Professional Documents
Culture Documents
Overcoming The Challenges of Systems Engineering at NGA
Overcoming The Challenges of Systems Engineering at NGA
Our Mission
2
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Background
• NGA is a Combat and Intelligence Support Agency
– We serve many masters
• Secretary of Defense
• Director of National Intelligence
• Director of Central Intelligence
• Acquisition workforce does not come from an
acquisition culture
• A lot of challenges being successfully overcome
NGA
NGAhas
hasbeen
beenimproving
improvingSE
SEand
andAcquisition
Acquisition
Management
Managementoverall
overallsince
sinceJan
Jan2000
2000
3
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Disclaimer
5
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Technology, Organizations
Tools, & and
Training People
Processes
and
Practices
6
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
STAFF OFFICES
Director (D)
FIA Joint Management
Component Acquisition Executive NRO NGA
Office Support Team
Dr. Art Decker
Director
DD
Deputy Director (DD) Deputy Director
Chief of Staff Dr. Keith E. Littlefield
Staff Officer / Tasking Office Staff Officer Staff Officer Staff Officer / HR Staff Staff Officer / Comp Tech Support
LINE OFFICES
A c q u is it io n E n g in e e r i n g
P la n n in g a n d R e q u ir e m e n t s a n d A r c h it e c t u re S y s te m C h ie f S y s t e m s G eoScout F IA N S G
A n a ly s is C u s to m e r In te rfa c e E n g in e e r in g In te g r ity E n g in e e r in g P la n n i n g P r o je c t O f f ic e
10
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
• Maturing SE competencies
– Strong training program
– Infusion of external SE and Acquisition
Management expertise
– Support from external SE & SI support
• Enterprise Engineering Contract (SE)
• GeoScout Contract (SI)
• MITRE
– Apply standard processes
13
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Legacy O&S
Ops &
•Operational Baseline •Hardware Maint
•System Operations
•Enterprise Services
•License Mgmt
•Inventory Mgmt
Contract(s)
Sustainment •Software Admin •Maintain NPE / ITF
(NJVC)
14
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Tools
Acquisition Management Professional Advisory Board
15
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Training
Growing SE Capabilities
• Systems Engineering Graduate Certificate Program
– ½ Master Degree through The George Washington Univ and University
of Missouri-Rolla
– 2 year program; 6 courses; 1 course/semester; on-site
– 76 graduates since Jan 01
– 54* students currently enrolled
• Systems Engineering Masters Completion Program
– Completes academic requirements for MSSE
– 2 year program; 6 courses; 1 course/semester; on-site
– 18 students to graduate Apr 05
• Continuing Education (Long-term Full Time Training)
– 3 Doctor of Science Engineering Management
– 3 Masters in Systems Engineering
Training
Growing SE Capabilities (con’t)
• Defense Acquisition Workforce Improvement Act
– Certification (System Planning, Research, Development and Engineering;
Program Management, Test & Evaluation, Logistics, others)
– Competency improvement
• Leadership Development Program
– “Prepare participants as potential, future leaders with the
knowledge and skills that are required and desirable in moving
forward and upward in career pursuits”
– Mid & Senior levels (GS13-15/Bands 4-5)
• Shadowing and Mentoring Programs
• Long Term Full Time Training
• Ad-hoc Training
• On-the-Job Training
17
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Technology
Information Management
Documented, repeatable
processes that achieve
predictable results
19
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
20
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
2003 - 2009
Processes and Practices Configuration Mgmt
Process Migration Contract Management
Outsourcing
Project Management
Quality Assurance
2000 - 2003 Readiness**
Risk Management
Contract Management (3) System Evaluation
Configuration Mgmt (3) Transition
Needs (3) Alternatives
Outsourcing (3) Architecture
Project Management (2)* Design
Quality Assurance (1)* Information Mgmt
Readiness** Integrated Teaming
Requirements (3) Integration
Risk Management (3) Measurement
System Evaluation (3) Needs
Transition (3) Peer Review
Process Definition
Process (Appraised Level) Process Improvements
Requirements
Strategic Planning
System Security*
Process not sufficiently institutionalized for Level 3
Process not in FAA-iCMM
Tech Insertion
Where it makes good business sense Training 21
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
Life Cycle Processes From All To All
Risk
Management Processes Management
Support Processes
Additional Processes Project Pre Award &
Management Contracting
System
Security
Enterprise
Strategic Needs &
Planning Requirements From All
Enterprise Alternative
Architecture Modeling & Training
Simulation
To All
Process Technology
Information Integration
Definition Insertion
Management
Configuration
CM, TX Management
Test &
Readiness
Evaluation
Process
Transition
Improvement
To All
PM
Quality Peer Review
Assurance
Measurement
Draft 6/4/04
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Project
Drafts, Tailors & Implements Processes
All
Allmaterials
materialsmaintained
maintainedin in
Process
Process Asset
Asset Library
Library
23
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Process Application
• Overlays ‘expanded’ Mil-Std 499B SE model
• Mandatory for all program offices (PO)
– Implemented as processes completed
– Training provided by process teams
– Process ‘artifacts’ expected by acquisition leadership
• Processes not put on contracts, but
– Contractors need to help fulfill PO’s responsibilities
– Most/all contractors have supporting processes
• Being expanded across agency
Much
Muchlonger
longer story
storyneeding
needing
much
muchmore
moretime
time 24
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Lessons Learned
25
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way
NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY
Lessons Learned
Point of Contact
27
INCOSE Washington Metro Area Meeting 8 March 2005 Approved for Public Release/ 05-116 Know the Earth…Show the Way