You are on page 1of 7

MULTIPLE-RATE FLOW TEST

ANALYSIS

Iwan Setya Budi, MT


CONTENTS

• General equations
• Two-Rate Flow Test
• Two-Rate Flow Test Analysis for Non-ideal Cases
1. LAJU ALIR BERVARIASI TANPA KONTROL
• PDD test is divided into intervals during each of which the production rate can be considered
constant
,

The pressure drop during initial time period is,

Where

Applying the principle of superposition, then the pressure drop during the second time period is
162.6 𝑞𝜇𝐵 162.6 𝑞𝑛 𝜇𝐵
𝑝𝑖−𝑝𝑤𝑓 =
𝑘h
[ 𝑞1 log𝑡+(𝑞2−𝑞1) log (𝑡 −𝑡1)+ …+(𝑞3 −𝑞2) log (𝑡 −𝑡1)+. +(𝑞𝑛 −𝑞𝑛−1) log (𝑡 −𝑡 𝑛−11)]+
𝑘h
𝑠
TWO RATE FLOW TEST

Where

= rate prior to the rate change,


= rate after the rate change,
t = producing rate prior to the rate change,
∆t’ = producing time measured from the instant of rate change
INTERFERENCE TEST

You might also like