Calculation of IDMT Over Current Relay Settings:

Name of Feeder
Load Current: (IL)
Min Fault Current ( Line-Line):
Max Fault Current ( Line-Line):
Relay Type
Relay Code
Relay No
CT Primary Current
CT Secondary Current
Relay Error (%)
CT Error (%)
Over shoot
C.B Interrupting Time
Safety
Total Grading Time
Expected Operating Time of Relay

384
11000
22000

Amp
Amp
Amp

600
1
7.5%
10.0%
0.05
0.17
0.33
0.58
0.271

Amp
Amp

Over Current Relay Setting


Low Over Current Setting: (I>)
Over Load Current :
125%
Over Load Current :(In)
480
Required Over Current Relay Plug Setting
0.8
Actual Plug Setting of Over Current Relay
0.80
Time Dial Setting of Over Current Relay (TMS)
0.125
Curve Selection for Relay
Normal Inverse (NI)
Pick Up Setting of Over Current Relay (PMS): (I>)
0.8
Plug Setting Multiplier (PSM):
22.92
Operation Time of Relay
2.17
Actual Operating Time of Relay : (tI>)
0.271
Total Grading Time
0.58
Operating Time of Previous Up steam Relay
0.85
High Over Current Setting: (I>>)
Actual Plug Setting of Relay
2.50
Time Dial Setting of Over Load Relay (TMS)
0.100
Curve Selection for Relay
Normal Inverse (NI)
Pick UP Setting of Over Load Relay (PMS): (I>>)
2.5
Plug Setting Multiplier (PSM):
7.33
Time of Operation of Relay
3.44
Actual Operating Time of Relay : (tI>>)
0.34
Total Grading Time
0.58
Operating Time of Previous Up steam Relay
0.92
Summary of Over Current Relay Setting:
Low Over Current Setting: (I>)
0.8 A X In
Actual Operating Time of Relay(tI>)
0.271
High Over Current Setting: (I>>)
2.5 A X In
Actual Operating Time of Relay(tI>>)
0.34

Sec
Sec
Sec
Sec
Sec

X IL
Amp
0.8 A X In
0.8 A X In

Sec
Amp
Sec
Sec
Sec
Sec
2.5 A X In

Sec
Amp
Sec
Sec
Sec
Sec
Amp
Sec
Amp
Sec

18.33333333

Calculation of IDMT Earth Fault Relay Settings:


Name of Feeder
Load Current: (IL)
Min Fault Current ( Line-Ground):
Max Fault Current ( Line-Ground):
Relay Type
Relay Code
Relay No
CT Primary Current
CT Secondary Current
Relay Error (%)
CT Error (%)
Over shoot
C.B Interrupting Time
Safety
Total Grading Time
Expected Operating Time of Relay

384
11000
22000

600
1
7.5%
10.0%
0.05
0.17
0.33
0.58
0.176

Earth Fault Relay Setting


Low Earth Fault Setting: (Ie>)
Earth Fault Current :
20%
Earth Fault Current
96
Required Earth Fault Relay Plug Setting
0.2
Actual Plug Setting of Earth Fault Relay
0.16
Time Dial Setting of Earth Fault Relay (TMS)
0.125
Curve Selection for Relay
Normal Inverse (NI)
Pick Up Setting of Earth Fault Relay (PMS): (Ie>)
0.16
Plug Setting Multiplier (PSM):
114.58
Operation Time of Relay
1.41
Actual Operating Time of Relay : (te>)
0.18
Total Grading Time
0.58
Operating Time of Previous Up steam Relay
0.76
High Earth Fault Setting: (Ie>>)
Actual Plug Setting of Relay
2.50
Time Dial Setting of Over Load Relay (TMS)
0.100
Curve Selection for Relay
Normal Inverse (NI)
Pick UP Setting of Earth Fault Relay (PMS): (Ie>>)
2.5
Plug Setting Multiplier (PSM):
7.33
Time of Operation of Relay
3.44
Actual Operating Time of Relay : (te>>)
0.34
Total Grading Time
0.58
Operating Time of Previous Up steam Relay
0.92
Summary of Earth Fault Relay Setting:
Low Earth Fault Setting: (Ie>)
0.2 A X In
Actual Operating Time of Relay(te>)
0.176
High Earth Fault Setting: (Ie>>)
2.5 A X In
Actual Operating Time of Relay(te>>)
0.34

ettings:

Jignesh.Parmar www.electricalnotes.wordpress.com jiguparmar@yahoo.com

Amp
Amp
Amp

Amp
Amp

Sec
Sec
Sec
Sec
Sec

X In
Amp
0.2 A X In
0.2 A X In

Sec
Amp
Sec
Sec
Sec
Sec
2.5 A X In

Sec
Amp
Sec
Sec
Sec
Sec
Amp
Sec
Amp
Sec

Normal Inverse (NI)


Very Inverse (VI)
Exteremely Inverse (EI)
Long Time Inverse