]111 The Contractor shall be responsible for checking that the supports are complete and that all bolts have been cOlTectly tightened before conductor stringing commences. A record of this work shall be kept by the Contractor and made available to the Owner/Engineer on request. Critical bolts are to be marked after erection with red paint to ensure priority checking during maintenance. Where appropriate, tests on the aircraft obstruction lighting shall be undertaken to provide compliance of the systeill. Records of the tests shall be made available to the Owner/Engineer upon request. After complete erection and stringing the live line washing installation shall be demonstrated by the Contractor. All insulators shall be thoroughly washed before carrying any electrical tests. 7.8 Packaging, Protection and Despatch Marking The Contractor shall adopt packing methods that are enumerated in Section 15 as a minimum requirement under this Contract. 7.9 Health Safety and Environmental Requirements Contractor's attention is drawn to the fact that the location of the work is mostly mountains, with access difficulties, communication difficulties etc. The Contractor shall take stringent measures to ensure safety of men and material. Health, Safety and Environmental plan of the Contractor shall be specifically devised to meet the special needs of the site and the activities undertaken. Construction of 132kV Overhead line between Awqad GSS &SFZ GSS Rev. No. :A and Associated Works (Package-1) Volume 2 Overhead Line Specification Date : December 2010 Section 7 Supports Page :Page 25 of 38 _. ..' ...-..,....... _ M.M._U'" __