- DocumentProcurement Register 20231208uploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(14953)_2022-4863-Construction of Raw Water Main Side Drainuploaded bythisula
- Document5088uploaded bythisula
- Documentdiffer loanuploaded bythisula
- DocumentMoratoriumuploaded bythisula
- DocumentDoc9uploaded bythisula
- Documentcredit carduploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(15958)_2022-5237-Prevention of hazard due to unprotected open trenches (1)uploaded bythisula
- Document15.KNPIWSP-E301-02-S-03-Reinforcment-01uploaded bythisula
- DocumentL-KNPIWSP-PD-2022 -3334-Material request for the pipe laying work on loan basisuploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(16382)_2022-5294-Disinfection of water mainsuploaded bythisula
- DocumentL-KNPIWSP-PD-2022-3061-Material request for the yard piping work in Yahalathenna SRuploaded bythisula
- Document178- Regarding the returning of fittings taken on loan basis from NWSDBuploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(15636)_2022-5128-Revised Kulugammana PH-Granty crane installation detailsuploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(15883)_2022-5211-Dust control measures related to construction work at Intake areauploaded bythisula
- Document5088uploaded bythisula
- DocumentIntake Side Drain (1)uploaded bythisula
- Documente-receipt_Other_Banks_Accounts_801212333736336uploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(16422)_2022-5312-Unsafe locations along Karaduwawala road in Harispattuwa Zoneuploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(16421)_2022-5311-Delay in yard piping works of SRs in Harispattuwa Zoneuploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(16323)_2022-5270-Regarding the final connection work in Ranawana road (Uduwawala Zone)uploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(16112)_2022-5298-Regarding side drains along the intake road, diversion of the drainuploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(15724)_2022-5157-Delay in road reinstatement worksuploaded bythisula
- DocumentE-receipt Other Banks Accounts 159772139200439uploaded bythisula
- Documente-receipt_Other_Banks_Accounts_804105181587701uploaded bythisula
- Documente-receipt_Other_Banks_Accounts_154969188165034uploaded bythisula
- DocumentFee Structure - February 2023uploaded bythisula
- DocumentGohagodauploaded bythisula
- DocumentTO duty reviseduploaded bythisula
- DocumentTO dutyuploaded bythisula
- Documentnulluploaded bythisula
- DocumentKulugammana PHuploaded bythisula
- DocumentSE MD FM - 2021uploaded bythisula
- DocumentAppendix11.1 S Summary- Decemberuploaded bythisula
- DocumentAsphalt Requirementuploaded bythisula
- Document01 Line Diagram_Updateduploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(14308)_2022-4618-Laying pipes along Yatihalagala SR access roaduploaded bythisula
- DocumentDocument (5)uploaded bythisula
- DocumentIntake scheduleuploaded bythisula
- DocumentASB 27.04.2022uploaded bythisula
- DocumentAppendix11.2 S Curve (Physical)- Decemberuploaded bythisula
- DocumentL-KNPIWSP-PD-2022-2198-Concrete Defect inspection report of Uduwawala SRuploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(11910)_2021-4111-Roads damages during project construction worksuploaded bythisula
- DocumentDoc20220128091705 (1)uploaded bythisula
- DocumentVirtual Interview for Parents-2022uploaded bythisula
- Document18.KNPIWSP-E301-02-S-02-Reinforcment-18uploaded bythisula
- DocumentRSC-C_KNPIWSP_03-B_(11320)_2021-3873-Special meeting regarding Gohagoda and Barigama roadsuploaded bythisula
- DocumentL-KNPIWSP-PD-2021-1903-Modification of Footings at Kulugammana PHuploaded bythisula
- DocumentL-KNPIWSP-2021-131-Notice of The safety violation report to CT-8(ASB)uploaded bythisula