P.W.

(Roads) Directorate
Schedule of Rates : 2008-2009

Section : 3
Consumption of Materials

CONSUMPTION OF MATERIALS
3.1

Consumptions for Plastering, Brickworks, Concreting etc.

Consumption of different materials of construction in the corresponding contract items of works shall
be computed on the basis of the quantities shown in Table: 3-1, subject to a variation of plus / minus
five percent. Where, however, the circumstances of work so require, the Engineer-in-charge shall be
competent to allow (for record reason) for a greater variation.
N.B. :- This statement is based on the following assumptions:
(1)
That dry sand with necessary allowance for bulking is used.
(2)
That the size of bricks shall be 9 x 4 x 2 .
(3)
Volume of 1 bag (50 Kg) cement = 0.035 m3

TABLE 3.1 1:

Sl.
No.

QUANTITIES OF MATERIALS REQUIRED FOR PLASTERING, BRICKWORK,


CONCRETING & OTHER ITEMS

Description of items

Unit

Sand
Cement
Sand
Cement
Sand
Cement
Sand
Cement
Sand
Cement
Sand
Cement
Brick
Cement
Sand
Brick
Cement
Sand
Brick
Cement
Sand
Stone
Cement
Sand
Stone
Cement
Sand
Stone
Cement
Sand

1.200 m3
428.6 kg
1.460 m3
657.1 kg
2.170 m3
778.6 kg
1.800 m3
428.6 kg
2.400 m3
571.4 kg
0.370 m3
174.3 kg
388 nos.
152.9 kg
0.320 m3
388 nos.
118.6 kg
0.330 m3
388 nos.
78.57 kg
0.330 m3
1.250 m3
128.6 kg
0.360 m3
1.250 m3
101.4 kg
0.374 m3
1.250 m3
92.9 kg
0.385 m3

m3

Stone
Cement
Sand

1.250 m3
107.1 kg
0.300 m3

m3

Stone
Cement
Sand

1.250 m3
89.1 kg
0.312 m3

10 mm cement plaster (4 : 1)

100 m2

15 mm cement plaster (4 : 1)

100 m2

20 mm cement plaster (4 : 1)

100 m2

15 mm cement plaster (6 : 1)

100 m2

20 mm cement plaster (6 : 1)

100 m2

Ruled pointing

100 m2

Brickwork in cement mortar (1 : 3)

m3

Brickwork in cement mortar (1 : 4)

m3

Brickwork in cement mortar (1 : 6)

m3

10

Random / Coursed / Rubble masonry in cement


mortar in road & jhora works (1 : 4)

m3

11

Random / Coursed / Rubble masonry in cement


mortar in road & jhora works (1 : 5)

m3

12

Random / Coursed / Rubble masonry in cement


mortar in road & jhora works (1 : 6)

m3

13

Square & coursed Rubble masonry in cement


mortar in road & jhora works (1 : 4)

14

Square & coursed Rubble masonry in cement


mortar in road & jhora works (1 : 5)

167

Quantities of materials required.

Section : 3
Consumption of Materials

P.W. (Roads) Directorate


Schedule of Rates : 2008-2009

Sl.
No.

Description of items

Unit

15

Square & coursed Rubble masonry in cement


mortar in road & jhora works (1 : 6)

m3

16

Nominal mix cement concrete (1 : 11/2 : 3)

m3

17

Nominal mix cement concrete (1 : 2 : 4)

m3

18

Nominal mix cement concrete (1 : 3 : 6)

m3

19

Nominal mix cement concrete (1 : 4 : 8)

m3

20
21
22
23
24
25

Neat cement punning


Single brick flat soling
Brick on edge flooring
75 mm wide brick on end edging
75 mm wide brick on edge edging
Boulder for pitching apron & sausage work

TABLE 3.1 2:

100 m2
100 m2
100 m2
100 m2
100 m2
m3

Quantities of materials required.


