Instructions for installation, operation and maintenance of
conservator type and hermettically sealed distribution transformers
My bin p ngm du tiu chun ca chng ti l kiu kn, The lifetime of the transformers can be extended with
y du, t gin n vi cnh tn nhit bng cnh gp sng. a correct installation, commissioning, operation and
Nu lp t, vn hnh v bo dng my bin p theo maintenance, so that operation and service costs can
ng quy nh, tui th ca my s c ko di vi cc be economically low.
chi ph thp nht. We have attempted to include all information that will
Chng ti c gng cung cp y cc yu cu cn thit be of value to the user .But if problems should arise
khi s dng my bin p. Nu cn thng tin g thm, xin outside the scope of this manual, please do not hesi-
vui lng lin h li vi chng ti. tate to contact
1. Cu to 3 1. Construction 13
3. Lp t 4 3. Installation 14
4. a vo vn hnh 5 4. Commissioning 15
4.2. Kim tra sau khi ng in 5 4.2 Checks after energizing 15+16
6.1 Bo dng my bin p kiu kn ngm du 8+9 6.1 Maintenance of Hermetically sealed type transformer 19+20
6.2 Bo dng My bin p c bu du ph 10+11+12 6.2 Maintenance of transformer with conservator 20+21+22+23
2
HNG DN LP T, VN HNH V BO DNG
MY BIN P NGM DU
C BU DU PH V KHNG C BU DU PH
1. Cu to:
1.1. My bin p kiu kn, y du, t gin n, khng c m kh:
y l loi my kiu kn y du vi v thng cnh sng do vy s dn n ca du trong my do thay i ph
ti v nhit c b li bng s co gin ca cnh gp sng v my. Du khng tip xc vi khng kh v hi
m do vy trnh c lo ha, m bo cht lng ca du khng thay i t lc lp t cho n ht tui th
ca my.
Do vy my khng cn phi ly mu du trong thi gian vn hnh (20-30 nm)
My bin p kiu kn ph hp vi mi trng c m cao.
Tui th ca my vn b nh hng bi mt phn nh m v xy cn li trong thnh phn cch in (Du,
giy, ba). V vy phi gim ti a thnh phn trong my.
1.3. Ngoi loi my bin p chnh k trn, chng ti cn thit k, ch to nhng my bin p theo yu cu ngi s
dng nh my ngm du c m kh Nit, my c hp cp cao h, my dng iu chnh di ti hoc nhng
my bin p chng chy s dng dung dch Silicone lm mt v.v
2. Vn chuyn v bo qun:
3
2.2. Bo qun
My bin p nn a vo lp t v vn hnh ngay sau khi nhn my. Nu khng th c, my bin p phi
c bo qun ni kh ro, c che y cn thn, tt nht l trong kho. iu ny nhm bo v lp sn
bn ngoi ca my iu kin tt.
Cc my bin p khng c lp t qu gn nhau trnh lm h hng cc b phn tn nhit cc thit b km
theo khc.
Li i gia cc my phi m bo s thun tin cho vic kim tra mc du v lp sn bn ngoi khi my
trong kho. i vi my kiu kn khng cn kim tra cch in ca du.
i vi my bin th c bnh du ph.
Bnh du phi c lp t li
Kim tra mu du (in p nh thng v thnh phn m )
Cui k lu kho, mt mu du c ly v kim tra so snh kt qu vi mu trn.
Kim tra cch in ca my
3. Lp t
My bin p do Cng ty TNHH ABB ch to c th lp t trong nh hoc ngoi tri.
3.1. Lp t trong nh
My bin p c th di chuyn trn 4 bnh xe hoc con ln, dng n by. My bin p c lm mt bng
khng kh xung quanh .Bi vy s thng gi tt l cn thit cho lm mt my bin th.
c th lm mt tt, ca a kh lnh vo nn phn thp ca my bin p v ca thot kh nng c
t pha trn ca bung t my. Lung kh mt i vo v lung kh nng a ra nn c b tr cho nhau
trong phng t my.
lm mt 1kW tn hao cn c lung kh lnh 3m3/pht nhit 200C. Khi ng kh vo v ng kh ra chnh
lch 3m, ca kh ra cn c tit din ct ngang khong 0,4m2 lm mt 5kW tn hao hoc 0,2m2 cho 2,5kW.
