BACKGROUND
PERCENTAGE AND GROWTH RATE OF URBAN POPULATION
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
PROBLEM STATEMENT
• THE DESIGN AND THE PLANNING OF THE HOUSES SHALL BE DONE IN SUCH MANNER THAT THEY
ARE SUITABLE FOR LOW INCOME GROUPS
• SINCE PREVIOUS STUDIES HAVE SHOWN THAT BLOCKS AND CEMENT HOLLOW BLOCKS ARE THE
MOST SUITABLE ALTERNATIVES FOR LOW-COST HOUSING, THE STUDY WILL ONLY INCLUDE THESE
TWO TECHNIQUES
• THE STUDY WILL FOCUS ON WALL MATERIALS AND THE DURABILITY OF CONSTRUCTION
DETAILS.
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
OBJECTIVES
•TO EXAMINE THE PRESENT HOUSING SCENARIO IN NEPAL
•TO STUDY VARIOUS CONSTRUCTION TECHNIQUES WHICH CAN BE USED TO REDUCE THE COST
OF CONSTRUCTION
•STUDY OF ALTERNATIVE MATERIALS WHICH CAN BE USED FOR LOW COST HOUSING
•TO ACHIEVE EFFICIENT UTILIZATION OF LAND AND AVOID NEGATIVE SPACES AS FAR AS
POSSIBLE
•TO EXPAND THE USE OF LOCAL SKILLS AND IMPROVE EXISTING METHODS AVOIDING COMPLEX
INFRASTRUCTURE
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
GROWING POPULATION DAY BY DAY
NON
TOXIC
SELECTIO
N OF
MATERIAL
S
POLLUTION
PREVENTING RECYCLABLE
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY SUBJECT:LOW COST
SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING HOUSING
ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN TOPIC: CASE STUDY
POUDEL(18),SONA GHIMIRE(40)
LITERATURE REVIEW
THE
FOLLOWING
ARE THE
VARIOUS A. PLANNING C. USE OF
RECOMMENDA OF LAND AND B. DESIGN OF BUILDING
TIONS FOR LAND INDIVIDUAL MATERIALS AND
APPROACHING DEVELOPMENT BUILDING. CONSTRUCTION
TO LOW COST . TECHNOLogy.
OR COST
EFFECTIVE
HOUSING:-
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY SUBJECT:LOW COST
SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING HOUSING
ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN TOPIC: CASE STUDY
POUDEL(18),SONA GHIMIRE(40)
PLANNING OF LAND AND LAND DEVELOPMENT
SUPPLY OF LAND
HOUSING INVOLVES BUYING OF PLOT, CONSTRUCTION OF HOUSE AND RECEPTION OF
SUPPLY OF LAND
ROAD (MORE LAND) AND SERVICES
Housing involves buying of plot, construction of house and reception of road (more
land) and services CREATES MORE DEMAND OF HOUSES BUT THERE IS THE SCARCITY OF
URBANIZATION
Urbanization
LAND creates more demand of houses but there is the scarcity of land
Scarcity of land increases the value of land
SCARCITY OF LAND INCREASES THE VALUE OF LAND
High priced land increases cost of housing
HIGH PRICED LAND INCREASES COST OF HOUSING
In the context of Nepal,
IN of
Out THE CONTEXT
total land inOF NEPAL,
Nepal only 16.07% is fit for agriculture.
Most
OUT OFofTOTAL
our settlements are located
LAND IN NEPAL in andISaround
ONLY 16.07% FIT FORtheAGRICULTURE
fertile land.
