TRIVENI ENGICONS. PVT. LTD.

NAME OF CONTRACTOR : - RAJU MAHTO


FINAL BILL FOR LINING WORK MEASUREMENT
S. NO. CH. NO DEFRENCE OF
CHANAGE
1 6.91 6.997 0.087

2 2.143 2.16 0.017

3 2.331 2.355 0.024

4 1.877 1.969 0.092

5 1.071 1.1 0.029


0
6 0.926 1.071 0.145
TOTAL LENGTH 0f first reach= 0.394
TOTAL LENGTH OF FIRST
REACHIN (M) = 394

7 33.291 33.584 0.293


TOTAL LENGTH IN SECOND
REACH =
TOTAL LENGTH IN SECOND 0
REACH(M) = 293
s. no. Description NO. L B D QTY. UNIT

1 EARTH WORK/DRESSING
IN BED PORTION
L = 374M., B = 5.355 M.
2 IN SLOPING PORTION 394 5.355 2109.87
L = 374M., B = 7.052 M. 394 7.052 2778.488
TOTAL EARTH WORK DERESSING 4888.36 SQ.M. 13.07048 10 130.7048

3 SAND FILLING FOR FILLTER


A BEAM LONGITUDINAL IN BED & SLOPE
L = 374 M., B = 0.5 ,M., D = 0.15M.
NO. = 4 4 394 0.5 0.15 118.2
B TRANSVERSE BEAM IN BED, no = 1.
L = 4.355 M., B = 0.5 ,M., D = 0.15M.
NO. = 394/3.2 =
123.125
SAY, 123NO. 123 4.355 0.5 0.15 40.17
C TRANSVERSE BEAM IN SLOPING,NO = 2
L = 0.627+2.699 - 0.25 -0.1
2.976
L = 2.976 M., B = 0.5M., D = 0.15M.
NO. = 394/3.2 =
123.125
SAY, 123NO.= 123*2 = 246 246 2.976 0.5 0.15 54.91
D IN BED NO.
L = 4.855-0.2
4.655
L = 4.655 M., B = 3.00 ,M., D = 0.15M.
NO. = 394/3.2 =
123.125
SAY, 123 NO. 123 4.655 3 0.15 257.65
E IN SLOPE NO.=2
L = 0.627+2.699-0.1
3.326
L = 3.226 M., B = 3.00 ,M., D = 0.15M.
NO. = 394/3.2 =
123.125
SAY, 123 = 123*2 =246 NO. 246 3.226 3 0.15 357.12
TOTAL SAND FILLTER QTY. 828.0545 CU.M 2.103743 130 273.4866

4 BEAM CONCRETE
A BEAM LONGITUDINAL IN BED
L = 394 M., B = 0.2 ,M., D = 0.15M.
NO. = 2 2 394 0.2 0.15 23.64
A BEAM LONGITUDINAL IN SLOP
L = 394 M., B = 0.3 ,M., D = 0.15M.
NO. = 2 2 394 0.3 0.15 35.46
B TRANSVERSE BEAM IN BED , no. = 1
L = 4.655 M., B = 0.2 ,M., D = 0.15M.
NO. = 394/3.2 =
123.125
SAY, 123NO. 123 4.655 0.2 0.15 17.18

c TRANSVERSE BEAM IN slope no. = 2


L = 3.226 M., B = 0.2 ,M., D = 0.15M. 3.326
NO. = 394/3.2 =
123.125
SAY,123NO.= 123*2 = 246 246 3.226 0.2 0.15 23.81
cu.m.
5 Dawel ,
L= 374-9 = 365 m., B =( 0.3+0.15) /2 = 0.225m,
D = 0.3m 2 365 0.225 0.3 49.275 cu.m.
6 Stair L & R SIDE
L = 1.5 , section area of one step =0.5*0.3*0.15= 0.0225
0.0225 sq.m , no. of step = 8
no. of stair = 6 48 1.5 0.0225 1.62 cu.m.
Total Qty. of conc. Of Beam +Dawel +stair = 150.98 cu.m. 0.403689 750 302.767
7 Bed linning =
L = 394 M., B = 4.855 M., D = 0.1M.
1 394 4.855 0.1 191.3 cu.m. 0.511463 325 166.2253
9A Slope linning manual in left side =
L = 24+17 = 41 -3.00 =38., B = 3.626 M., D = 0.1M.
1 38 3.626 0.1 13.78 cu.m.
B Slope linning manual in r/s =
L = 51 -3.00 = 48 m., B = 3.626 M., D = 0.1M.

