Professional Documents
Culture Documents
Cost Abstract
Cost Abstract
UNIT
QUANTITY
RATE
IN (Rs.)
AMOUNT
IN LACS
Hectare
6.0
41466.52
2.49
Hard Soil
Cum
70986.06
106.58
75.66
Ordinary Rock
Cum
10140.86
182.03
18.46
Cum
14197.20
303.77
43.13
Cum
6084.52
417.85
25.42
Extra lead for disposal of excavated material beyond 50m upto 1KM
Cum
41276.62
25.00
10.32
TOTAL
172.99
SITE CLEARANCE/GRUBBING:
1
PAVEMENTS:
3
Cum
17199.00
45.02
7.74
Cum
13815.90
1554.73
214.80
c)P/L of W.B.M-III
Cum
2898.22
2009.16
58.23
Sqm
38643.00
31.56
12.20
Cum
1932.15
5929.14
114.56
f) Tack Coat
Sqm
38643.00
9.37
3.62
g) 20MM O.G.P.C
Sqm
38643.00
117.12
45.26
Sqm
38643.00
40.86
15.79
i)Earthen Shoulders
Cum
77800.50
185.95
14.47
RM
1000.00
59.00
0.59
RM
11700.00
427.77
50.05
TOTAL
537.31
No
4.27
25.61
No
7.51
15.02
TOTAL
40.63
PROTECTION WORKS:
5
RM
1300
9280.76
120.65
a) Kilometer Stone
No
13
1631.40
0.21
b) Boundary Pillars
No
234
430.24
1.01
No
02
9189.74
0.18
d) PMGSY Logo
No
06
2500.00
0.15
e)Back Pillars
Km
11.70
20882.70
2.44
f) Reference Pillars
Km
11.70
5231.27
0.61
g) Job pillars
No
16
508.51
0.08
h) Citizen inf.Boards
No
18000.00
0.36
i) Project Preparation
Km
11.70
10000.00
1.17
j) Surveying Charges
Km
34000.00
2.04
TOTAL
8.25
90.00
10.00
Retaining/Breast Walls
ROAD FURNITURE:
6
MISCELLANEOUS:
7
Cum
11115.00
G.TOTAL
MAINTENANCE COST:
IST YEAR @ 0.45% =3.17 LACS
2ND YEAR @ 0.75% = 5.28 LACS
3RD YEAR @ 1.05 % = 7.39 LACS
4TH YEAR @ 1.25% = 8.79 LACS
5TH YEAR @ 1.65% = 11.61LACS
Executive Engineer
892.32