Professional Documents
Culture Documents
HACCP02
20:
0205/20/20 :
..........................
HACCP02 :
0 02
0205/20/20 :
20:
.0
( )
()
.% 6
( . ) 5002/8314
.0 :
.
.3 :
.4
.
.5 :
.
.6
:
/ ()
.
.2 :
.8
.9
OPP, Met 50 80
( 6 35) ( )
() ( UV varnish or gloss
)lamination ( ) .
.02 :
.00:
HACCP02 :
02 3
0205/20/20 :
20:
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Manual
weighing Choco
Rice and Choco
Pops
Manual
weighing of
Sugar Syrup
ingredients
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Conch
(Temp.45-48C,
Time3-4 hr.)
Transfer
through pips
Transfer by
bucket elevator
Transfer
through pips
End
Transportation
to the customer
Mixing of Sugar
Syrup
ingredients for
10min.
Manual
weighing of
Chocolate
ingredients
transversal
cutting
Scrap
(Bar length 8595mm)
Coating with
chocolate
(Temp. 90 F)
Warehouse
(cool and dry
place away
from direct sun
light).
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp. (25-80C)
Scrap
longitudinal
splitting
Compression
Cooling tunnel
drum
Conveyor at 10-12C with
belt
(thickness 12Speed 1.517mm)
1.7m/min.
Cooling tunnel at
10-12C with Speed
1.5-1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
Feeding belt Conveyor
metal detector
belt
- sorting
CCP (metal detection)
Fe 1.2mm, Non Fe 1.5mm and SS
2mm
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
4 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
%6
Rework
Scrap
PRP
PRP
()GMP.GHP
OPRP
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
%6
PRP
HACCP02 :
02 5
0205/20/20 :
20:
Canu Coconut Bar .00.0
.00.0.0
Start
No
Storing Raw material
according to
manufacturer
instructions
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Mixing of (Corn
syrup, Fructose,
glycerin) for
10min.
Chocolate
Preparation
Manual
weighing Crisp
Rice, Pops and
Coconut
Conch
(Temp.45-48C,
Time3-4 hr.)
Transfer
through pips
Transfer
through pips
Feeding tank
with stirrer at
60C5
Mixing syrup
with dry
ingredients in
Transfer by
contmixer
screw elevator
End
Transportation
to the customer
Mixing in
Blender No(1)
for 10 min.
Cooking at 112-118
for 20-25min.
Brix 80-85%
Manual
weighing
Chocolate
ingredients
Scrap
transversal
cutting
(Bar length 8595mm)
Coating with
chocolate
(Temp. 90 F)
Warehouse
(cool and dry
place away
from direct sun
light).
Hand palette
to warehouse
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp. (25-80C)
Scrap
longitudinal
splitting
Compression
Cooling tunnel
Conveyor at 10-12C with
drum
belt
(thickness 12Speed 1.517mm)
1.7m/min.
Cooling tunnel at
10-12C with Speed
1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
Feeding belt Conveyor
metal detector
belt
- sorting
CCP (metal detection)
Fe 1.2mm, Non Fe 1.5mm and SS
2mm
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
6 02
1..1111
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
%6
Rework
Scrap
PRP
PRP
()GMP.GHP
OPRP
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
%6
PRP
HACCP02 :
02 2
0205/20/20 :
20:
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Manual
weighing of
Sugar Syrup
ingredients
Manual
weighing Choco
Flakes
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Conch
(Temp.45-48C,
Time3-4 hr.)
Transfer
through pips
Transfer by
bucket elevator
Transfer
through pips
End
Transportation
to the customer
Mixing of Sugar
Syrup
ingredients for
10min.
Manual
weighing of
Hazelnut Cream
ingredients
Scrap
transversal
cutting
(Bar length 8595mm)
Warehouse
(cool and dry
place away
from direct sun
light).
Coating with
chocolate
(Temp. 90 F)
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp. (25-80C)
Scrap
longitudinal
splitting
Compression
Cooling tunnel
drum
Conveyor at 10-12C with
belt
(thickness 12Speed 1.517mm)
1.7m/min.
