Professional Documents
Culture Documents
Plumbing Manual
Plumbing Manual
201-202
Urinal, Siphon
J et
2 3 3
2
[50]
1.5
[40]
.75
[20]
606 Drinking
Fountain
0.5 0.75 0.75 1.5
[40]
1.5
[40]
.5
[15]
701-704,
711
Shower 2 1.5 1.5 2 2
[51]
1.5
[40]
.5
[15]
.5
[15]
705 Individual
Fixture
Thermostatic
Mixing Valve
3 3 4 .75
[20]
.75
[20]
706 Emergency
Shower
1.5
[40]
708 Emergency
Eye & Face
Wash
.75
[20]
709 Emergency
Eye & Face
Wash
(Pedestal
Mounted)
.75
[20]
710 Emergency.
Eye & Face
Wash (Fully
Recessed,
WM)
.75
[20]
801
Wall Hydrant .75
[20]
808
Washing
Machine
3 3 4 4 2 1.5
[40]
.5*
[15]
Supply/Drain
Unit
2 1.5
[40]
.75
[20]
.75
[20]
809
Dialysis Box 2** 2** .5*
[15]
810 Thermo
Steam/Water
Mixing Valve
2.25 2.25 .75
[20]
Note: * Reagent Grade Water
** Chemical-Resistant Pipe
4.2 SCHEDULE OF FLOOR DRAINS
Indicate the size and type of all floor drains on the plans and diagrams. See Master Specification 22 13 00,
FACILITY SANITARY SEWERAGE for floor drain descriptions.
Animal Areas Type Size
in/[mm]
Sewer Remarks
- Cubicle Housing F 4 [102] S
- Large Animal Conventional J 4 [102] S Flushing rim,
stainless steel
trench with grate
- Receiving & Examination F 3 [76] S
Cage Wash Room F 3 [76] S
Cage Washer I 4 [102] S
Dark Room X 3 [76] S
PLUMBING DESIGN MANUAL
58
Animal Areas Type Size
in/[mm]
Sewer Remarks
Infectious Animal Suite: N 4 [102] S
Sterilizer ? ? ?
Necropsy K 4 [102] S Sealable FD
flushing rim
Post Operative Intensive Care K 4 [102] S Sealable FD
flushing rim
Quarantine Room F 3 [76] S
Dietetic Areas Type Size
in/[mm]
Sewer Remarks
Can Crusher S 3 [76] S
Can Wash Pit S 4 [102] S
Canteen S 3 [76] S Modify w/2 in [50
mm] hole in grate
Dining Room Serving Line S 3 [76] S Modify w/2 in [50
mm] hole in grate
Dishwashing Room Floor S 3 [76] S
Food Conveyer Belt S 2 [51] S Under belt with in
[15 mm] grate
Hood Washdown none 3 [76] S Stub up to 3 in [80
mm] pipe 6 in [150
mm] AFF
Hot Food Table S 3 [76] S With in [15 mm]
grate
Kitchen, Main S 3 [76] S
Kitchen, Main S 3 [76] S At kettles and
cooker
Kitchen, Serving S 3 [76] S With in [15 mm]
grate
Platform Scale Pit S 3 [76] S/ST
Pot Sink S 3 [76] S No grate
Prep, Meat and Dessert S 3 [76] S At each kettle
w/sediment basket
Prep, Vegetable S 3 [76] S With in [15 mm]
grate
Pulper S 4 [102] S With 2 in [50 mm]
hole in grate
CHAPTER 4: SUPPORT DATA
59
Dietetic Areas Type Size
in/[mm]
Sewer Remarks
Refrigerator, Chilled Vegetable S 3 [76] S Inside, w/air gap
Refrigerator, Garbage S 3 [76] S Inside
Refrigerator, Machine Room S 3 [76] S/ST
Refrigerator, Walk-In S 3 [76] S Outside refrigerator
door w/depressed
grate
Scullery S 3 [76] S For portable sink,
w/depressed grate
Tray Make-Up S 3 [76] S W/2 in [50 mm] hole
in grate
Trayveyor Shafts S 3 [76] S W/2 in [50 mm] hole
in grate
Vending Machine Room S 3 [76] S
Film Processing Areas:* Type Size
in/[mm]
Sewer Remarks
Cardiac Cath. Dark Room T 2 [51] S At XP-6 w/full flow
thru funnel
Processing Unit T 3 [76] S W/full flow thru
funnel
Roll Processing T 2 [51] S
Chemical Storage Sump X 2 [51] S
*When WSF flooring is used, provide Type "F" epoxy coated w/full flow funnel.