Hy ch rng din tch ca vo ca lung kh lnh c th nh hn ca ra ca lung kh nng khong 10%. Nu
khng t c iu ny th ca kh ra cng rng cng tt.
khng kh tun hon d dng xung quanh my, my cn c t cch tng t nht l 50cm v khong
cch cc my cng nh vy khi t nhiu my trong cng mt phng.
Cc my bin p phi c b tr vic kim tra v bo dng c th thc hin c ngay c trong khi my
ang vn hnh. c bit trong cc cng vic b xung hay tho du v cc vic u ni dy u phi c thc
hin mt cch thun tin. Ch th mc du, R le hi, Van gim p phi nhn thy c.
4
4. a my vo vn hnh
Trc khi ng in, tt c cc my phi qua kim tra trc khi ng in. Nu pht hin thy bt c s h hng
hoc s khc thng no, cn thng bo ngay cho nh sn xut trong vng 1 ngy km theo cc bin bn th
nghim vi cc giy t lin quan khc.
5. Vn hnh my bin p:
Trong qu trnh vn hnh, nhng th tc kim tra thng l di y bt buc phi thc hin y .
5
5.3. Van gim p
Van gim p dng lm gim p sut ca my bin p khi xut hin s c bn trong my bin p nh chm V,
ngn mch gia cc pha .v.v Khi p sut bn trong my bin p ln hn 0.35bar th van gim p s t ng
m cho p sut thot ra v t ng ng li khi p sut gim xung.
5.4. R le hi
R le hi dng cung cp tn hiu cho cc thit b bo v my bin p khi trong my xut hin kh bi mt
nguyn nhn no hoc khi my b d du.
R le hi cng c tin hnh kim tra sau khi c lp rp, bao gm mch bo chung v mch ct. Vic
kim tra ny thc hin bng cch n nt kim tra v bm kh vo trong r le qua van kim tra s tc ng
ca cc tip im tng ng.
5.5. Nhit k:
Nhit k c th c cung cp o nhit lp du trn cng
6
Ph ti
Bng di y cho kh nng qu ti ca my bin p theo ph ti ban u K1
Ti K1= 0.25 Ti K1= 0.5 Ti K1= 0.7 Ti K1= 0.8 Ti K1= 0.9 Ti K1= 1.0
t = 0,5 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,00
t=1 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,00
t=2 K2= 1,50 K2= 1,50 K2= 1,46 K2= 1,41 K2= 1,32 K2= 1,00
t=4 K2= 1,34 K2= 1,31 K2= 1,27 K2= 1,24 K2= 1,18 K2= 1,00
t=8 K2= 1,16 K2= 1,15 K2= 1,13 K2= 1,12 K2= 1,09 K2= 1,00
t = 24 K2= 1,00 K2= 1,00 K2= 1,00 K2= 1,00 K2= 1,00 K2= 1,00
Bng 1 cho thy: Ph ti tng t h s ph ti ban u (K1) n h s ph ti K2 trong mt qung thi gian t.
Sau khi my bin p hot ng mc ph ti K2 trong qung thi gian (t) (gi) th my bin p phi c t tr li
mc ph ti ban u K1 trong vng t nht l 8 ting
Ti K1= 0.25 Ti K1= 0.5 Ti K1= 0.7 Ti K1= 0.8 Ti K1= 0.9 Ti K1= 1.0
t = 0,5 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 0,90 K2= 0,90
t=1 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,45 K2= 0,90 K2= 0,90
t=2 K2= 1,50 K2= 1,45 K2= 1,35 K2= 1,26 K2= 0,90 K2= 0,90
t=4 K2= 1,27 K2= 1,23 K2= 1,17 K2= 1,11 K2= 0,90 K2= 0,90
t=8 K2= 1,09 K2= 1,07 K2= 1,04 K2= 1,01 K2= 0,90 K2= 0,90
t = 24 K2= 0,90 K2= 0,90 K2= 0,90 K2= 0,90 K2= 0,90 K2= 0,90
Bng 2 cho thy: Ph ti tng t h s ph ti ban u (K1) n h s ph ti K2 trong mt qung thi gian t (gi).
