Tnh ton cng trnh tng tc vi nn t bng phn mm Plaxis

BI TP: H

H mng su

O SU

Phn tch ng sut, ni lc, chuyn v ca tng vy tng tc vi t nn trong qu


trnh thi cng h o su

Bc 1: General settings
Bc 2: V mt ct cc lp t (kch thc 45m*25m), tng vy (diaphragm wall),
thanh chng (anchor), ti trng
: diaphragmwall

: anchor

: ti trng

2.1. Mt ct a cht gm 3 lp

Thnh phn

Thng
s

Lp 1

Lp 2

Lp 3

t = 5m

t = 10m

t = 10m

St, do
nho

St, do
cng

Ct,
cht

Dung trng trn mc nc ngm


(kn/m3)

unsat

11.1

16.7

16.7

Dung trng di mc nc ngm


(kn/m3)

sat

16.7

19.4

20

H s thm ngang (m/ngy m)

kx

0.6*10-4

2.6*10-4

H s thm ng (m/ngy m)

ky

0.3*10-4

1.3*10-4

Ch s nn hiu chnh

0.096

0.046

0.012

Ch s n hiu chnh

0.019

0.009

0.002

GV: O NGUYN V

Tnh ton cng trnh tng tc vi nn t bng phn mm Plaxis

H mng su

Lc dnh (kn/m2)

25

Gc ma st trong ()

22.4

15

31

interfaces

0.8

0.9

0.8

2.2. Cc thng s v diaphragmwall (b*h=1m*0.6m)


Thnh phn

Thng s

Tr s

n v

Material type

Elastic

2.64*107

kN/m2

A=b*h

0.6

m2

b * h3
I=
12

0.018

m4

cng dc trc

E*A

1.584*107

kN/m

cng chng un

E*I

4.752*105

kNm2/m

Chiu dy

0.6

Trng lng

kN/m/m

H s poisson

0.15

Loi m hnh
Module n hi
Din tch tit din ngang
Moment qun tnh

2.3. Cc thng s v anchor


Thnh phn

Thng s

HP360

n v

Material type

Elastic

Module n hi

2*108

kN/m2

Din tch tit din

22.2*10-3

m2

cng dc trc

E*A

44.4*105

kN

Loi m hnh

GV: O NGUYN V

Tnh ton cng trnh tng tc vi nn t bng phn mm Plaxis

Khong cch

Ls

5.5

H mng su

2.4. Cc thng s v ti trng


Kch double vo ti Distributed Load-Load system A Select Distributed Load (system
A)

Bc 3: Chn Generate mesh,


Chn Update, vo Mesh Global Coarseness Medium Generate Update
Bc 4: Chn,

Chn Phreatic level,


V mc nc ngm code 23m

Bc 5: Chn generate water pressure,


Chn Phreatic level OK update
GV: O NGUYN V

Tnh ton cng trnh tng tc vi nn t bng phn mm Plaxis

Bc 6: Chn initial pore pressure,

H mng su

Lu : Trong bc ny nhng vt liu, cu kin, v.v d tnh lm trong qu trnh thi cng
phi c deactivate.
Bc 7: Chn generate initial stress,

, OK (chp nhn cc tr K0)

Bc 8: Calculate
Phase 1: Kch hot ti trng, t = 1ngy
Nhp chut vo v tr ti trng,

Phase 2: Thi cng Diaphragmwall, t = 15ngy

Phase 3: H mc nc ngm, t = 2ngy


Chn water pressure

GV: O NGUYN V

Tnh ton cng trnh tng tc vi nn t bng phn mm Plaxis

Chn Phreatic level,


(45, 23)

H mng su

, h mc nc ngm t v tr (0, 23) (15, 21) (30, 21)

Chn generate water pressure,


Update

Groundwater calculation OK Update

Phase 4: o t n code 22m, t = 1ngy


Phase 5: Lp anchor tng th nht, t = 1ngy
Phase 6: H mc nc ngm, t = 2ngy
Chn water pressure

Chn Phreatic level,


(45, 23)

, h mc nc ngm t v tr (0, 23) (15, 18) (30, 18)

Chn generate water pressure,


Update

Groundwater calculation OK Update

Phase 7: o t n code 19m, t = 1ngy


Phase 8: Lp anchor tng th hai, t = 1ngy
Phase 9: Consolidation, t = 30ngy
Phase 10: minimum pore pressure

GV: O NGUYN V