Hospital Areas Type Size
in/[mm]
Sewer Remarks
Aide-A-Bath M 3 [76] S
Autopsy Room J 3 [76] S Flushing rim type
Bldg. Management/Storage D 3 [76] S
Cart Storage Room C 2 [51] S
Cart Wash R 4 [102] S
Clean Work Area C 3 [76] S
Congregate Bath C/S 2 [51] S
Cysto Room L/S 3 [76] S At foot of table
Deep Therapy Equipment Room M 2 [51] S/ST
PLUMBING DESIGN MANUAL
60
Hospital Areas Type Size
in/[mm]
Sewer Remarks
Glasswasher R/S 3 [76] S
Hydrotherapy Area (stainless steel) C 2 [51] S Adjacent to tub
Hydrotherapy Congregate Bath O 3 [76] S With in [20 mm]
grate or (stainless
steel) 2 in [50 mm]
hole in grate
Ice Machine M 2 [51] S
Laboratory F 3 [76] S
Linear Accelerator C 2 [51] S/ST
Perennial Bath C 2 [51] S
Shower, Double C/D 3 [76] S
Shower, Single C/D 2 [51] S
Soiled Linen Collection Room D 3 [76] S
SPD Sterilizers R/S 4 [102] S
Trash Collection Room D 3 [76] S
Washer Sterilizers R 4 [102] S 2 in [50 mm] hole in
grate
Laundry Areas Type Size
in/[mm]
Sewer Remarks
Laundry B/F 3 [76] S F for seamless vinyl
Lint Collector H 4 [102] S/ST
Mechanical Equipment Areas: Type Size
in/[mm]
Sewer Remarks
Boiler House B 3 [76] S With in [15 mm]
grate
Boiler Water Column Drain V 4 [102] S One for each boiler
Compressor Room B 3 [76] S Modify with funnel
Fan Room B 3 [76] S/ST With in [15 mm]
grate
Incinerator Room E 4 [102] S
Machine Room B 3 [76] S/ST
CHAPTER 4: SUPPORT DATA
61
Mechanical Equipment Areas: Type Size
in/[mm]
Sewer Remarks
Mechanical Equipment Room B 4 [102] S With in [15 mm]
grate when
adjacent to
equipment
Paint Spray Booth H 4 [102] S
Steam Service Entrance Pit B 3 [76] S/ST
Water Softener R 4 [102] S
Miscellaneous Areas: Type Size
in/[mm]
Sewer Remarks
Finished Walk Areaway B 4 [102] ST
Window Well Areaway B 3 [76] ST
Silver Recovery Room T 3 [76] S
Legend:
S =Sanitary Sewer CI =Cast Iron
ST =Storm Sewer NB =Nickel Bronze
Types:
B CI W/NB Grate M NB Funnel Strainer
C Finished Areas N NB Extended Rim
D Latex Mastic Floors/Thin Set Tile O 12 in [300mm] Square
E 12 in [300 mm] CI W/Sediment Bucket P 12 in [300 mm] Square w/Grate
F Seamless Vinyl Floors R 8 in [200 mm] Square
G Porcelain Enamel Interior w/NB Frame and Grate S 12 in [300 mm] Square w/Grate
H 12 in x 6 in [300 mm x 150 mm] deep CI T CRP w/Funnel
I
J
K
L Flushing Rim
V CI w/Funnel
X CRP
NOTES:
1. Floor drains for general floor drainage are located by architect. Use Type "C" in finished
areas.