1 48 3.626 0.1 17.40


TOTAL SLOPE LINING MANUAL 31.1836 cu.m. 0.362598 325 117.8443
10 Slope linning left side (Paver)=
L = 394 - 38-1.5= 354.5 m ., B = 3.626 M., D = 0.1M.
1 354.5 3.626 0.1 128.54
Slope linning right side (Paver)=
L = 394 -48-1.5-10 =334.5 m ., B = 3.626 M., D = 0.1M.
1 334.5 3.626 0.1 121.29
TOTAL SLOPE LINNING (PAVER) 249.83 cu.m. 0.72 150 107.9963
SECOND REACH 1102.35
TOTAL EARTH WORK DERESSING

2.7
TRIVENI ENGICONS. PVT. LTD.
NAME OF CONTRACTOR : - RAJU MAHTO
FINAL BILL FOR LINING WORK ABSTRACT
s.no. Description Unite QTY. Rate (Rs.) Thise bill Total this Previouse Total Bill Adv. Against Net amount
Amount Bill amount Bill Amount Amount Previous Bill

1 EARTH WORK DRESSING SQ.M. 8100.22 10 81002.24

2 SAND FILLING FOR FILTER CU.M. 1394.11 130 181234

3 BEAM CONCRETE + DAWEL +STAIR CU.M. 261.89 750 196420

4 BED LINING CU.M. 318.62 325 103553

5 SLOPE LINING ( MANUAL) CU.M. 31.1836 325 10134.67

6 SLOPE LINING ( PAVER) CU.M. 443.68 150 66552.03


638896 638896
FINAL BILL FOR LINING WORK ABSTRACT
s.no. Descriptio Unite QTY. Rate (Rs.) Thise bill Total this Previouse Total Bill Adv. Agains
Amount Bill amoun Bill Amou Amount Previous Bill

1 EARTH WOSQ.M. 0.00 10 0

2 SAND FILLICU.M. 0.00 130 0

3 BEAM CONCU.M. 0.00 750 0

4 BED LININ CU.M. 110.91 325 36046.69

5 SLOPE LIN CU.M. 0 325 0

6 SLOPE LINICU.M. 0.00 150 0


36046.7 638896
Net amount
Previous Bill
TRIVENI ENGICONS. PVT. LTD.

NAME OF CONTRACTOR : - RAJU MAHTO


FINAL BILL FOR LINING WORK (MEASUREMENT BOOK) in second reach
s.no. Description no. L B D/H Qty.
EARTH WORK DRESSING
1 IN BED PORTION
L =293 M., B = 4.346+0.5= 4.846M. 1 293 4.846 1419.878
IN SLOPING PORTION
L = 293 M., B =( 0.537+2.471+0.3)-0.25 =
3.058*2=6.116 M. 1 293 6.116 1791.988
TOTAL EARTH WORK DERESSING
3211.866
2 SAND FILLING FOR FILLTER
a BEAM LONGITUDINAL IN BED & SLOPE
L = 293 M., B = 0.5 ,M., D = 0.15M.
NO. = 4 4 293 0.5 0.15 87.9
b TRANSVERSE BEAM IN BED, no. = 1
L = 3.846 M., B = 0.5 ,M., D = 0.15M.
NO. = 293/3.2 =
91.5625
SAY,92 NO. 92 3.846 0.5 0.15 26.54
c TRANSVERSE BEAM IN SLOPING,NO = 2
L = 0.537+2.471 - 0.25 -0.1
2.658
L = 2.658 M., B = 0.5 ,M., D = 0.15M.
NO. = 293 /3.2 =
91.5625
SAY,92 NO.= 92*2 = 184 184 2.658 0.5 0.15 36.68
d IN BED ,NO. -1
L = 4.346-0.2
4.146
L = 4.146 M., B = 3.00 ,M., D = 0.15M.
NO. = 293/3.2 =
91.5625
SAY, 92.56 NO. 92.56 4.146 3 0.15 172.69
e IN SLOPE BED , NO.= 2
L = 0.537+2.471-0.1
2.908
L = 2.908 M., B = 3.00 ,M., D = 0.15M.
NO. = 293/3.2 =
91.5625
SAY, 91.56=92.56*2 =185.12 NO. 185.12 2.908 3 0.15 242.25
3 TOTAL SAND FILLTER QTY. 566.06

