CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE OF SEPARATION SLUG


CATCHER FOR PHASE I
TRIME, C.A.

 Objective: Design, local transportation, civil works, Construction and pre-commissioning of the
multipipe Slug Catcher, part of the accelerated early production onshore facilities.

 Client: CARDON IV. Ubicación: Punto Fijo, Falcón State.

 Year of Execution: 2014-2015


CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE


OF SEPARATION SLUG CATCHER FOR PHASE I

 Reach of Construction:

 The Works Contemplate:


 Welding and installation of 48¨ø pipe (thickness 1,5¨).
 Manifolds installation and weldingMontaje y Soldadura de Manifolds
 Intrass Gas Manifolds 2x85 ton each.
 Liquid Gas Manifolds 2x60 ton each.
 Dry Gas 2x30 Ton each.
 Construction and installation of fundations (Civil Works)(All fundation, bases, colums and heams concreat
prefabricated in our worksshops located in Valencia and Punto Fijo, and transported to job side).
 Fabrication and installation of steel plataforms.
 Installation of the earthing system.
 Construction and Installation of cable ducts.
 Installation and Calibration of Instruments.
 Installation of the fire fightin and foam system.
 Hydrostatic test of all the equipments and associated systems.

 Horas Hombres Estimadas: 350.624 Horas Hombres

Líneas de Negocio Petróleo y Gas Ficha Técnica Siguiente Construcción y Adecuación de Plantas
CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE


OF SEPARATION SLUG CATCHER FOR PHASE I

 Total amount of concret prefabrication – civil works:

Líneas de Negocio Petróleo y Gas Ficha Técnica Anterior Siguiente Construcción y Adecuación de Plantas
CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE


OF SEPARATION SLUG CATCHER FOR PHASE I

 Summary of Quantities – Mechanical Assembly:

Líneas de Negocio Petróleo y Gas Ficha Técnica Anterior Construcción y Adecuación de Plantas