Professional Documents
Culture Documents
CD =
24
NR
NR =
v S .d
4 (p ) d
4 (p ) d
vS2 = .g.
.
= .g.
.
.vs d
3
CD 3
24.
g ( p ) d 2
vS =
.
8
18
4 (p ) d
vS = .g.
.
CD
3
1
2
CD =
18.5
( N R ) 0.6
v sc = 4. g. s
.d
I t k
Intake
b
Inlet Channel
Inlet Channel:
h
s
.d
= 4. 9.81.
(2650 1000)
.(0.0025) = 0.805 m/s
1000
VH > Vsc
1 5L
1.5L
L
Inlet Channel
Sludge
b
B
Plan
a
0.25 m
H
h
h1
0 25 m
0.25
Hw
Elevation
0.25 m
Sludge
Inlet Channel
Baffle
Scum Remover
Settling Zone
Sludge
Effluent
Launder
Q = Flowrate
Vs = Q/(L.B) = Q/As;
In a rectangular sedimentation tank, the critical settling velocity is always numerically equal to the SOR
For a 20 m particle, Vs = 3.56 x 10-4 m s-1, i.e., SOR = 30.77 m3/m2/d
A PST is generally designed with SOR of 30-50 m3/m2/d
VH = Q/(B.D); VH < Vsc