You are on page 1of 1

Engineering and Maintenance ARPL Bangalore

Announcement

Headline To identify and switch off the unwanted power loads

Date and time Effective from 10-Jan-17 till next communication mail from Engineering

Services or area impacted Whole ARPL areas

Damage of UG cable feeding ARPL from BESCOM is damaged due to excavation


work carried out by the government outside Apotex near Gate – 2 by which we are not
Background
able to consume power for which the loads of ARPL is catered through DG sets
continuously. Running DG sets continuously is causing increased temperature issue.

To avoid DG set tripping due to increased temperature, request each one to identify
and switch OFF the unwanted loads ( like lights, stand-by equipment's, non-critical lifts,
Support needed from you
AC units etc.,) at your responsible area to ensure reduced loads on DG sets until
BESCOM power is restored at ARPL

Any queries should be addressed to Engineering.


Contact
Mr. Sivasankar – 9538964440 or Mr. Mahesh P S - 9916986752
Date of issue 10-Jan-17

Engineering & Maintenance - ARPL, Bengaluru

You might also like