4 BEAM CONCRETE
a BEAM LONGITUDINAL IN BED
L = 293 M., B = 0.2 ,M., D = 0.15M.
NO. = 2 2 293 0.2 0.15 17.58
b BEAM LONGITUDINAL IN SLOP 0
L = 293 M., B = 0.3 ,M., D = 0.15M.
NO. = 2 2 293 0.3 0.15 26.37
c TRANSVERSE BEAM IN BED , no. = 1 0
L = 4.346-0.2 = 4.146 M., B = 0.2 ,M., D = 0.15M. 0
NO. = 293/3.2 = 0
91.5625 0
SAY, 92 NO. 92 4.146 0.2 0.15 11.44
0
d TRANSVERSE BEAM IN slope no. = 2 0
L = 2.471+0.537-0.1 = 2.908 M., B = 0.2 ,M., 0
D = 0.15M.
NO. = 293/3.2 = 0
91.5625 0
SAY, 91.56 NO.= 91.56*2 = 183 183 2.908 0.2 0.15 15.96
0
5 Dawel , 0
L= 293 m., B =( 0.3+0.15) /2 = 0.225m, 0
D = 0.3m. No. = 2 2 293 0.225 0.3 39.56
(4+5+6) Total Qty. of conc. Of Beam +Dawel = 111

7 Bed linning =
L = 293 M., B = 4.346 M., D = 0.1M. 1 127.34
293 4.346 0.1

10a Slope linning both side side (Paver)=

L = 293 m ., B = 3.308 M., D = 0.1M.


NO. = 2 2 293 3.308 0.1 193.85

11 TOTAL SLOPE LINNING (PAVER) 193.85


unit

sq.m.
CU.M.

71.36
0.243542

39.56
CU.M.

CU.M. 0.4346

CU.M.

CU.M. 0.6616
TRIVENI ENGICONS. PVT. LTD.

NAME OF CONTRACTOR : -
FINAL BILL FOR LINING WORK (MEASUREMENT BOOK) in second reach
s.no. Description no. L B D/H
1 EARTH WORK/DRESSING
IN BED PORTION
L = M., B = 4.346+0.5= 4.846M. 1 4.846
IN SLOPING PORTION
L = M., B =( 0.537+2.471+0.3+0.1)-0.25 = 3.158*2=6.316 1 6.316
TOTAL EARTH WORK DERESSING

2 SAND FILLING FOR FILLTER


a BEAM LONGITUDINAL IN BED & SLOPE
L = M., B = 0.5 ,M., D = 0.15M.
NO. = 4 4 0.5 0.15
b TRANSVERSE BEAM IN BED, no. = 1
L = 3.846 M., B = 0.5 ,M., D = 0.15M. 3.846 0.5 0.15
NO. = L/3.2 =

SAY, NO.
c TRANSVERSE BEAM IN SLOPING,NO = 2
L = 0.537+2.471 - 0.25 -0.1

L = 2.658 M., B = 0.5 ,M., D = 0.15M.


NO. = L /3.2 =
2.658 0.5 0.15
SAY, NO.= no*2 =
d IN BED NO.
L = 4.346-0.2

L = 4.146 M., B = 3.00 ,M., D = 0.15M.


NO. = L/3.2 =

SAY, NO. 4.146 3 0.15


e IN SLOPE
L = 0.537+2.471-0.1

L = 2.908 M., B = 3.00 ,M., D = 0.15M.


