RESPONSIBILITY ASSIGNMENT MATRIX

Project RAM Detail


Project Name: Construction of Security Post at CSUC,Kumasi Project Manager: Fredua Agyemang A

<--- Stakeholders ---> Deliverables 1.0 PRE CONTRACT STAGE 1.1 Contract Documentation -1.2 Working Drawings -1.3 Tender Preparations -1.4 Selection of Contractor -1.5 Award of Contract 2.0 SUB STRUCTURE STAGE -2.1 Setting out of the Building -2.2 Excavation of Foundation trench -2.3 Casting of Foundation Concrete -2.4 Foundation Blockwork -2.5 Hardcore Filling -2.6 Casting of oversite concrete 3.0 SUPER STRUCTURE STAGE -3.1 Blockwork -3.2 Joinery -3.3 Plumbing installation -3.4 Electrical installation -3.5 Finishes A A A A A PI PI PI PI A A A PI PI PI PI PI PI PI PI P P A A PI A A A A A A A P P P P P A A A A A A PI PI PI PI PI PI P P P P P P AS AS AS AS AS P I I AS Fredua A A. Project Mgr CSUC. Sponsor Victor B. Architect Dan. Civil Engineer Samuel O.B. Q.S K. Agyemang. Services eng

AI PI -

AI PI -

PI AI AI AS

AI PI -

-3.6 Painting and Decoration -3.7 Roofing

A A

A PI

PI PI

PI PI

Definitions
Code A P R I S Accountable Participant Review Required Input Required Sign-off Required Responsible for success/failure of this activity Actively participates in the activity This person must review the output of this activity Project Team needs input from this person in this activity Must sign-off the appropriate document

Role

Sponsor, Project Manager, Architect, Civil Engineer, Quantity Surveyor, Services engineer