TRIME C.A
TRIME, C.A. Industrial and Mechanical Works
TRIME C.A
Industrial and Mechanical Works
TRIME, C.A.

 TRIME C.A. group of companies, is a General Contractor with


over 35 years of experience, with highly qualified human
resources and adequate equipment, leading projects and
works in the areas of Oil, Gas, Generation, Infrastructure.
 The company has the capacity to implement projects in
various contractual arrangements, such as EPC, Turnkey,
Construction, Industrial Equipment Supply and Project
Management.
TRIME C.A
TRIME, C.A. Industrial and Mechanical Works

OBJECTIVE OF THE COMPANY


Develop a structure capable of delivering frontline services for the execution of
mechanical works, civil works and construction, electrical and instrumentation,
generation, oil and gas, and the supply, manufacture and marketing of a wide
range of products for these areas, building in their subsidiary companies and
divisions of special services with equipment and personnel to each particular
discipline or as a General Contractor.
TRIME C.A
Industrial and Mechanical Works
TRIME, C.A.

 Trimeca – Valencia, Venezuela.

 Trimeca USA – Houston, United States of America.

Houston  Trimeca Colombia – Barranquilla – Colombia


Cartagena (Patio de Máquinas)
Venezuela
Colombia

Sedes
TRIME C.A – BILLING OF TRIME C.A

TRIME C.A
TRIME, C.A. Industrial and Mechanical Works

Year Billing (US$)

2007 329,822,028.70

2008 478,583,592.47

2009 352,907,336.46

2010 467,760,602.81

2011 149,279,379.57

2012 97,369,099.88

2013 61,696,874.00

2014 79,523,442.00

2015 141,581,242.00
TRIME C.A
Industrial and Mechanical Works
TRIME, C.A.

SOME OF OUR CLIENTS


 EXXON MOBIL  CHEVRON TEXACO
 SNAMPROGETTI
 GRUPO ENI ITALIA
 BECTHEL
 ALSTON
 TECHNIP
 GENERAL MOTORS
 TGI
  AKZO NOBEL
SOFINTER ITALIA
 PDVSA  MARAVEN

 CITGO  LAGOVEN
 CORPOVEN  PEQUIVEN
 MENEVEN  ENTES GUBERNAMENTALES EN VENEZUELA
TRIME C.A
TRIME, C.A. Industrial and Mechanical Works

SUMMARY OF OUR EXPERIENCE

 GENERATION (15 Contracts)  MARINE WORKS(5 Contracts)


 Thermal Plants(5)
  TRANSMISSION LINES(15 Contracts)
Hydraulic Plants(3)
 Substations (7)  PIPELINES (12 Contracts)
 OIL AND GAS(90 Contracts)  MANUFACTURING (450 Contracts)
 Upstream (20)
 Offsite & Facilities (45)  BUILDINGS (15 Contracts)
 Downstream (25)
 INFRASTRUCTURE(30 Contracts)
 Shutdowns/Revamps

 PETROCHEMICAL (15 Contracts)


 Urea (2)
 Ammonium (2)
TRIME C.A
Industrial and Mechanical Works
TRIME, C.A.

Business Lines

MANUFACTURIN
G SERVICE AND LOGISTICS AND
CONSTRUCTION EPC PROJECTS
METALWORKIN MAINTENANCE TRANSPORT
G
TRIME C.A – SERVICE LINES

CONSTRUCTION
TRIME, C.A.

 TRIME C.A. through its Construction Organization has the expertise, highly
qualified staff and adequate equipment to carry out works such as
multidisciplinary:
 Civil Works
 Mechanical Works
 Electrical and Instrumentation Works
 Startup

 The division has the capacity for direct execution and/or acting as part of EPC
projects, consortiums or support to other divisions.
CONSTRUCTION
TRIME, C.A.

