1. Introduction part
Short summary about the program
There were 48 sub projects in the Budget year (of which , 1 ,43 and 4 of the sub
projects were categorized as schedule one , two and three respectively).
All sub projects were Screened and appropriate safeguard tools (ESIA, IEE, ESMP
and RAP were prepared for 1 sub projects). All Sub projects were certified by EPA
before commencement of the physical work .
This quarter / bi-annual/ monitoring report prepared23 for 43 sub projects which
were categorized as schedule two.
Drainage construction
1-Medhanialem church to
4. Profile of Projects
4.1. Sub project Type: Cobblestone road
Project Name No of Screening Prepared Certification Site Physical(2)
lots approval safeguard Date handover work Status
Date tool (1) Date
1. Cobblestone projects
1.1.
1.2. Etc
2. Drainage
2.1.
2.2.
2.3. Etc
2.
3.
4. Etc
Generates jobs etc. (N.B for each positive impacts please state detail benefits if possible
support with numerical data).