Haphazard
MOST OF OUR planning consumesARE
SETTLEMENTS land unnecessarily
LOCATED IN AND AROUND THE FERTILE LAND
Currently, no. of houses/hectare is only 15 units
HAPHAZARD
Standard PLANNING
density in urbanCONSUMES LAND
areas should UNNECESSARILY
be 300 houses/hectare
Continuation
CURRENTLY, of low
NO. OF density housing will
HOUSES/HECTARE destroy
IS ONLY 15 land
UNITS for growing population
STAIRCASE SHALL BE PLACED AS FAR AS POSSIBLE AT THE CENTER OF THE PLAN WHICH HELPS
IN DETERMINING THE ECONOMY OF THE PLAN
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
3.STOREY HEIGHT
INCREASING HEIGHT WILL NOT ONLY INCREASE THE COST OF WALLING
BUT ALSO MAKE THE ROOM UNCOMFORTABLE AND UNPROPORTIONATE
4.AREA OF OPENING
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
PRIMARY SURVEY AND DATA COLLECTION
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
ALTERNATIVE MATERIALS
FLY ASH BRICKS
PREFABRICATED MATERIAL
• THE COMPONENTS INCLUDE STEEL FRAMES, MADE OF FLY ASH, LIME, GYPSUM
WOODEN PANELS, CEMENT AND GYPSUM FOR AND SAND. THESE CAN BE
FLOORS ALONG WITH FACTORY FABRICATED EXTENSIVELY USED IN ALL BUILDING
DOORS, WINDOWS, CEILINGS AND WALLS CONSTRUCTIONAL ACTIVITIES
SIMILAR TO THAT OF COMMON
• DEPENDING ON THE REQUIREMENTS, THE BURNT CLAY BRICKS. THE FLY ASH
COMPONENTS LIKE WALL AND CEILING PANELS, BRICKS ARE COMPARATIVELY
AS WELL AS STRUCTURAL STEEL FRAMES, CAN BE LIGHTER IN WEIGHT AND STRONGER
CUSTOM MADE AND THEN ASSEMBLED. THAN COMMON CLAY BRICKS.
ADVANTAGES-
• SAVES CONSTRUCTION COST
• LESS WATER SEEPAGE AND
DAMPNESS IN WALL
FERROCEMENT • LESS ENERGY CONSUMPTIOn
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
BAMBOO:
• GREEN BUILDING MATERIAL, WHICH IS VERY POPULAR
DUE TO ITS LOW COST, LOW WEIGHT AND DURABILITY
BUT SHOULD BE TREATED WITH APPROPRIATE CHEMICALS
TO MAKE IT TERMITE RESISTANT.
INTERLOCKING BLOCKS:
• DESIGNED WITH A PROJECTION ON ONE SIDE AND A
DEPRESSION ON THE OTHER SO THAT THEY ALIGN
WITH BRICKS OF A SIMILAR TYPE, LIKE A JIGSAW
PUZZLE, TO MAKE WALLS.
• INTERLOCKING BRICKS ARE MADE OUT OF LATERITE
STONE POWDER, CEMENT AND GRAVEL.
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
PREFAB WALL PANEL (ECO-PANEL)- ITS USES-
RESIDENTIAL AND
COMMERCIAL BUILDING
It IS A LIGHT WEIGHT INTERLOCKING OFFICE BUILDING
SANDWICH PANEL WITH THE COMPOSITION OF ANIMAL SHEDS , FENCES AND
NON ASBESTOS CALCIUM SILICATE BOARD, OTHER FARM USES
CEMENT, WATER, SAND AND EXPANDABLE
POLYSTYRENE (EPS).
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
HOLLOW CONCRETE BLOCK DESCRIPTION
• IS A LARGE RECTANGULAR BRICK USED • ONE OR MORE HOLLOW CORES.
IN CONSTRUCTION.
• HOLLOW CORE CONCRETE IS MORE
PORTLAND CEMENT AND AGGREGATE,
THAN 50 % SOLID.
USUALLY SAND AND FINE GRAVEL FOR
• STANDARD CONCRETE BLOCKS COME
HIGH-DENSITY BLOCKS.
IN FULL AND HALF SIZES.
• SIZE -12X8X4 INCH
• FULL-SIZE BLOCKS ARE RECTANGULAR
AND HAVE TWO CORES.
COMMON PARTS • HALF SIZE BLOCKS ARE CUBICAL AND
HAVE ONE CORE.