2. Connect cooling tower drain, overflow and blowdown to the sanitary sewer.
PLUMBING DESIGN MANUAL
62
3. Provide hub at floor level for ethylene oxide sterilizer fitting. Caulk fitting tight in hub.
4. Provide trap primer for all drains not receiving a direct discharge.
CHAPTER 4: SUPPORT DATA
63
THIS PAGE LEFT INTENTIONALLY BLANK
PLUMBI
64
NG DESIGN MANUAL
4.3 SCHEDULE OF BASE AND VIBRATION ISOLATORS
See Master Specification 23 05 41, Noise and Vibration Control for HVAC Piping and Equipment (23 05 41 Noise and vibration control), for
base and isolator description.
Equip
On
Grade
- Base
Type
Equip
On
Grade
- Isol
Type
Equip
On
Grade
- Min
Defl
Equipt
On 20
ft [6 m]
Floor
Span -
Base
Type
Equipt
On 20
ft [6 m]
Floor
Span -
Isol
Type
Equipt
On 20
ft [6 m]
Floor
Span -
Min
Defl
Equip
On 30
ft [9
m]
Floor
Span -
Base
Type
Equip
On 30
ft [9 m]
Floor
Span -
Isol
Type
Equip
On 30
ft [9
m]
Floor
Span -
Min
Defl
Equip
On 40
ft [12
m]
Floor
Span -
Base
Type
Equip
On 40
ft [12
m]
Floor
Span -
Isol
Type
Equip
On 40
ft [12
m]
Floor
Span -
Min
Defl
Equip
On 50
ft [15
m]
Floor
Span -
Base
Type
Equip
On 50
ft [15
m]
Floor
Span -
Isol
Type
Equip
On 50
ft [15
m]
Floor
Span -
Min
Defl
Compressors
& Vacuum
Pumps up to
1200 W Over
1200 W
-- D,L,W -- -- D,L,W -- -- D,L,W -- -- D,L,W -- -- D,L,W --
Compressors
& Vacuum
Pumps 500 -
750 RPM
-- D -- -- S 43 -- S 63 -- S 63 -- S 89
Compressors
& Vacuum
Pumps Over
750
-- D -- -- S 25 -- S 43 -- S 63 -- S 89
Close
Coupled
Circulating
Pumps up to
1200 W
-- -- -- -- D,L.W -- -- D,L,W -- -- D,L,W -- -- D,L,W --
Close
Coupled
Circulating
Pumps over
1200 W
-- -- -- I S 25 I S 25 I S 43 I S 43
CHAPTER 4: SUPPORT DATA
65
Equip
On
Grade
- Base
Type
Equip
On
Grade
- Isol
Type
Equip
On
Grade
- Min
Defl
Equipt
On 20
ft [6 m]
Floor
Span -
Base
Type
Equipt
On 20
ft [6 m]
Floor
Span -
Isol
Type
Equipt
On 20
ft [6 m]
Floor
Span -
Min
Defl
Equip
On 30
ft [9
m]
Floor
Span -
Base
Type
Equip
On 30
ft [9 m]
Floor
Span -
Isol
Type
Equip
On 30
ft [9
m]
Floor
Span -
Min
Defl
Equip
On 40
ft [12
m]
Floor
Span -
Base
Type
Equip
On 40
ft [12
m]
Floor
Span -
Isol
Type
Equip
On 40
ft [12
m]
Floor
Span -
Min
Defl
Equip
On 50
ft [15
m]
Floor
Span -
Base
Type
Equip
On 50
ft [15
m]
Floor
Span -
Isol
Type
Equip
On 50
ft [15
m]
Floor
Span -
Min
Defl
Base
Mounted
Circulating
Pumps up to
7500 W
-- -- -- -- D,L,W -- -- D,L,W -- -- D,L,W -- -- D,L,W --
Base
Mounted
Circulating
Pumps 10
kW to 30 kW
I S 25 I S 25 I S 43 I S 43 I S 43
Base
Mounted
Circulating
Pumps over
30 kW
I S 25 I S 25 I S 43 I S 63 I S 63
Diesel
Engines up
to 19 kW
I N 7.6 I N 7.6 I S 43 I S 63 I S 63
Diesel
Engines 10
kW to 75 kW
I N 7.6 I N 43 I S 63 I S 89 I S 89
Diesel
Engines over
75 kW
I N 7.6 I N 63 I S 89 I S 114 I S 114
PLUMBING DESIGN MANUAL
66
Notes:
1. For suspended floors lighter than 4 in [100 mm] concrete, select deflection requirement from next higher span.
2. If equipment is located in a building separated from the buildings that house patients, isolator pads are not required.
3. Directly bolt fire pumps to concrete base. Provide pads (D) for domestic water booster pump package.
4. This chart applies to non-seismic areas. If project is located in VA Seismic Area A or B, substitute DS for D, and SS for S.
5. SI conversion to English: 0.3 =7.6 mm, 1 =25 mm, 1.7 =43 mm, 2.5 =63 mm,
3.5 =89 mm, 4.5 =114 mm. 1.5 hp =1120 Watts, 10 hp =7.5 kW, 15 hp =11 kW,
25 hp =19 kW, 30 hp =20 kW, 40 hp =30 kW, 100 hp =75 kW
---END OF SECTION---
CHAPTER 4: SUPPORT DATA
67
INDEX
I-1
INDEX
A
A/E......................................................................1
acidinjectionsystem........................................11
airsystems
location...........................................................1
animalcarefacilities ........................................11
ASCE7................................................................5
autmaticfilmprocessor .....................................7
B
backflowpreventers ..........................................2
sanitaryandroofdrainage .............................6
bariatricwatercloset .........................................1
baseandvibrationisolatorschedules ...........79
biologicalsafetylevel3labs.......................1011
boosterheatercalculations ...............................9
boosterpumps .............................................11,8
bracing
seismic ............................................................6
BSL3................. Seebiologicalsafetylevel3labs
C
CADstandards....................................................8
CAFMSeeComputerAidedFacilitiesManagement
calculations ..................................................910
sanitaryandroofdrainage .............................7
carbonfilters ....................................................12
castironpiping
sanitaryandroofdrainage .............................6
CD1. Seesubmissionrequirements,construction
documentlevel1
centralsupplysystems
medicalgasandvacuumsystems ..................8
checklist .............................................................6
chemicalfumehoods.........................................5
chemicalresistantpipe
sanitaryandroofdrainage .............................6
cleanouts
sanitaryandroofdrainage .............................6
commissioning ...................................................3
commissioningplan
plumbing.........................................................6
compliancerequirements ..................................1
compressedaircalculations.............................10
ComputerAidedFacilitiesManagement .....11,1
constructiondocumentlevel1
plumbingplans............................................... 7
contractdrawings .......................................... 78
coordination
interdiscipline................................................. 9
costestimating .................................................. 9
D
DD1Seesubmissionrequirements,designdevelopment
level1
DD2Seesubmissionrequirements,designdevelopment
level2
deionization....................... Seedemineralization
demineralization................................................ 1
calculations .................................................... 9
dentalcompressedairsystems ................. 1618
design........................................................... 16
equipment.................................................... 16
GradeDair ................................................... 16
intake ........................................................... 16
location ........................................................ 16
outlets .......................................................... 17
pipingsystems.............................................. 17
pressureregulators ...................................... 17
pressurerequirements................................. 16
shutoffvalves.............................................. 16
solenoidvalves............................................. 17
utilityjunctioncenter................................... 17
valves............................................................ 17
volumeandpressurerequirements............. 17
design
procedures ..................................................... 7
seismic.......................................................... 10
sustainable ..................................................... 9
designalerts....................................................... 6
designdevelopmentlevel1
disciplinecoordinationdocument ................. 6
plumbingplanrequirements ......................... 5
updateddesignnarrative............................... 5
designdevelopmentlevel2
equipmentcutsheets.................................... 6
plumbingplans............................................... 6
riserdiagrams................................................. 6
specifications.................................................. 6
stackdiagrams ............................................... 6
updateddesignnarrative............................... 6
designguides ..................................................... 7
PLUMBING DESIGN MANUAL
I-2
designmanuals ..................................................4
designsubmissionrequirements .......................5
digitalformat..................................................1
devicecalibration...............................................5
dialysismachines ...............................................4
distilledwaterstills ............................................4
domestichotwatersystems
buildings .........................................................3
buildings,other ..............................................4
dieteticequipment .........................................4
exception........................................................4
heattraps .......................................................5
hotwatersupplyandreturnlines..................4
hydrotherapyequipment ...............................4