Cooling tunnel at
10-12C with Speed
1.5-1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
Feeding belt Conveyor
metal detector
belt
- sorting
CCP (metal detection)
Fe 1.2mm, Non Fe 1.5mm and SS 2mm
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
8 02
0205/20/20 :
20:
HACCP02 :
9 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
PRP
PRP
()GMP.GHP
Rework
Scrap
%6
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
PRP
OPRP
%6
HACCP02 :
02 02
0205/20/20 :
20:
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Manual
weighing of
Sugar Syrup
ingredients
Manual
weighing Choco
Scoops
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Conch
(Temp.45-48C,
Time3-4 hr.)
Transfer
through pips
Transfer by
bucket elevator
Transfer
through pips
End
Transportation
to the customer
Mixing of Sugar
Syrup
ingredients for
10min.
Manual
weighing of
White Cream
ingredients
transversal
cutting
Scrap
(Bar length 8595mm)
Warehouse
(cool and dry
place away
from direct sun
light).
Coating with
chocolate
(Temp. 90 F)
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp.(25-80C)
Scrap
longitudinal
splitting
Compression
Cooling tunnel
drum
Conveyor at 10-12C with
belt
(thickness 12Speed 1.517mm)
1.7m/min.
Cooling tunnel at
10-12C with Speed
1.5- 1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
Feeding belt Conveyor
metal detector
belt
- sorting
CCP (metal detection)
Fe 1.2mm, Non Fe 1.5mm and SS 2mm
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
00 02
0205/20/20 :
20:
HACCP02 :
00 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
PRP
PRP
()GMP.GHP
Rework
Scrap
%6
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
PRP
OPRP
%6
HACCP02 :
02 03
0205/20/20 :
20:
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Manual
weighing of
Sugar Syrup
ingredients
Manual
weighing corn
Flakes
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Conch
(Temp.45-48C,
Time3-4 hr.)
Transfer
through pips
Transfer by
bucket elevator
Transfer
through pips
End
Transportation
to the customer
Mixing of Sugar
Syrup
ingredients for
10min.
Manual
weighing of
Yogurt Cream
ingredients
transversal
cutting
Scrap
(Bar length 8595mm)
Warehouse
(cool and dry
place away
from direct sun
light).
Coating with
chocolate
(Temp. 90 F)
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp. (25C)
Scrap
longitudinal
splitting
Compression
Cooling tunnel
drum
Conveyor at 10-12C with
belt
(thickness 12Speed 1.517mm)
1.7m/min.
Cooling tunnel at
10-12C with Speed
1.5- 1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
Feeding belt Conveyor
metal detector
belt
- sorting
CCP (metal detection)
Fe 1.2 mm, Non Fe 1.5mm and SS 2mm
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
04 02
0205/20/20 :
20:
HACCP02 :
05 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
PRP
PRP
()GMP.GHP
Rework
Scrap
%6
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
PRP
OPRP
%6
HACCP02 :
02 06
0205/20/20 :
20:
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Manual
weighing
Granola and
Soy Protein
Manual
weighing of
Sugar Syrup
ingredients
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Conch
(Temp.45-48C,
Time3-4 hr.)
Transfer
through pips
Transfer by
bucket elevator
Transfer
through pips
End
Transportation
to the customer
Mixing of Sugar
Syrup
ingredients for
10min.
Manual
weighing of
Hazelnut Cream
ingredients
Scrap
transversal
cutting
(Bar length 8595mm)
Warehouse
(cool and dry
place away
from direct sun
light).
Coating with
chocolate
(Temp. 90 F)
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp. (2580C)
Scrap
longitudinal
splitting
Compression
Cooling tunnel
drum
Conveyor at 10-12C with
belt
(thickness 12Speed 1.51.7m/
17mm)
min.
Cooling tunnel at
10-12C with Speed
1.5-1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
Feeding belt Conveyor
metal detector
belt
- sorting
CCP (metal detection)
Fe 1.2mm, Non Fe 1.5mm and SS 2mm
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
02 02
0205/20/20 :
20:
HACCP02 :
08 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
PRP
PRP
()GMP.GHP
Rework
Scrap
OPRP
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
%6
%6
PRP
HACCP02 :
02 09
0205/20/20 :
20:
Yes
Laboratory
testing
Acceptance
Visual
inspection
Raw Material
Receiving
Manual
weighing of
Sugar Syrup
ingredients
Mixing of Sugar
Syrup
ingredients for
10min.