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
RAMMED EARTH PROCESS
SETTING LAYERS OF EARTH INTO A FORMWORK AND EXCAVATION FOR OBTAINING THE
COMPACT IT TO INCREASE ITS DENSITY AND ITS SOIL
COMPRESSIVE STRENGTH PREPARATION OF THE MIXTURE
INSERTION OF THE MIXTURE ON
COMPOSTION OF SAND,CLAY,SILT,COLOR PIGMENT THE FORMWORK
AND CEMENT THAT IS BLENDED WITH WATER TO MAKE COMPACTION
A DAMP MIXTURE
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
SOIL TO BE USED: ENVIRONMENTAL IMPACT
THE SOIL IS TAKEN FROM THE LAND ON WHICH
IS TO BE BUILT AVOID USE OF FOSSIL FUELS BY:
HAND COMPRESSING LOCAL
AROUND 30% SAVING IN COST EARTH ONSITE
LESS CEMENT
MINIMAL HEATING/COOLING
Impact on comfortable
living MAINTENANCE
Feature Rammed earth building
SOCIO-CULTURAL IMPACT
Thermal insulation Warm in winter cool in
summer STABLE,FAIR EMPLOYMENT
SKILL DEVELOPMENT
humidity Comfortable year around TRADITIONAL LOOKING,
Earthquake resistance Earthquake resilient ATTRACTIVE BUILDINGS
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
PRE FAB PANEL
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
CASE STUDY: TARA HOUSING:
• LOCATION: ALAKANANDA, NEW DELHI, INDIA
• PRINCIPLE ARCHITECT: CHARLES CORREA
• AREA: 1.48 HECTARES
• CONSTRUCTED DATE:1975-1978
• NUMBERS OF UNITS: 160 UNITS OF 2 AND 3 BED ROOMS
• DENSITY: 375 PEOPLE PER HECTARE
• CLIENT: TARA COOPERATIVE GROUP HOUSING SOCIETY
• SYSTEM: REINFORCED CONCRETE, BRICK WALL
• COST: $1.48 MILLION
THE CONCEPT WAS INTRODUCE TO REHABILATE THE
1947 PARTITION AFFECTED PEOPLE WHO HAD NOWHERE
TO SETTLE DOWN AFTER THEIR RETIREMENT FROM
THEIR PROFESSIONAL LIVES.
: Vehicular path
: Pedestrian path
MATERIALS:
USUALLY REFINED EXPOSED BRICK
AND CONCRETE CONSTRUCTION
REFLECTS THE ARCHITECTS
PREVAILING COMMITMENT TO THE
MODERNIST IDIOM.
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
CASE STUDY: TARA HOUSING:
TWO BEDROOM TYPE CONCEPT
• THE SECOND FLOOR WHICH IS A CREATIVE VERNACULAR TYPOLOGY IN TERMS OF ARRANGING AND
LARGER THAN THE GROUND ONE PILLING THE SINGULAR FLAT INTO UNITED BLOCKS.
WITH A BIG OVERHANG THAT THERMAL RELIEF WITH BIG OVERHANGS OVER THE UNIT AND A
RISES FURTHER APPROX.6M CENTRAL GARDEN, ALLOWING INFILTRATION OF AMPLE LIGHT
GIVES THE MIXTURE BETWEEN WITHIN THE UNITS WHILE PREVENTING THE HIGH TEMPERATURE.
SHADOW AND LIGHT. BY SEPARATING THE OUTSIDE WORLD AND PROVIDING AN INTERIOR
• THE DUPLEX ABOVE IS ALSO GARDEN, THE BUILDING PRESERVES WELL THE PRIVATE LIFE OF THE
PUSH BACK HENCE FRONT OF FAMILY WITHIN.
THE BELOW ONE IS PROTECTED
TOO.
• IN THAT WAY ,THE WHOLE
CENTRAL GARDEN IS FULFILLED
WITH SHADOW.
FEATURES
-VERNACULAR ARCHITECTURE
-TRADITIONAL
SEPARATE CONSTRUCTION TECHNIQUE
KITCHEN -LOCAL MATERIALS
-BOUNDARY WALL :CULTURAL
MOSTLY SETTLE IN GROUP FEATURES
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
POST –TSUNAMI HOUSING
LOCATION: KIRINDA,SRILANKA MATERIALS AND CONSTRUCTION
AREA OF SINGLE UNIT: 71SQ TECHNOLOGY
METRES COMPRESSED EARTH BLOCKS
• NUMBER OF UNITS: 67 (CEB)
• COST PER UNIT: USD15,000 COMPRESSED MIXTURE OF
• OVERALL COST: USD 1.7 MILLION SUNBAKED CLAY
• SITE AREA: 15900 SQ METERS CEMENT
CLAY TILES WERE USED ON THE
ROOF, ON TOP OF THE TIMBER
TRUSSES
WOODEN PANELS USED FOR
FOLDING DOORS BETWEEN THE
HALL AND THE ROOFED COURT
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
DESIGN TECHNOLOGY
THE HOUSES WERE DESIGNED TO ALLOW MAXIMUM
CROSS VENTILATION
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
A CASE STUDY ON –MUSAHAR BASTI OF BARDIBAS
FIRST ATTEMPT FROM
PROJECT INFORMATION- PRIVATE SECTOR TO
PROJECT NAME – UNIFIED BUILD THE DWELLING
MUSAHAR MODEL VILLAGE FOR MARGINAL
PROJECT LOCATION – MAHOTTARI-2, GROUPS IN NEPAL AND
BARDIBAS THE CAMPAIGN BEGAN
BUILT BY- DHURMUS SUNTALI RIGHT AFTER THE
FOUNDATION EARTHQUAKE 2015.