Sau khi my bin p hot ng mc ph ti K2 trong qung thi gian (t) (gi) th my bin p phi c t tr li
mc ph ti ban u K1 trong vng t nht l 8 ting
Ti K1= 0.25 Ti K1= 0.5 Ti K1= 0.7 Ti K1= 0.8 Ti K1= 0.9 Ti K1= 1.0
t = 0,5 K2= 1,50 K2= 1,50 K2= 1,50 K2= 0,80 K2= 0,80 K2= 0,80
t=1 K2= 1,50 K2= 1,50 K2= 1,35 K2= 0,80 K2= 0,80 K2= 0,80
t=2 K2= 1,39 K2= 1,31 K2= 1,16 K2= 0,80 K2= 0,80 K2= 0,80
t=4 K2= 1,15 K2= 1,11 K2= 1,01 K2= 0,80 K2= 0,80 K2= 0,80
t=8 K2= 0,98 K2= 0,96 K2= 0,91 K2= 0,80 K2= 0,80 K2= 0,80
t = 24 K2= 0,80 K2= 0,80 K2= 0,80 K2= 0,80 K2= 0,80 K2= 0,80
Bng 3 cho thy: Ph ti tng t h s ph ti ban u (K1) n h s ph ti K2 trong mt qung thi gian t (gi).
Sau khi my bin p hot ng mc ph ti K2 trong qung thi gian (t) (gi) th my bin p phi c t tr li
mc ph ti ban u K1 trong vng t nht l 8 ting
7
V d 1:
Mt my bin p phn khi 500kVA loi ngm du, lm mt bng khng kh lm vic ti mc ph ti 250kVA
(50% ti). Nu cn phi lm vic qu ti mc ph ti 650kVA.
Vy my bin p c th chy qu ti trong bao lu m khng gim tui th ca my?
Nhit mi trng xung quanh ti thi im qu ti l 200C
Gi s in p khng i
Tr li:
650
K1 = 50; K2 = = 1.3
500
Theo bng 1:
My bin p c th chy qu ti ti mc ph ti 650kVA trong vng 4 ting (t=4)
V d 2:
Mt my bin p 250kVA loi ngm du, lm mt bng khng kh cn phi lm vic mc ph ti 300kVA trong
khong thi gian l 2 ting. Nhit mi trng trong 2 ting l 300C
Gi s in p khng i
Vy ph ti ban u ti a l bao nhiu trc khi din ra qu ti?
Tr li:
300
K2 = = 1.2 ; t=2 ting
250
Theo bng 2:
Mc ph ti ti a ban u (K1) c th l 80% mc ph ti ca my
C ngha l: K1 = 250 x 0,8 = 200kVA
V d 3:
Gi d mt my bin p 100kVA loi ngm du, lm mt my bng khng kh lm vic ti mc ph ti 80kVA
(80% mc ph ti ca my) trong mt ngy. Nu cn phi lm vic ti (100%) trong bui chiu 4 ting. Nhit
mi trng vo bui chiu l 400C. Gi s in p khng thay i. Vy my c th lm vic mc ti
khng?
Tr li:
Theo bng 3, my bin p ch c th ti ti a 80% mc ti ca my khi nhit mi trng l 400C. C ngha
l ph ti ti a ca my bin p trong iu kin nhit mi trng l 400C l:
100kVA 0,8 = 80kVA
6. Bo dng my bin p
6.1.1 Bo dng nh k:
8
Vic bo dng nh k c thc hin mt nm mt ln. Vic bo dng ny bt buc phi thc hin khi my
bin p c vn hnh li sau mt thi gian dng hot ng. Cc cng vic bo dng nh k bao gm:
- Lm sch s cch in v cc u ct.
- Kim tra mc du, nu mc du qu thp, kim tra xem c hin tng b r r du hay khng.
- m bo cc thit b bo v gn trn my lm vic tt (ch th mc du, r le hi)
- Kim tra lp sn v my bin p
- i vi iu kin hot ng bnh thng, khng cn thit phi kim tra du.
- Khng cn s bo dng i vi iu chnh v van gim p.