CIVIL WORKS
 EARTHWORKS 6.000.000 M3/ Year

 CONCRETE WORKS 20.000.000 M3/Year

 ASPHALT WORKS 1.550.000 Tons/Year

 METALLIC STRUCTURES 2.500 Tons/Year


CONSTRUCTION
TRIME, C.A.

CIVIL WORKS, TYPICAL ACTIVITIES IMPLEMENTED


 Topographic Survey  Drainage and Hydraulic Works
  Sewage
Deforestation and removal of
plant layers, reforestation.  Rainwater
 Earthworks:  Oily Water
  Potable Water
Fill Bench
 Deep Well
 Filling and compaction
 Pumping Systems
 Haulage and Transport
 General Piping
 Concrete Works
 Roads
 Prefabricated Elements
 Formation of Sub-Bases and Bases
 Equipment Fundations  Asphaltic Pavimentation
 Buildings  Ramps, Bridges, Walls
 Tunnels and Deep Fundations
CONSTRUCTION
TRIME, C.A.

MECHANICAL WORKS

 MAKING PIPE SPOOL 250.000 Inches/Year

 INSTALLATION OF PIPELINES 100.000 Inches/Year

 STATIC EQUIPMENT INSTALLATION 15.000 Tons/Year

 ROTATING EQUIPMENT INSTALLATION 5.000 Tons/Year


CONSTRUCTION
TRIME, C.A.

MECHANICAL WORKS (PIPELINE)


 PIPELINE :

 Trench Excavation 1.500.000 M3/ Year


 Fill and Compaction 1.500.000 M3/ Year
 LAYING OF PIPES:

 Pipe Laying and Positioning 8 – 16” 250.000 ML/Year


 Pipe Laying and Positioning 18 – 24” 150.000 ML/Year
 Pipe Laying and Positioning 26 – 42” 75.000 ML/Year
CONSTRUCTION
TRIME, C.A.

MECHANICAL WORKS (STORAGE TANKS)

 CIVIL WORKS TANKS:


• Exacavation Foundations 1.000 M3/ YEAR
• Concrete Fundations 1.000 M3/ YEAR

 TANK ASSEMBLY FOR MANUFACTURING


• Fabrication for Assembly up to 20.000 Bls 300 Tn/YEAR
• Fabrication for Assembly up to 80.000 Bls 500 Tn/YEAR
• Fabrication for Assembly up to 250.000 Bls 800 Tn/YEAR
CONSTRUCTION
TRIME, C.A.

MECHANICAL WORKS, TYPICAL ACTIVITIES


 Mounting and Assembly of Equipments  Pipelines for industires (Oil, Gas, Industrial)
 Static Prefabricated Elements and Assembly of
 Drums Isometrics Carbon Steels.
 Towers Carbon Steel
 Separators Low and Medium Steel Alloy Chrome-
Molybdenum.
 Packages.
Stainless Steel
 Rotary
High Alloy Steels
 Turbo Generators
 Compressors
 API Storage Tanks
 Pumps
Bolted Tanks
 Flares and Vents
Welded Tanks
 Pipes  Up to 20,000 Bles. 80,000 Bles
Flow Lines (Pipeline)  Greater than a 100,000 Bles
 Flow Lines(Oil and Gas).
 High pressure gas wells injection lines.
 Salt water injection lines
 Pipeline Transport (Oil, Gas, others)
 Aqueducts
CONSTRUCTION
TRIME, C.A.

ELECTRICAL AND INSTRUMENTATION WORKS


 ELECTRICAL AND INSTRUMENTATION BENCHES 1.500 ML/ YEAR
 ELECTRICAL WIRING 250.000 ML/YEAR
 POWER LINES 13.8 – 24 KV 50.000 ML/YEAR
 POWER LINES 115 – 138 KV 50.000 Ton/YEAR
 ELECTRIC SUB STATIONS 10 UNITS/YEAR
 CATHODIC PROTECTION
 Measurement Points 200 UNITS
 Rectifiers Anodes bed 10 UNITS
CONSTRUCTION
TRIME, C.A.

