PRASAR BHARATI

OFFICE OF THE DEPUTY DIRECTOR GENERAL (E)


HIGH POWER TRANSMITTER; ALL INDIA RADIO
KINGSWAY: MALL ROAD, DELHI-09.
(Phone/FAX-01123818416)

No. HPTK-11(06)(02)/2014-15/ Dated :-04-07-2014


To,
The Additional Director General(E)(NZ),
Kind Attn: Deputy Director General(AVM),
All India Radio &Doordarshan,
Jamnagar House,Shahjahan Road,
New Delhi-110011.

Sub: Monthly report on the working of FM Transmitters at TV tower


Pitampura, Delhi for the month of Jun 2014.

Sir,

Find enclosed herewith the above cited subject report for your kind
perusal and further action please.

Enclosures: As above- 6 pages.

Yours faithfully

(Bal krishna)
Assistant Director (Engg.)
For Deputy Director General (Engg.)

1
STATISTICAL DATA (F.M. TRANSMITTERS)
FOR THE MONTH OF Jun 2014

F.M. I F.M. II
BREAKDOWNS + SHUTDOWNS
( Rainbow) (Gold)
Numbers 00 00
Major
B/D Duration 00:00 00:00
due to
GEAR Numbers 01 00
Minor
Duration 00:02 00:00
Numbers 00 00
Major
B/D Duration 00:00 00:00
due to
POWER SUPPLY Numbers 07 08
Minor
Duration 00:07 00:08
Numbers 00 00
Major
B/D Duration 00:00 00:00
due to
O/C Numbers 00 00
Minor
Duration 00:00 00:00
Numbers 0 0
Major
RF Shutdown Duration 00:00 00:00
(SD) Numbers 0 0
Minor
Duration 00:00 00:00
Numbers 0 00
Total BD + SD Major
Duration 00:00 00:00
Numbers 08 08
Minor Duration 00:09 00:08

RF Shutdown = SD

2
STATISTICAL DATA
FOR THE MONTH OF May 2014

FM I FM II
MONTHLY FIGURES (10KW) (R&S) (20 KW) (Nautel)
Hours of Testing 00:00 00:00
WORKING OF
Hours of Programme 720:00 744:00
TRANSMITTER
Total Working Hours 720:00 744:00
B/D due to Gear 00:02 00:38
Percentage 0.0046% 0.0851%
B/D due to P/S 00:07 00:13
Percentage 0.0162% 0.0291%
B/D due to O/C 00:00 00:00
Percentage 0.0000% 0.000%
SD 00:00 00:00
Percentage 0.0000% 0.000%
Total (BD+SD) 00:09 00:51
Percentage 0.0208% 0.1142%

FM I FM II
PROGRESSIVE TOTAL (10KW) (R&S) (20 KW) (Nautel)
Hours of Testing 00:00 00:00
WORKING OF
Hours of Programm 2184:00 1464:00
TRANSMITTER
Total Working Hours 2184:00 1464:00
B/D due to Gear 00:09 00:43

Percentage 0.0068% 0.0489%


B/D due to P/S 00:27 00:20
BREAK DOWNS/ Percentage 0.0206% 0.0227%
INTERRUPTIONS\ B/D due to O/C 00:00 00:00
SHUTDOWN Percentage 0.0000% 0.0000%
SD 00:02 00:00
Percentage 0.0015 % 0.0000%
Total(BD+SD) 00.38 00:63
Percentage 0.0289% 0.0717 %
3
BREAKDOWN IN RESPECT OF FM TRANSMITTER
FOR THE MONTH OF May 2014

FM I TRANSMITTER (102.6 MHz) (RAINBOW)


B/D due to GEAR
B/D Timing Duration
Date Cause
From To Hours Minutes

05.06.14 1433 1435 02 Gear- Repair of UPS

Total 02

B/D due to POWER SUPPLY FAILURE


B/D Timing Duration
Date Cause
From To Hours Minutes
04.06.14 2248 2249 01 PSF
04.06.14 2316 2317 01 PSF
12.06.14 2001 2002 01 PSF
12.06.14 2314 2315 - 01 PSF
13,06.14 0113 0114 - 01 PSF
13.06.14 0950 0951 - 01 PSF
13.06.14 1015 1016 01 PSF

