SL. DESCRIPTION RATE/SFT
AMOUNT
(Builtup area)
TOTAL ESTIMATED VALUE - INCL. TAXES - -
TOTAL ESTIMATED - EXCL. TAXES - -
I CIVIL & STRUCTURAL - -
EARTHWORK & ANTI-TERMITE
A - -
TREATMENT WORKS
B PLAIN CONCRETE CEMENT WORKS - -
C RCC AND FORMWORK - -
D REINFORCEMENT STEEL WORKS - -
E MASONRY WORKS - -
F FLOORING WORKS - -
G PLASTERING WORK - -
H STRUCTURAL STEEL WORKS - -
I WATERPROOFING WORKS - -
J WOOD WORK - -
K PAINTING WORKS - -
L ALUMINIUM WORKS - -
O ALUMINIUM GLAZED PARTION - -
N GRID FLASE CEILING - (t) - -
SERVICES (II+III) - -
II PLUMBING & ELECTRICAL WORKS - -
IV TAXES - -
AO GST 18% ( WORK CONTRACT) - -
Remarks
Incl.Taxes
Excl. Taxes
A EARTH WORK
Earthwork excavation for foundation of buildings, water supply, sanitary lines and
electrical conduits either in pits or in trenches of all depth and width in all kinds of
soil with all lifts including dressing the bottom and sides of pits and trenches, stacking
the excavated soil clear from the edges of excavation with all lead and lifts after
1.01 breaking of clods, including cost and conveyance of all materials, labour, HOM of
machinery, with all leads and lifts, loading and unloading, transportation , all other
incidental charges, complete for successful completion of work as per specifications,
and as directed by the Engineer-in- charge.
Filling available excavated earth (excluding rock) in sides of foundations upto plinth
in layers not exceeding 20cms in depth, compacting each deposited layer by ramming
after watering to OMC to required density, including cost of all materials, labour,
1.08
HOM of machinery, with all leads and lifts, loading and unloading, transportation cost
and conveyanceof all materials, all other incidental charges, complete for successful
completion of work as per specifications, and as directed by the Engineer-in- charge.
TOTAL AMOUNT - A
The rate shall include cover blocks made of PVC or Nylon of approved make /
quality to keep reinforcement steel in position within concrete and
arrangements to provide recesses to slabs, columns, walls and placing and
securing properly within the formwork, sleeves and/or opening in slabs,
embedments such as insert plates, bolts, corner protection angles, anchors etc.
(embedment shall be paid separately under respective items), construction joints,
sunk slabs, cantilever slabs, making holes or cutting formwork for taking out
electrical conduits or dowels for column to Block / Brick work etc. to the
required shape, size and slope as shown in
the drawing.
The successful tenderer shall maintain at site, cube testing machine in good
working order, sieves, slump cones, graduated cylinder & weigh scales as part of
material testing lab at site.
The designing of concrete mix for different grades of controlled concrete should
be done in accordance with latest IS-SP-23 ( Hand book on concrete mix design.
