I. PEKERJAAN PENDAHULUAN
HORIZONTAL
Segmen 3
B-C = 2.85 m x 2.6 = 7.41 M2
H-I = 2.35 m x 2.6 = 6.11 M2
Segmen 4
B-C = 2.70 m x 3.5 = 9.45 M2
Segmen 6
B - G.2 = 9.50 m x 2.6 = 24.70 M2
Segmen 7
B - G.2 = 6.50 m x 2.6 = 16.90 M2
VERTIKAL
Segmen B.2
4-5 = 1.35 m x 3.5 = 4.73 M2
Segmen E
6-7 = 2.85 m x 3.5 = 9.98 M2
Segmen F
6-7 = 2.85 m x 3.5 = 9.98 M2
30.95 89.245
Jumlah = ### M2
PENGURANGAN
Diketahui :
Pasangan Kusen
P2 = 1.22 x 2.67 x 2.000 = 6.515 m2
P1 0.9 x 2.22 x 1.000 = 1.998 m2
P3 = 0.8 x 2.22 x 1.000 = 1.776 m2
PV = 0.9 x 2.52 x 2.000 = 4.536 m2
1.64 x 0.50 x 2.000 = 1.640 m2
PJ1 = 1 x 2.50 x 1.000 = 2.500 m2
1.64 x 1.75 x 1.000 = 2.870 m2
J2 = 2.59 x 1.75 x 3.000 = 13.598 m2
J1 = 2.59 x 1.75 x 1.000 = 4.533 m2
V1 = 1.05 x 0.50 x 2.000 = 1.050 m2
V2 = 0.55 x 0.50 x 2.000 = 0.550 m2
V3 = 2.51 x 0.50 x 1.000 = 1.255 m2
42.820 m2
Jumlah = 42.820 M2
Diketahui :
* Acian Beton = 38.880 m
Penyelesaian :
** Jadi Volume, Acian Dinding, Kolom, Dan Pondasi
M = 38.880 + 190.85
M Total = 229.73 m
Diketahui :
1 * Rg. Loket = 6.698 m
2 * Rg. Poli KIA = 10.973 m
3 * Rg. Poli Umum 1 = 10.973 m
4 * Rg. Poli Umum 2 = 10.973 m
5 * Rg. Apotek = 10.973 m
6 * Rg. Koridor 1 = 25.623 m
= 1.823 m
= 5.550 m Segmen 6 - 7 (E - F)
7 * Rg. Staff 1 = 8.123 m
8 * Rg. Staff 2 = 9.548 m Segmen 6 - 7 (C - E)
9 * Rg. Staff 3 = 12.398 m Segmen 6 - 7 (F - H.1)
10 * Rg. Obat = 5.273 m
11 * Rg. Teras Keliling = 33.750 m
= 6.563 m
= 24.550 m
= 13.400 m
Luas Total = 197.185 m
Penyelesaian :
Volume. Pas. Keramik 20 x20 Lantai Km / Wc.
* Wc/Km Type B (1,5 x 1,5) 1 Unit = 1.823 m
Diketahui :
4.600 m
Penyelesaian :
** Jadi Volume. Pas. Keramik 20 x 20 Dinding Km / Wc. Tinggi = 2 m
M Total = 9.200 m 9.200
Diketahui :
Horizontal
Segmen 2.a
A-B 0.85
I-J 0.85
Segmen 2.a
B-C 2.85
Segmen 8
A-B 0.85
I-J 0.85
Vertikal
Segmen E
6-7 2.85
Segmen F
6-7 2.85
Penyelesaian :
** Jadi Volume, Pek. Sloof 12/20 K. 175
M = 11.950 x 0.15 x 0.20
M Total = 0.359 m
Diketahui :
* Luas kolom Prkatis 12 x 12 cm K. 175 = 0.014 m
* Tinggi kolom Praktis = 0.50 m
* Jumlah Kolom = 33 Bh
Jumlah = 16.50 m
Penyelesaian :
** Jadi Volume pek.Kolom Praktis K. 175
M = 0.014 x 65.50
M Total = 0.943 m
Diketahui :
* Luas Penampang kolom 15/25 = 0.038 m
* Tinggi kolom Praktis/ Buah = 1.650 m
* Jumlah kolom = 6 Bh
0.371
* Tinggi kolom Praktis/ Buah = 0.500 m
* Jumlah kolom = 2 Bh
0.038
* Tinggi kolom Praktis/ Buah = 3.500 m
* Jumlah kolom = 2 Bh
0.263
Penyelesaian :
** Jadi Volume pek. Ring Balk 12/25 K. 175
M = 63.45 x 0.030
M Total = 1.904 m
Balok Nok
Balok 6/10 = 3.500 0.006 = 0.021 M
Jumlah = 0.900 M
M Total = 207.702 m