ELECTRICAL, INSTRUMENTATION, AND TELECOMMUUNICATIONS WORKS


 Electricity  Electrical Sub Stations
 General Works  Opened Sub Stations
 Earth Grids  Encapsulated Sub Stations
 Construction of Bancadas
 Wiring and Connecting  Transmissions and Distributon
 Testing  High Voltage Lines (115 KV;138 KV)
 Medium Voltage Lines (13,8 KV;24 KV)
 Generation  Low Voltage Lines (480 V;208 V; 110 V)
 Hydrogeneration
 Thermogeneration  Instrumentation y Telecommunications
 Related activities  Construction and Equipment Control
 Mounting and assembly of Rooms
Turbogenerators  SCADA, SIS, DCS Systems
 Mounting and assembly of power
transformers  Installation of instruments, calibration

and loop test.
Mounting and assembly of electrical
equipment: Switches, Circuit Breakers,  Optical fiber.
Terminal Cups.
TRIME C.A – LÍNEA DE SERVICIOS – CONSTRUCTION

AVAILABLE EQUIPMENTS
TRIME, C.A.
TRIME C.A – LÍNEA DE SERVICIOS – CONSTRUCTION – AVAILABLE EQUIPMENTS

PIPELINE
TRIME, C.A.

EQUIPMENT QUANTITY CAP. SPECIALITY

SIDE BOOMS 17 PIPELINE


PIPE BENDING EQUIPMENT 2
26 TO 36" PIPELINE
PIPE BENDING EQUIPMENT 2
6 TO 24" PIPELINE
COATING FAULT DETECTORS
7 PIPELINE
METAL DETECTORS
4 PIPELINE
PRESSURE AND TEMPERATURE RECORDERS
6 PIPELINE

DIRECTIONAL DRILLING EQUIPMENT 6 6-42" PIPELINE


FILLING PUMP 150/400
FLOW PUMPS 4 PIPELINE
1500 PSI 4 GPM (WASH)
DIESEL PRESSURE PUMPS 7 PIPELINE

POLLY PIG 1 UP TO 16" PIPELINE

SAND SCREEN 1 PIPELINE


CONSTRUCTION – OIL AND GAS– UPSTREAM – FLUX COLLECTION LINES

HAMACA PROJECT UPSTREAM PACKAGE "C". CONSTRUCTION PACKAGE N° 3 ”PIPELINES


OF THE EAST AREA"

 Contract Amount: US$ 3.746.470,67


 Objective: Pipelines installation in East Area of Hamaca Project Upstream Package "C", which is aimed to
ensure the availability of infrastructure for production and management of 190,000 bpd of extra heavy oil,
57,800 BPD of diluent, 90.25 MMSCFSD of gas, and 19,000 BWPSD of water.
 Amount of pipe installed 36,348 lineal/meters of the following diameters 4,6,8,10,16,24 and 30″.
Installation of 2500 thermosetting sleeves. Excavation 40.000m3, filling 40.746m3 surface pipe installation
300 meters.
 Client: PETROLERA AMERIVEN, S.A. Location: Centro Operativo Bare, El Tigre, Anzoategui State.
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

CERRO NEGRO PIPELINE PROJECT, EXECUTED BY THE CONTUBOR CONSORTIUM

 Contract Amount: US$ 48,744,573.44

 Objective: Construccion of the main pipeline for the Cerro Negro Pipeline Project, stretches A and B
located in between Cantaura and Jose, Anzoategui State.

 Total amount of pipe installed 446km (47km of 42″, 225km of 20″ and 174km of 30″) earth movement
1,500,000m3 concrete 2000m3.

 Client: Operadora Cerro Negro, S.A. (Subsidiary of Pdvsa).

 Location: Campo Morichal to Jose complex , Anzoátegui State.


CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

CERRO NEGRO PIPELINE PROJECT, EXECUTED BY THE CONTUBOR CONSORTIUM


CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

GAS LINE CONSTRUCTION 26" – GAS INTERCONNECTION COLOMBIA - VENEZUELA.


