1. Project Introduction
.
Main Contractor: Teacly(S) Pte Ltd
PSR-TC 5, WO 11
PIONEER RD LP 102 Status of Work
Schedule of work:
Fabricated ball
Valve
6
DSS - Considerations
Notify to
Neighbour contractor people who is
performing nearest our fencing.
Exxon Mobil
PSR 07 TEMPORARY ADIT (EXCEPT COLLAR AND BREAK OUT TO TUNNEL)
Construction Safety Submission (CSS) - Construction
3 2 6
Hazard Cause Unauthorized entry Possible impact
People not aware of testing works May cause bodily injury
3 1 3
Construction Safety Submission (CSS) - Construction
Hazard No. 2 Loading and unloading of the materials by excavator
5 2 10
Hazard Cause Load hit onto rigger Possible impact
Using of uncertified or expiry Lifting machine / LG Serious injury to the
Hit by swinging load worker / fatality/
Hit by falling load due to improper rigging property damaged
Lifting gears failure falling object
Mitigation Measures (Construction):
1. Lifting crew must competent and appointed
2. To conducted pre-start briefing to lifting crew by lifting supervisor
3. Signal man and excavator operator communication language is both understand
4. LM/LG good condition and valid certificate available on site for verification
5. To determine the CG before proceeding to lift up the load
6. rigger to move away from the load after rigging completed
7. PTW & Lifting plan available on site and lifting works must be according to lifting plan.
8. To conduct test lift and load control by the tag line .
Residual Accident Severity Residual Accident Frequency Residual Risk Rating
5 1 5 9
Construction Safety Submission (CSS) - Construction
Hazard No. 3 Installation of fitting using by hand tools
3 2 6
Hazard Cause Pinch point Possible impact
Tripping hazards Bodily injury /fracture /
Incorrect, not calibrated equipment used Sprain/laceration to worker
Loose fitting / improper connection
Mitigation Measures (Construction):
1. Safety gloves to be worn
2. Do not place hand finger in between the material or equipment.
3. To use good condition tools.
4. Do not obstruct the access/ work area by materials.
5. Ensure all test equipment comes with calibrated certificate prior to install
6. QC supervisor to be double check every fitting after installation and connection
7. To comply pre-checklist for valve passing test.
8. Competent personnel to do the task
9. QC to do a line check at every connection before allowing to start the pressurization.
Residual Accident Severity Residual Accident Frequency Residual Risk Rating
3 1 3 1
0
Construction Safety Submission (CSS) - Construction
Hazard No. 4 Standing on work platform about 1m height
4 2 8
Hazard Cause Possible Impact
Falling hazards Bodily injury /fracture /
sprain/laceration to worker
4 1 4
1
1
Construction Safety Submission (CSS) - Construction
Hazard No. 5 Pressurising of N2 into ball valve
5 2 10
Hazard Cause N2 pressure in contact to worker Possible Impact
High Noise level Injury to worker / eye,
Incompetent person other part of body/
worker/NID
5 1 5
1
3
Summary
PSR-TC6WO5-01: Summary of Major Hazards - Residual
No. Hazards Identified in The CSS Stage Residual Initial Residual Residual
Accident Accident Accident Risk
Severity Frequency Frequency Rating
by excavator
tools
height
open environment
5 x 5 Risk Evaluation Matrix
SIC Briefing
Emergency Response
Plan
TL4.2C - Laying and Commissioning of GTP
from Choa Chu Kang Way to Mandai Road
Emergency Response
During an emergency all site staff are to evacuate to site Assemble Area (CAA) outside
of the site at side table.(Displayed emergency assembly point signage)
1. Immediately stopped the work activities
2. Evacuation are to be in orderly manner
3. Site supervisor for each location has to evacuate every workers out from the site
4. Perform a headcount or check to ensure that all workers are safely accounted.
5. Project Manager are to reported to Ley choon management and SPPG & WP
Reporting
Project Manager shall proceed to emergency site within the shortest possible time
to carry out his preliminary investigation.
He shall report to WP/SPPG any other governmental agencies.
The incident must be reported to the applicable agencies for incident involving
injuries to workers and loss insurance agency. Incident not involving injuries shall
also be reported WP/SPPG.
1
7
Emergency Contact List
8368 8979
Sivakumar Senior Operation supervisor
Jerome WP 91772239
2 Police 999
1
9
Emergency Communication
SIC Briefing
Flow Chart
TL4.2C - Laying and Commissioning of GTP
from Choa Chu Kang Way to Mandai Road
Emergency Communication Flow Chart
TEACLY (S) PTE LTD
TC 5 Project
EMERGENCY
1. Fire/Explosion/Gas Leakage
4. Injury
DISCOVERER YES
Fatal Accident
Hamzah WP 91002114
Leo 91267901
Ambulance 995