Stone
Cement
Sand
Stone chips (6 to 20 mm)
Cement
Sand
Stone chips (6 to 20 mm)
Cement
Sand
Stone chips (6 to 20 mm)
Cement
Sand
Stone chips (6 to 20 mm)
Cement
Sand
cement
Brick
Brick
Brick
Brick
Boulder

1.250 m3
76.4 kg
0.321 m3
0.860 m3
408.6 kg
0.430 m3
0.880 m3
314.3 kg
0.440 m3
0.940 m3
222.9 kg
0.470 m3
0.960 m3
171.4 kg
0.480 m3
217.1 kg
3228 nos.
5380 nos.
800 nos.
400 nos.
0.90 m3

QUANTITIES OF MATERIALS REQUIRED FOR DESIGN MIX CONCRETE


ITEMS

Concrete
grade

Coarse aggregates

M-15

0.9 m3/m3 of concrete

M-20

0.9 m3/m3 of concrete

M-25

0.9 m3/m3 of concrete


m3/m3

M-30

0.9

M-35

0.9 m3/m3 of concrete

Remarks

1. The quantities given in the table are only for


estimating purpose. The actual quantities,
however, shall be ascertained by proper Mix
Design.

of concrete

M-40

0.9 m3/m3 of concrete

M-45

0.9 m3/m3 of concrete

M-50

0.9 m3/m3 of concrete

M-55

0.9 m3/m3 of concrete

2. The coarse aggregates may be assumed to be a


mixture of 22.4 mm & 11.2 mm chips in a
proportion of 60: 40 by volume.

168

P.W.(Roads) Directorate
Schedule of Rates : 2008-2009

3.2

Section : 3
Consumption of Materials

Consumption of materials for Bituminous Works items

General Notes :
1.

Consumption of different materials of construction in the corresponding contract items of works


shall be computed on the basis of the quantities shown in the following sections, subject to a
variation of plus / minus five percent except for Bitumen/CRMB/Emulsion. The variation in
consumption of Bitumen/CRMB/Emulsion may be allowed upto plus/minus one percent.
Where, however, the circumstances of work so required, the Engineer-in-charge shall have the
authority to allow (with recorded reasons) for a greater variation.

2.

For open graded mixes, having no specific job mix formula, the quantities as shown in the
following tables shall be applicable. In case of any design mix, the consumption shall be guided
by the specific approved job mix formula and relevant provisions of SPECIFICATIONS FOR
ROAD AND BRIDGE WORKS published by MoRTH (4th Revision). However, for estimating
purposes, the following quantities may be considered for all cases.

Table : 3 2 :
Item No. vide
Section 4.7
3(a)
3(b)
4(a)
4(b)
4(c)
5(a)

Brief Description

Unit

Tack coat over granular


surface.
Tack coat over Bituminous
surface.
Primer coat.
(Low porosity)
-Do(Medium porosity)
-Do(High porosity)
Bituminous penetration
macadam
(50 mm thick)

m2
m2
m2
m2
m2

m2

5(b)

Bituminous penetration
macadam
(75 mm thick)
m2

169

Materials

Quantity

RS/ MS Type Bituminous


emulsion
- Do-

0.4 kg

SS/ MS Type Bituminous


emulsion
-Do-

0.75 kg

-Do-

1.35 kg

Bitumen (Packed/Bulk)

5.00 kg

Coarse aggregates:
26.5 mm chips (40%)
22.4 mm chips (47%)
11.2 mm chips (13%)

0.06 m3
0.0240 m3
0.0282 m3
0.0078 m3

Key aggregates:
13.2 mm chips (30%)
11.2 mm chips (60%)
5.6 mm chips / grit (8%)
Stone dust (2%)
Bitumen (Packed/Bulk)

0.015 m3
0.0045 m3
0.0090 m3
0.0012 m3
0.0003 m3
6.80 kg

Coarse aggregates:
37.5 mm ballast (20%)
26.5 mm chips (65%)
11.2 mm chips (15%)

