You are on page 1of 7

SUBSTATION SITE

SELECTION
ALDRIAN LOUIE TRABUCON
FACTORS AFFECTING SUBSTATION
SITTING
EXISTING
SUBTRANSMISSI
ON LINE LOAD
LOAD
LOCATION AVAILABILI
FORCAST
TY

LOAD COST OF
DENSITY SUBSTATI LAND
ON
CLOSENES
SITE LAND-USE
S TO LOAD REGULATIO
CENTERS NS

FEEDER EXISTING
LIMITATIO SUBSTATI
N ON
LOCATION
SUBSTATI
ON SITE
SERVICE REGION
SELECTI
- Is the area under
ON
evaluation
PROCEDU
- It may be defined as the
RE
service territory of the
utility
CANDIDATE AREA
-initial screening is applied by using a set
of consideration
CONSIDIRATIONS:

 SAFETY
 ENGINEERING
 SYSTEM PLANNING
 INSTITUIONAL
 ECONOMICS
 AESTHETICS

- In this stage of the site selection mainly indicates that the


areas are unstable for site development.
SITES HELD FOR
UNSUITABLE LATER
SITE CANDIDATE EVALUATION
-site that are SITES - Sites that have
some promise but
unsuitable for -candidate are not selected for
development in sites that are detailed evaluation
the foreseeable to be studied during the
planning cycle
in more detail
PROPOSE
SITES
THAN
K

You might also like