Mhydraulically Operated Bush Bearing Puller: Diploma in Mechanical Engineering (Foundry)
Mhydraulically Operated Bush Bearing Puller: Diploma in Mechanical Engineering (Foundry)
PULLER
DIPLOMA
SUBMITTED BY:
1. G.K. MANIGANDAN
2. B. KARTHIKEYAN
3. P. BALASUBRAMANI
4. J. DHANAJEYAN
5. D. DURAIVEL
6. L. PRABHU
Under guidance of
Mr. V.K. RAJENDRAN,M.E.
OCTOBER 2007.
DEPARTMENT OF MECHANICAL ENGINEERING (FOUNDRY)
BONAFIDE CERTIFICATE
This is to certify that this Project work on
INTERNAL EXAMINER
PROJECT GUIDE
EXTERNAL EXAMINER
ACKNOWLEDGEMEN
T
ACKNOWLEDGEMENT
At the outset, we would like to emphasize our sincere thanks to the
Principal Mr. R. J. KUMAR, B.E., M.E., MISTE., Ph.D., encouragement
and valuable advice.
Ultimately, we extend our thanks to all who had rendered their cooperation for the success of the project.
CONTENTS
CONTENTS
Chapter No.
TITLE
1.
INTRODUCTION
2.
SYNOPSIS
3.
CONSTRUCTION
4.
WORKING PRINCIPLE
5.
DESCRIPTION OF PNEUMATIC
COMPONENTS
6.
7.
8.
9.
10.
11.
COST ESTIMATION
12.
CONCLUSION
13.
BIBILOGRAPHY
INTRODUCTION
INTRODUCTION
This is a self assessment test on the part of the students to assess his
competency in creativity.
During the course of study, the student is put on a sound theoretical
foundation of various mechanical engineering subjects and of course, to a
satisfactory extent. Opportunities are made available to him to work on
different kinds of machines, so that he is exposed to various kinds of
manufacturing process.
As a students learn more and more his hold on production technology
becomes stronger. He attains a stage of perfection, when he himself is able
to design and fabricate a device.
This is the project work. That is the testimony for the strenuous
training, which the student had in the institute. This assures that he is no
more a student, he is an engineer.
This report discuses the necessity of the project and various aspects of
planning , design, selection of materials, fabrication, erection, estimation and
testing.
SYNOPSIS
SYNOPSIS
A Hydraulically operated bush bearing puller is a device
which enables the single persons to operate it alone and removes
the bearing the from machine parts . No special skill is needed to
operate or remove the bush bearing form the machine parts. It can
widely used. It is easy to fit on the operate or remove the bearing
from the machine parts..
This device is worked by the principle of hydraulic lifting system to exert
the pulling power to remove the bearing from the machine blocks. This is
operated by hydraulic power without use of man power.
. As the bottom flange has a hole which is set below the bottom portion of
the bush bearing in the machine block, makes to provide grip for pulling
the bush bearing. Through this bottom flange hole a screw rod inserted . he
other end of the screw rod is connected to the top flange which is moving
towards upward direction by the action of hydraulic jack.
If we lift the jack, the top flange pulled the centre rod. So the centre rod
rises with bottom flange gradually with the liner. Thus the liner is removed.
CONSTRUCTION
CONSTRUCTION
HYDRAULIC JACK
A Hydraulic Jack is a device using Hydraulic Power in its simplest possible
shape shown in figure and consists of five fundamental components.
1. pump
2. reservoir
3. cylinder
4. suction valve and
5. delivery valve
WORKING PRINCPLE
WORKING
PRINCPLE
WORKING PRINCPLE
HYDRAULIC JACK
A Hydraulic Jack or for that matter any device using Hydraulic Power
in its simplest possible shape consists of five fundamental components.
A. The Hydraulic Reservoir storing the Hydraulic Oil (Oil is used as the
medium to transmit force and motion-such fluids are called Hydraulic
Oils) should be thoroughly clean, whether integrally built-in or used
as a separate tank.