Design mix shall be as approved by the Structural Consultant / Employers
representative. (Micro silica to be used for the Concrete of higher grade than
M45 Grade )
RCC M20Grade
Footing Cum 17.82
Column upto plinth beam Cum 2.32
Plinth Beam Cum 15.07
Column from stilt floor to Ist floor slab Cum 8.65
Ground floor roof beam Cum 21.33
Ist floor slab / Ground floor roof slab Cum 21.52
Column from Ist floor slab to Ist floor roof top Cum 5.69
First floor floor roof beam Cum 9.36
Ist Floor roof slab at top Cum 13.98
Staircase Cum 3.91
Head room slab Cum 2.66
Head room roof beam Cum 1.05
Lintel Cum 0.53
TOTAL AMOUNT -C
D FORM WORK
Providing, fabricating and erecting form work at all levels and places and
profiles wherever needed/specified as per drawing, with 12mm plastic coated,
marine resistant waterproof ply/Smooth finished MS plates with adjustable steel
props of acceptable staging system and with sufficient bracing as approved by
consultant. Cost to include designing of proper form work and staging system to
suit the requirements, submission of design calculations and shop drawings for
approval, sealing the joints with heavy duty brown self adhesive tape, aligning to
line and levels including M.S. ties, PVC spacer, providing openings/ cut-outs/
pockets, making holes / recess for leaving dowels embedments etc., applying
deshuttering chemical to avoid sticking of cement on the plywood and to have
form finish which does not require any further finishing work to be carried out ,
deshuttering as approved by the consultant etc., complete, at all heights and
levels,with all lead
The Floor height may vary from floor to floor. The formwork staging for single
floor height shall be as per drawings and the cost towards same shall be included
in the quoted rates. The Contractor to indicate the rates for double height floor
staging and triple height floor staging of formwork area separately under
respective item
Note : Only plan area shall be considered. No extra shall be paid for Side
shuttering of Drop panel/ column capitals.
1) plywood shuttering shall be considered for all vertical elements, beam soffit,
core walls, stairs, ramps, tanks, pedestals, etc.
2) MS plates shall be considered for foundation, slabs only.
3) Shuttering & deshuttering sequence shall be 100% ,80% & 40% and
approval
to be taken from the Engineer In Charge.
Footing Sqm 58.89
Column upto plinth beam Sqm 23.38
Plinth Beam Sqm 143.91
Column from stilt floor to Ist floor slab Sqm 102.86
Ground floor roof beam Sqm 196.05
Ist floor slab / Ground floor roof slab Sqm 170.69
Column from Ist floor slab to Ist floor roof top Sqm 64.84
First floor floor roof beam Sqm 96.57
Ist Floor roof slab at top Sqm 121.41
Staircase Sqm 41.26
Head room slab Sqm 17.73
Head room roof beam Sqm 6.97
Lintel Sqm 9.34
TOTAL AMOUNT - D
Providing, Fabricating & fixing in position reinforcement for RCC work with
high yield strength ribbed cold twisted tor steel (HSD) bars of
TATA/SAIL/RINL/JINDAl/BHUWALKA/ISPAT make of various diameters and
grade of steel as specified below confirming to IS-1786 including cutting,
providing, supplying & bending, straightening,shifting, hoisting, fabricating and
placing in position according to drawings and binding the reinforcement with
galvanised annealed binding wire of double fold of 18 gauge and providing PVC
cover blocks for placing the reinforcements in position and for maintaining the
F MASONTRY WORKS
Providing and constructing 230mm thk. burnt brick masonry walls in CM1:6
including necessary scaffolding, curing, hacking of concrete surfaces and
1 packing of the space between columns / beams / roof slab / walls and filling of Cum 69.21
voids created by chasing of walls for water supply & electrical works with
appropriate material as directed etc., complete.
Providing and constructing 150mm thk. burnt brick masonry walls in CM1:6
including necessary scaffolding, curing, hacking of concrete surfaces and
2 packing of the space between columns / beams / roof slab / walls and filling of Cum 12.20
voids created by chasing of walls for water supply & electrical works with
appropriate material as directed etc., complete.
Providing and constructing burnt brick masonry Partition walls 115 mm thick in
superstructure using First class table molded Bricks, adequately soaked in water
before use, in cement mortar 1:4, using 2 nos. 6 mm dia mild steel bars at every
3 Sqm 57.16
tenth course embedded in cement mortar 1:4 20 mm thick, including necessary
scaffolding, curing, etc., complete (Inclusive of cost of steel and fabrication
charges).