PACKAGE C.

 Contract Amount: US$ 60,455,813.95


 Objective: Construction of the gas pipeline, gas interconnection Colombia-Venezuela package C.
Venezuela segment, section river Limon-Siloe to Siloe Tule 30,97km 20 ″ and a segment in
Colombia section Carraipia to 4 ways 24km 26″.
Construction of the 4 ways station and one station in Majayura.
 Client: PDVSA GAS, S.A. Location: Zulia State - Venezuela and Guajira Deparment- Colombia.
CONSTRUCTION – OIL AND GAS – FACILITIES – PIPELINE

GAS LINE CONSTRUCTION 26" – GAS INTERCONNECTION COLOMBIA - VENEZUELA.


PACKAGE C.
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

CONSTRUCTION AND COMMISSIONING OF 32 KM OF GAS PIPELINE DIAMETER 36 "AND


26" AND THREE VALVE STATION/ SECTION BARBACOA – PROVISOR TO PUERTO LA CRUZ

 Contract Amount: US$ 30.141.602,67

 Objective: Work excecuted in Corsotium (GASOR 1), Construction of the section BARBACOA-
PROVISOR-PUERTO LA CRUZ of the main gas pipeline BARBACOA-CUMANA-MARGARITA ISLAND,
to provide gas to the Luisa Caceres Arismendi power generation plant located in the Margarita
island.

 Client: PDVSA GAS, S.A. Location: Puerto La Cruz, Anzoátegui State.


CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

CONSTRUCTION AND COMMISSIONING OF 32 KM OF GAS LINE OF DIAMETER 36 "AND 26"


AND THREE VALVE STATION/ SPAN BARBACOA – PROVISOR – PUERTO LA CRUZ
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

INTERCONNECTION OF THE GAS TRANSPORTATION SYSTEMS EAST-CENTER-WEST (ICO)


FACE II

 Contract Amount: US$ 12,593,162.18

 Objective: Construction and startup of a 24,31km gas pipeline 30″ and construction of the
Manglar and Vinccler sectioning station. This work included deforestation works, bankers
watered, 88,000m3, excavations 4,400m3, pipe welding 2050 ø inches, 18 road crocing, 19
river crosing, concrete 3000m3, the construction of the two sectioning station included all
the electricity and instrumentation works and the fabrication of pipe traps.

 Client: PDVSA GAS, S.A. Location: Coro, Falcón State.


CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

INTERCONNECTION SYSTEMS OF GAS TRANSPORTATION CENTRO-ORIENTE/OCCIDENTE


(ICO)
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

CONSTRUCTION GAS PIPELINE LOOP ANACO ALTAGRACIA -LANA 36

 Contract Amount: US$ 6,960,427.19

 Objective: Civil and mechanical works for the construction of gas pipeline 27km of 36 ", Loop
Anaco-Altagracia, section I of the Project LANA, and the construction and connection to valve
station.

 Client: ROBICA / CORPOVEN, S.A. Location: Anaco, Anzoátegui State


CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

CONSTRUCTION LAZO ANACO ALTAGRACIA -LANA 36


CONSTRUCTION – OIL AND GAS – FACILITIES – PIPELINE

CONSTRUCTION OF POLIDUCT EL PALITO BARQUISIMETO (SISCO) Y RELOCATION OF


OLEODUCT BARINAS/EL PALITO (EXAP) SECTOR II

 Contract Amount: US$ 6,584,003.36

 Objective: Construction of 42 km of 20” buried pipe for the oleoduct Barinas-El Palito (EXAP)
Sector II and 42 km of 12” buried pipe for the poliduct El Palito-Barquisimeto (SISCO).
Includes construction of 4 valve station, earth movements, cathodic protection and testing.

