A. RA 1080 B. PD 1067 C. RA 1037 D. PD 856 2. The Revised ational Pl!"#in$ Code of the Philippines of 1%%% was approved on A. &!ne 18' 1%55 B. &an!ar( )8' 1%5% C. ove"#er )8' 1%67 D. De*e"#er )1' 1%%% 3. +,piration of pl!"#in$ per"it if s!spended or a#andoned for a period of A. 60 da(s B. 365 da(s C. 1)0 da(s D. 180 da(s 4. A-PAP was or$ani.ed and re$istered to /+C A. 1%50 B. 1%%% C. 1%35 D. 1%50 5. Known as the Code on /anitation of the Philippines A. PD %07 B. PD 865 C. PD 856 D. PD 586 6. The two *a!ses of fi,t!re trap seal loss that vent s(ste"s prote*t a$ainst in nor"al fi,t!re !se are A. #a*1flow and #a*12press!re B. siphona$e and #a*12press!re C. va*!!" and #a*1flow D. va*!!" #rea1er and #a*1flow preventer 7. Another ter" !sed to des*ri#ed a *ontin!o!s vent is A. vent pipe B. vent sta*1 C. sta*1 vent D. soil sta*1 8. The trade na"e for relief vent is A. d!al vent B. re2vent C. #a*1 vent D. *i*!it vent 9. A vent *onne*tin$ to a hori.ontal drain pipe thro!$h a fittin$ at an an$le not $reater the 05 de$rees to the verti*al is A. side vent B. #a*1 vent C. *o""on vent D. (o1e vent 10. The dr( portion of a soil or waste pipe that e,tends a#ove the hi$hest hori.ontal drain *onne*ted to the sta*1 and ter"inates a#ove the roof is A. vent sta*1 B. (o1e vent C. sta*1 vent D. d!al vent 11. The f!n*tion is to *onne*t two or "ore vent pipes to the "ain vent at one point' or e,tend thro!$h the roof separatel( is A. vent e,posed B. vent line C. vent header D. vent *ap 12. The p!rpose is to prevent the press!re *han$es in the sta*1 A. relief vent B. (o1e vent C. re2vent D. loop vent 13. A positive press!re is A. siphona$e B. #a*1 press!re C. va*!!" D. #a*1flow 14. The ne$ative press!re is *alled A. trap seal loss B. siphona$e C. #a*1 press!re D. #a*1flow 15. What will happen if the "a,i"!" fi,t!re !nit load in*reases A. the hei$ht of the vent pipe in*reases B. the hei$ht of the vent pipe de*reases C. the hei$ht of the vent pipe "aintains D. the hei$ht of the vent pipe do!#les 16. -ini"!" vent si.e for water *loset is A. 1 in*h3 B. ) in*hes3 C. ) 14)5 in*hes3 D. 3 in*hes3 17. The s"allest individ!al vent sta*1 si.e per"itted #( the *ode is A. 1 1405 B. 1 14)5 C. 15 D. )5 18. The "a,i"!" vent si.e that *an #e !sed for a 3 in*hes drain pipe is A. 1 14)5 B. )5 C. ) 14)5 D. 1 1405 19. The fa*tor that deter"ines the "a,i"!" len$th of an( vent pipe is A. invert B. dia"eter C. fi,t!re load D. *olor 20. Kit*hen sin1s lo*ated awa( fro" walls or partitions are *alled A. slop sin1 B. *enter sin1 C. island sin1 D. isolated sin1 21. -a,i"!" len$th of hori.ontal wet vent is A. 0350 foot B. 1 foot C. 1 14) feet D. ) feet 22. Also 1nown as the RA %)75 A. Water Code of the Philippines B. ational 6!ildin$ Code of the Philippines C. Philippine Clean Water A*t of )000 D. Code on /anitation of the Philippines 23. The first a"end"ent of the ational Pl!"#in$ Code whi*h in*l!des As#estos2Ce"ent pipe as approved pl!"#in$ "aterials was A. &!ne 18' 1%55 B. De*e"#er )1' 1%%% C. ove"#er )8' 1%67 D. &an!ar( )8' 1%5% 24. 7ow "an( provision of the -aster Pl!"#er Code of +thi*s A. 6 B. 7 C. 8 D. % 25. 7ow "an( set of plans ret!rn to the appli*ant after approval of per"it A. 6 B. 1 C. ) D. 0 26. 