NO. = 374/3.2 =
2.908 3 0.15
SAY, 116.875 = 116.875*2 =234 NO.
3 TOTAL SAND FILLTER QTY.
4 BEAM CONCRETE
a BEAM LONGITUDINAL IN BED
L = M., B = 0.2 ,M., D = 0.15M.
NO. = 2 2 0.2 0.15
b BEAM LONGITUDINAL IN SLOP
L = M., B = 0.3 ,M., D = 0.15M.
NO. = 2 2 0.3 0.15
c TRANSVERSE BEAM IN BED , no. = 1
L = 4.346-0.2 = 4.146 M., B = 0.2 ,M., D = 0.15M.
NO. = L/3.2 =

SAY, 117 NO. 4.146 0.2 0.15

d TRANSVERSE BEAM IN slope no. = 2


L = 2.471+0.537-0.1 = 2.908 M., B = 0.2 ,M., D = 0.15M.
NO. = L /3.2 =

SAY, 117 NO.= 117*2 = 234 2.908 0.2 0.15

5 Dawel ,
L= m., B =( 0.3+0.15) /2 = 0.225m,
D = 0.3m. No. = 2 2 0.225 0.3
6 Stair
L = 1.5 , section area of one step =
0.0225 sq.m
no. of stair = 6*no.of step = total no 1.5 0.0225
(4+5+6) Total Qty. of conc. Of Beam +Dawel +stair =

7 Bed linning =
L = M., B = 4.346 M., D = 0.1M. 1 4.346 0.1

8a Slope linning manual in left side =


L = m., L = 2.471+0.537+0.3= 3.308 M., D = 0.1M.
no. = L/3.2 1 3.308 3 0.1

SAY , NO.
b Slope linning manual in r/s =
L = m., L= 3.308 M., B= 3.00M. D = 0.1M.
no. = L/3.2

SAY , NO.
1 3.308 3 0.1
9 TOTAL SLOPE LINING MANUAL
10a Slope linning left side (Paver)=

L = m ., B = 3.308 M., D = 0.1M.


L = m., L= 3.308 M., B= 3.00M. D = 0.1M. 1 0.1
no. = L/3.2

SAY , NO. 3.308 3


10b Slope linning right side (Paver)=

L = 374-51 =323m ., L= 3.308 M., B= 3.00M, D = 0.1M.


no. = 1 1 3.308 3 0.1
TOTAL SLOPE LINNING (PAVER)
Qty. unit

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0.9924

0
0

0.9924
1.9848
0

0
0
0
0.9924
0.9924
TRIVENI ENGICONS. PVT. LTD.

NAME OF CONTRACTOR : -
FINAL BILL FOR LINING WORK (MEASUREMENT BOOK)
s.no. Description no. L B
1 EARTH WORK/DRESSING
IN BED PORTION
L = 667 M., B = 5.355 M.
IN SLOPING PORTION
L = 667 M., B = 7.052 M.
TOTAL EARTH WORK DERESSING

2 SAND FILLING FOR FILLTER


a BEAM LONGITUDINAL IN BED & SLOPE
L = 374 M., B = 0.5 ,M., D = 0.15M.
NO. = 4
b TRANSVERSE BEAM IN BED
L = 4.355 M., B = 0.5 ,M., D = 0.15M.
NO. = 374/3.2 =

SAY, 117 NO.


c TRANSVERSE BEAM IN SLOPING,NO = 2
L = 0.627+2.699 - 0.25 -0.1

L = 2.976 M., B = 0.5 ,M., D = 0.15M.


NO. = 374/3.2 =

SAY, 117 NO.= 117*2 = 234


d IN BED NO.
L = 4.855-0.2

L = 4.655 M., B = 0.5 ,M., D = 0.15M.


NO. = 374/3.2 =

SAY, 116.875 NO.


e IN SLOPE
L = 0.627+2.699-0.1

L = 3.266 M., B = 0.5 ,M., D = 0.15M.


NO. = 374/3.2 =

SAY, 116.875 = 116.875*2 =234 NO.