0.09 m3
0.0180 m3
0.0585 m3
0.0135 m3

Key aggregates:
22.4 mm chips (25%)
13.2 mm chips (60%)

0.018 m3
0.0045 m3
0.0108 m3

0.3 kg

1.05 kg

Section : 3
Consumption of Materials

Item No. vide


Section 4.7

Brief Description

P.W. (Roads) Directorate


Schedule of Rates : 2008-2009

Unit

Built-up Spray Grout


(75 mm thick)

m2

7(A)

7(B) (a)

7(B) (b)

7(B) (c)

8(A)

8(B)(a)

Bituminous Macadam
(HMP) for Profile
Corrective course

Bituminous Macadam
(HMP) for Base / Binder
Course
(40 mm Thick)

Bituminous Macadam
(HMP) for Base / Binder
Course (50 mm Thick)

Bituminous Macadam
(HMP) for Base / Binder
Course (75 mm Thick)

Bituminous Macadam
(Mobile HMP) for Profile
Correcting Course.
Bituminous Macadam
(Mobile HMP) for Base /
Binder Course (40 mm
Thick)

m2

m2

170

Materials

Quantity

5.6 mm chips / grit (13%)


Stone dust (2%)
Bitumen (Packed/Bulk)

0.0023 m3
0.0004 m3
3.00 kg

Coarse aggregates:
26.5 mm chips (30%)
22.4 mm chips (60%)
13.2 mm chips (10%)

0.10m3
0.0300 m3
0.0600 m3
0.0100 m3

Key aggregates:
13.2 mm chips (40%)
11.2 mm chips (58%)
5.6 mm chips / grit (2%)
Bitumen (Packed/Bulk)

0.013 m3
0.0052 m3
0.0075 m3
0.0003 m3
66.00 kg

Aggregates
22.4 mm chips (25%)
11.2 mm chips (25%)
5.6 mm chips (35%)
Stone Dust (15%)
Bitumen (Packed/Bulk)

1.4152 m3
0.3538 m3
0.3538 m3
0.4953 m3
0.2123 m3
2.99 kg

Aggregates:
22.4 mm chips (25%)
11.2 mm chips (25%)
5.6 mm chips (35%)
Stone Dust (15%)
Bitumen (Packed/Bulk)

0.0567 m3
0.0142 m3
0.0142 m3
0.0198 m3
0.0085 m3
3.74 kg

Aggregates:
22.4 mm chips (25%)
11.2 mm chips (25%)
5.6 mm chips (35%)
Stone Dust (15%)
Bitumen (Packed/Bulk)

0.0708 m3
0.0177 m3
0.0177 m3
0.0248 m3
0.0106 m3
5.61 kg

0.1063 m3
Aggregates
22.4 mm chips (25%)
0.0266 m3
11.2 mm chips (25%)
0.0266 m3
5.6 mm chips (35%)
0.0372 m3
Stone Dust (15%)
0.0159 m3
Refer materials & quantity columns for item
no. 7(A)
Refer materials & quantity columns for item
no. 7(B )(a)

P.W.(Roads) Directorate
Schedule of Rates : 2008-2009

Item No. vide


Section 4.7
8(B)(b)

9(a)

Brief Description
Bituminous Macadam
(Mobile HMP) for Base /
Binder Course (50 mm
Thick)
Dense Bituminous
Macadam
(50 mm Thick)

Section : 3
Consumption of Materials

Unit

m2

Dense Bituminous
Macadam (75 mm Thick)

m2

10 & 11

12

13

14

15

16

20 mm thick open graded


Premixed Carpet

20 mm thick open graded


Premixed Carpet (with
Bitumen Emulsion)

12 mm thick Premixed
Carpet

12 mm thick Premixed
Carpet (with Bitumen
Emulsion)

6 mm thick Premixed
Carpet

Liquid Seal Coat


(Type A)

Quantity

Refer materials & quantity columns for item


no. 7(B)(b)

Bitumen (Packed/Bulk)

m2

9(b)

