Professional Documents
Culture Documents
MISCELLANEOUS
CONSTRUCTION MATERIALS
AND SIGNIFICANCE
QUALITY CONTROL OF MISCELLANEOUS
CONSTRUCTION MATERIALS AND
SIGNIFICANCE
(CONTENTS)
Reinforced
Concrete
RCCP Culvert Pipe
Reinforcing Steel
Bar
GUARDR CHB
AIL
RSB
Concrete Masonry
Classes of Highway Units
Guardrail
2
REINFORCING STEEL BAR
BAR – a steel product of plain, round or deformed
cross-section for concrete reinforcement.
Governing Specification
3
Classification
4
Classification
5
Uses
6
SAMPLING/MINIMUM TESTING
REQUIREMENT
7
TESTS ON REINFORCING STEEL
BAR
• TENSION TEST
RSB - determines the tensile properties
- results are used to classify bars into grades
- provides information on the strength and
ductility of materials under uniaxial tensile stresses.
- results maybe useful in comparison of
materials, alloy development and quality control.
• YIELD POINT
• TENSILE STRENGTH
• ELONGATION
8
TENSION TEST
RSB
9
DIMENSION
RSB
10
VARIATION IN MASS
RSB
11
BENDING TEST
RSB
12
PHOSPHOROUS CONTENT
DETERMINATION
13
DEFORMATION MESUREMENTS
RSB
14
AVERAGE SPACING (SPACING BET. THE LUGS)
15
Tensile Requirements Grade 40 Grade 60
Tensile Strength min., MPa 420 620
Yield Strength min., MPa 280 420
Elongation in 200mm:, min.
%
Bar Ø mm 10 11 9
12, 16, 20 12 9
22, 25 - 8
28, 32 - 7
36 - 7
16
Variation in Mass, % - shall not
exceed 6% under nominal weight except
for bars smaller than 3/8 in. (10mm)
plain round. In no case shall the
RSB overweight be the cause for rejection.
Bending requirement: No cracking on
outside ben portion
Phosphorous Content, % : 0.06 max
17
AASHTO M31: Nominal Dimensions
18
AASHTO M31: Deformation Requirements
(mm)
19
AASHTO M31: Deformation Requirements
(mm)
20
TYPES OS HIGHWAY GUARDRAIL:
AASHTO M 180 (1980)
TYPE I – zinc coated, 1.80 ounces per
square foot (550g/sq.m)minimum single
spot.
GUARDRAI
TYPE II – zinc coated, 3.60 ounces per
L
square foot (1,100 g/sq.m) minimum
single spot.
21
CLASSES OF HIGHWAY GUARDRAIL
22
DPWH Volume IV, PQA
(The Roles of DPWH Implementing Offices, the BRS and the
BQS in Testing and Inspection )
23
Quality Management of Construction
Process
DPWH
DPWH Secretary
Secretary
DPWH
DPWH Quality
Quality Management
Management
Representative
Representative (ISO
(ISO 9001)
9001)
Project
Project
ProjectQuality
Quality
QualityAssurance
Assurance
Assurance
Program (PQAP)
(PQAP)
Program (PQAP)
(PQAP)
QC
Quality
QualityAssurance
Assurance Quality
Quality Control
Control Program
Program
Program
Program (QAP)
(QAP) (QCP)
(QCP)
Quality
QualityAssurance
Assurance Quality
QualityAssurance
Assurance Quality
Quality
Quality Control
Control Quality Control
Control
Testing
Testing Plan (QATP)
Plan (QATP) Inspection
Inspection Plan (QAIP)
Plan (QAIP) Testing
Testing Plan
Plan Inspection
Inspection Plan
Plan (QCIP)
(QCIP)
(QCTP)
(QCTP)
24
DPWH Volume IV, PQA
(Testing and Inspection Plans)
Contractor DPWH
Plan Activity
Head of
ME PE Office
Chief ER PI ME
Project QAHD /
Preparation QAS
Quality
Assurance
Program
(PQAP)
-Testing Approval RD/DE
Project
Quality CD/CS
Preparation
Assurance
Program
(PQAP)
-Inspection Approval RD/DE
25
Quality Control Program
26
Project Quality Assurance Program
(Master Schedule for Testing)
PROJECT QUALITY ASSURANCE PROGRAM (PQAP) DPWH-TR-F003A
MASTER SCHEDULE FOR TESTING
Contract ID : ________________________________________________________________________________________________________________________________
Contract Name : ________________________________________________________________________________________________________________________________
Contractor Name : ________________________________________________________________________________________________________________________________
Project Component Description : ________________________________________________________________________________________________________________________________
Project Component Cost : ________________________________________________________________________________________________________________________________
City / Municipality : _______________________________________________________________________________________________________________________________
Station Limits : ________________________________________________________________________________________________________________________________
27
Project Quality Assurance Program
(Project Quality Assurance Program - Inspection)
28
Quality Management of Construction
Process
DPWH
DPWH Secretary
Secretary
DPWH
DPWH Quality
Quality Management
Management
Representative
Representative (ISO
(ISO 9001)
9001)
Project
Project Quality
QualityAssurance
Assurance
Program (PQAP)
Program (PQAP)
QC
Quality
QualityAssurance
Assurance Quality
Quality Control
Control Program
Program
Program
Program (QAP)
(QAP) (QCP)
(QCP)
Quality
QualityAssurance