 Client: CORPOVEN, S.A. Location: El Palito, Edo. Carabobo and Barquisimeto, Edo. Lara
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE

POLIDUCT CONSTRUCTION EL PALITO BARQUISIMETO (SISCO) AND RELOCATION OF THE


OLEODUCT BARINAS/EL PALITO (EXAP) SECTION II
CONSTRUCTION – INFRASTRUCTURE – HYDRAULIC

DESIGN, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF THE NEW LINE OF


DRIVING CLAVELLINOS II (TRAMO C) ,VENTOSA LIBRE-CHACOPATA; ACUEDUCT LUISA
CÁCERES DE ARISMENDI

 Contract Amount: US$ 25,628,530.00

 Objective: Aqueduct belonging to the project Margarita Island II , which involved the construction of
a second supply line to increase the flow of water going to the Margarita Island 200 L/sec to 1035
L/sec

Supply and instalation of 14,6km of a 54″ pipe 9mm thickness and accessories, earth movement 3279m3

 Client: HIDROVEN, S.A. Location: Cumaná, Sucre State.


CONSTRUCTION – INFRASTRUCTURE – HYDRAULIC

DESIGN, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF THE NEW LINE OF


DRIVING CLAVELLINOS II (TRAMO C) ,VENTOSA LIBRE-CHACOPATA; ACUEDUCT LUISA
CÁCERES DE ARISMENDI
CONSTRUCTION – INFRASTRUCTURE – HYDRAULIC

CIUDAD PLAZA

 Contract Amount: US$ 10.004.992,01

 Objective: Construction of adduction pipe for water and sewage discharge, construction planning and
construction services in common areas of buildings of Phase I, Stage I. Work carried out in three stages.

 Client: Fondo Nacional de Desarrollo Urbano (FONDUR) Location: Valencia, Carabobo State.
CONSTRUCTION – INFRASTRUCTURE – HYDRAULIC

CIUDAD PLAZA
CONSTRUCTION – INFRASTRUCTURE – HYDRAULIC

NEW ADUCTION PIPE D=1700 mm ø BETWEEN TAGUACITA PUMP STATION E/B 21 AND THE
LAGARTIJO RESERVOIR DISCHARGE PIPE, SECTION II

 Contract Amount: US$ 1.292.466,74

 Objective: The purpose of those works is to conect the Taguacita pump station with the Lagartijo
reservoir througt the installation of 3,5km of steel pipe 1700 mm ø and all its accesories, Earth
movement 96.524m3 and 138m3 of concrete on the civil works.

 Client: Ministerio del Ambiente y de los Recursos Naturales Renovables (M.A.R.N.R)

 Location: Santa Teresa del Tuy, Edo. Miranda


CONSTRUCCIÓN – INFRASTRUCTURE – HYDRAULICS

NUEVA ADUCCIÓN D=1700 mm ENTRE ADUCCIÓN TAGUACITA E/B 21 Y TUBERÍA EMBALSE


LAGARTIJO, ESTADO MIRANDA, TRAMO 2. (ver obra)
CONSTRUCCIÓN – INFRASTRUCTURE – HYDRAULICS

ADUCCTION FROM THE TAGUAZA RESERVOIR SECTION NORTH ENTRANCE HALL OF THE
TRANSFER TUNNEL TO FUTERE TAGUARA PUMP STATION.

 Contract Amount: US$ 5.628.878,49

 Objective: Installation of 3,0km of steel pipe 3000mm ø and 18mm thickness for the aduction
from the Taguaza reservoir, which has a capacity to stock 184 millions of cubic meters of
water and a fluoded surface of 816 hectares, to the future Taguaza pump station.
Installation of 168 meters of a 1700mm ø steel pipe for the section Taguaza – tuy IV to
Taguacita and bypass construction for the future Taguaza pump station, to supply water
to the metropolitan area of the Caracas City.
 Client: Ministerio del Ambiente y de los Recursos Naturales Renovables. Location: Edo. Miranda
CONSTRUCCIÓN – INFRASTRUCTURE – HYDRAULICS

ADUCCIÓN DESDE EL EMBALSE TAGUAZA, TRAMO PORTAL NORTE DEL TÚNEL DE TRASVASE
HASTA FUTURA ESTACIÓN DE BOMBEO TAGUAZA
CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE OF SEPARATION SLUG


CATCHER FOR PHASE I
TRIME, C.A.