Materials

5.18 kg

Aggregates:
22.4 mm chips (20%)
13.2 mm chips (24%)
11.2 mm chips (10%)
5.6 mm chips (20%)
Stone Dust (24%)
Filler @ 2%
(Lime stone dust/cement)
Bitumen (Packed/Bulk)

0.0732m3
0.0144 m3
0.0173 m3
0.0072 m3
0.0144 m3
0.0173 m3
2.20 kg

Aggregates:
22.4 mm chips (20%)
13.2 mm chips (24%)
11.2 mm chips (10%)
5.6 mm chips (20%)
Stone Dust (24%)
Filler @ 2% (Lime stone
dust / cement)
Bitumen (Packed/Bulk)

0.1098 m3
0.022 m3
0.026 m3
0.011 m3
0.022 m3
0.026 m3
3.29 kg

13.2 mm chips
11.2 mm chips
Bituminous Emulsion
(MS Type)

0.0180 m3
0.0090 m3
2.15 kg

7.76 kg

1.46 kg

m2

m2

13.2 mm chips
11.2 mm chips
Bitumen (Packed/Bulk)

0.018 m3
0.009 m3
0.896 kg

11.2 mm chips
5.6 mm chips
Bituminous Emulsion
(MS Type)

0.01 m3
0.006 m3
1.28 kg

11.2 mm chips
5.6 mm chips
Bitumen (Packed/Bulk)

0.01 m3
0.006 m3
0.735 kg

5.6 mm chips
Medium sand
Bitumen (Packed/Bulk)
5.6 mm chips

0.008 m3
0.0025 m3
0.98 kg
0.009 m3

m2

m2
m2
171

Section : 3
Consumption of Materials

Item No. vide


Section 4.7
17

18
19

20(a)

Brief Description
Liquid Seal Coat
(Type A)
(with Bitumen Emulsion)
Premixed Seal Coat
(Type B)
Premixed Seal Coat
(Type B)
(with Bitumen Emulsion)
Mix Seal Surfacing
(Type-A) (by HMP)

P.W. (Roads) Directorate


Schedule of Rates : 2008-2009

Unit

Bituminous Emulsion

m2

Mix Seal Surfacing


(Type-B) (by HMP)

22 (a)

Mix Seal Surfacing


(Type-A and Type-B)
(by Mobile HMP)
Semi-dense Bituminous
Concrete
(25 mm Thick)

m2

Semi-dense Bituminous
Concrete
(40 mm Thick)
m2

23(a)

5.6 mm chips
Bitumen (Packed/Bulk)
Sand/grit
Bitumen (Packed/Bulk)

0.009 m3
0.68 kg
0.006 m3
1.05 kg

Sand/grit
Bitumen (Packed/Bulk)

0.006 m3
2.20 kg

Aggregates:
5.6 mm chips
Stone Dust
Bitumen (Packed/Bulk)

0.027 m3
0.02 m3
0.007 m3
1.90 kg

0.027 m3
Aggregates:
11.2 mm chips
0.0067 m3
5.6 mm chips
0.0162 m3
Stone Dust
0.0041 m3
Refer materials & quantity columns for
item no. 20(a) & 20(b)
Bitumen (Packed/Bulk)

m2

22 (b)

1.5 kg

m2

m2

21

Quantity

m2

m2

20(b)

Materials

Bituminous Concrete
(BC)
(25 mm Thick)
m2

172

2.875 kg

Aggregates:
11.2 mm chips(10%)
5.6 mm chips (60%)
Stone dust (28%)
Filler @ 2% (Lime stone
dust)
Bitumen (Packed/Bulk)

0.0364 m3
0.0036 m3
0.0218 m3
0.0102 m3
1.092 kg

Aggregates:
13.2 mm chips(10%)
11.2 mm chips(20%)
5.6 mm chips (40%)
Stone dust (28%) Filler
@ 2% (Lime stone dust)
Bitumen (Packed/Bulk)