Assurance Quality
QualityAssurance
Assurance Quality
Quality
Quality Control
Control Quality Control
Control
Testing
Testing Plan (QATP)
Plan (QATP) Inspection
Inspection Plan (QAIP)
Plan (QAIP) Testing
Testing Plan
Plan Inspection
Inspection Plan
Plan (QCIP)
(QCIP)
(QCTP)
(QCTP)
29
DPWH Volume IV, PQA
(Testing and Inspection Plans)
Contractor DPWH
Plan Activity Head of
ME PE Office
Chief ER PI ME
Preparation
Confirmation
QATP QAHD
Review / QAS
Quality
Approval RD/DE
Assurance
Program Preparation
(QAP)
Confirmation
QAIP CD/
Review CS
Approval RD/DE
30
Quality Control Program
31
Quality Assurance Test Plan
DPWH-TR-F002
QUALITY ASSURANCE PROGRAM -QUALITY ASSURANCE TEST PLAN (QATP)
Contract ID : ________________________________________________________________________________________________________________________________
Contract Name : ________________________________________________________________________________________________________________________________
Contractor Name : ________________________________________________________________________________________________________________________________
Project Component Description : ________________________________________________________________________________________________________________________________
Project Component Cost : ________________________________________________________________________________________________________________________________
City / Municipality : _______________________________________________________________________________________________________________________________
Station Limits : ________________________________________________________________________________________________________________________________
32
Quality Assurance Inspection Plan
33
Quality Management of Construction
Process
DPWH
DPWH Secretary
Secretary
DPWH
DPWH Quality
Quality Management
Management
Representative
Representative (ISO
(ISO 9001)
9001)
Project
Project Quality
Quality Assurance
Assurance
Program (PQAP)
Program (PQAP)
QC
Quality
QualityAssurance
Assurance Quality
Quality Control
Control Program
Program
Program
Program (QAP)
(QAP) (QCP)
(QCP)
Quality
QualityAssurance
Assurance Quality
QualityAssurance
Assurance Quality
Quality Control
Control Quality
Quality Control
Control
Testing
Testing Plan (QATP)
Plan (QATP) Inspection
Inspection Plan (QAIP)
Plan (QAIP) Inspection
Testing
Testing Plan
Plan Inspection Plan (QCIP)
Plan (QCIP)
(QCTP)
(QCTP)
34
DPWH Volume IV, PQA
(Testing and Inspection Plans)
Contractor DPWH
Plan Activity Head
ME PI PE of Chief ER PI ME
Office
Preparation
Confirmation
2nd Review
QCTP Review (QAHD/QAS 1st Review
)
Confirmation
Quality
Control Approval RD/DE
Program Preparation
(QCP)
Confirmation
2nd Review 1st
QCIP Review (CD/CS) Review
Confirmation
Approval RD/DE
36
Quality Control Test Plan
DPWH-TR-F001
QUALITY CONTROL PROGRAM -QUALITY CONTROL TEST PLAN (QCTP)
Contract ID : ________________________________________________________________________________________________________________________________
Contract Name : ________________________________________________________________________________________________________________________________
Contractor Name : ________________________________________________________________________________________________________________________________
Project Component Description : ________________________________________________________________________________________________________________________________
Project Component Cost : ________________________________________________________________________________________________________________________________
City / Municipality : _______________________________________________________________________________________________________________________________
Station Limits : ________________________________________________________________________________________________________________________________
37
Quality Control Inspection Plan
38
Certificate of Quality Control
Assurance
39
Certificates
Certificate of Quality Control Certificate of Quality Assurance
40
Inspection Process Flow
Request for Inspection (RFI)
Testing Process Flow
Request for Testing (RFT)
Minimum Testing Requirement
APPENDIX 2 (Annex B)
45
Minimum Testing Requirement
APPENDIX 2 (Annex B)
46
Minimum Testing Requirement
APPENDIX 2 (Annex B)
47
Minimum Testing Requirement
APPENDIX 2 (Annex B)
48
Minimum Testing Requirement
APPENDIX 2 (Annex B)
49
Minimum Testing Requirement
APPENDIX 2 (Annex B)
50
DPWH Volume IV, PQA
(Definition of Control Points)
Control
Control Points
Points
51
DPWH Volume IV, PQA
(Definition of Control Points)
Control Points
Milestone
Witness Points
Hold Points
DPWH Volume IV, PQA
(Types of Control Points)
Control
Control Points
Points
a.
