SITE WORK OF
PROJECT
1. POURING OF
CONCRETE
To mark the column in a straight way in horizontal and vertical way
both.
Three points are measured and marked with the help of total station.
The fourth point is measured after with the help of those three points.
3. CLEANING OF SITE
Keeping your work area clean is imperative and if it is not done properly
it can create serious health and safety risks which will cost the whole work
team time and money.
Cleaning of the site and iron rods, bars and several construction
equipments are placed at suitable places.
It is necessary to keep the site clean so as our health and labourers health
remains healthy.
4. CURING
Safety nets are classified as a passive fall protection system which can be
installed as either a barrier to prevent a fall, or beneath the work to catch
a falling worker. Safety nets are designed to decrease the fall distance, to
absorb the energy of a fall, and to reduce the likelihood or seriousness of
an injury.
Safety nets are tied around the building on the upper floor so as if
anyone fall from the height during work he/she does not get fall on floor
and doesn’t get hurt .
Formwork on the first floor is being fitted and tied up during the whole
day by putting the reinforcement bars and electrical aplliances inside the
formwork.
9. LEVELLING DONE OF THE
FORMWORK
Levelling is done with the help of the level pipe and a rod for the
support.
10. LEARN AND OBSERVE THE WORKING OF THE
TRANSIT MIXER
Transit mix put the concrete into the concrete pumping machine and
then the concrete pumping machine pump the concrete through the pipe
to the place where it has to be placed.