9
3. Ko cc phn trn ca s (1)
4. Thay th s (1), giong (7) v (10) hng hoc thiu.
5. Lp li theo th t ngc li
6. Tin hnh lm tip theo ging nh cch thay th s cao th
Ch s dng nhng ph kin do ABB cung cp hoc t cc nh cung cp cho ABB
6.2.1 Bo dng nh k:
Vic bo dng nh k c thc hin mt nm mt ln. Vic bo dng ny bt buc phi thc hin khi my
bin p c vn hnh li sau mt thi gian dng hot ng. Cc cng vic bo dng nh k bao gm:
- Lm sch s cch in v cc u ct.
- Kim tra mc du, nu mc du qu thp, kim tra xem c hin tng b r r du hay khng.
- m bo cc thit b bo v gn trn my lm vic tt (ch th mc du, r le hi)
- Kim tra lp sn v my bin p
- i vi iu kin hot ng bnh thng, khng cn thit phi kim tra du.
Tuy nhin, nu c nghi ng hi m thm nhp vo (him khi xy ra) do b st m hoc bt k nguyn nhn khc
th nn kim tra du. Hi m trong du s c pht hin bng cch kim tra Crackle. Cc loi kim tra khc l
khng cn thit.
Cch kim tra hi m Crackle: Ly mt mu du nh vo trong mt ng nghim kh v nung nng t t
bng ngn la cho ti khi du si, khi s c mt ca hi m s gy ra ting n lch tch hon ton r. Mt
phng php khc l khuy u 0,2 lt mu du bng mt thanh kim loi ng knh khong 12mm c
t nng hi . Ting lch tch s cho thy c hi m. Nu mt mu b hng trong ln kim tra u tin th 2
mu tip theo s c kim tra m 2 mu ny qua kim tra Crackle phi t th du mi t yu cu.
Kim tra cch in ca du, kt qu ny khng c nh hn 30kV/2,5mm v thnh phn axit khng thp
hn 0,3mg KOH/g.
Kim tra mu ca ht ht m. Khi ht chng m chuyn sang mu hng, cn phi ti to li kh nng chng m
bng cch sy chng nhit 1000C-2000C cho n khi chng chuyn v mu xanh tr li.
Khng cn s bo dng i vi iu chnh v van gim p
10
tra hi m t yu cu.
Nu cn phi lc du hoc thay du m khng th tin hnh c ti ch, c th vn chuyn my ti Cng ty
TNHH ABB.
3. Tho cc cu (9)
4. p nh vo nh ty s (2) cho ty s tt xung.
5. Tho cu (12), vng kp (14) v vu kp (15)
6. Nh nhng ko s ra, ng thi p nh ty s (2). Ch cn thn v cn dy dn ty s v cun dy c th b
ko ra.
7. Thay th s hoc giong
8. Lp t theo th t ngc li. Cn thn a ty s qua s bng cch buc mt si dy vo nh ty s, lun si
dy qua s, ko si dy trong khi t s tr li ch c.
9. Du tho ra, qua kim tra t yu cu mi c tra li vo my qua ng du. Cn thm mt lng du mi
( c kim tra) mt lng va sao cho du c vo y ti g ming ca ng du, ng thi x
kh s cao th bng cch ni lng ai c.
10. p nh vo nh ty s (2) cho lng ra, cui cng ko ty s ln. Khe h gia giong v s xut hin cho
khng kh trong s thot ra ngoi v du s iu vo trong s lm cho mc du ng du s tt xung.
tip du vo ng du, mc du trong s s ngang bng vi mc du ng du.
11
6.2.6.1 cch in
Phi bng hoc ln hn 30kV/2,5mm, nu thp hn du phi c x l li, hoc phi thay th.
12
INSTRUCTIONS FOR INSTALLATION, OPERATION AND MAINTENANCE OF
CONSERVATOR TYPE AND HERMETICALLY SEALED
DISTRIBUTION TRANSFORMERS
1. Construction
1.1 ABB type of hermetically sealed transformer is completely filled with oil. No gas cushions exist inside
the tank.
The tank has corrugated walls, so that the expansion and contraction caused by the changes in the
oil volume due to loading and ambient temperatures can easily managed. No air moisture can pen-
etrate into the tank, therefor a slow aging of oil and insulation material are ensured.