 Objective: Design, local transportation, civil works, Construction and pre-commissioning of the
multipipe Slug Catcher, part of the accelerated early production onshore facilities.

 Client: CARDON IV. Ubicación: Punto Fijo, Falcón State.

 Year of Execution: 2014-2015


CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE


OF SEPARATION SLUG CATCHER FOR PHASE I

 Reach of Construction:

 The Works Contemplate:


 Welding and installation of 48¨ø pipe (thickness 1,5¨).
 Manifolds installation and weldingMontaje y Soldadura de Manifolds
 Intrass Gas Manifolds 2x85 ton each.
 Liquid Gas Manifolds 2x60 ton each.
 Dry Gas 2x30 Ton each.
 Construction and installation of fundations (Civil Works)(All fundation, bases, colums and heams
concreat prefabricated in our worksshops located in Valencia and Punto Fijo, and transported to
job side).
 Fabrication and installation of steel plataforms.
 Installation of the earthing system.
 Construction and Installation of cable ducts.
 Installation and Calibration of Instruments.
 Installation of the fire fightin and foam system.
 Hydrostatic test of all the equipments and associated systems.

 Horas Hombres Estimadas: 350.624 Horas Hombres


CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE


OF SEPARATION SLUG CATCHER FOR PHASE I

 Total amount of concret prefabrication – civil works:


CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING

ONSHORE INSTALLATION OF THE PRIMARY STAGE


OF SEPARATION SLUG CATCHER FOR PHASE I

 Summary of Quantities – Mechanical Assembly:


CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

ORBITAL WELDING EQUIPMENT

MODEL 15 WELDING HEAD FOR LARGE DIAMETER TUBES

We have robust welding head to perform radial


and axial welds with the TIG process of all pipe
sizes from 3 inches (76 mm) in diameter, without
limit, including longitudinal welding. It is designed
primarily for use on site where exceptional weld
quality and consistent results are required. 
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

95 ORBITAL WELDING HEAD WITH WIRE

They offer precise but simple mechanical


systems. They are used for precision orbital
welding with or without pipe, pipe, return
elbow, fitting and flange material, taking into
account the welding of small diameter pipe
and fittings having limited axial or radial
access.
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

Model 95-1500 head (torches b and c)

  and Pipe External Diameter Range:


Pipe
0.625 - 1.50 "(16-40 mm)

Head Model 95-2375

Pipe and Pipe External Diameter Range:


0.750-2.375 "(19-61 mm)

Head Model 95-3500

Pipe and Pipe External Diameter Range:


1.0 - 3.5 "(25-90 mm)
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

FUSION WELDING HEAD MODEL 81 FOR SMALL DIAMETER PIPES

It is a proven welding head on site, its Standard


configuration is used in pipes from 1.90 "to
5.563" outside diameter with a radial
separation of up to 1,750 "and axial gap up to
6.325".
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

WELDING EQUIPMENT BUG-O

The Piper-plus is an autonomous machined welding


equipment, making quality welding by reducing
welding times, improving productivity in the
production of pipes.
The parameters of welding, voltage, wire feed rate,
current, travel and oscillation are programmable and
digitally controlled.
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

WELDING EQUIPMENT BUG-O

We have (02) Stations with Automated BUG-O Welding Equipment


Welding for 48 Di Diameter Pipe for Manufacturing Tanks with 96 Di Diameter.
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