Hydraulic Oil is pumped into the cylinder and as more and more oil is
forced into the cylinder pressure builds up and when enough oil is
forced into the cylinder the resultant pressure will cause the ram,
plunger or piston to move and consequently lift, press, push, pull or
bend any object any object as the case may be.
The Ram and Cylinder are also precision engineered and mostly fitted
with high quality seals which give it the necessary compression
holding capacity and prevent leakages.
1. The release valve is closed tightly to ensure flow of oil from the pump
to the cylinder only.
3. When the Pump Plunger is pressed down the Delivery Valve opens up
to allow the passage of oil from the pump into the cylinder, at the
same time the suction valve automatically closes to prevent oil
returning to the reservoir.
4. By repeating the above two operations successively more and more oil
is pumped into the cylinder resulting in the generation of pressure by
the action of the load being lifted.
APPLICATIONS
APPLICATIONS
ii)
ADVANTAGES
ADVANTAGES
MECHANICAL
SPARE PARTS
DIAGRAM
SAFTY,CARE AND
MAINTENANCE
Lifting any load calls for precise and safe jacking points. Jack should be
centrally loaded eccentric loading causes dangerous accidents and damages
beyond repair.
The world over prudent safety minded operators observe the flowing basic
safety rules :
A. To overpower the load, whether one or a dozen cylinders are used to lift
the load, the cylinder lifting capacity should be two times the weight of
the load. This allows for a reduction in the oil pressure, prevents strain
and possible break-down of the cylinder.
C. Never raise the hydraulic ram beyond the specified stroke (lift).
F. Never extend the hydraulic ram by means other than the pump.
H. Use safety lock nut type jacks for supporting load on jack for long
periods.
I. Use steel plates or heavy wooden sleepers where ground surface is soft
and yielding
J. Do not disturb the factory preset internal safety valve provided for
preventing overloading.
K. Do not load more than 50% of the rated head capacity on the toe (claw)
of toe lifting jacks.
Positioning the Jack
Jack should be centrally loaded, jack base and upper jacking point must be
in level.
Jack Storage
Retract ram completely, close oil filler, keep the Jack away in a safe clean
place.
Caution
Do not use the Jack beyond rated capacity and lift mentioned on the name
plate.
Air
Dos
venting is an
precaution
for
the
important Under
no
Donts
circumstances
the
fit
equipment.
Abuse of accessories
are
prevalent.
If
the
strainer
Every time the hydraulic hose is Do not use brake fluid as refill.
attached to the pump and the ram
cylinder assembly unit, it should be
thoroughly flushed.
Release
valve
to
be
pressure
open
release
PAINTING AND
FINISHING
JOB PREPARATION
Before welding, remove any bend in the L angle with the sludge
hammer on the anvil block. Then it is cut to the required length with the
hacksaw blade and fabricated to required dimensional shape with arc
welding.
After welding, any slag on the welded area is removed with the
chipping hammer and cleaned with the metal wire brush. Then all the
surfaces are rubbed with the emery sheet.
Metal primer is applied on the surfaces with the brush. After drying the
metal primer, the second coating is applied with the paint.
COST ESTIMATION
COST ESTIMATION
800,00
2. hydraulic jack
3800.00
600.00
5. Painting cost
200.00
6. transport cost
200.00
TOTAL COST
5600.00
CONCLUSION
CONCLUSION
We make this project entirely different from other projects. Since
concepts involved in our project is entirely different that a single unit is used
to various purposes, which is not developed by any of other team members.
By doing this project we gained the knowledge of fabrication work
and how the welding is doing and material selection for particular
components etc.,
It is concluded that any fabrication work can be done with the help of
welding.
We have successfully completed the project work on using welding
work at our Institute.
BIBLIOGRAPHY
BIBLIOGRAPHY
1. WORKSHOP TECHNOLOGY
-HAJRA CHOWDRY
2. PRODUCTION TECHNOLOGY
-R.S. KHURMI
-S.S.MANIAN
- R.K.JAIN
PHOTO VIEW
PHOTO VIEW