laundries.........................................................4
shutoffandbalancingvalves.........................5
sizeheaters.....................................................4
therapeuticpools ...........................................4
domesticwaterboostersystems
hospitals .........................................................3
otherbuildings ...............................................3
drawings
crosssections .................................................7
details .............................................................7
piping..............................................................7
PLseries .........................................................7
plumbing.....................................................67
plumbingfixturenumbers..............................7
roomidentification.........................................7
scale................................................................7
stackandriserdiagrams.................................8
E
electricwatercoolers.........................................5
emergencyshowersandeye/facewashes ........1
energyconservation ..........................................3
EPACT.............................................................1,3
equipmentschedules,order ..........................89
ExecutiveOrder..............................................1,3
F
filmprocessingareas .........................................5
fireprotection..................................................11
fixtureunitsandwaste/vent
sanitaryandroofdrainage .............................5
floordrainschedules......................................37
floordrains
sanitaryandroofdrainage .............................5
fumehoods ........................................................5
funneldrains.................................................. 4,5
G
greaseremoval
sanitaryandroofdrainage............................. 6
H
handfreecontrols ............................................. 1
heartandlungmachines ................................... 4
hemodialysis .......................................... 1,1112
monitoring ................................................... 12
hospitalbuildingmodules ................................. 1
hospitals
pumps ............................................................ 3
hotwaterbranchlines....................................... 3
hotwaterheaters
location .......................................................... 1
housekeepingpadsSeeplumbingdesign,equipment
pads
hydropneumatictank ....................................... 3
I
inletisolationvalves .......................................... 2
inspections......................................................... 4
insulateroofdrainleaders
sanitaryandroofdrainage............................. 7
interiorfuelgassystem
silverrecovery................................................ 7
J
joints
hublesswasteandventsystems.................... 2
K
kitchenequipment............................................. 5
L
laundry............................................................. 19
dedicatedsump............................................ 19
equipment.................................................... 19
floorsinksanddrains ................................... 19
LEEDLeadershipinEnergyandEnvironmental
Design ................................................................ 7
Legionella
source............................................................. 3
loadingdock..................................................... 21
M
maindistributionpanels
pipingover ..................................................... 2
I-3
medicalairandvacuumsystems
calculations...................................................10
sizing...............................................................8
medicalairsystems............................................8
ventilators.....................................................11
medicalcompressedairsystems .......................7
medicalgasalarms
alarmpanels .................................................11
primary .........................................................11
secondary .....................................................11
medicalgasandvacuumsystems ................712
aircompressors ..............................................9
alarms...........................................................11
anesthesiaevacuationpiping.......................10
centralsupplysystems ...................................8
connectingtoexistingsystems ....................12
discharge ......................................................10
dryers,filters,andpressureregulators ..........9
gascylinders ...................................................9
gasoutletsandvacuuminlets......................11
highpressuregaseousoxygencontainers .....9
inlineshutoffvalves ...................................10
intakes ..........................................................10
liquidoxygencontainers ................................9
mainlineshutoffvalves ..............................10
manifolds........................................................9
multiplexing....................................................9
nitrogenstationoutlets................................11
pipingsystems........................................1011
pressurepipingsystems ...............................10
prohibitedusesofmedicalgases .................10
protectivepipeenclosure.............................11
quickcouplers...............................................10
renovationprojects ........................................8
setup...............................................................9
shutoffvalves ................................................9
ventilators.................................................9,11
watertesting ..................................................8
zonevalves ...................................................10
medicalgassystems,existing
blowdown.....................................................12
couplings.......................................................12