3 TOTAL SAND FILLTER QTY.
4 BEAM CONCRETE
a BEAM LONGITUDINAL IN BED
L = 374 M., B = 0.2 ,M., D = 0.15M.
NO. = 4
b BEAM LONGITUDINAL IN SLOP
L = 374 M., B = 0.3 ,M., D = 0.15M.
NO. = 4
c TRANSVERSE BEAM IN BED , no. = 1
L = 4.655 M., B = 0.2 ,M., D = 0.15M.
NO. = 374/3.2 =

SAY, 117 NO.

d TRANSVERSE BEAM IN slope no. = 2


L = 3.226 M., B = 0.2 ,M., D = 0.15M.
NO. = 374/3.2 =

SAY, 117 NO.= 117*2 = 234

5 Dawel ,
L= 374m., B =( 0.3+0.15) /2 = 0.225m,
D = 0.3m
6 Stair
L = 1.5 , section area of one step =
0.25 sq.m
no. of stair = 6
(4+5+6) Total Qty. of conc. Of Beam +Dawel +stair =

7 Bed linning =
L = 374 M., B = 4.855 M., D = 0.1M.

8a Slope linning manual in left side =


L = 24+17 = 41 m., B = 3.626 M., D = 0.1M.
no. = 1
b Slope linning manual in r/s =
L = 51 m., B = 3.626 M., D = 0.1M.
no. = 1
9 TOTAL SLOPE LINING MANUAL

10a Slope linning left side (Paver)=

L = 374-41 =333m ., B = 3.626 M., D = 0.1M.


no. = 1
10b Slope linning right side (Paver)=

L = 374-51 =323m ., B = 3.626 M., D = 0.1M.


no. = 1
TOTAL SLOPE LINNING (PAVER)
D/H Qty. unit
TRIVENI ENGICONS. PVT. LTD.

NAME OF CONTRACTOR : -
FINAL BILL FOR LINING WORK (MEASUREMENT BOOK)
s.no. Description no. L B D/H
1 EARTH WORK/DRESSING
IN BED PORTION
L = 917.4 M., B = 5.355 M. 1
917.4 5.335
IN SLOPING PORTION
L = 917.4 M., B = 7.052 M. 1
917.4 7.052
TOTAL EARTH WORK DERESSING

2 SAND FILLING FOR FILLTER


a BEAM LONGITUDINAL IN BED & SLOPE
L = 917.4 M., B = 0.5 ,M., D = 0.15M.

NO. = 4 4 917.4 0.5 0.15


b TRANSVERSE BEAM IN BED
L = 4.355 M., B = 0.5 ,M., D = 0.15M.

NO. = 917.4/3.2 =
286.6875
SAY, 287 NO. 287 4.355 0.5 0.15
c TRANSVERSE BEAM IN SLOPING,NO = 2
L = 0.627+2.699 - 0.25 -0.1

L = 2.976 M., B = 0.5 ,M., D = 0.15M.

NO. = 917.4/3.2 =
286.6875
SAY, 286.6875 NO.= 286.6875*2 = 573.375 573 2.976 0.5 0.15
d IN BED NO.
L = 4.855-0.2

L = 4.655 M., B = 0.5 ,M., D = 0.15M.

NO. = 917.4/3.2 =
286.6875
SAY, 286.69 NO. 286.69 4.655 3 0.15
e IN SLOPE
L = 0.627+2.699-0.1

L = 3.266 M., B = 0.5 ,M., D = 0.15M.

NO. = 917.4 / 3.2 =


286.6875
SAY, 286.6875 = 286.6875 *2 =573.375 NO. 573 3.266 3 0.15
3 TOTAL SAND FILLTER QTY.

4 BEAM CONCRETE
a BEAM LONGITUDINAL IN BED
L = 917.4 M., B = 0.2 ,M., D = 0.15M.
917.4
NO. = 2 2 0.2 0.15
b BEAM LONGITUDINAL IN SLOP
L = 917.4 M., B = 0.3 ,M., D = 0.15M.

NO. = 2 2 917.4 0.3 0.15


c TRANSVERSE BEAM IN BED , no. = 1
L = 4.655 M., B = 0.2 ,M., D = 0.15M.

