Main entrance of building towards west.
1. Building Envelope
Solar Duct
Solar ducts for natural flow of hot air. Tapered windows on East and
West sides to avoid sun rays in
summer months.
EXSITING ECBC FEATURES IN AKSHAY URJA BHAWAN
1. Building Envelope
1. Building Envelope
1. Building Envelope
2. Lighting
LUX level has been recorded at the workstations and machineries as detailed below.
LIGHT DETAILS
S.NO. TYPE QUANTITY WATT (W) TOTAL WATT
(W)
2. Lighting
ROOM TEMPERATURE PROFILE
EXSITING ECBC FEATURES IN AKSHAY URJA BHAWAN
3. Electric Power
ELECTRICITY BILL ANALYSIS
Plant is using 42.5 kW solar PV (with 5 kW B.I.P.V installed) modules to generate
electricity and catering the lighting demands of the building form the solar. In addition,
250 kVA connection from the State electricity board is used to cater the air
conditioning and other power requirements of the building. Solar Photovoltaic Cells
(Panels) Capacity -180 KWH per day
3. Electric Power
ELECTRICITY CONSUMPTION DETAILS 2014