tieins............................................................12
valves............................................................12
medicalvacuumsystems ...............................7,8
MemorandumofUnderstanding...................1,3
modules
hospitalbuilding.............................................1
modules,building
firecompartmentation .................................. 1
functionalzones............................................. 1
plumbingutilities ........................................... 1
servicezones.................................................. 1
structuralbays................................................ 1
MOU.......... SeeMemorandumofUnderstanding
multimediafiltration ...................................... 12
N
nitrogencalculations ....................................... 10
nitrogensystems ........................................... 7,8
nitrousoxidecalculations................................ 10
nitrousoxidesystems .................................... 7,8
O
oralevacuationcalculations ............................ 10
oralevacuationsystems ........................ 1,1516
airflowandvacuumrequirements............... 15
frictioncompensation.................................. 15
HVEoutlets................................................... 15
HVEsystems................................................. 15
separators .................................................... 16
solenoidvalves............................................. 16
vacuumproducers ....................................... 15
vacuumreliefvalves..................................... 15
outsidesubsoildraintile
sanitaryandroofdrainage............................. 6
oxygencalculations.......................................... 10
oxygensystems.............................................. 7,8
ventilators .................................................... 11
P
Pete'splugs........................................................ 5
pharmacy ......................................................... 12
pipedesign
sanitaryandroofdrainage............................. 5
pipesizecalculations ......................................... 9
pipestub
silverrecovery................................................ 7
pipingdesign...................................................... 4
plumbing
animalcarefacilities .................................... 11
biologicalsafetylevel3labs................... 1011
pharmacy ..................................................... 12
plumbingcommissioningplan........................... 6
plumbingdesign
equipmentpads ............................................. 2
freezeconditions............................................ 2
newservices................................................... 2
PLUMBING DESIGN MANUAL
I-4
pipesupportdesign........................................2
piping..............................................................2
testspriorto...................................................2
plumbingdrawings........ Seedrawings,plumbing
systemstoshow.............................................1
plumbingfixtureschedules............................13
plumbingfixtures
bariatric ..........................................................1
general............................................................1
pressurezonecalculations.................................9
pressurereducingvalves ...................................3
procedures
designandconstruction.................................7
Q
qualityalerts ......................................................7
R
reagentgradewatersystems ..........................20
chemicalresistantpipinganddrains ...........21
emergencyshowerandeye/facewash........21
floorspaceforchemicals..............................20
floorspaceforequipment............................20
negativepressureventilation.......................21
Redbook .............................................................1
renovationprojects
medicalgasandvacuumsystems ..................8
requirements
drawing...........................................................1
researchandlabgassystems
alarms...........................................................14
centralsupplysystems .................................12
discharge ......................................................13
emergencyshutoff ......................................14
location.........................................................13
pipingsystems..............................................13
shutoffvalves ..............................................13
valves............................................................14
researchandlaboratorygassystems.........1214
reverseosmosis................................................12
RO........................................ Seereverseosmosis
roofdrainagesystems
backflowpreventers.......................................6
calculations.....................................................7
castironpiping...............................................6
chemicalresistantpipe ..................................6
cleanouts ........................................................6
fixtureunitsandwaste/vent ..........................5
floordrains .....................................................5
greaseremoval............................................... 6
insulateroofdrainleaders............................. 7
outsidesubsoildraintile............................... 6
pipedesign..................................................... 5
sanitaryandstormconnections..................... 6
wasteandventsystems................................. 6
S
S1Seesubmissionrequirements,schematiclevel1
S2Seesubmissionrequirements,schematiclevel2
sanitarysystems
backflowpreventers ...................................... 6
calculations .................................................... 7
castironpiping............................................... 6
chemicalresistantpipe.................................. 6
cleanouts........................................................ 6
fixtureunitsandwaste/vent.......................... 5
floordrains..................................................... 5
