Professional Documents
Culture Documents
Substation Site Selection: Aldrian Louie Trabucon
Substation Site Selection: Aldrian Louie Trabucon
SELECTION
ALDRIAN LOUIE TRABUCON
FACTORS AFFECTING SUBSTATION
SITTING
EXISTING
SUBTRANSMISSI
ON LINE LOAD
LOAD
LOCATION AVAILABILI
FORCAST
TY
LOAD COST OF
DENSITY SUBSTATI LAND
ON
CLOSENES
SITE LAND-USE
S TO LOAD REGULATIO
CENTERS NS
FEEDER EXISTING
LIMITATIO SUBSTATI
N ON
LOCATION
SUBSTATI
ON SITE
SERVICE REGION
SELECTI
- Is the area under
ON
evaluation
PROCEDU
- It may be defined as the
RE
service territory of the
utility
CANDIDATE AREA
-initial screening is applied by using a set
of consideration
CONSIDIRATIONS:
SAFETY
ENGINEERING
SYSTEM PLANNING
INSTITUIONAL
ECONOMICS
AESTHETICS