Transfer
through pips
End
Transfer by
bucket elevator
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Gravity
Sheet making
drums
Temp. (2580C)
Scrap
longitudinal
splitting
Cooling tunnel at
Compression
10-12C with
drum
Conveyor Speed 1.5-1.7m/
belt
(thickness 12min.
17mm)
CCP (6% Max. of
moisture content)
Transportation
to the customer
Automatic
packaging
machine
Warehouse
(cool and dry
place away
from direct sun
light).
Automatic
Placing the
packed bars
into boxes
Manually
Placing the
packs into
carton and
sealing
HACCP02 :
02 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
PRP
PRP
()GMP.GHP
CCP
PRP
CCP
PRP
PRP
Rework
Scrap
%6
FIFO
OPRP
OPRP
PRP
PRP
PRP
HACCP02 :
02 00
0205/20/20 :
20:
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Manual
weighing of
Sugar Syrup
ingredients
Manual
weighing corn
Flakes
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Conch
(Temp.45-48C,
Time3-4 hr.)
Transfer
through pips
Transfer by
bucket elevator
Transfer
through pips
End
Transportation
to the customer
Mixing of Sugar
Syrup
ingredients for
10min.
Manual
weighing of
Yogurt Cream
ingredients
transversal
cutting
Scrap
(Bar length 8595mm)
Warehouse
(cool and dry
place away
from direct sun
light).
Coating with
chocolate
(Temp. 90 F)
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp. (2580C)
Adding
Dehydrated
Strawberry
pieces
Scrap
longitudinal
splitting
Compression
Cooling tunnel
drum
Conveyor at 10-12C with
belt
(thickness 12Speed 1.517mm)
1.7m/min.
Cooling tunnel at
10-12C with Speed
1.5- 1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
Feeding belt Conveyor
metal detector
belt
- sorting
CCP (metal detection)
Fe 1.2mm, Non Fe 1.5mm and SS 2mm
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
00 02
0205/20/20 :
20:
HACCP02 :
03 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
PRP
PRP
()GMP.GHP
Rework
Scrap
OPRP
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
%6
%6
PRP
HACCP02 :
02 04
0205/20/20 :
20:
.00.9
.00.9.0
Start
No
Storing Raw material
according to
manufacturer
instructions
Yes
Acceptance
Laboratory
testing
Visual
inspection
Raw Material
Receiving
Mixing of Sugar
Syrup
ingredients for
10min.
Conch
(Temp.45-48C,
Time3-4 hr.)
Mixing in
Blender No(1)
for 10 min.
Mixing syrup
Feeding tank
with dry
Transfer by
with stirrer at
screw elevator ingredients in
60C5
contmixer
Transfer
through pips
Transfer
through pips
Scrap
End
Transportation
to the customer
Transfer by
bucket elevator
Manual
weighing of
Coating
Chocolate
ingredients
Manual
weighing Crisp
Rice, Whey
powder, Soy
Protein and
Dried Dates
Manual
weighing of
Sugar Syrup
ingredients
transversal
cutting
(Bar length 8595mm)
Warehouse
(cool and dry
place away
from direct sun
light).
Coating with
chocolate
(Temp. 90 F)
Manually
Placing the
packs into
carton and
sealing
Gravity
Sheet making
drums
Temp. (2580C)
Scrap
Cooling tunnel at
10-12C with Speed
1.5-1.7m/min.
CCP (6% Max. of
moisture content)
Conveyor
belt
longitudinal
splitting
Compression
Cooling tunnel
drum
Conveyor at 10-12C with
belt
(thickness 12Speed 1.517mm)
1.7m/min.
Automatic
Placing the
packed bars
into boxes
Automatic
packaging
machine
HACCP02 :
05 02
0205/20/20 :
20:
HACCP02 :
06 02
1..1.11
0205/20/20 :
20:
OPRP
OPRP
OPRP
PRP
PRP
PRP
FIFO & FEFO
OPRP
PRP
PRP
()GMP.GHP
PRP
OPRP
()GMP.GHP
%6
Rework
Scrap
PRP
PRP
()GMP.GHP
OPRP
PRP
PRP
CCP
CCP
PRP
PRP
PRP
PRP
FIFO
OPRP
OPRP
%6
PRP
)CCP (02
)CCP (03
20:
% 6
-:
.3
3.5
.5
3.2
.1 5
0205/20/20 :
HACCP02 :
02 02
0205/20/20 :
20:
QF-26-07
QF-26-21
WF-06-02
..........................