TOTAL PERIOD OF CONSTRUCTION – 95
DAYS
TOILETS – ONE INSIDE HOME
NUMBER OF HOUSEHOLD – 54
TAP – ONE IN EACH
POPULATION PER HOUSEHOLD – 5
HOUSEHOLD
TOTAL STOREYS – 2
NATURE OF HOUSE –
AREA OF HOUSEHOLD – 3.5 DHUR
EARTHQUAKE RESISTANT,
TOTAL AREA OF PROJECT – 15 KATHHA
FLOOD/LANDSLIDE
TOTAL AREA OF HOUSE – 872 SQ.FT
RESISTANT, DISABLE
(GROUND FLOOR 22*22, FIRST FLOOR
FRIENDLY, CHILD FRIENDLY
22*18)
BENEFICIAL FAMILY NUMBER
HEIGHT OF HOUSE – 19 FT
– 53
NUMBER OF ROOMS – FOUR
TYPE OF BENEFICIARIES –
AREA OF ROOMS- 9*10
MOST DISADVANTAGED AND
UNDERPRIVILEGED
COMMUNITY
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
• DWELLING DENSITY IS 103.88 PER HECTARE AND POPULATION DENSITY IS 721 PER
HECTARE.
•
ETHNICITY – MAJHI, DUSADH, HAJAM, MUSAHAR.
CONSTRUCTED INFRASTRUCTURE – 53
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
Wall materials 9”thk brick wall
Embodied energy
for roofing
materials(per cu.m
in MJ)
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
SITE ANALYSIS
SOIL TYPE : CLAY WITH GRAVEL. PUBLIC SPACES : CRICKET GROUND, SCHOOL FIELD. HEALTH POST
CULTURAL ASPECT
TEMPLE AND CHRUCH ARE SITUATED
NEAR THE SITE. SECTION AT Y-Y
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
1..GRAVEL ROAD 5.GOVERNMENTAL SCHOOL
7.CRICKET GROUND
3.SCHOOL GROUND
4.HEALTH POST
8.SEUTI BRIDGE
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
PROGRAMME FORMULATION
N
1)COMMERCIAL ZONE
-RENTAL SHOP
2)RESIDENTIAL ZONE
-ECONOMICALLY WEAK GROUP
(APARTMENT)
3)COMMUNAL ZONE
1) USE OF EXISTING INVENTORY
-COMMUNITY HALL
2) LINEAR PATTERN
-EXISTING HEALTHPOST
3)RECTANGULAR FORM
-EXISTING SCHOOL
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
CONCEPT AND DESIGN DEVELOPMENT 2)ZONING
FARMING
1)ROAD NETWORK
COMMUNAL
ZONE
COMMER
APARTME
CIAL
NT
ZONE RESIDENTIAL
ZONE(LIG+LMI
G)
COMMERCIAL ZONE
COMMUNAL ZONE
RESIDENTIAL ZONE(LIG+LMIG)
APARTMENT(EWG)
FARMING
SITE PLAN N
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
Existing HOUSING TECHNOLOGY Site surrounding
BYE LAWS TARGET GROUPS
.-VERY FEW MODERN RCC STRUCTURE 1.WEST AND NORTH –NON SQUATTER
-STEEL FRAME STRUCTURES SETTLEMENT WITH GOOD ROAD FACILITIES AND
MINIMUM
-TYPICAL 4 ANNA
WOODEN OF LAND
POST,MUD ANDFOR BUILDING
TIN ROOF HOUSES MODERN HOUSES
CONSTRUCTION
-HOUSES ARE CONSTRUCTED WITHOUT USING BEAMS AND 2.EAST- RIVER ALONG WHICH THE ANOTHER
MERGING 2,3 PLOTS INTO 1 SO THE TARGET
PILLARS SQUATTER SETTLEMENT EXISTS NAMED AS ‘
GROUPS CAN
-SEPARATE SPACEAFFORD
FOR ANIMAL HUSBANDRY IN BACKWARD DEURALI’
-SPACE FOR KITCHEN GARDENING IS AVAILABLE IN EACH MIDDLE INCOME
3.SOUTH- GROUP
FOREST AREA
HOUSES ALONG WITH BIG TREES IN BACKYARDS Family members:6(2
grandparents, 2 parents,
2 children)
No. of rooms:5
TARGET
LOWER INCOME GROUPS ECONOMICALLY
GROUP
WEAK SECTOR