0.0586 m3
0.0058 m3
0.0116 m3
0.0234 m3
0.0164 m3
1.75 kg
3.53 kg

Aggregates:
22.4 mm chips (5%)
13.2 mm chips (15%)
11.2 mm chips (20%)
5.6 mm chips (35%)
Stone dust (23%)
Filler @ 2% (Lime stone
dust)

0.0369 m3
0.0018 m3
0.0055 m3
0.0074 m3
0.0129 m3
0.0085 m3
1.11 kg

4.14 kg

P.W.(Roads) Directorate
Schedule of Rates : 2008-2009

Item No. vide


Section 4.7
23 (b)

Brief Description

Section : 3
Consumption of Materials

Unit

Bitumen (Packed/Bulk)

Bituminous Concrete
(BC)
(40 mm Thick)

m2

24

Mastic Asphalt
(25 mm thick)

m2

25(a)

25(b)

Repairing pot-holes (by


Concrete mixer / Mobile
HMP)
Repairing pot-holes
(Grouting method)

m3

Repairing pot-holes (with


bitumen emulsion)
m3

27(a)

27(b)

Pre-coating stone
aggregates

Repairing pot holes with


pre-coated stone
materials

22.4 mm chips (5%)


13.2 mm chips (15%)
11.2 mm chips (20%)
5.6 mm chips (35%)
Stone dust (23%) Filler @
2% (Lime stone dust)

0.003 m3
0.009 m3
0.0118 m3
0.0206 m3
0.0136 m3
1.77 kg

Bitumen (Packed/Bulk)
10/20
[For cold climatic
region(temperature <100 C,
use 30/40 grade bitumen]
Bitumen (Packed/Bulk)
60/70
Coarse aggregates:
5.6 mm chips (50%)
11.2 mm chips (50%)
Fine aggregates:
(Medium Sand/stone
dust/mixture of both)
Lime stone powder
13.2 mm chips
Bitumen (Packed / Bulk)
Coarse aggregates

173

6.35 kg

0.015 kg
0.0078 m3
0.0078 m3
0.011 m3

10.30 kg
0.0005 m3
54.00 kg
1.00 m3
70.00 kg

Coarse aggregates
11.2 mm chips / Bajree
(key aggregates)
Bitumen emulsion

1.0000 m3
0.100 m3

22.4 mm chips / Bajree


11.2 mm chips / Bajree

0.6000 m3
0.4000 m3

m3

5.65 kg
0.0591 m3

Bitumen (Packed / Bulk)


m

Quantity

Aggregates:

Bitumen (Packed / Bulk)


m3

26

Materials

Stone aggregates
(As specified)
Refer materials & quantity
columns for item no. 27(a)

70.7 kg

56.0 kg
1.0000 m3

Section : 3
Consumption of Materials

Item No. vide


Section 4.7
28 (a)
28 (b)

29
30 (a)

30 (b)

30 (c)

31

P.W. (Roads) Directorate


Schedule of Rates : 2008-2009

Brief Description

Unit

Surface Dressing (Single


coat/1st coat)
Surface Dressing (Second
coat)

m2

Spreading sand over


bituminous surface
Slurry Seal
(5 mm Thick)

Slurry Seal
(3 mm Thick)

Slurry Seal
(1.5 mm Thick)

Fog Spray
(Without blinding)

Materials

Quantity

Bitumen (Packed / Bulk)


13.2 mm chips / Bajree
Bitumen (Packed / Bulk)

1.20 kg
0.015 m3
1.00 kg

11.2 mm chips / Bajree


Sand

0.010 m3
0.3 m3

m2
100
m2
m2

m2

m2
m2

174

Bituminous emulsion

1.21 kg

Grit
Cement
Bituminous emulsion

0.0064 m3
0.220 kg
0.86 kg

Sand
Cement
Bituminous emulsion

0.0037 m3
0.132 kg
0.53 kg

Sand
Cement
Bituminous emulsion

0.0018 m3
0.066 kg
0.75 kg