TOTAL AMOUNT - F - -
G FLOORING WORKS
Providing & laying 12mm thick Vitrified tiles for flooring at all level of
approved colour, make and size of 600 x 600mm set in cement mortar bed 1:6,
20mm thick including pointing with tinted white cement to match the colour of
tiles. Rate to include for laying tiles of approved pattern and as directed by the
6 Engineer-in-charge including curing, acid wash POP protective layer over Sqm 117.96
polythene sheet for protection if the motor thickness exceeds 35mm, then screed
concrete shall be provided and no extra claims will be considered for the same.
etc., complete.
(Basic cost Rs.450/-Smt)
Providing & laying anti skid ceramic tiles for flooring at all level of approved
colour, make and size ( 300 x 300mm or any other approved size) set in cement
mortar bed 1:6, 20mm thick including pointing with tinted white cement to
7 match the colour of tiles. Rate to include for laying tiles of approved pattern and Sqm 42.72
as directed by the Engineer-in-charge including curing, acid wash POP
protective layer over polythene sheet for protection etc., complete.
(Basic cost Rs.236/-Smt)
Providing & laying ceramic tiles wall cladding for flooring at all level of
approved colour, make and size ( 300 x 300mm or any other approved size) set
in cement mortar bed 1:6, 20mm thick including pointing with tinted white
7 cement to match the colour of tiles. Rate to include for laying tiles of approved Sqm 331.43
pattern and as directed by the Engineer-in-charge including curing, acid wash
POP protective layer over polythene sheet for protection etc., complete.
(Basic cost Rs.236/-Smt)
Providing and laying granite stone slab of specified size and 20mm thickness,
hand / machine cut and polished before and after laying over a bed of CM 1:6
for staircase tread / risers including cement slurry, tinted white cement pointing
9 to match the colour of the slab, curing, waxing , Protecting the polished surface Sqm 52.37
with POP till handing over the building including full nosing of treads etc.,
complete.
(Basic cost Rs.1937/-SQM)
9 Yoga space flooring at open space - Flamed granite Sqm 47.49
Providing and fixing of Skirting with Vitrified Tiles at all level of approved
colour, make and size of 100 mm high above finished floor level in CM 1:6,
including necessary cement plastering to walls, cement slurry, pointed with
12 -
tinted white cement to match the colour of the tiles, chasing wall wherever
necessary & making good plastering at junctions, acid wash, curing etc.,
complete.
a for living / dining /Bed rooms/ Kitchen/ Passage Living RMT 117.96
Extra cost for nosing work for granite / marble / kota stone including necessary
4
tools and tackles as per the pattern shown in the drawing
a Edge shampering (Kitchen granite counters) RMT Rate Only
b Half nosing (For Lobby granite skirting) RMT Rate Only
c Bull nosing RMT Rate Only
TOTAL AMOUNT - G
H WOOD WORKS
Providing & fixing of Flush Doors consisting of the following / as detailed in the
relevant drawings/ specifications: Frame: Made out of HW/Sal wood finger
Jointed Frame of finished size 125x65mm, either by 6nos 400mm long M.S hold
fasts made out of M.S flat 25 x 3mm embedded in PCC 1:2:4 or by lock set fixing
to wall/ columns, 15cms thick inculding termite proof work for the sides of
1 frame.The rate shall inculde with 2 coats of synethic matt enamel painting over - -
one coat of primer.Shutters: Skin moulded paneld/ flushShutters shall be of
32mm thick . The rate shall inculde allround lipping beading ,with 2 coats of
synthetic matt enamel painting over 1 coat of primer, as directed by the
Architect/ Engineer In Charge ( Please note Hardware supplied from builder
needs to be fixed)
Mode of Measurement: Shall be measured from the outer faces of the frame and
- -
height shall be measured from the finished floor level
Providing & polishing surfaces as indicated in technical procedure & as directed
- -
by the Architects / Engineer In charge.
Main door SQM 7.73
Toilet door SQM 20.46
TOTAL AMOUNT - H - -
I PLASTERING WORK
Note : Bull marking of plastering to be done 15 days prior so that other agencies
to start the work. The rate shall include for finishing of electrical and plumbing
- -
works. Inside packing of electrical works with GI mesh shall be paid separately
as per site condition.