greaseremoval............................................... 6
insulateroofdrainleaders............................. 7
outsidesubsoildraintile............................... 6
pipedesign..................................................... 5
sanitaryandstormconnections..................... 6
wasteandventsystems................................. 6
schedules
baseandvibrationisolator ........................ 79
equipment.................................................. 1,2
floordrain .................................................. 37
plumbingfixture......................................... 13
schematiclevel1
codereview,summary................................... 3
fixturecountschedule ................................... 3
meterandbackflowpreventerassembly ...... 4
pipingpressurezoningdesign........................ 4
soilboringinformation .................................. 3
stormsewersystemdesign............................ 4
topographicalplan ......................................... 3
waterpressure............................................... 4
waterutilitycoordination .............................. 4
schematiclevel2
acidwaste ...................................................... 5
plumbingfloorplans .................................. 5,7
updateddesignnarrative............................... 5
seismicbracing .................................................. 6
seismicdesign.................................................. 10
seismicrequirements .................................... 56
seismicrestraint
drawings......................................................... 6
ductworkandpipingplansandsections........ 6
I-5
equipmentrestraints......................................6
exceptions ......................................................5
sensoroperatedfaucets ....................................1
shopcompressedairsystems ..........................18
silverrecovery....................................................7
equipment ......................................................7
sleeves
penetration,piperiserorstackfloor .............2
SMACNA.........................................................5,6
solenoidvalve ....................................................2
specialequipment..........................................45
chemicalfumehoods .....................................5
dialysismachines............................................4
distilledwaterstills.........................................4
filmprocessingareas......................................5
heartandlungmachines................................4
kitchenequipment .........................................5
sterilizers ........................................................5
specifications
Master ............................................................6
springloadedswingcheckvalves ......................3
sterilizers............................................................5
stills ....................................................................4
submissionrequirements ............................910
constructiondocumentlevel1.......................6
designdevelopmentlevel1 ...........................5
designdevelopmentlevel2 ...........................6
schematiclevel1............................................3
schematiclevel2............................................5
sumppumpcalculations ..................................10
T
temperedwatersupply......................................5
therapeuticpool
calculations.....................................................9
disinfection...................................................18
equipment ..............................................1819
equipmentroom ..........................................19
filter ..............................................................18
pHbalancing.................................................18
pipesandequipment....................................18
recirculatingpump .......................................19
vacuumcleaningequipment ........................19
waterheater.................................................18
thermostaticmixingvalve................................11
trapprimers .......................................................2
trashroom........................................................21
U
UJC ..............................Seeutilityjunctioncenter
ultravioletdisinfection ................................... 12
utilityjunctioncenter ...................................... 15
V
VAAuthorities.................................................... 2
vacuumsystems
ventilators .................................................... 11
VAHBS ................................................................ 4
variablefrequencydrives .................................. 3
vivarium....................... Seeanimalcarefacilities
VoluntaryProductAccessibilityTemplate......... 1
VPAT................................................................... 1
W
wallhydrants ..................................................... 2
wasteandventsystems
sanitaryandroofdrainage............................. 6
wasteanestheticgasdisposal ........................... 8
waterdistributionsystem
coordination................................................... 2
minimumpressure......................................... 2
waterhammerarrestors ................................... 2
waterqualityreport ........................................ 10
watersofteningsystems............................ 1920
brineandcausticsodatanks........................ 20
dealkanizingequipment............................... 20
dealkanizingtank ......................................... 20
miscellaneous............................................... 20
saltstorage................................................... 20
softener........................................................ 19
whererequired ............................................ 19
watertesting
medicalgasandvacuumsystems .................. 8
waterutility
recoveringmoneyfrom ................................. 1
waterlessurinals................................................ 1
PLUMBING DESIGN MANUAL
I-6