ESIA & TOPO

SURVEY &
TRAFFIC
SURVEY
Some idea and points to solve for way forward
ESIA METHODOLOGY
 Preparation of IEE (checklist)- with preliminary Impact identifications, EMP.
 Preparation of ToR for DoE and application for Environmental clearance
 Based on Approved ToR we have to conduct the ESIA which will contain but not limited to:
 Collection of Mouza map, location map, NoC and Details design of infrastructure
 Data collection of :
 Water Quality (SW, GW), Air quality, Noise level, Flora Fauna
 Community consultation, Stakeholder consultation, KII & FGD
 Environmental Impact Analysis based on identified data
 Environmental Monitoring and Management Plan preparation
 Environmental Mitigation Plan Preparation for the items with Negative impact.
 Waste water and waste disposal management plan Preparation and Completion of ESIA
ESIA (ENVIRONMENTAL AND SOCIAL
IMPACT ASSESSMENT)
Item Comments
Collecting drawings, designs, All drawing designs, location maps should be
Locational maps collected for ESIA ToR approval from DOE
ESIA ToR preparation ToR will include the scope of ESIA, and other
instructions for quality ESIA.
Application for ToR approval and
other DoE related Works
Desktop Study and Preparation of EIA Preliminary assessment, stakeholder
field works identification, ESIA planning etc.
Reconnaissance Survey Identifying survey need, extent of work,
stakeholder analysis etc.
Socio-economic data, Water Quality, Social data, demographic data, economical
Air Quality, Noise level data condition of local population, and all
collection environmental parameters
ESIA (ENVIRONMENTAL AND SOCIAL
IMPACT ASSESSMENT)
Item Comments
Getting Back approved ToR from DoE Expected; Extra push from govt. is required.
Flora, Fauna data collection Stakeholders: DoE, Local people, Local leaders,
stakeholder consultation -2, NoC Environmental organizations, port authority etc.
collection from local govt. , KII
(around 15 people)
Extra data collection suggested by DoE may give some extra requirement of data
DoE in ToR collection which need to be collected
Data analysis and report preparation ESIA report and presentation preparation (for DoE),
data analysis, Risk matrix preparation, EMMP &
EMP preparation.
Report Submission & Correction Draft and final report submission
ESIA
Need to start Now: Need to Start after ToR approval:
1. Collecting All design and drawings 1. All types of testing
2. ToR preparation for ESIA 2. Survey & Data collection
3. Communicating with Local DoE (to understand about the
local process, like online or offline application, whether
they will allow to submit ToR later)

Can start after preparing ToR but before approval Challenges:


of ToR: 1. IEE preparation (Required for ToR approval) – Most of the cases
1. ESIA Desktop study for Govt. project DoE exempted IEE(need to discuss with DoE
2. NoC collection from local govt. before ToR submission and application)
3. Community consultation 2. Time for ToR approval (Discussing with DoE it could be shorten)
4. Common EIA data collection 3. Approval of ToR from DoE without Major changes in submitted
ToR (Generally for Gov. project DoE do not make major changes
but need pre discussion from govt. level)
TOPOGRAPHIC SURVEY
 A short ToR (mentioning all requirements) preparation is required based on which consultant will
deliver the survey. ( We can also provide a draft ToR which can be finalized by client) / Some
important specifications and points could also add in work order as an alternative of ToR
 Topo survey could deploy in field as early as possible after ToR preparation.
 Topo Survey could Include:

l. Land survey
2. Bathometric survey (in port area- Water depth and data extent is required to get the budget for it)
3. Mouza map overlapping
4. RTK point positioning
5. A drone survey could also be done to give idea, feasibility discussion and decision making from
office with senior officials.
TRAFFIC SURVEY
 ToR for Traffic survey is required mentioning all details location and type of survey, pick hour
off pick hour, survey date, time, whether its going to be 24 hour week long survey or classified
survey etc. (from Client; consultant can help/prepare)
 Method of Statement is required from consultant/ firm proposing for traffic survey
 This survey could start now if the details (ToR) could finalize
 To minimize the costing:

1. Traffic survey could be planned for pick and off pick hour
2. A reconnaissance survey could be done before traffic survey planning (to understand
which is pick time which is off pick, whether there any traffic after 12.00 am night, which type
of survey will be best fitted etc.)