CCS CONTINGENCY PROCEDURES
A. CCS MALFUNCTIONS
1. The BOC shall direct the CCSO to repeat the turn-off
and turn-on procedure;
2
CCS CONTINGENCY PROCEDURES
CCS MALFUNCTIONS
4. CCSO shall turn off the defective CCS laptop.
3
CCS CONTINGENCY PROCEDURES
A. CCS MALFUNCTIONS
7. CCSO shall insert the SD card into the
contingency CCS laptop.
8. CCSO shall connect the contingency CCS laptop
to the main power source and turn it on.
9. CCSO shall store the defective CCS laptop in its
original packaging and turn-over to the BOC.
10. CCSO shall call NTSC and inform about the
acceptance of the contingent CCS laptop.
4
CCS CONTINGENCY PROCEDURES
B. All/Majority of USB tokens are unavailable.
5
CCS CONTINGENCY PROCEDURES
C. All/Majority of the BOC PINs/Passwords are
unavailable/denied.
1. CCSO shall inform the NTSC of the missing pins and/or
passwords.
2. NTSC shall refer the matter to the PMO Project Director
who shall authorize the issuance of the pins and/or
passwords to the BOC and
2. NTSC shall refer the matter to the PMO Project Director who
shall authorize the issuance of the blank SD cards to the BOC.
3. CCSO shall insert the blank SD card in the SD card slot.
7
CCS CONTINGENCY PROCEDURES
E. There is power supply interruption (Brownout/
Blackout) in the canvassing venue.
8
CCS CONTINGENCY PROCEDURES
E. There is power supply interruption (Brownout/
Blackout) in the canvassing venue.
b. Start-up the generator set: check for the activity
indicator in the generator set;
c. Unplug the CCS laptop adaptor from the external
electricity source, and plug the same in the
generator set outlet;
d. Continually check status of the external electricity
source;
9
CCS CONTINGENCY PROCEDURES
E. There is power supply interruption (Brownout/
Blackout) in the canvassing venue.
e. When the external electricity source is back,
unplug the CCS laptop adaptor from the generator
set and connect it to the external electricity power
source;
f. Call the NTSC indicating the status of the CCS;
and
g. Record the new status in the Minutes.
10
CCS CONTINGENCY PROCEDURES
F. There is Network Failure.
11
CCS CONTINGENCY PROCEDURES
F. There is Network Failure.