Primary Job :
FIELD :
BANGKO
WELL :
DATE :
19-Aug-15
NUMBER :
SEQUENCE JOB
1265
PBTD:
Max Inc-BUR-KOP
1.
2.
3.
TD :
BO067 # O-W1-22
BNKO0006720150819LOG05
Swab
Water Shut Off
1900
Last WFL/FAP
Present
Proposed
Last Pump
Remarks
Normal
Normal
Priority :
:
:
:
:
:
:
Charge To:
ON
2500CP112012
1 days
POT
:
0 BOEPD
: $ 3,500
0
:
Review
Oil Gain
0/302 MCFD/0% WC @1 August 2015
Cost
Field Rev
=
=
=
=
=
=
=
500
psi
110
psi
3000
psi
Gas/Condensate/Water
none
ppg
120
deg. F
240'-242'
Procedure Rig
1 Check master valves, swab valves, and wing valve before MIRU. Report to WSM.
2 MIRU. N/U Lubricator & BOPE and test.
3 RIH with dummy tool to PBTD. Move up and down along packer and
seal locator assy.
4 POOH with dummy tool.
5 RIH with pressure equipment to 448 ft.
6 Record flowing BHP for 60 minutes
7 Record flowing BHP for 60 minutes and gas rate as well (Please coordinate with
Operations to do gas rate measurement with DP meter).
8 Record pressure at the following depths :
- 50' interval for every 10 minutes from 448' to 200'.
9 POH w/ pressure equiptment
10 N/D Lubricator & BOPE. RDMO.
11 Open master valve and POP.
275'-277'
370'-372'
Petani sand
Arr Pkr @ 448'
530'-550'
Cmt Cup @ 1265'
TOS @ 1274'
LSP @ 1297'
Telisa 1480'sd
1516'-1528'
1528'-1543'
Duri 1600'sd
1656'-1688'
Duri 1680'sd
1728'-1736'
1736'-1747'
1760'-1780'
Justification
> Bangko #67 is a vertical gas poducer and status is ON
> Last test on 1 August-2015 was 302 MCFD.
> We propose to run SBHP survey for this well.
> The information obtained will be used to update bottom hole pressure to calculate P/Z
to estimate RR and to recognize if any liquid loading formed in the wellbore.
Surf. Casing
Int. Casing1
Prod Casing
Liner
Tubing
:
: 7 in - lb/ft, - J-55 - Prod. Csg @1898 ft
: : 3.5 in - BadData - Tubing Set @437 ft
CCL
PREPARED BY :
Petroleum Engineer
DMS/ARF/RH/JWID
(on weekdays)
(on weekdays)
(on weekend)
APPROVED BY:
Earth Scientist
Team Manager
KTB