EQUIPOS DE SOLDADURA PWT PIPELINE


TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

  SUBMERGED ARC WELDING EQUIPMENT

• The high penetration power significantly reduces or


even eliminates the need to bevel.
• High execution speed due to the use of high currents
in one or more wires.
• High speed and performance: With 5/32 "(4mm) and
3/16" (5mm) electrodes at 800 and 1000 Amperes, it
is possible to deposit up to 15 Kg of solder per hour.
With ¼ "(6.5mm) and 1300 Amperes, up to 24 kg are
deposited. Per hour (three to four times faster than in
manual welding).
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 EQUIPO DE SOLDADURA POR ARCO SUMERGIDO

PUENTE DE SOLDADURA ARCO


SUMERGIDO
PANDJIRIS-LINCOLN 1500 AMP,
COLUMNA 5500MM
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

 EQUIPOS DE PERFORACION DIRECCIONAL


 VERMEER D1000 x 900 ( 2 EQUIPOS)
 La D1000x900, con sus numerosas
características para mejorar el
rendimiento, la fiabilidad y el
diseño probado que ofrece
Vermeer como es conocida, puede
manejar los desafíos difíciles de
perforación de gran diámetro.
 Opera de forma eficiente con
motores hidráulicos Hagglund de
alto par y baja velocidad que
activan las funciones de rotación y
propulsión del carro de
empuje/retirada, de tal manera que
pueda utilizar simultáneamente el
par y las rpm máximas.
 VERMEER R9 x 12 (2 EQUIPOS)

 La recuperadora R9x12 para


proyectos de tuberías a gran escala
con caudales de fluido altos, está
equipada para un rendimiento
óptimo. Desde un movimiento
lineal opcional o sacudidor orbital
que mejora la eficiencia de
reciclado hasta características
como una plataforma de trabajo de
un nivel y gatos hidráulicos
independientes, la R9x12 abarca
todos los aspectos. Y está equipada
con bombas, conos, rejillas y
válvulas que lideran la industria.
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

Proyecto Cruce Rio Guere


 Objetivos : Instalación con HDD de 470m de tubería de acero de diámetro 36” para gas.
 Monto del contrato: 21.941.021,00 Bs.
 Cliente: ZIC (cliente final PDVSA)
 Ubicación: Aragua de Barcelona, Edo. Anzoátegui
 Periodo de Ejecución : Ago-Dic 2013
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

Proyecto Cruce Rio Unare


Objetivos : Instalación con HDD de 480m de tubería de acero de diámetro 36” para gas.
Monto del contrato: 28.252.611,00 Bs.

Cliente: ZIC (cliente final PDVSA)

Ubicación: Onoto, Edo. Anzoátegui

Periodo de Ejecución : May-Nov 2013


TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos

Proyecto Cruce Rio Morichal


Objetivos : Instalación con HDD de 800m de tubería de acero de diámetro 30”
Monto del contrato: 25.696.000,00 Bs – 148.555,00 US $
Cliente: Grupo Royso, c.a (cliente final PDVSA PETRODELTA)º
Ubicación: Maturín, Edo Monagas.
Periodo de Ejecución : Sep 2014 –Feb 2015
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
Proyecto CRUCE SUBFLUVIAL Km 87+097 y Km 88+780 DEL POLIDUCTO CARTAGO-YUMBO
Objetivos : Perforación. Horizontal Direccional de dos (2) tubo A/C 8” y 10” x 430 metros
Monto del contrato: 3.800.000.000,00 PCol. (1.380.000,00 US$)

Cliente: ECOPETROL S.A.

Ubicación: Rio Tuluá, Cali, Colombia

Periodo de Ejecucion : Jul-Sep 2015


TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
Proyecto HDD Sector Rio Negro y Puerto Salgar
Objetivos : Perforación. Horizontal Direccional de dos (2) tubo A/C 8” x 1.396 y 919 mts y dos (2) tubos A/C 10” x 1.396 y 919 mts
Monto del contrato: 18.133.000.000,00 PCol. (5.849.000,00 US$)
Cliente: ECOPETROL S.A.
Ubicación: Rio Negro – Puerto Salgar, Colombia
Periodo de Ejecucion : Oct 2016 – Feb 2017

EN EJECUCION