Professional Documents
Culture Documents
3 Machine Foundation Design - Considering Water Table at 4.5 M Below GL
3 Machine Foundation Design - Considering Water Table at 4.5 M Below GL
X/Y
MSY =
MSZ =
Dmi =
Hmi =
xmi =
ymi =
zmi =
Dmo =
xmo =
ymo =
zmo =
TZ =
Tx,y =
T,x =
T,y =
T =
z =
,X =
,Y =
,Y =
X,Y =
Note :
Here the foundation along with soil resting over it, mill & motor are refer
ulation:
foundation is resting
vibration
es of vibration
vibration
vibration
f vibration
x direction
y direction
z direction
solid cylinder.
olid cylinder.
g mode of vibration
g mode of vibration
20
T/m2
qGROSS =
33.1
T/m2
SHEAR MODULUS (G) OF SOIL AT CORRESPONDING DEPTH (BELOW FOOTING) :ELASTIC MODULUS, E =
45.20
Mpa
POISION'S RATIO, =
0.45
Gsoil =
15.59
Mpa
soil =
1.835
kNS2/m4
DENSITY OF CONCRETE:CONC. =
0.245
9.450
TS2/m4
m
2.37
Kg/cm3
Cu =
3.856
Kg/cm3
C =
1.928
Kg/cm3
C =
7.711
Kg/cm3
C =
2.892
90
23
996
1.00
Kg/cm3
RPM
RPM
RPM
m
SOIL PROPERTY:
Cu test=
-4.500
M LVL.
DESCRIPTION
AA
BB
CC
DD
EE
FF
GG
HH
II
JJ
KK
LL
MM
NN
OO
PP
QQ
RR
SS
TT
UU/Base Raft
VV
WW
SOIL
-
EFFECTIVE
VOLUMN
m3
VX*
VY*
VZ*
X*
Y*
Z*
17.05
1.84
4.41
3.25
31.30
75.23
55.42
6.86
13.73
6.86
15.93
17.05
1.26
6.87
1.87
1.26
6.87
86.71
6.87
1.26
1.87
6.87
1.26
21.68
73.76
21.68
74.66
1.25
1.25
0.00
0.00
3.34
4.50
5.09
4.50
7.17
0.25
1.16
0.37
0.25
1.16
4.50
7.84
8.76
8.64
7.84
8.76
2.07
4.50
6.94
4.62
1.08
7.93
0.00
0.00
5.09
5.67
5.09
4.00
4.41
3.00
2.91
1.75
0.50
0.58
1.75
2.91
3.00
1.75
0.58
0.50
-1.03
-2.93
-1.03
1.04
1.75
1.75
0.00
0.00
3.25
3.25
3.25
3.25
3.25
3.25
3.25
1.63
3.25
3.25
3.25
3.25
3.25
1.63
3.25
3.25
3.25
3.25
3.25
0.50
1.63
1.63
0.00
0.00
22.90
61.82
34.92
71.76
122.31
0.31
8.00
0.70
0.31
8.00
390.60
53.87
11.00
16.13
53.87
11.00
44.86
332.22
150.42
344.62
1.35
9.91
0.00
0.00
34.92
77.78
34.92
63.72
75.23
3.76
19.99
3.26
0.63
4.00
151.49
19.99
3.76
3.26
4.00
0.63
-22.43
-215.90
-22.43
77.75
2.18
2.18
0.00
0.00
22.30
44.61
22.30
51.78
55.42
4.08
22.32
3.03
4.08
22.32
281.82
22.32
4.08
3.03
22.32
4.08
70.45
239.72
70.45
37.33
2.03
2.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MASS (TS2/M)
FOUNDATION
MIIL
MOTOR
-
96.56
33.64
1.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
MX'
MY'
MZ'
436.00
151.51
5.97
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
97.36
0.00
-6.46
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
261.12
317.89
8.55
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
eX =
eY =
0.00
0.03
m
i.e
%
0.32
2.42
m
i.e
%
IN Z DIRECTION THE C.G OF TOTAL LOAADS IS BELOW THE TOP OF FOUNDATION, HENCE OK.