NO. = 917.4/3.2 =
286.6875
SAY, 287 NO. 287 4.655 0.2 0.15
d TRANSVERSE BEAM IN slope no. = 2
L = 3.226 M., B = 0.2 ,M., D = 0.15M.

NO. = 917.4/3.2 =
286.6875
SAY, 286.6875 NO.= 286.6875*2 = 573.375m 573 3.226 0.2 0.15
TOTAL BEAM CONCRETE
5 Dawel , r/s
L= 917.4-1.5 -80-167 = 668.9m., B =( 0.3+0.15) /2 = 0.225m,
D = 0.3m , NO. = 2 1 668.9 0.225 0.3
Dawel , l/s
L= 917.4 -1.5 - 167 = 748.9m., B =( 0.3+0.15) /2 = 0.225m,
D = 0.3m , NO. = 2 1 748.9 0.225 0.3
6 Stair
L = 1.5 , section area of one step =
0.0225
no. of stair = 2, NO. OF STEP = 8 16 1.5 0.0225
(4+5+6) Total Qty. of conc. Of Beam +Dawel +stair =

7 Bed linning =
L = 917.4 -3.2 = 914.2 M., B = 4.855 M., D = 0.1M.
914.2
one panel bed lining not done due to stoe in bed 1 4.855 0.1
8a Slope linning manual in left side =
L = 9.6 = 9.6 m., B = 3.626 M., D = 0.1M.
no. = 1 1 9.6 3.626 0.1
b Slope linning manual in r/s =
L = 9.6 m., B = 3.626 M., D = 0.1M.
no. = 1 1 9.6 3.626 0.1
9 TOTAL SLOPE LINING MANUAL

10a Slope linning left side (Paver)=

L = 917.4-3.2-9.6-=904.6-1.5-1.5 = 901.6m ., B = 3.626 M.,


D = 0.1M. no. = 1 1 901.6 3.626 0.1
10b Slope linning right side (Paver)=

L = 917.4 -3.2-9.6 -4.5-1.5=898.6 m ., B = 3.626 M., D = 0.1M.


no. = 1 1 898.6 3.626 0.1
TOTAL SLOPE LINNING (PAVER)
Qty. unit Remark

4894.329

6469.5048

11363.83 SQ.M. 80 m ONE

SIDE DAWEL NOT


DONE
at ch. Bet.
18.481
TO 18.6809
275.22 CU.M. to

93.741375 CU.M.

127.8936 CU.M.
600.543878 CU.M.

842.1381
1939.537 CU.M.

55.044

82.566

40.07955

55.45494
233.14 CU.M.

45.15 CU.M.

50.55
0.54 CU.M.
329.39 CU.M.

443.84 CU.M.

3.48

3.48
6.96 CU.M.

total slop lining


L /S. L= 901.6m

326.92

total slop lining


325.83 R /S. L= 898.6m
652.75
Length of sabir alam
S. NO. CH. NO DEFRENCE OF
CHANAGE
1 7.288 7.478 0.19
0
2 7.14 7.264 0.124
0
3 9.905 9.94 0.035
0 x
4 9.961 10.0728 0.1118
0
5 17.207 17.2967 0.0897
0
6 18.481 18.6809 0.1999
0
7 20.6326 20.7996 0.167
TOTAL LENGTH 0f first reach= 0.9174
TOTAL LENGTH OF FIRST
REACHIN (M) = 917.4
dawel not done 80m
17.2967

18.6809

S
FINAL BILL FOR LINING WORK ABSTRACT OF SABIR ALAM 1ST REACH+SECOND REACH
s.no. Description Unite QTY. Rate (Rs.) Thise bill Total this Previouse
Amount Bill amoun Bill Amou