Family members:5(1
grandparent, 2 parents, Family members:4(2
2 children) parents, 2 child)
No. of rooms:4 No. of rooms: 2
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
GROUND FLOOR PLAN FIRST FLOOR PLAN
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
INDIVIDUAL HOUSING
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
BUILT-UP AREA: 35m2
LENGTH:
BREADTH:
NO.OF STOREY:2
EACH FLOOR HT:3
NO.OF BUILDING UNITS:18
NO.OF FAMILY ACCOMODATION:5
MATERIAL USED:RAMMED EARTH
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
APARTMENT
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
CONCEPT OF COURTYARD
CREATING AN OPEN SPACE IN
THE CENTER PART OF THE
THREE
BUILDINGS( APARTMENTS) SO
AS TO GIVE AN ESSENCE OF
COMMON PLAZA
SPACE( COURTYARD
CENTR
APARTM AL APARTM
ENT OPEN ENT
SPACE
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
SECTION THROUGH A-A
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
PRECAST PANEL LAYOUT
DETAILS OF PANEL
FOOTING DETAIL
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
COMMERCIAL WITH
RESIDENTIAL
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
W/C COMMERCIAL WITH RESIDENCE:
STAIRCASE W/C STAIRCASE W/C
2.9mx STORAGE
2.9mx STAIRCASE 2.9mx 5.3m
3mx 2.7m 3mx 2.7m 5.3m KITCHEN
5.3m 2.8mx 3mx 2.7m LENGTH OF GROUND FLOOR=
+DINNING
3.1m 2.7mx 4.5m 11m
BALCONY LENGTH OF FIRST AND TOP
2.7mx 4.5m FLOOR= 9m
BREADTH= 8m
BED ROOM NO.OF BUILDING UNITS= 4
SHOP NO.2 3.7mx 2.9m
SHOP NO.1 2.9mx 5.3m
NO.OF FAMILY
3.1mx 4.0m BED ROOM TERRACE ACCOMODATION= 4
3.8mx 4.0m 7.7mx 4.0m
BALCONY
3.7mx 1.0m
LOBBY FIRST FLOOR PLAN TOP FLOOR PLAN
8.0mx 2.0m AREA= 72 SQ.M AREA= 38.4 SQ.M
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
WATER SUPPLY LAYOUT:
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
SEWERAGE SYSTEM LAYOUT:
• THE SEPTIC TANK FOR HOUSES IN EACH SECTOR A,B,C,D FOR SEWER LINE
AROUND 100 PEOPLE IS DESIGNED.
• SEPTIC TANK IS ACCORDING TO IS 2470 i.e. 7.5m x2.65m FOR
HUNDRED PEOPLE.
• TOTAL OF 4 SEPTIC TANK AND SOAK PIT IS LOCATED IN
DIFFERENT PLACES.
• MANHOLES ARE PROVIDED IN EVERY JUNCTION OF THE ROAD.
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
DRAINAGE SYSTEM LAYOUT:
TRIBHUVAN UNIVERSITY l INSTITUTE OF ENGINEERING TITLE:- RELOCATION OF THE SQUATTER SETTLEMENT DATE:-
DEPARTMENT OF ARCHITECTURE l PURWANCHAL CAMPUS SUBJECT :- LOW COST HOUSING 2078/01/31
BINITA NEUPANE(06) l KIRAN SUBEDI(14) l KRITIKA ADHAKARI(15) l MADHU SUDHAN PAUDEL(18) l SONA GHIMIRE(40)
BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM BEDROOM
EWS ( APARTMENT)
CONCEPT OF COURTYARD
BINITA NEUPANE(06),KIRAN
TRIBHUWAN UNIVERSITY
SUBJECT:LOW COST SUBEDI(14),KRITIKA SHEET
INSTITUTE OF ENGINEERING
HOUSING ADHIKARI(15),MADHUSUDHAN NO:
PURWANCHAL CAMPUS,DHARAN
POUDEL(18),SONA GHIMIRE(40)