C.G OF BASE RAFT =
4.62
X1 =
m
1.04
Y1 =
m
PROPERTY OF FOUNDATION :
AREA OF BASE, Ab =
74.66
m2
Tm
MSY =
Tm
MSZ =
Tm
33.64
TS2/M
xmi =
153.48
TS2M
ymi =
153.48
TS2M
zmi =
105.12
TS2M
MOTOR
Dmo =
1.20
1.33
TS2/M
xmo =
0.76
TS2M
ymo =
0.12
TS2M
zmo =
0.12
TS2M
DESCRIPTION
MASS (M)
(TS2/M)
FOUNDATION
MILL
MOTOR
1
2
3
4
5
6
7
96.56
33.64
1.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
DISTANCE OF C.G
X'
4.52
4.50
4.50
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Y'
1.01
0.00
-4.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Z'
2.70
9.45
6.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
X'
Y'
Z'
1406.63
1004.74
47.03
0.00
0.00
0.00
0.00
0.00
0.00
0.00
972.59
988.68
5.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1316.47
121.19
41.17
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.87
r0,X,Y =
4.87
r0,,X =
5.33
r0,,Y =
4.77
r0, =
5.07
3.00
0.45
15.59
m
Mpa
kz =
kx,y =
k,x =
k,y =
k =
2878364.9
kN/m
393306.1
kN/m
11433.2
kN/m/rad.
8208.7
kN/m/rad.
10851.6
kN/m/rad.
MASS RATIOS :
BZ =
0.85
BX,Y =
1.20
B,X =
1.07
B,Y =
2.09
B =
2.40
DAMPING RATIOS :
TOTAL DAMPING
Z =
0.46
TZ =
0.51
x,y =
0.26
Tx,y =
0.31
,x =
0.07
T,x =
0.12
,y =
0.03
T,y =
0.08
0.09
T =
0.14
=
INTERNAL DAMPING DUE TO MATERIAL =
0.05
CALCULATION OF NATURAL FREQUECY OF THE SYSTEM FOR DIFFERENT MODES BY ELASTIC-HALF-SPACE ANALOG :
VERTICAL MODE OF VIBRATION
46.78
446.72 RPM
z =
sec-1
Imposed Frequency =
90.00
RPM
HENCE OK
SO THE FOUNDATION IS HIGHLY TUNED
0.53
996.00
0.42
996.00
0.86
Imposed Frequency =
23.00
17.29
Imposed Frequency =
996.00
sec-1 =
RPM
sec-1 =
RPM
sec-1 =
RPM
sec-1 =
RPM
X,Y =
17.29
sec-1
5.04
RPM
HENCE OK
4.04
RPM
HENCE OK
8.18
RPM
HENCE OK
165.13
HENCE OK
RPM
,X =
0.53
sec-1
A1 =
A2 =
COUPLED1 =
499.61
139.07
499.33
sec-1 =
4768.28
RPM
COUPLED1 =
0.28
996.00
sec-1 =
RPM
2.66
RPM
Imposed Frequency =
HENCE OK
X,Y =
17.29
sec-1
,X =
0.86
sec-1
A1 =
A2 =
COUPLED1 =
699.85
512.29
699.12
sec-1 =
6676.09
RPM
COUPLED1 =
0.73
996.00
sec-1 =
RPM
7.00
RPM
Imposed Frequency =
HENCE OK
1
(assumed)
26108.815 N
0.31
(Ref. BVT report)
0.025
OK
(Ref. page no. 20 of IS 2974, Part I - 1982)
T/m2
C NO - Q915516-00-4en-revH )
96.56
Z'
2.70
Y'
1.01
4.52
X'
MASS OF FOUNDATION
(TS2/M)
AREA (m2)
MX
MY
MZ
58.37
40.00
81.80
31.57
80.10
31.57
42.95
58.37
1.83
9.71
0.99
0.70
3.93
75.28
9.71
1.83
0.99
3.93
0.70
35.50
366.81
35.50
245.18
0.63
0.63
0.00
0.00
5.95
8.96
4.17
11.72
39.50
6.21
22.48
8.45
6.21
22.48
95.89
22.24
6.15
8.37
22.24
6.15
45.10
47.62
44.52
190.03
4.02
3.98
0.00
0.00
30.86
75.72
29.08
39.19
81.30
6.82
25.52
8.26
5.69
19.73
86.93
25.28
6.77
8.18
19.49
5.63
59.54
342.77
58.96
281.56
3.86
3.82
0.00
0.00
By
3.79
2.753
2.753
1.53
3.05
1.53
3.54
3.79
0.28
1.53
0.75
0.28
1.53
19.27
1.53
0.28
0.75
1.53
0.28
4.82
16.39
4.82
74.66
1.00
1.00
0.00
0.00
1.751
3.502
1.751
3.502
2.753
0.747
1.747
0.747
0.747
1.747
5.515
1.747
0.747
0.747
1.747
0.747
3.104
2.800
3.104
0.000
1.000
1.000
0.00
0.000
1.742
1.742
1.742
1.011
2.753
0.747
1.747
2.000
0.747
1.747
3.494
1.747
0.747
2.000
1.747
0.747
3.104
5.854
3.104
0.000
2.000
2.000
0.00
0.000
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
MASS OF SYSTEM
(TS2/M)
131.53
4.47
0.69
4.51
HENCE OK
HENCE OK
DATION, HENCE OK.