Consequently it is not necessary to take any oil sample of the transformer during its lifetime(20-30
years)
Hermetically sealed transformers are suitable for high humidity environment.
Some ageing still exist, supported by residual moisture and oxygen left in the transformer insulation
(oil, paper and pressboard). Through carefully treatment these residual quantities are kept to a mini-
mum.
1.3 Beside the oil transformers mentioned above, we can also manufactured transformers on especial
request like, silicone liquid Transformers, dry type transformers, gas filled transformers, etc.
2.1 Dispatch
All ABB Transformers are thoroughly tested and inspected before leaving the Company Works.
The transformers are oil filled and including all the necessary accessories before dispatch.
2.1.1 Handling
A proper handling for the on loading and off loading of transformers are essential in order to avoid
any damage to the transformer. All the provided lifting eyes or hooks must be used during thel lifting
of the transformer. The use jack is only permitted when jacking pads are available Shifting, movement
and vibration during transportation shall be avoided.
13
Especial care shall be given to fins wall and bushings.
2.2 Storage
It is recommend that the transformer shall be installed and energized after delivered to the site with a
minimum delay. However if the transformer can not be installed immediately, a dry place and protect-
ed from any weather conditions, preferably indoor if available, shall be used.
If more than one transformer shall be stored, a minimum distance between the transformers shall be
acted, in order to avoid collision and routine in section if needed.
Transformers with a storage longer than twelve months shall be checked before installation. The oil
level shall be checked. The manual tap changer shall be switched into every position for at least fix
a times. Since the transformer is hermetically sealed no dielectric strength test is needed. Oil sample
shall not be taken at any time.
3. Installation
Transformers can be installed outdoor or indoor.
14
Note that the are of the cooling air intake may be less than of the warm air outlet by about 10%.
Never the less, the openings are to be made as wide as possible. The transformer shall be positioned
at least 50cm from the next partition or wall, or even to the next transformer, if there is any.
The transformer shall be located, that an easy access is ensured for any maintenance works. The
filling and draining plugs as well the couplings shall be free to access at anytime. Gauges, Buchholz
relays and pressure controllers shall be visible.
4 Commissioning
If the oil level is low, so contact ABB Transformer for refilling. Please do not refill without contacting
ABB Transformers.
Make sure that bushings are clean and dry before processing the measurements. If the readings are
lower than the values above, then thorough clean the LV and HV bushings and repeat the insulation
resistance measurement.
- Ratio test
- Tapchanger setting:
The tapchanger shall be set to the desired position.
Caution Tapchanger must only be operated when the transformer is de-energised.
Following checks shall be performed after energizing but before loading the transformer:
15
- Check voltage at LV side, if the voltage is not in the desire value, then de energize the transformer
and select the right tap for the correct level.
- Check the phase sequence, if the phase sequence is not correct, then de energize the transform-
er and re arrange the cable connections.
- Check the transformer noise, if after energizing massive noise or abnormal sound is registered,
then de energize the transformer and notify ABB Ltd. immediately.
5. Operation
The following checks shall be done according to a schedule control and maintenance plan during the
operation of the transformer.
16
( which can be reset )
No micro - switches
- If the maximum pointer is still indicating 100C and above, the transformer is overloaded or is not
sufficiently ventilated. The transformer can be returned to operation once the above has been cor-
rected.
Table 1: load increase from initial load factor K1 to load factor K2 for a period of time T (hours)
At K1= 0.25 At K1= 0.5 At K1= 0.7 At K1= 0.8 At K1= 0.9 At K1= 1.0
t = 0,5 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,00
t=1 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,00
t=2 K2= 1,50 K2= 1,50 K2= 1,46 K2= 1,41 K2= 1,32 K2= 1,00
t=4 K2= 1,34 K2= 1,31 K2= 1,27 K2= 1,24 K2= 1,18 K2= 1,00
t=8 K2= 1,16 K2= 1,15 K2= 1,13 K2= 1,12 K2= 1,09 K2= 1,00
t= 24 K2= 1,00 K2= 1,00 K2= 1,00 K2= 1,00 K2= 1,00 K2= 1,00
After the transformer has been loaded with K2 for the period of time T (hours), then the transformer must be
brought back to the initial load factor K1 for at least 8 hours.