1 EARTH WORK DRESSING SQ.M. 16844.83 10 168448.3

2 SAND FILLING FOR FILTER CU.M. 2897.19 130 376634.1

3 BEAM CONCRETE + DAWEL +SCU.M. 787.31 750 590485.4

4 BED LINING CU.M. 661.14 325 214871.8

5 SLOPE LINING ( MANUAL) CU.M. 6.96 325 2262.624

6 SLOPE LINING ( PAVER) CU.M. 983.55 150 147532.9


1500235
ECOND REACH
Total Bill Adv. Against Net amount
Amount Previous Bill
MEASUREMENT SECOND REACH SABIR ALAM

s.no. Description no. L B D/H


EARTH WORK DRESSING
1 IN BED PORTION
L =500 M., B = 4.346+0.5= 4.846M. 1 500 4.846
IN SLOPING PORTION
L = 500 M., B =( 0.537+2.471+0.3)-0.25 =
3.058*2=6.116 M. 1 500 6.116
TOTAL EARTH WORK DERESSING

2 SAND FILLING FOR FILLTER


a BEAM LONGITUDINAL IN BED & SLOPE
L = 500 M., B = 0.5 ,M., D = 0.15M.
NO. = 4 4 500 0.5 0.15
b TRANSVERSE BEAM IN BED, no. = 1
L = 3.846 M., B = 0.5 ,M., D = 0.15M.
NO. = 500/3.2 =
156.25
SAY,156 NO. 156 3.846 0.5 0.15
c TRANSVERSE BEAM IN SLOPING,NO = 2
L = 0.537+2.471 - 0.25 -0.1
2.658
L = 2.658 M., B = 0.5 ,M., D = 0.15M.
NO. = 500 /3.2 =
156.25
SAY,156 NO.= 156*2 = 312 312 2.658 0.5 0.15
d IN BED ,NO. -1
L = 4.346-0.2
4.146
L = 4.146 M., B = 3.00 ,M., D = 0.15M.
NO. = 500/3.2 =
156.25
SAY, 156.25NO. 156.25 4.146 3 0.15
e IN SLOPE BED , NO.= 2
L = 0.537+2.471-0.1
2.908
L = 2.908 M., B = 3.00 ,M., D = 0.15M.
NO. = 500/3.2 =
156.25
SAY, 156.25=156.25*2 =312.5 NO. 312.5 2.908 3 0.15

3 TOTAL SAND FILLTER QTY.


4 BEAM CONCRETE
a BEAM LONGITUDINAL IN BED
L = 500 M., B = 0.2 ,M., D = 0.15M.
NO. = 2 2 500 0.2 0.15
b BEAM LONGITUDINAL IN SLOP
L = 500 M., B = 0.3 M., D = 0.15M.
NO. = 2 2 500 0.3 0.15
c TRANSVERSE BEAM IN BED , no. = 1
L = 4.346-0.2 = 4.146 M., B = 0.2 ,M., D = 0.15M.
NO. = 500/3.2 =
156.25
SAY, 156.25 NO. 156.25 4.146 0.2 0.15

d TRANSVERSE BEAM IN slope no. = 2


L = 2.471+0.537-0.1 = 2.908 M., B = 0.2 ,M.,
D = 0.15M.
NO. = 500/3.2 =
156.25
SAY, 156.25 NO.= 156.25*2 = 312.5 312.5 2.908 0.2 0.15

5 Dawel ,
L= 2490.6 m., B =( 0.3+0.15) /2 = 0.225m,
D = 0.3m. No. = 2 2 2490.6 0.225 0.3
(4+5+6) Total Qty. of conc. Of Beam +Dawel =

7 Bed linning =
L = 500 M., B = 4.346 M., D = 0.1M. 1
500 4.346 0.1

10a Slope linning both side side (Paver)=

L = 500 m ., B = 3.308 M., D = 0.1M.


NO. = 2 2 500 3.308 0.1

11 TOTAL SLOPE LINNING (PAVER)


BIR ALAM

Qty. unit

2423

3058
5481 sq.m

150

45.00

62.20

291.52

408.94

957.65 CU.M.
30

45

19.43

27.26

336.23
458 CU.M.

217.30 CU.M.

330.80 CU.M.

330.80 CU.M.
sabir alam
S. NO. CH. NO DEFRENCE OF
CHANAGE
1 32.5734 to dn.stre 0.500 km
TOTAL LENGTH 0f first reach= 0.5
TOTAL LENGTH OF secondreach
REACHIN (M) = 500