NEARMISS
Project Name: IVRCL/NTPC/SOLAPUR/HSE-2
Brief Description: Around at 9:15 am at TG deck erection site. While an erection of cribs coloumn
(length 9 meter, approximately 300 kg weight) was being lowered to the condenser ground for the
purpose of installation with the help of ( capacity – 50 ton) tyre mounted crane. Before incident they
had already installed 200 numbers of cribs coloumns at site. All the cribs coloumns were in the vertical
position with properly supported. but 5 numbers of cribs coloums were not supported properly at
condenser site. While erection times the bottom part of the cribs colomn was striked to another non-
supported crib coloumn. Suddenly 4 cribs colomns were collapsed due to strike of erection crib
coloumn. That’s why the incident was occurred. No personal injury is reported that incident time.
Immediate cause: Inform concern engineer and concerned agency to provide/support properly.
Immediate Action Taken: Notification has been issued to M/S New Sai.
Lesson Learnt: First make proper arrangement then start the activities.
Always erect 2-3 cribs during installation time.
The installation of cribs should be supported to another crib.