Total 07

B/D due to OTHER CAUSES


B/D Timing Duration
Date Cause
From To Hours Minutes

Total

Momentary Interruptions
Date MI Timing Cause
04.06.14 1824,1914 PSF
05.06.14 1250 PSF
12.06.14 2003 PSF
13.06.14 1051 PSF

4
RF Shut down
B/D Timing Duration
Date Cause
From To Hours Minutes

Total
FM II TRANSMITTER (106.4 MHz) (GOLD)
B/D due to GEAR
B/D Timing Duration
Date Cause
From To Hours Minutes
Fuse blown of STL& OPTIMODE due to
24.05.14 1927 2001 34 heavy storm UPS (40 KVA ) also got
defective
27.05.14 0016 0018 02 Changeover of Power supply of speech
rack
27.05.14 0253 0255 02 do
Total 38

B/D due to POWER SUPPLY FAILURE


B/D Timing Duration
Date Cause
From To Hours Minutes
02.05.14 0452 0453 1 PSF
03.05.14 1047 1048 1 PSF
03.05.14 1053 1054 1 PSF
08.05.14 1836 1838 2 PSF
16.05.14 1209 1210 1 PSF
25.05.14 0034 0035 1 PSF
26.05.14 1730 1731 1 PSF
26.05.14 1943 1944 1 PSF
30.05.14 1650 1651 1 PSF
31.05.14 2259 2300 1 PSF
31.05.14 0200 0201 1 PSF
31.05.14 0637 0638 1 PSF

B/D due to OTHER CAUSES


B/D Timing Duration
Date Cause
From To Hours Minutes

5
,
Momentary Interruptions
Date MI Timing Cause
02.05.14 0937,0943,0956 PSF
03.05.14 1427,2026 PSF
08.05.14 0618,1317 PSF
09.05.14 0323,0528,0758 PSF
10.05.14 1809,1845,1908 PSF
15.05.14 0806,0808,1500,1530,1600 PSF
16.05.14 1430,1902 PSF
17.05.14 1855 PSF
22.05.14 1804,1835 PSF
23.05.14 1249 PSF
25.05.14 0036 PSF
29.05.14 1638,1642 PSF
RF Shut down
B/D Timing Duration
Date Cause
From To Hours Minutes

STATUS OF DG I(For FM RAINBOW)


FOR THE MONTH OF MARCH 2014

HMR OF D.G. Set as on 30.05.2014 406


HMR OF D.G. Set as on 31.04.2014 390
For Testing 1Hrs 40mins
D.G. Set running
during the month of For Transmission 14Hrs 20mins
March 2014 Total Running 16Hrs 30mins
Balance in tank as on 31/4/2014 240 ltr
Added in tank during March
DIESEL Balance in tank as on 30/5/2014 100 Litres
POSITION
Consumed during March 140 Litres
Average* Consumption 9 Litres/Hour

6
STATUS OF DG II (For FM GOLD)
FOR THE MONTH OF MARCH 2014

HMR OF D.G. Set as on 30.05.2014 454


HMR OF D.G. Set as on 31.04.2014 436
For Testing 1Hrs 50mins
D.G. Set running
during the month of For Transmission 17 Hrs 30 mins
March 2014 Total Running 18 Hrs 20 mins
Balance in tank as on 31/4/2014 260 Litres
Added in tank during March
DIESEL Balance in tank as on 30/5/2014 100 Litres
POSITION
Consumed during March 160 Litres
Average Consumption 9 Litres/Hour

Important Work Done During The Month

Sr.No Date Work Done


1. 15.04.14 Cooling fan of IPA low voltage power supply was not
working in Nautel transmitter, on thorough checking one
51 volt zener diode found short. Faulty 51 volt Zener
diode (CR20) removed from circuit in LVPS Distribution
Board.
2 Date
17.04.14 D/G set of rainbow transmitter not starting up and main
contactor was also not operating so A new Cot Scanner
procured and module installed in AMF Panel of rainbow
D.G. set

You might also like