9.01
Y DIRECTION,L =
12.10
SX
SY
SZ
1478.84
4103.60
4591.36
1478.84
y= Y/SY
0.43
x=
x/SX
0.60
1966.59
2458.40
TOTAL DAMPING
0.51
0.31
0.12
0.08
0.14
PACE ANALOG :
Part I - 1982)
s (m) of section
Hz
4.500
4.500
4.500
4.500
4.500
4.500
4.500
4.500
1.250
4.500
4.500
4.500
4.500
4.500
1.250
4.500
4.500
4.500
4.500
4.500
0.000
1.250
1.250
0.00
0.000
0.000
0.000
0.000
0.000
0.000
DEPTH
74.7
M2
SECTION DIMENSIONS
ax
by
2.75
2.75
3.50
6.25
2.75
2.75
2.75
3.49
2.75
3.49
3.10
3.10
3.10
3.10
2.80
5.83
SECTION
NAME
1
Mass
0.93
AREA
3.79
21.88
3.79
9.62
9.62
4.82
4.82
16.33
2
3
4
5
6
7
8
5.35
0.93
2.35
2.35
1.18
1.18
4.00
41.05
10.99
3.76
3.76
5.81
5.81
74.26
5.98
6.53
26.37
23.07
8.37
20.15
2.99
46.14
25.84
29.74
26.44
18.94
30.72
76.58
156.43
101.11
281.35
for section UU
A*X
6.96
98.53
27.18
13.24
73.39
9.97
41.79
73.56
A*Y
16.71
68.33
16.71
16.79
16.79
-4.98
-4.98
-47.63
A*Z
1.89
10.94
1.89
4.81
4.81
2.41
2.41
8.17
I
X
1.60
71.15
1.60
9.78
9.78
2.58
2.58
46.31
Y
1.60
22.36
1.60
6.07
6.07
2.58
2.58
10.67
3
4
5
6
7
8
MOMENT OF INERTIA OF
FULL RAFT =
44.61
14.56
14.56
23.34
23.34
302.16
26.36
106.99
93.51
33.82
81.96
10.88
633.17
407.06
322
16.1
4.504
1.747
26
4.504
3.128
4.62
m
1.04
m
1638.28 T
4.51
m
0.94
m
0.11
0.10
T
T
m
m
T
m
m
m
m
170.61
172.98
88.55
Tm
Tm
Tm
74.66
m2
ZX =
90.37719 m3
ZY =
104.6558 m3
T/m2
T/m2
26.3
Pmin =
T/m2
17.6
FOR STATIC CHECK
TOTAL DEAD WEIGHT OF THE SYSTEM =
1290.28
ECCENTRECITY OF CG OF LOAD ABOUT X AXIS =
4.51
ECCENTRECITY OF CG OF LOAD ABOUT Y AXIS =
0.69
T/m2
m
m
4.62
1.04
T
m
m
0.10
0.35
m
m
452.06
133.98
Tm
Tm
74.66
m2
ZX =
90.37719 m3
ZY =
104.6558 m3
T/m2
23.6
T/m2
Pmin =
11.0
T/m2
T/m2
REINFORCEMENT CALCULATION
16
DIA BARS
400
mm C/C
OR,=
29.59
OK
Kg/m3
PROVIDE
16
DIA BARS
200
mm C/C
SURE
REMARKS
OK
OK
OK
OK
REMARKS
OK
OK
OK
OK
TION
Kg/m3
OF IS 2974 PART 4, CLAUSE 7.6)
(internally in each direction)
n reinforcement.