17
Table 2: Load increase from initial load factor K1 to load factor K2 for a period of time T (Hours) (The ambi-
ent temperature (during the load increase) is 30C.
K1 - initial Load factor K2= Load factor of rated power for a period of time (t)
At K1= 0.25 At K1= 0.5 At K1= 0.7 At K1= 0.8 At K1= 0.9 At K1= 1.0
t = 0,5 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,50 K2= 0,90 K2= 0,90
t=1 K2= 1,50 K2= 1,50 K2= 1,50 K2= 1,45 K2= 0,90 K2= 0,90
t=2 K2= 1,50 K2= 1,45 K2= 1,35 K2= 1,26 K2= 0,90 K2= 0,90
t=4 K2= 1,27 K2= 1,23 K2= 1,17 K2= 1,11 K2= 0,90 K2= 0,90
t=8 K2= 1,09 K2= 1,07 K2= 1,04 K2= 1,01 K2= 0,90 K2= 0,90
t = 24 K2= 0,90 K2= 0,90 K2= 0,90 K2= 0,90 K2= 0,90 K2= 0,90
After the transformer has been loaded with K2 for the period of time T (hours), then the transformer must be
brought back to the initial load factor K1 for at least 8 hours.
Table 3: Load increase from initial load factor K1 to load factor K2 for a period of time T (Hours)
(The ambient temperature (during the load increase) is 40C.
K1 initial Load factor K2 = Load factor of rated power for a period of time (t)
At K1= 0.25 At K1= 0.5 At K1= 0.7 At K1= 0.8 At K1= 0.9 At K1= 1.0
t = 0,5 K2= 1,50 K2= 1,50 K2= 1,50 K2= 0,80 K2= 0,80 K2= 0,80
t=1 K2= 1,50 K2= 1,50 K2= 1,35 K2= 0,80 K2= 0,80 K2= 0,80
t=2 K2= 1,39 K2= 1,31 K2= 1,16 K2= 0,80 K2= 0,80 K2= 0,80
t=4 K2= 1,15 K2= 1,11 K2= 1,01 K2= 0,80 K2= 0,80 K2= 0,80
t=8 K2= 0,98 K2= 0,96 K2= 0,91 K2= 0,80 K2= 0,80 K2= 0,80
t = 24 K2= 0,80 K2= 0,80 K2= 0,80 K2= 0,80 K2= 0,80 K2= 0,80
After the transformer has been loaded with K2 for the period of time t (hours), then the transformer must be
brought back to the initial load factor K1 for at least 8 hours.
Example No. 1:
A 500 kVA oil immersed, air cooled distribution transformer operates at a load of 250kVA, i. e. 50%
load.
It needs to be overloaded to a load of 650kVA. How long can the transformer be overloaded, without
increasing the reduction of its lifetime?
The ambient temperature during the overload is 20C.
18
Example No. 2:
A250kVA oil immersed, air cooled distribution transformer needs to be loaded with a capacity of 300
kVA for a period of 2 hour continuously. The ambient temperature during these 2 hours is 30C.
What can the maximum initial load be before the overload takes place?
Example No. 3
A 100kVA oil immersed, air cooled distribution transformer operates at 80kVA (80% nominal load),
during the day. It needs to be full loaded during the after noon for a period of 4 hours. The ambient
temperature at the afternoon is 40C can this full load be reached, without reducing the normal life-
time?
6. Maintenance
19
- Remove the oil indicator at the top of the filling pipe.
- Lower the oil level by opening the draining valve to a level just above the transformer cover. The oil
shall pours into a dry and clean container.
- Further remove the nuts(9)
- Tap at the top of the connecting bolt (2) until the bolt is loosen
- Remove the nuts (12), clamp supporting (14) and clamps (15)
- Softly pulls off the insulator, at the same time tap lightly the connecting bolt (2), Caution is essen-
tial, and otherwise the connecting lead and the winding might be pulled out.
- Replace the defective insulator of gaskets. Use spare parts delivered by ABB Transformer or origi-
nal parts from ABB suppliers.
