TRIME C.A
TRIME, C.A. Industrial and Mechanical Works
TRIME C.A
Industrial and Mechanical Works
TRIME, C.A.
Sedes
TRIME C.A – BILLING OF TRIME C.A
TRIME C.A
TRIME, C.A. Industrial and Mechanical Works
2007 329,822,028.70
2008 478,583,592.47
2009 352,907,336.46
2010 467,760,602.81
2011 149,279,379.57
2012 97,369,099.88
2013 61,696,874.00
2014 79,523,442.00
2015 141,581,242.00
TRIME C.A
Industrial and Mechanical Works
TRIME, C.A.
CITGO LAGOVEN
CORPOVEN PEQUIVEN
MENEVEN ENTES GUBERNAMENTALES EN VENEZUELA
TRIME C.A
TRIME, C.A. Industrial and Mechanical Works
Business Lines
MANUFACTURIN
G SERVICE AND LOGISTICS AND
CONSTRUCTION EPC PROJECTS
METALWORKIN MAINTENANCE TRANSPORT
G
TRIME C.A – SERVICE LINES
CONSTRUCTION
TRIME, C.A.
TRIME C.A. through its Construction Organization has the expertise, highly
qualified staff and adequate equipment to carry out works such as
multidisciplinary:
Civil Works
Mechanical Works
Electrical and Instrumentation Works
Startup
The division has the capacity for direct execution and/or acting as part of EPC
projects, consortiums or support to other divisions.
CONSTRUCTION
TRIME, C.A.
CIVIL WORKS
EARTHWORKS 6.000.000 M3/ Year
MECHANICAL WORKS
AVAILABLE EQUIPMENTS
TRIME, C.A.
TRIME C.A – LÍNEA DE SERVICIOS – CONSTRUCTION – AVAILABLE EQUIPMENTS
PIPELINE
TRIME, C.A.
Objective: Construccion of the main pipeline for the Cerro Negro Pipeline Project, stretches A and B
located in between Cantaura and Jose, Anzoategui State.
Total amount of pipe installed 446km (47km of 42″, 225km of 20″ and 174km of 30″) earth movement
1,500,000m3 concrete 2000m3.
Objective: Work excecuted in Corsotium (GASOR 1), Construction of the section BARBACOA-
PROVISOR-PUERTO LA CRUZ of the main gas pipeline BARBACOA-CUMANA-MARGARITA ISLAND,
to provide gas to the Luisa Caceres Arismendi power generation plant located in the Margarita
island.
Objective: Construction and startup of a 24,31km gas pipeline 30″ and construction of the
Manglar and Vinccler sectioning station. This work included deforestation works, bankers
watered, 88,000m3, excavations 4,400m3, pipe welding 2050 ø inches, 18 road crocing, 19
river crosing, concrete 3000m3, the construction of the two sectioning station included all
the electricity and instrumentation works and the fabrication of pipe traps.
Objective: Civil and mechanical works for the construction of gas pipeline 27km of 36 ", Loop
Anaco-Altagracia, section I of the Project LANA, and the construction and connection to valve
station.
Objective: Construction of 42 km of 20” buried pipe for the oleoduct Barinas-El Palito (EXAP)
Sector II and 42 km of 12” buried pipe for the poliduct El Palito-Barquisimeto (SISCO).
Includes construction of 4 valve station, earth movements, cathodic protection and testing.
Client: CORPOVEN, S.A. Location: El Palito, Edo. Carabobo and Barquisimeto, Edo. Lara
CONSTRUCTION – OIL AND GAS– FACILITIES – PIPELINE
Objective: Aqueduct belonging to the project Margarita Island II , which involved the construction of
a second supply line to increase the flow of water going to the Margarita Island 200 L/sec to 1035
L/sec
Supply and instalation of 14,6km of a 54″ pipe 9mm thickness and accessories, earth movement 3279m3
CIUDAD PLAZA
Objective: Construction of adduction pipe for water and sewage discharge, construction planning and
construction services in common areas of buildings of Phase I, Stage I. Work carried out in three stages.
Client: Fondo Nacional de Desarrollo Urbano (FONDUR) Location: Valencia, Carabobo State.
CONSTRUCTION – INFRASTRUCTURE – HYDRAULIC
CIUDAD PLAZA
CONSTRUCTION – INFRASTRUCTURE – HYDRAULIC
NEW ADUCTION PIPE D=1700 mm ø BETWEEN TAGUACITA PUMP STATION E/B 21 AND THE
LAGARTIJO RESERVOIR DISCHARGE PIPE, SECTION II
Objective: The purpose of those works is to conect the Taguacita pump station with the Lagartijo
reservoir througt the installation of 3,5km of steel pipe 1700 mm ø and all its accesories, Earth
movement 96.524m3 and 138m3 of concrete on the civil works.
ADUCCTION FROM THE TAGUAZA RESERVOIR SECTION NORTH ENTRANCE HALL OF THE
TRANSFER TUNNEL TO FUTERE TAGUARA PUMP STATION.
Objective: Installation of 3,0km of steel pipe 3000mm ø and 18mm thickness for the aduction
from the Taguaza reservoir, which has a capacity to stock 184 millions of cubic meters of
water and a fluoded surface of 816 hectares, to the future Taguaza pump station.
Installation of 168 meters of a 1700mm ø steel pipe for the section Taguaza – tuy IV to
Taguacita and bypass construction for the future Taguaza pump station, to supply water
to the metropolitan area of the Caracas City.
Client: Ministerio del Ambiente y de los Recursos Naturales Renovables. Location: Edo. Miranda
CONSTRUCCIÓN – INFRASTRUCTURE – HYDRAULICS
ADUCCIÓN DESDE EL EMBALSE TAGUAZA, TRAMO PORTAL NORTE DEL TÚNEL DE TRASVASE
HASTA FUTURA ESTACIÓN DE BOMBEO TAGUAZA
CONSTRUCTION - OIL AND GAS - DOWNSTREAM - RAW REFINING
Objective: Design, local transportation, civil works, Construction and pre-commissioning of the
multipipe Slug Catcher, part of the accelerated early production onshore facilities.
Reach of Construction:
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
TRIME C.A
TRIME, C.A. Trabajos Industriales y Mecánicos
EN EJECUCION