The document outlines 3 agenda points for a customer audit meeting at Mercury Fittings Pvt ltd regarding part number SU303919. The first point assigns Suresh the responsibility to submit an 8D report by December 30th for a quality issue with part SU303919 for customer John Deer. The second point tasks the NPD team with forming a CFT team and reducing inspection time by December 30th. The third point assigns Suresh and Vimal the responsibility to document measuring values in the production line for part SU303919 and perform SPC by December 30th.
The document outlines 3 agenda points for a customer audit meeting at Mercury Fittings Pvt ltd regarding part number SU303919. The first point assigns Suresh the responsibility to submit an 8D report by December 30th for a quality issue with part SU303919 for customer John Deer. The second point tasks the NPD team with forming a CFT team and reducing inspection time by December 30th. The third point assigns Suresh and Vimal the responsibility to document measuring values in the production line for part SU303919 and perform SPC by December 30th.
The document outlines 3 agenda points for a customer audit meeting at Mercury Fittings Pvt ltd regarding part number SU303919. The first point assigns Suresh the responsibility to submit an 8D report by December 30th for a quality issue with part SU303919 for customer John Deer. The second point tasks the NPD team with forming a CFT team and reducing inspection time by December 30th. The third point assigns Suresh and Vimal the responsibility to document measuring values in the production line for part SU303919 and perform SPC by December 30th.
1 Suresh quality issue(Jhon Deer). To form the CFT team and to reduced the Consuming 2 NPD team inspection time To document the measuring value in production line 3 Suresh/Vimal for part no:SU303919 and do the SPC d,.(Unit-2)