7ow "an( set of plans retain to the 8o#site after approval of per"it A. 1 B. ) C. 3 D. 0 27. 7ow "an( set of plans retain to the Ad"inistrative A!thorit( after approval of per"it A. 1 B. ) C. 3 D. 0 28. ational Pl!"#in$ Code of the Philippines approved #( the -ala*a9an$ A. &!ne 18' 1%55 B. &an!ar( )8' 1%5% C. ove"#er )8' 1%67 D. De*e"#er )1' 1%%% 29. -ini"!" vol!"e of the di$estive *ha"#er of a septi* tan1 A. 1 *!3" B. ) *!3" C. 135 *!3" D. )35 *!3" 30. The "ini"!" differen*e in elevation of the inlet and o!tlet pipe of the septi* tan1 A. 5038 "" B. 10)38 "" C. 15)38 "" D. )0038 "" 31. /tandard *onversion fa*tor to "!ltipl( the TD7 in feet to a*:!ire the press!re in psi of water in a pipe to a *ertain elevation A. 6)30 B. 03033 C. 3)3) D. %381 32. 1 *!#i* "eters of water is e:!al to A. )50 $allons B. 1500 liters C. 1000 1$s D. )500 l#s3 33. 1 *!#i* "eters of water is e:!al to A. 10 liters B. 100 liters C. 1000 liters D. 10'000 liters 34. 1 *!#i* "eters is how "an( $allons A. 105 $allons B. )60 $allons C. )85 $allons D. 365 $allons 35. 1 psi is e:!al to A. 638%5 1pa B. %3876 1pa C. 33678 1pa D. 73365 1pa 36. Known as the /anitar( +n$ineerin$ ;aw A. RA %)75 B. RA 1378 C. RA 1360 D. RA %510 37. Known as the <ire Code of the Philippines of )008 A. RA %)75 B. RA %510 C. RA 1368 D. RA %)50 38. The re:!ire"ent of the Dr( /tandpipe in ever( 0 store( or "ore was stated in A. PD %07 B. PD 10%3 C. PD )5%6 D. PD 10)5 39. A pipeline s(ste" filled with water and *onne*ted to a *onstant water s!ppl( for the !sed of the 6<P for <ire /!ppression p!rposes is A. Dr( /tandpipe B. Wet /tandpipe C. Co"#ination /tandpipe D. /tandard /tandpipe 40. The "ini"!" si.e of Dr( /tandpipe is A. 60"" =) 14)5> B. 5)"" =)5> C. 38"" =1 14)5> D. 10)"" =05> 41. ?s a te*hni:!e where#( air is #lown into spa*es whi*h are desi$ned to #e 1ept *lear s"o1e A. Aeration B. Paste!ri.ation C. Press!ri.ation D. Co"pressed Air 42. The pipes are nor"all( not filled with water3 Water is introd!*ed into the s(ste" thr! fire servi*e *onne*tion is A. Dr( /tandpipe B. Wet /tandpipe C. Co"#ination /tandpipe D. /tandard /tandpipe 43. The "a,i"!" travel distan*e of a Dr( /tandpipe o!tlet *onne*tion to an( point in a #!ildin$ is A. )0 "eters B. 30 "eters C. 00 "eters D. 50 "eters 44. ?s an a!,iliar( fireline s(ste" with *onstant water s!ppl( installed pri"aril( for e"er$en*( !se A. Dr( /tandpipr B. Wet /tandpipe C. Co"#ination /tandpipe D. /tandard /tandpipe 45. The "a,i"!" hei$ht of a <ire /ervi*e Conne*tion a#ove $radeline is A. 060"" B. 1)00"" C. 1))0"" D. )110"" 46. The valve dia"eter "!st #e installed in ever( floor for a Wet /tandpipe is A. 3)"" =15> B. 38"" =1 1405> C. 5)"" =)5> D. 60"" =) 14)5> 47. /tandard slope of all hori.ontal r!ns of a Dr( /tandpipe is A. 5@ B. 10@ C. 15@ D. )0@ 48. -ini"!" hei$ht of a Wet /tandpipe a#ove floor is A. 810"" B. %10"" C. 1100"" D. )100"" 49. The "ini"!" press!re of the h(drostati* testin$ for the Dr( /tandpipe is A. 50psi =3351$4*")> B. 60psi =0351$4*")> C. 70psi =5301$4*")> D. 80psi =6351$4*")> 50. What is the "a,i"!" Dr( /tandpipe desi$n press!re to withstand water press!re when read( for servi*eA A. 100psi B. )00psi C. 300psi D. 000psi