- Reassemble the insulator. Guide the connecting bolt (2) through the insulator by attaching a string
at the top of the connecting bolt. Insert the string through the insulator; pull the string during the posi-
tioning of the insulator.
- Fill the oil back to the transformer through the filling pipe. If new oil is needed, then test the oil
before filling it in to the transformer.
- Fill the oil up to the rim of the filling pipe and at the same time bleed the high voltage bushing by
looking the nut (9). Tap the top of the connecting bolt (2), loose it and pull the connecting bolt up-
wards,
Insulators will be lightly loose, so that the trapped air can be drained out, and the oil can fill into the
bushing. The oil level at the filling pipe will reduce, this happens, because the oil is drained into the
bushing. Fill up till the rim again. Provide some lactate on the head of the oil level indicator. Fasten the
oil level indicator well.
20
- Checking the paint works and surfaces
- Under normal operation, conditions it is not necessary to test oil
However, if there is any reason to believe that moisture filtration has occurred, i.e. cracked bushings,
then the oil shall be checked. The Crackle Test can detect the presence of moisture.
Crackle test:
Small oil samples are put into a well dry test tube and gently heated over a flame until oil boils (120
130C), when moisture is present, an audible cracking can be noticed. Another method is to stir a
0.2 liter of sample with a metal road of about 12, which has been heated to a dull red heat. Again,
audible crackling will indicate the presence of moisture. If oil fails to pass the first test, two additional
samples should be tested, both of which must pass the crackle test in order to be considered as
satisfactory. Oil, that does not pass the test, should be treated.
The dielectric strength shall be checked. The results shall be at least 30 kV/2.5 mm and the acid con-
tent should be less than 0.3 mg KOH/g.
Dehydrating breather shall be inspected periodically. The color of the drying agent, silica get, is nor-
mally blue. When it turns to blown or pink, it shows that moisture has been absorb. The replacement
or dying of the silica gel is necessary.
No maintenance is required for the tap changer and the pressure relief device.
21
- Fill the oil until the level indicator shows 20and at the same time bleed the high voltage bush-
ing by looking the nut(9). Tap the top of the connecting bolt(2), loose it and pull the connection bolt
upwards. Insulator shall be lightly loose, so that the trapped air can be drained out and the oil can fill
into the bushing. The oil level may reduce. Fill again till the level indicator shows 20C.
22
Replacement pf the liquid is necessary, if the color of the liquid is dark or sliding is observed.
23
BN V S CAO TH
HIGH VOLTAGE BUSHING
BN V S H TH
LOW VOLTAGE BUSHING
24
MY BIN TH KIU KN
TRANSFORMER TYPE: OIL-IMMERSED, HERMETICALLY SEALED
MY KHNG BU DU PH V C HP BO V
TRANSFORMER TYPE: OIL-IMMERSED, HERMETICALLY SEALED WITH CABLE BOXES
25
MY BIN TH C BNH DU PH
TRANSFORMER TYPE: OIL-IMMERSED WITH CONSERVATOR
26
PH KIN
S ..
Kn H
.. Nhit k c tip im ..
Kn
..
H
iu chnh
ng nhit k .. .. Nhit k khng tip im
Nhn du c tip im
.. ..
Van tho du
Cc ni t . .. Van gim p c tip im
Bnh xe
.. ..
Bnh du ph
Van gim p . .. Hp u dy
R le hi
.. ..
Bnh ht m
Mc cu my .. .. Hp cp cao th
Hp cp h th .
Chng st s cao th
Bin my
Nhn du khng tip im
.. ..
ACCESSORIES
. . . .
Sealed Open Sealed Open
. . . .
Bushings Thermometer with contacts
. . .
Tap changer Thermometer w/o contact
. . . .
Thermometer pocket Oil level gauge with contacts
. . . .
Oil drain valve Pressure relief device with contact
. . .
Earthing terminal Wheels
. . . .
Oil conservator Marshaling box
. . .
Pressure relief valve Buchholz relay
. . . .
Dehydrating breather HV cable box
. .
Lifting lug on cover LV cable box
. .
Arcing horn on HV bushing
. .
Name plate
Oil level gauge w/o contact
27