a. Milestone
Milestone Example:
Completion of the foundations to a
bridge or building, or completion of
the base course on a specified road
section. Milestones shall be
included in the QCIP and QAIP, to
indicate project progress.
53
Road Construction Process Control
Chart
Control Points
Milestone
DPWH Volume IV, PQA
(Types of Control Points)
b.
b. Hold
Hold Point
Point It shall be applied by the Engineer’s
Representative where inspection and/or
Examples:
testing and/or survey by the Engineer’s
Field Density Test Representative are required to confirm
Slump Test compliance with plans and specifications
Flexural Strength of Concrete before the next activity can be started, or
the next component added.
40-A
Road Construction Process Control
Chart
Control Points
Hold Points
DPWH Volume IV, PQA
(Types of Control Points)
Examples:
Temporary Facilities
Equipment
Construction Safety and Health
Excavation
51-A
DPWH Volume IV, PQA
(Types of Control Points)
51-B
Controlling Construction Processes 3
Control Points
Witness Points
59
Project Non-Conformance Report
49
Project Non-Conformance Report
50
DPWH Volume IV
PCMA Application
57
DPWH Volume IV
PCMA Application
PCMA Modules
57
DPWH Volume IV
PCMA Application
57
DPWH Volume IV
PCMA Application
PQA Tab
58
DPWH Volume IV
PCMA Application
59
DPWH Volume IV
PCMA Application
DPWH Volume IV
PCMA Application
DPWH Volume IV
PCMA Application
DPWH Volume IV
PCMA Application
DPWH Volume IV
PCMA Application
DPWH Volume IV, PQA
(Scope of Testing)
Quality
Quality Control
Control Testing
Testing Quality
Quality Assurance
Assurance Testing
Testing
Independent
Independent Assurance
Assurance
Verification
Verification Testing
Testing Testing
Testing
Dispute
Dispute Resolution
Resolution Testing
Testing
In the case where the BRS performs the Independent Assurance Testing,
the subsequent Dispute Resolution Testing may be performed by the BRS
or another laboratory nominated by the BRS.
60
QUALITY ASSURANCE
TESTING
All Quality Assurance inspections, sampling and testing
shall be undertaken for and on behalf of the DPWH
Implementing Office by the Engineer’s Representative
61
QUALITY CONTROL TESTING
All Quality Control inspections, sampling and testing shall
be undertaken by the contractor
Shall
utilize its own laboratories or avail the services of
DPWH-accredited private testing laboratories
62
VERIFICATION TESTING
63
INDEPENDENT ASSURANCE (IA)
TESTING
May be a check on a test result, but more typically a check on sampling and
testing procedures and equipment
( 1st step in a dispute process)
RO will conduct IA for DEO projects, BRS or BRS nominated lab will do IA for
UPMO and RO projects.
64
DISPUTE RESOLUTION (DR)
TESTING
When IA testing results are not acceptable to either or both
parties, DR shall proceed
65
DPWH Volume IV, PQA
(Use of Contractor’s QC Results)
The Engineer may opt to use some of the results of the Contractor’s
inspection, sampling and testing for acceptance, provided that:
66
DPWH Volume IV, PQA
(Use of Contractor’s QC Results)
67
DPWH Volume IV, PQA
(Statistical Treatment of QA and QC Test Result)
68
DPWH Volume IV, PQA
(Certificate of Completion)
69
DPWH Volume IV, PQA
(Certificate of Acceptance)
70
Thank
You!