATE

MS PLATE

BARRICADE
OPEN TRENCH

Traffic Plan
DURATION: 3WEEKS

MS PLATE

BARRICADE

OPEN TRENCH
MS PLATE

Traffic Plan
DURATION: 3WEEKS

OPEN TRENCH

BARRICADE

OPEN TRENCH BARRICADE


MS PLATE
DURATION: 2WEEKS

OPEN TRENCH
MS PLATE

BARRICADE
BI PIPE
FRAME GI SHEET BARRICADE

2.40 meters

OPEN TRENCH
1.20 meters

VARIES

BARRICADE DETAILS
PROPOSED LOCATION

HARD BARRICADE LAYOUT


EXCAVATION LAYOUT - A EXCAVATION LAYOUT - B
PIPELINE SECTION - A
PIPELINE SECTION - B