Prepare the RCC surfaces of ceiling, beams, columns, walls & lofts etc and
plaster with cement mortar 1:4, 15mm thick finished smooth including
- -
necessary scaffolding, curing and hacking the surfaces etc. complete. The rate
to include for making grooves, patties etc.,
with lime rendering - Ceiling SQM 503.30
Plastering internal surfaces of solid block walls, etc. with CM 1:6, 15 mm thick
average, according to specification including necessary scaffolding, curing etc.
complete. The rate shall include the cost of GI Plaster mesh - 4" to 6" wide -
(manufactured by M/s. Arpita Exports Ltd.,).at the junction of column/
Beam/Lintal. The rate to include for making patties wherever necessary etc.,
J PAINTING WORKS
Prepare the surfaces and plastered internal Ceiling,walls, columns,
beams, fins etc. and apply two coats of Oil Bound Distemper of approved
make and shade over one coat of wall primer painting including necessary
SQM 503.30
sand papering, full putty work, scaffolding etc., complete. The rate shall
include for finishing the painting to obtain an even and uniform shade as
directed by the Architects / Project Managers.
Providing two coats of APEX exterior paint of approved shade over one coat
of primer. The surface should be thoroughly cleaned before painting.
The painting should be done as per the manufacturer's specification. THE SQM 384.68
SURFACE AREA ONLY SHALL BE MEASURED AND PAID FOR
(External Wall)
Prepare the surfaces and plastered internal walls, columns, beams, fins
etc. and apply two coats of Acrylic Emulsion Paint of approved make and
shade over one coat of wall primer painting including necessary sand
SQM 673.62
papering, full putty work, scaffolding etc., complete. The rate shall
include for finishing the painting to obtain an even and uniform shade as
directed by the Architects / Project Managers.
TOTAL AMOUNT - J
K ALUMINIUM WORKS
fixed to be the wall lintel, floor rawl plugs and teakwood gutas etc including
cutting masonry concrete and making good to the original surface using cement
mortar all the aluminium section should be pretreated for removal of any rust
and preventation of further rust and coated with greasy materials for non-
odherence of mortar and any other sticky materials. this coating should be - -
cleaned after installation with all lead and lift etc.complete as per the
specifications/ relevant drawings,as directed by the Architect / Engineer In
Charge. Shop Drawings to be prepared by the Manufacture/ Contractor and
approved by the Architect / Engineer In Charge
(including Corner Window CW) Sqm 3.87
Providing & fixing powder coated aluminium ventilators with approved colour
outer frame 63mm x38 mm along with aluminium Top hung Shutter frame of
40mmx18mm fixed with 4mm thk clear glass( provision for Exhast fan which
temporarily closed with 4mm thick glass ) inclusive powder coated aluminium
- -
screws, with rubber beading, provision for exhaust fan etc., complete, according
to the specifications/ relevant drawings, as directed by the Architect/ Engineer In
Charge. Shop Drawings to be prepared by the Manufacture/ Contractor and
approved by the Architect / Engineer In Charge.
Sqm 8.56
TOTAL AMOUNT - K
M WATER PROOFING
3.1 Terrace, Raft, Retaining Wall etc - -
Providing and laying insulation and waterproofing with the following
- -
specification including cleaning
Supplying & mixing in Terrace, raft, retaining wall and other areas as specified
cementitious crystallization based concrete integral waterproofing admixture
3.1.1 - -
such as Dr Fixit Power Water Proof or equivalent @ 2% by weight of cement
incase of ordinary pan mixture or as per manufacturers specifications.
TOTAL AMOUNT - P
I CIVIL WORKS
II PLUMBING WORKS sft 3,229.49
III ELECTRICAL WORKS sft 3,229.49
TOTAL AMOUNT
-
-
-
-
-
-
-
-
-
-
-
- AVG
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- #DIV/0!
#DIV/0!