Diketahui :
* Panjang Bumbungan = 5.93 m
* Panjang Talang Jurai = 43.22 m
* Panjang Talang Jurai Dalam = 7.34 m
Diketahui :
1 * Segmen 7 - 9 (C.1 - G.2) = 13.850 + 3.700 = 17.550 m
2 * Segmen 6 - 7 (B - C) = 5.700 + 5.700 = 11.400 m
3 * Segmen 6 - 7 (C - D) = 6.700 + 5.700 = 12.400 m
4 * Segmen 6 - 7 (E - F) = 3.150 + 3.150 = 6.300 m
5 * Segmen 6 - 7 (F - H.1) = 5.700 + 8.700 = 14.400 m
6 * Segmen 6 - 7 (H.1 - I) = 3.700 + 5.700 = 9.400 m
7 * Segmen 5 - 6 (B.1 - H.2) = 3.700 + 27.700 = 31.400 m
8 * Segmen 4 - 5 (B - B.2) = 2.700 + 2.700 = 5.400 m
9 * Segmen 4 - 5 (B.2 - C) = 2.700 + 2.700 = 5.400 m
10 * Segmen 3 - 4 (B - C) = 5.700 + 4.700 = 10.400 m
11 * Segmen 3 - 5 (B - C) = 5.700 + 7.700 = 13.400 m
12 * Segmen 3 - 5 (D - G) = 5.700 + 7.700 = 13.400 m
13 * Segmen 3 - 5 (G - H) = 5.700 + 7.700 = 13.400 m
14 * Segmen 3 - 5 (H - I) = 5.700 + 7.700 = 13.400 m
15 * Segmen 1 - 3 (B - I) = 29.700 + 7.800 = 37.500 m
Diketahui :
A. Lisplank Tampak Belakang
* Panjang Bangunan Kiri = 3.590 m
* Panjang Bangunan Samp. Kanan = 3.590 m
Jumlah = 7.180 m
Diketahui :
Pengecetan Dinding Bangunan Lama = 76.80 x 2.500
= 192.000 M2
* Volume, Pengecetan Beton
Pasangan Kusen
P2 = 1.22 x 2.67 x 2.000 = 6.515 m2
P1 0.9 x 2.22 x 3.000 = 5.994 m2
PV = 0.9 x 2.52 x 3.000 = 6.804 m2
1.64 x 0.50 x 3.000 = 2.460 m2
PJ1 = 1 x 2.50 x 3.000 = 7.500 m2
1.64 x 1.75 x 3.000 = 8.610 m2
J3 = 1.77 x 1.75 x 1.000 = 3.098 m2
40.980 m2
Jumlah = 151.020
Pengecetan Dinding Lama = 151.020 x 2.00 = ### M2
1 Type/ Volume/
Jenis Pekerjaan
No. satuan
Type/ Volume/
Jenis Pekerjaan
No. Jumlah
Total = 18.385 M2
1. KG BESI SLOOF 15 x 20 cm (SL-1)
Panjang Lipatan
Tulangan Tulangan
(m1) (m1)
c d e
0.20 0.30 0.15
Jarak Beugel Besi Jml. Beugel Jumlah Panjang Besi
Koefisien Besi
(m1) Bh Pembulatan (m1)
h i j=g/h k l=fxk m
0.15 8 80.67 80 52.00 0.006165
Luasan Vol. Sat.Balok
m2 m3
4.78 0.00
Jumlah 4.78 m2
Panjang Lipatan
Tulangan Tulangan
(m1) (m1)
c d e
0.14 0.34 0.15
Jarak Beugel Besi Jml. Beugel Jumlah Panjang Besi
Koefisien Besi
(m1) Bh Pembulatan (m1)
h i j=g/h k l=fxk m
0.15 8 120.33 120 75.60 0.006165
Luasan Vol. Sat.Balok
m2 m3
7.88 0.00
Jumlah 7.88 m2
Panjang Lipatan
Tulangan Tulangan
(m1) (m1)
c d e
0.14 0.40 0.15
Jarak Beugel Besi Jml. Beugel Jumlah Panjang Besi
Koefisien Besi
(m1) Bh Pembulatan (m1)
h i j=g/h k l=fxk m
0.15 8 424.00 424 292.56 0.006165
Luasan Vol. Sat.Balok
m2 m3
25.38 0.00
Jumlah 25.38 m2
Besi
(Kg)
n=ixixlxm 62.952 kg
20.517
Besi
(Kg) Penggunaan
Tulangan
g=dxdxexf
95.345 Tul. Utama
Besi
(Kg)
n = i x i x l x m 125.174 kg
29.829
Besi
(Kg) Penggunaan
