You are on page 1of 2

IVRCL Ltd.

NEARMISS
Project Name: IVRCL/NTPC/SOLAPUR/HSE-2

Initial Notification Report


Report No. 5 Date / Time of Report:- 27-1-2014, 9:15am
Name of agency: M/s:- New sai Location:- Unit – 1 ,TG deck erection site

Classification of Report Event Potential Category Level of Analysis


(Click more than one if appropriate) (A,B,C or D) Summary
Near Miss (First Aid Case) Restrictive work case
Medical Treatment Case Occupational Illness Lost time injury
Fatality Chemical Spill Production loss
Oil Spill Fire / Explosion Property damage
Hazard Gas Release / Leakage Local complaint
Off the Job Others:

Brief Description: Around at 9:15 am at TG deck erection site. While an erection of cribs coloumn
(length 9 meter, approximately 300 kg weight) was being lowered to the condenser ground for the
purpose of installation with the help of ( capacity – 50 ton) tyre mounted crane. Before incident they
had already installed 200 numbers of cribs coloumns at site. All the cribs coloumns were in the vertical
position with properly supported. but 5 numbers of cribs coloums were not supported properly at
condenser site. While erection times the bottom part of the cribs colomn was striked to another non-
supported crib coloumn. Suddenly 4 cribs colomns were collapsed due to strike of erection crib
coloumn. That’s why the incident was occurred. No personal injury is reported that incident time.

Immediate cause: Inform concern engineer and concerned agency to provide/support properly.

Root cause: Lack of supervision.


PTW system was not followed at site.
Competent riggers are not available.
Installations of cribs are not supported to another crib.
Method statement and HIRA was not prepared.
Basic rigging plan must be in place
Guide rope was not properly tied with the cribs coloumn.

Remedial measure: Immediate provide support to installation of cribs

Immediate Action Taken: Notification has been issued to M/S New Sai.

Recommendation: Installation of cribs must be supported to other cribs.

Lesson Learnt: First make proper arrangement then start the activities.
Always erect 2-3 cribs during installation time.
The installation of cribs should be supported to another crib.
IVRCL Ltd.
NEARMISS
Project Name: IVRCL/NTPC/SOLAPUR/HSE-2

Before work activity method statement and HIRA to be prepared.


Proper supervision during work at site.

Safety Officer Signature