Tulangan
g=dxdxexf
471.401 Tul. Utama
Besi
(Kg)
n = i x i x l x m 642.695 kg
171.294
Besi
(Kg) Penggunaan
Tulangan
g=dxdxexf
225.313 Tul. Utama
Besi
(Kg)
n = i x i x l x m 340.746 kg
115.432
Besi
(Kg) Penggunaan
Tulangan
g=dxdxexf
297.366 Tul. Utama
Besi
(Kg)
n = i x i x l x m 587.861 kg
290.495
PERHITUNGAN VOLUME PEKERJAAN
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Panjang (m) Penampang
Horisontal Vertikal Kusen (m2)
1 Kusen 0.9 2.15 5.200 1 5.2 0.0075
0 2.15
0
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Penampang
Panjang (m)
Horisontal Vertikal Kusen (m2)
1 Kusen 0 0 0.000 1 0 0.0075
0 0
0
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Panjang (m) Penampang
Horisontal Vertikal Kusen (m2)
1 Kusen 0.8 2 4.800 1 4.8 0.0075
0 2
Jumlah 1.463
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Panjang (m) Penampang
Horisontal Vertikal Kusen (m2)
1 Kusen 2.54 2.47 10.820 2 21.64 0.0075
2.54 2.47
0.4
0.4
Ukuran (m) Volume
No. Uraian Jumlah (bh)
Lebar Tinggi (m2)
5. Kusen Kayu Type-PJ1 ( 1 Unit ) Ganti Kusen 1 Unit, Ganti Pintu Dan Jendela 3 Unit
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Panjang (m) Penampang
Horisontal Vertikal Kusen (m2)
1 Kusen 2.64 2.45 15.120 1 15.12 0.0075
2.64 2.45
1.64 1.65
1.65
Ukuran (m) Volume
No. Uraian Jumlah (bh)
Lebar Tinggi (m2)
Ukuran (m)
Luas
Volume
No. Uraian Panjang (m) Jumlah (bh) Penampang
Panjang (m)
Kusen (m2)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Panjang (m) Penampang
Horisontal Vertikal Kusen (m2)
1 Kusen 2.59 1.65 15.220 1 15.22 0.0075
2.59 1.65
2.59 1.65
0.85 1.65
Ukuran (m) Volume
No. Uraian Jumlah (bh)
Lebar Tinggi (m2)
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Panjang (m) Penampang
Horisontal Vertikal Kusen (m2)
1 Kusen 2.95 1.65 15.450 3 46.35 0.0075
2.95 1.65
2.95 1.65
1.65
Ukuran (m) Volume
No. Uraian Jumlah (bh)
Lebar Tinggi (m2)
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Panjang (m) Penampang
Horisontal Vertikal Kusen (m2)
1 Kusen 1.77 1.65 10.260 1 10.26 0.0075
1.77 1.65
1.77 1.65
Ukuran (m)
Luas
Volume
No. Uraian Panjang Panjang Panjang (m) Jumlah (bh) Penampang
Panjang (m)
Horisontal Vertikal Kusen (m2)
1 Kusen 1.05 0.4 3.300 2 6.6 0.0075
1.05 0.4
0.4
Volume
(m2)
1.300
Volume
Kusen
(m3)
0.000
Volume
(m2)
0.000
Volume
Kusen
(m3)
0.036
Volume
(m2)
1.200
Volume
Kusen
(m3)
0.162
Volume
(m2)
5.410
Volume
Kusen
(m3)
0.113
Volume
(m2)
3.780
Volume
Kusen
(m3)
Volume
Kusen
(m3)
0.114
Volume
(m2)
3.805
Volume
Kusen
(m3)
0.348
Volume
(m2)
11.588
Volume
Kusen
(m3)
0.077
Volume
(m2)
2.565
Volume
Kusen
(m3)
0.050
Volume
(m2)
1.650